January 4, 2007

Project Overview

RHIC II ProjectInternal Cost Review

Roberto Than

Cryogenics Systems

January 4, 2007

2

January 4, 2007

Scope

2K Cryo Plant and transfer lines RHIC Ring Cryogenics VJ multi-line bundles & modifications

• Perform extensive Engineering and Design efforts– Define and finalize high level design

– Complete RFQ, equipment specs and drawing package Plant components RHIC Ring Cryogenics VJ multi-line bundle

• Procure Major Equipment– Vendor interface & visits

– Equipment testing and approval

• Installation– Major Plant and subsystems

– Transfer lines and piping

– Component Testing & Commissioning

3

January 4, 2007

Scope: Refrigerator Technology

WARMCOMPRESSION

HYBRIDCOMPRESSION

Small

HYBRIDCOMPRESSION

Large

COLDCOMPRESSION

With / without Ref.Rec.

Refr.Rec.

4

January 4, 2007

Scope: 2K Plant Size Map

1

10

100

1000

10000

1.6 1.7 1.8 1.9 2 2.1

Temperature [K]

Ca

pa

cit

y [

W]

WARM COMPRESSION

HYBRID COMPRESSION

COLD COMPRESSION

LHC

TORASUPRA

ELBE Rossendorf

NHMFLMTF

A0

R H I C - I I

TJNL CEBAF

SNS

5

January 4, 2007

Scope: 2K Cryo System

MainCold Box

Cavity Cryo modules SC Gun

Sub AtmColdbox

RecComp

ProcVac Sys

Main Comp

LN2Storage

LHeStorage

LN2

Gas Storage

HX 2-4K HX 2-4K

Distribution System

6

January 4, 2007

Scope: Cryo Process Flow Diagram

7

January 4, 2007

Costs by WBS

Direct Burdened Contingency TotalWBS Description FTEs Cost Cost 30.0%

1.2.9.1 Helium Refrigeration Systems 3.48 392 463 139 602

1.2.9.3 RHIC Ring VJ Line Modifications (Tuozzolo) 0.00 0 0 0 0

1.3.9.1 Helium Refrigeration Systems 6.63 5859 6601 1980 8582

1.3.9.3 RHIC Ring VJ Line Modifications (Tuozzolo) 0.00 0 0 0 0

1.3.13.1.12 Cryogenics 0.00 0 0 0 0

1.3.13.2.7 Cryogenics 0.00 0 0 0 0

1.3.13.3.5 Cryogenics 0.00 0 0 0 0

1.3.13.4.5 RHIC Ring Cryogenic Modifications 0.00 0 0 0 0

0

Total 10.11 6252 7064 2119 9183

FY07 K$

8

January 4, 2007

Estimates Basis

• Vendor quotes / ROM Price– Main Helium Plant

– Warm Storage Tanks

– Process Vacuum Skids

– Recovery Compressor

– LHe Storage Dewar

– Gas Analyzer

• Own estimates– Sub-atmospheric Cold Box

– VJ Distribution System

– RING Multi-Line VJ Bundle Segments

• Own estimates based on recent procurements– Vacuum jacketed piping

– Phase 3 Components

– Labor: RHIC Installation & Refrigerator upgrades

– ERL Vacuum Pump Skid

– Available equipment SNS / TJ-Lab Information

9

January 4, 2007

Major Procurements (direct $)

• High Level

– Helium Plant – $1.7 M ( 2 European Vendors) Main Compressor System Main Coldbox + spare turbine cartridges

– Storage Dewar – $ 250K

– Sub-Atmospheric Coldbox - $650K

– Process Vacuum Skids - $500K

– Cold Transfer Line System - $200K

– Warm Storage Tanks - $250K

– LN2 storage tank - $110K

– RING Multi-Line VJ Bundle Sections- $900K (First estimate)

10

January 4, 2007

Contingency & Risk

• Foreign purchases

– Main Refrigerator Plant (Main Cold Box & Compressor System)

– No contingency applied yet for $-Euro uncertainty

• Added cost of 10CFR 851 QA, inspection & documentation

• System Heat Load: Testing mid 2007 of Cavity

11

January 4, 2007

Milestones

• Design complete

– P&ID and G A layout

– Equipment Specs & RFQ documents

• Purchase orders placed

– Main 4K Plant — Liquid Helium Storage

– Process Vacuum Skids — LN2 Storage

– Sub-atmospheric Cold Box

– Cold Transfer Lines System

– RHIC RING Multi-Line VJ Bundles

• Installation

• Commissioning and Testing

12

January 4, 2007

Assumptions

• Heat Loads are established and remain unchanged

• General arrangement of equipment remain unchanged

• Funding is available as planned/needed

• Conventional facility provides

– Required power, cooling water & buildings