july 21, 2011 steering committee meeting #2. meeting agenda review presentation and materials for...

Post on 01-Apr-2015

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

July 21, 2011STEERING COMMITTEE MEETING #2

MEETING AGENDA

Review Presentation and Materials for Stakeholder and Public MeetingsReview Preliminary RecommendationsDiscuss Initial Comments

STUDY PARTICIPANTS

Steering CommitteeH-GACTxDOTCities of Conroe, Cut and Shoot, and ClevelandMontgomery and Liberty CountiesConroe and Cleveland Chambers of CommerceState and US Elected Officials

Consultant TeamWilbur Smith AssociatesHNTBThe Lentz GroupCJ Hensch & Associates

General Public

STUDY PURPOSE

Identify short-, medium-, and long-range transportation improvements to:

Improve traffic flowImprove safetyImprove quality of life

WHAT IS ACCESS MANAGEMENT?Transportation strategy to:

Control access between roadways and land usesHelp shape corridor development Improve safety for all road usersMaximize roadway capacity

ACCESS MANAGEMENT BENEFITS

Improve mobility and safety for all transportation modesGuide access for new developmentImprove air qualityOpportunity for improved aestheticsPreserve roadway hierarchyDelay or avoid costly roadway improvements

ACCESS MANAGEMENT TOOLBOX

Raised medianAuxiliary/Turn lanesDriveway modificationsIntersection spacingPedestrian and bicycle facilitiesTraffic signal operation enhancementImproved supporting street network

SH 105 LAND USE CHARACTER

Emerging Commercial/Serv

ice District

Commercial/Residential District

Rural/Ranch District

Willis

Waukegan

Rd

Secu

rity

Fore

st

Dr

Loop

336

US 5

9

SH 105 CORRIDOR TRANSPORTATION

Loop 336

Wills W

aukegen Rd

Crocket M

artin Rd

S Walker R

d

Old Hwy 105 E

Fostoria Rd

CONROE CUT AND SHOOT

Security

CLEVELAND

5-lane Roadway 3-lane Roadway 2-lane Roadway Traffic Signal

Millm

ac Rd

Whipporw

ill RdD

uck Creek R

d

STUDY CORRIDOR TRANSPORTATION

On-going and planned projectsCleveland Bypass (under construction)Center line rumble strips“Super 2” upgrades

DAILY TRAFFIC VOLUMES

Loop 336

Wills W

aukegen Rd

Crocket M

artin Rd

S Walker R

d

Old Hwy 105 E

Fostoria Rd

2001: 16,1002011: 25,200Annual Growth: 4.6%

2001: 13,9002011: 17,800Annual Growth: 2.5%

2001: 10,6002011: 11,700Annual Growth: 1.0%

2001: 9,2002011: 11,000Annual Growth: 1.8%

2001: 9,2002011: 10,300Annual Growth: 1.1%

2001: 11,3002011: 11,700Annual Growth: 0.4%

CONROE

CUT AND SHOOT

Security

CLEVELAND

Duck C

reek Rd

TRAFFIC VOLUME PROJECTIONS

Loop 336

Wills W

aukegen Rd

Crocket M

artin Rd

Walker R

d

Old Hwy 105 E

Fostoria Rd

2011: 25,2002035: 40,500Annual Growth: 2%

2011: 17,8002035: 28,600Annual Growth: 2%

2011: 11,7002035: 18,800Annual Growth: 2%

2011: 11,0002035: 17,700Annual Growth: 2%

2011: 10,3002035: 13,100Annual Growth: 1%

2011: 11,7002035: 14,900Annual Growth: 1%

CONROE

CUT AND SHOOT

Security

CLEVELAND

Duck C

reek Rd

LEVEL OF SERVICE

LEVEL OF SERVICE - 2011

Emerging Commercial/Serv

ice District

Commercial/Residential District

Rural/Ranch District

Willis

Waukegan

Rd

Secu

rity

Fore

st

Dr

Loop

336

US 5

9

LOS A/B/CLOS DLOS ELOS F

LEVEL OF SERVICE - 2035 NO-BUILD

Emerging Commercial/Serv

ice District

Commercial/Residential District

Rural/Ranch District

Willis

Waukegan

Rd

Secu

rity

Fore

st

Dr

Loop

336

US 5

9

LOS A/B/CLOS DLOS ELOS F

LEVEL OF SERVICE - 2035 BUILD

Emerging Commercial/Serv

ice District

Commercial/Residential District

Rural/Ranch District

Willis

Waukegan

Rd

Secu

rity

Fore

st

Dr

Loop

336

US 5

9

LOS A/B/CLOS DLOS ELOS F

CRASH HOT SPOTS (2007-2009)

