jaocbs technology fall 2008 exit presentation
Post on 11-May-2015
217 Views
Preview:
DESCRIPTION
TRANSCRIPT
ESCG Contract Sensitive
Trey Cox
December 12, 2008
ESCG Contract SensitiveFebruary 26, 2007 - 2 of 17
Safety Moment
Hazards of Hanging Christmas Decorations– Falling off roof– Slipping on ladder
Some Precautions to take while hanging lights– Never hang lights alone– Check roof for ice, snow, slick spots– Check ladder
ESCG Contract SensitiveFebruary 26, 2007 - 3 of 17
Introduction
Currently a Sophomore Embry-Riddle Aeronautical University.
This is my 1st Co-op tour.
ESCG Contract SensitiveFebruary 26, 2007 - 4 of 17
Projects I’ve Worked On
Crew QuartersLunar Lander Mock-upPLSS PumpsOCA-USB
ESCG Contract SensitiveFebruary 26, 2007 - 5 of 17
Crew Quarters
Learned the signature process for TPS’s.Wrote transfer TPS’s for hardware.Attended TRR’s
ESCG Contract SensitiveFebruary 26, 2007 - 6 of 17
Crew Quarters
Crew Quarters Testing– Electrical Panel Vibe Tests– Acoustic and Lighting Tests– EMI Retest
ESCG Contract SensitiveFebruary 26, 2007 - 7 of 17
Lunar Lander Mock-up
Performed static load test– Placed sand bags on mock-up for three minutes
ESCG Contract SensitiveFebruary 26, 2007 - 8 of 17
PLSS Pumps
Assisted in writing several documents for tests including: Test Procedure, Access requests for EDF, and HA
Set up test in EDF
Thomas Diaphragm
Clark Mag Drive Gear
Peristaltic
Clark Piston Hargraves Diaphragm
Thomas Rotary Vane Pumps Inc.
Gear
Thomas Diaphragm
Clark Mag Drive Gear
Peristaltic
Clark Piston Hargraves Diaphragm
Thomas Rotary Vane Pumps Inc.
Gear
ESCG Contract SensitiveFebruary 26, 2007 - 9 of 17
OCA-USB
Wrote several Test requests for future Vibe, Thermal, EMI, and Acoustic tests.
Worked on getting HA written for hardware.
ESCG Contract SensitiveFebruary 26, 2007 - 10 of 17
Tours and Lectures
NBLBuilding 9Gene KranzSy LibergotChris KraftPaul DyeSpace Center Houston
ESCG Contract SensitiveFebruary 26, 2007 - 11 of 17
Other Co-op Events
Indoor Soccer Team (1-8-1)Houston Rockets Games
ESCG Contract SensitiveFebruary 26, 2007 - 12 of 17
What I’ve Learned
Process to start and run a testBeing in a professional environmentHow to land the Shuttle
ESCG Contract SensitiveFebruary 26, 2007 - 13 of 17
Future Plans
To return for a 2nd Co-op tour in Summer 2009.Plan on graduating in May 2012, with a degree in
Aerospace Engineering, minor in Business Administration.
top related