Industrial Summer Training at NTPC,Badarpur

Presented by:-Madhur Sharma(09011503010)

Introduction

21/08/2013

Overview of NTPC

NTPC was set up in the central sector in the 1975.

NTPC has installed capacity of 41,184 MW. It plans to be a 75,000 MW company by 2017.

Today NTPC contributes more than 3 / 5th of the total power generation in India

Overview of NTPC

*Total Capacity of NTPC is 41,184MW

No. of Plants Capacity

NTPC OWNEDCoal 16 31855

Gas 7 3955

Renewable - 10

Total 23 35820

OWNED BY JVsCoal & Gas 7 5364

TOTAL 30 41,184

Initiatives

• The company sets aside up to 0.5% of the profits for R&D.

• Roadmap developed for adopting Clean Development

• The welfare of project affected the local population around NTPC projects are taken care of through well drawn Rehabilitation and Resettlement policies.

• All stations of NTPC are ISO 14001 certified.

BTPS(Badarpur Thermal Power Station)

Overview of BTPS BTPS MEETS MORE THAN 24% OF DELHI’S

ELECTRICITY CONSUMPTION

INSTALLED CAPACITY 720 MW

DERATED CAPACITY 705 MW (3x95 + 2x210MW)

OWNED BY GOVT. OF INDIA, MINISTRY OF POWER

BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978

NTPC Badarpur

BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region.

The site construction activities started in 1968.

The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81.

BASIC THERMAL POWER PLANT

There are 3 main units:1. Steam Generator (Boiler)2. Steam Turbine3. Electric Generator

Electricity from Coal

OPERATION AND MAINTAINANCE

This control & instrumentation is the brain of the plant because from the relays to transmitters followed by the electronic computation chipsets and recorders and lastly the controlling circuitry, all fall under this. A View of Control Room at BTPS

BOILER MAINTENANCE DEPARTMENT

Water Circulation System

Natural circulation system Combined Circulation System

WATER TREATMENT PLANT

Water treatment process is divided into three section:-•Pre-treatment section•Demineralization•Internal treatment

ENVIRONMENTAL CONCERNS

ENVIRONMENT MANAGEMENT,OCCUPATIONAL HEALTH AND SAFETY SYSTEMS

POLLUTION CONTROL SYSTEMS

ASH UTILISATION

AFFORESTATION