impact evaluation design kenya - world...

Post on 28-Aug-2018

225 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Impact Evaluation Design Kenya

Country Team 1. Anne Amadi 2. Justice Daniel Musinga 3. Dr. Paul Kimalu 4. Kennedy Mugonyi

ieGovern Impact Evaluation Workshop Istanbul, Turkey January 27-30, 2015

: #ieGovern

What is the problem?

What is the problem? - Case backlog & case delays Intervention(s) - Regular feedback on performance (case backlog and

clearance rates to the courts). - Emails, phone calls, heads-of-court stations quarterly meetings, visits

by Judiciary officials. - *Considering tailoring printed feedback with influential images or

message (such as sending report with picture of the Chief Justice).

- Enhanced Court User Committees (CUCs) engagement - Greater stakeholders engagement – (Representatives from police,

prisons, advocates, CSOs, probation dpt etc)

1

Research questions • What is the most effective way of reducing case backlog and

improving case clearance rates? • Discuss mechanisms (e.g. multiple arms) - Monitoring and feedback without rewards or sanctions - Court stations stakeholders engagement. • Briefly mention the Theory of Change: Program -> A -> B -> C -

> X -Feedback Appreciation, recognition, managerial assistance, career progression/promotion Reduction in backlog -Stakeholders engagement Improved coordination, peer pressure Reduction in backlog.

Research Questions

2

Method Randomized Control Trial (RCT)

Clusters / sample size How many clusters? 160 courts How big is the sample size? 160 courts X 12 months = 1920 court months.

Design Cross-cutting design.

Methods & Design

3

Feedback

Stakeholders consultations

(CUC) 40 40

40 40

Outcomes:

- Speed -Case clearance rate.

-Disposition time.

-Case turnover ratio.

- Quality -Court users and employee satisfaction survey.

Unit(s) of observation: - Courts

Outcomes & Measurement

4

#ieGovern Impact Evaluation Workshop

Istanbul, Turkey January 27-30, 2015

Thank You!

facebook.com/ieKnow

#impacteval

blogs.worldbank.org/impactevaluations

microdata.worldbank.org/index.php/catalog/impact_evaluation

http://dime.worldbank.org WEB

Post Crisis Needs Assessment Impact Evaluation FATA & KPK

ieGovern Impact Evaluation Workshop Istanbul, Turkey January 27-30, 2015

: #ieGovern

Background • Post Crisis Needs Assessment Strategic Objectives, mainly

Citizen – State Trust

• Impact Evaluation & capacity building of country systems

• Rule of law (Judicial)

• Governance

• Infrastructure

• Health

• CDD

Evaluation Objectives

• To measure impact of key PCNA interventions with credible data and correctly specified indicators

• To establish credible evidence and inputs for governance and service delivery reforms for further programming decisions

• To institutionalize evaluation in country systems for evidence based decision making and development planning

Projects Evaluation

Type Evaluation Method Sample Size (with Over

Sample)

Off-Season Vegetable - Agriculture Ex-Ante Randomize Control Trials RCT

430 Farmers (Adopters & Non Adopters) were interviewed in survey against 1381 Farmers in Khyber & Mohmand Agency which is 30% of the total farmers.

Anti-corruption Hotline - Governance

Ex-Ante Randomize Control Trials RCT

16,000 Individuals

TB Control Program FATA - Health Ex-Ante Randomize Control Trials RCT

124 Villages with 871 Respondents

MNCHP - Health Ex-Post Randomize Control Trials RCT

22 CMWs , 22 LHWs

Right to Information - Governance Ex-Ante Randomize Control Trials RCT

240,000 Individuals

e-Citizen Grievance - Justice Ex-Ante Randomize Control Trials RCT

220,000 Individuals

Right to Access to Public Services - Governance

Ex-Ante Randomize Control Trials RCT

215,000 Individuals

Review Request

• Define Citizen Trust Restoration

• Quality of service satisfaction (17 measures)