Loop 335

Walker R

d

Fostoria Rd

65 Crashes @ Loop 336 20 Crashes @

Willis Waukegen

50 Crashes @ FM 1484

13 Crashes @ Fostoria

33 Crashes @ FM 1485

Old SH 105

Loop 336

Wills W

aukegen Rd

Crocket M

artin Rd

Old Hwy 105 E

Duck C

reek Rd

CRASH RATES

INCAPACITAT-ING INJURY

5%

NON-INCAPAC-ITATING

13%

POSSIBLE IN-JURY24%

FATAL2%

NOT INJURED56%

2007-2009539 Total Crashes

CRASH SEVERITY

16 deaths in 13 fatal crashes3 deaths in 2 fatal crashes at FM 1485378 injuries in 222 injury crashes

MOBILITY AND SAFETY CONCERNS

Congestion along the corridorHeavy truck trafficWide drivewaysSpeedingSlow traffic on a 2-lane roadwayIllegal passingLimited police enforcement

TRANSPORTATION IMPROVEMENTSOptimize traffic signal timing

Connect traffic signalsInstall new traffic signalConstruct raised medianConstruct two-way left-turn laneConstruct additional eastbound and westbound lanesConstruct turn lanesReconfigure and consolidate drivewaysExtend and widen roadways

Optimize traffic signal timing Construct passing lanesConstruct two-way left-turn laneConstruct turn lanesReconfigure and consolidate drivewaysRemove intersection approach skew

Optimize traffic signal timing Construct passing lanesConstruct raised medianConstruct turn lanesReconfigure and consolidate driveways

Willis

Waukegan

Rd

Secu

rity

Fore

st

Dr

Loop

336

US 5

9

TRANSPORTATION IMPROVEMENTSEmerging Commercial/Service District

Raised medianAdditional lanes in both directions FM 1485 to Crystal ForestInterconnect signals at Loop 336 and FM 1485New signal at Crystal Forest Drive

TRANSPORTATION IMPROVEMENTSEmerging Commercial/Service District

Two-way left-turn lane in front of Austin ElementaryAdd turn lanesReconfigure and consolidate driveways

TRAFFIC OPERATIONAL BENEFITS

Emerging Commercial/Service District

INTERSECTION EXISTING LOS

PROPOSED LOS

SH 105 at Loop 336 E DSH 105 at FM 1485 D CSH 105 at Whipporwill Rd B ASH 105 at Crystal Forest Dr E ASH 105 at Millmac Rd B BSH 105 at Willis Waukegan F B

WEEKDAY PM LEVEL OF SERVICE

INTERSECTION EXISTING LOS

PROPOSED LOS

SH 105 at Loop 336 D CSH 105 at FM 1485 C BSH 105 at Whipporwill Rd B BSH 105 at Crystal Forest Dr D ASH 105 at Millmac Rd B ASH 105 at Willis Waukegan E B

WEEKEND LEVEL OF SERVICE

Crash Hot Spot

TRANSPORTATION IMPROVEMENTSCommercial/Residential District

Turn lanesReconfigure drivewaysConsolidate drivewaysEliminate Old SH 105 skew

TRAFFIC OPERATIONAL BENEFITS

Commercial/Residential District

INTERSECTION EXISTING LOS

PROPOSED LOS

SH 105 at FM 1484 C BSH 105 at Crockett Martin Rd C BSH 105 at Walker Rd C CSH 105 at Olde Security Flea Mkt A A

WEEKDAY PM LEVEL OF SERVICE

INTERSECTION EXISTING LOS

PROPOSED LOS

SH 105 at FM 1484 B BSH 105 at Crockett Martin Rd C BSH 105 at Walker Rd D DSH 105 at Olde Security Flea Mkt E C