• Confidence in institutions (9 measures)

• Social satisfaction – self/family/other (17 measures)

• Use of technology mobile/internet for transparency and increase in trust in the government (43 measures)

What is the problem? • The effectiveness and utilization of the formal

judicial system • Back log of cases • Parallel judicial systems

• Build capacity of judicial system through trainings • Exploit variations in the timing of training (both experimental and

non-experimental)

• Exploit variations in where trained judicial officials are located

• Exploit variation in the type of training received

• Information about the availability of improved alternatives to formal court cases

Research Questions

• Who are the key actors underlying an effective Judicial System?

• What are barriers to citizen utilization of state supported Judicial System?

• Poorly trained Judicial staff leads to bad decisions and that leads to citizens distrust and under utilization

• On the supply side the judicial staff is trained

• On the demand side use awareness campaigns • Improved efficiency • Low cost mediation

Methods & Design • Triple Difference for the impact of judicial trainings

• Across judges

• Across time

• Across judicial staff

• RCT on the awareness campaign

• 350 judges across 27 districts

• Universe of cases that are brought forward and cases that are brought forward for mediation

Outcomes &

Measurement • Case specific outcomes

• Mediation vs formal court litigation • Time to completion • Number of hearings • Third party evaluation of decisions (random order)

• Litigant-specific outcomes • Satisfaction with decision • Cost incurred • Willingness to bring cases forward in the future

• Citizen outcomes • Willingness to access state institutions • Most recent form of dispute resolution • Trust in the state

• Court level outcomes • Backlog of cases • Case load per Judge

#ieGovern Impact Evaluation Workshop

Istanbul, Turkey January 27-30, 2015

Thank You!

facebook.com/ieKnow

#impacteval

blogs.worldbank.org/impactevaluations

microdata.worldbank.org/index.php/catalog/impact_evaluation

http://dime.worldbank.org WEB

Judicial Development Project KYRGYZ REPUBLIC

ieGovern Impact Evaluation Workshop Istanbul, Turkey January 27-30, 2015

: #ieGovern

What is the problem?

What is the problem? - Problems of access and efficiency deter (M)SMEs from using

courts to resolve their disputes and enforce their rights. Interventions - Arm 1: SMEs receive training on laws/procedures that commonly

affect SMEs (staggered) - Arm 2: SMEs receive court infrastructure (staggered) - Arm 3: SMEs receive infrastructure & training

1

Research questions • How do improvements in court infrastructure impact access &

perceived efficiency of justice for (M)SMEs? • How does targeted training impact (M)SMEs? • Which of the interventions provides the greater impact on (M)SMEs? Theory of change: • Demand-side interventions that raise awareness of law/procedure

among potential court users are more likely to increase capacity to resolve legal disputes than supply-side courthouse infrastructure.

Research Questions

2

Method - RCT built into quasi-natural experiment (courthouse)

Sample size - Baseline survey of 500 (M)SMEs + repeat surveys - Control for revenue, no. employees, distance to courthouse, gender

and ethnicity of manager/owner - Caseload data on timeliness, project data, case tracking

Spillovers: - Information spillovers - Understanding of preferences/behaviors of (M)SMEs on all topics - Increase in formality of (M)SMEs

Methods & Design

3

Outcomes:

- Project level: inform Kyrgyz Republic Phase 2 project

- World Bank level: inform design of future projects

- National/international level: inform decision-making by Kyrgyz (and other governments) on how to improve justice / business climate

Units of observation:

- Firm level

Outcomes & Measurement

4

#ieGovern Impact Evaluation Workshop

Istanbul, Turkey January 27-30, 2015

Thank You!

facebook.com/ieKnow

#impacteval

blogs.worldbank.org/impactevaluations

microdata.worldbank.org/index.php/catalog/impact_evaluation

http://dime.worldbank.org WEB

top related