WEEKEND LEVEL OF SERVICE

Crash Hot Spot

TRANSPORTATION IMPROVEMENTSRural/Ranch District

Turn lanesReconfigure drivewaysConsolidate drivewaysAdditional lane at US 59

TRAFFIC OPERATIONAL BENEFITS

Rural/Ranch District

INTERSECTION EXISTING LOS

PROPOSED LOS

SH 105 at Fostoria Rd C CSH 105 at FM 1725 A ASH 105 at US 59 SB Frtg Rd B BSH 105 at US 59 NB Frtg Rd C C

WEEKDAY PM LEVEL OF SERVICE

INTERSECTION EXISTING LOS

PROPOSED LOS

SH 105 at Fostoria Rd C CSH 105 at FM 1725 A ASH 105 at US 59 SB Frtg Rd B BSH 105 at US 59 NB Frtg Rd C C

WEEKEND LEVEL OF SERVICE

Crash Hot Spot

CORRIDOR-WIDE TRAFFIC BENEFITS

Delay: +11% Delay: -8%

Delay: -9%Delay: -30%Delay: -18%

Delay: -

26%

Weekday PM

CORRIDOR-WIDE TRAFFIC BENEFITS

Delay: +3% Delay: -32%

Delay: -11%Delay: -27%Delay: -22%

Delay: -

12%

Weekend Peak

SAFETY BENEFITS

IMPROVEMENT SAFETY BENEFITS

Add continuous TWLTL 35% reduction in total crashes

30% decrease in delay

30% increase in capacity

Replace TWLTL with a non-traversable median

15%-57% reduction in crashes on 4-lane roads

25%-50% reduction in crashes on 6-lane roads

Add a left-turn bay 25%-50% reduction in crashes on 4-lane roads

75% reduction in total crashes at unsignalized access

25% increase in capacity

SAFETY BENEFITS

IMPROVEMENT SAFETY BENEFITS

Add right-turn bay 20% reduction in total crashesLimit right-turn interference with traffic flow, increased capacity

Visual cue at driveways, driveway illumination 42% reduction in crashes

LAND USE IMPROVEMENTS

Adopt Corridor-wide Development Principles

Guide development within the three identified character districts

Implementation

DEVELOPMENT PRINCIPLES

Adopt Corridor-wide Development Principles

Promote visual continuity with unique identityPromote cross-accessAvoid driveways close to intersectionsReflect TxDOT driveway spacing standardsMultiple access points for large subdivisionsAdequate provisions for multimodal transportation

Willis

Waukegan

Rd

Loop

336

Emerging Commercial/Service DistrictPlan for intensive commercial usesDevelop a mix of complementary usesPromote set-back parking areasLimit access to SH 105Promote shared signage

PRINCIPLES FOR DISTRICTS

DEVELOPMENT CONCEPT

FM 1485

Commercial/Residential DistrictEncourage commercial nodesEncourage residential between commercial nodesEncourage shared parkingPromote set-back parking areasLimit access to SH 105

Secu

rity

Fore

st

Dr

Willis

Waukegan

Rd

PRINCIPLES FOR DISTRICTS

DEVELOPMENT CONCEPT

Crocket Martin-Crocket Trace

DEVELOPMENT CONCEPT

Walker Road

Rural/Ranch DistrictPreserve characterProtect rural landscape and wooded areasEmphasize water features and crossingsEncourage contiguous commercial nodes

US 5

9

PRINCIPLES FOR DISTRICTS

Secu

rity

Fore

st

Dr

IMPLEMENTATION OF PRINCIPLES

Corridor Improvement PlanAddress growth managementDevelop common tools and techniques

Apply Key Tools and TechniquesIdentify desired toolsDevelop plan review processDevelop appropriate guidelines, regulations, ordinances

GROUP DISCUSSION

NEXT STEPS

MEETINGS PURPOSE DATEH-GAC TAC/TPC Meetings Brief TAC/TPC on project

August and December 2011

Steering Committee Meeting No. 3

Project update, prepare for second public meeting

September 2011

Steering Committee Meeting No. 4

Review and discuss final recommendations and comments on draft report

December 2011

Public Meeting No. 1Introduce study and obtain input on draft recommendations

August 10, 2011

Public Meeting No. 2 Present final recommendations October 2011

top related