IEC 61850 – Update
Page 2 © 2008 UTINNOVATION
New title
Communication
network and systems
for power utility
automation
Page 3 © 2008 UTINNOVATION
Activities in WG10
■ Preparation of Edition 2 of IEC 61850
■ IEC 61850-80-1: Guideline for information exchange of IEC 61850 based CDC's, information addressing and services using IEC 60870-5-104/101
■ IEC 61850-90-1: Use of IEC 61850 for communication between substations
■ IEC 61850-90-2: Use of IEC 61850 for communication between substations and control centers
Page 4 © 2008 UTINNOVATION
IEC 61850 release plan
Edition 2 Edition 3
TISSUES- new TISSUES are collected until CDV
stageBasic model extensions- Statistical / Historical- Common usable elements from Hydro and
Wind standardsDomain model extensions- Power Quality Models- Monitoring extensions from IEC 62271-003Impact of SS-SS communicationTesting- Client conformance testing- Tool conformance testing
TISSUESBasic model extensions- Description of programmable scheme logic
(in SCL) (over communications)- Network and system management- Common usable elements from DER
standard- Redundancy- Security aspects from IEC 62351- Security – role based access- Time synchronization according to IEEE
1588Domain model extensions- Low voltage applications (German Report)- Eliminate IED specific settingsImpact of SS-CC communicationTesting- Testing scenarios- System testing?
CDV 2008 / FDIS 2009
Page 5 © 2008 UTINNOVATION
Edition 2 Schedule
J F M A M J J A S O N D J F M A M J J A S O N D
?
CD Ed 2 CDV Ed 2
CD Ed 2 CDV Ed 2
CD Ed 2 CDV Ed 2
CDV Ed 2 FDIS Ed 2 IS Ed 2
CDV Ed 2 FDIS Ed 2 IS Ed 2
CDV Ed 2 FDIS Ed 2 IS Ed 2
CDV Ed 2 FDIS Ed 2 IS Ed 2
CDV Ed 2 FDIS Ed 2 IS Ed 2
CDV Ed 2 FDIS Ed 2 IS Ed 2
CDV Ed 2 FDIS Ed 2
CDV Ed 2 FDIS Ed 2
CD Ed 2 CDV Ed 2
2008 2009
WG Meetings
Editor Meetings
61850-1
61850-3
61850-4
61850-5
61850-6
61850-7-1
61850-7-2
61850-7-3
61850-7-4
61850-8-1
61850-9-2
61850-10
Voting French Transl. Circulation of Draft Final Editing Geneva
Page 6 © 2008 UTINNOVATION
New parts - schedule
WG Meetings
Editor Meetings
61850-7-420 (WG17)
61850-7-500
61850-7-510 (WG18)
61850-80-1
61850-90-1
61850-90-2 (WG19)
J F M A M J J A S O N D J F M A M J J A S O N D
?
FDIS IS
DC
DTS
DC DTR
DC
2008 2009
Page 7 © 2008 UTINNOVATION
Document Naming and Numbering (1)
■ Domain specific extensions
– x00 – Substation automation
– x10 – Hydro power plants
– x20 – Distributed energy resources
– Example: IEC 61850-7-410 – Logical nodes for hydro power plants
■ New part 61850-7-5xx
– IEC 61850-7-500 – Use of logical nodes for
substation automation
Page 8 © 2008 UTINNOVATION
Document Naming and Numbering (2)
■ New part IEC 61850-80-x
– IEC 61850-80-1: Guideline for information exchange
of IEC 61850 based CDC's, information addressing
and services using IEC 60870-5-104/101
■ New part IEC 61850-90-x – Reports “How to use…”
– IEC 61850-90-1: Using IEC 61850 for communication
between substations
– IEC 61850-90-2: Using IEC 61850 for communication
between substations and control center
Page 9 © 2008 UTINNOVATION
Extending the scope of IEC 61850
■ 61850-90-1: Use of IEC 61850 for the communication between substations
– Work will be done in WG10
■ 61850-90-2: Use of IEC 61850 for the communication between control centers and substations
– Work will be done in WG19
– Includes harmonization with CIM standards
Page 10 © 2008 UTINNOVATION
SS – SS Use cases considered
■ Protection functions
– Differential protection
– Distance protection with permissive and blocking schemes
– Directional and phase comparison protection
– Transfer tripping
■ Control function
– Autoreclosing
– Interlocking
– Generator and load shedding
Page 11 © 2008 UTINNOVATION
SS – SS Communication aspects
Contr Prot ContrProt
TeleprTelepr
Gateway approach
Contr Prot ContrProt
Tunneling approach
Page 12 © 2008 UTINNOVATION
SS – SS Application example - PUTT
Zone 1 (Underreach)
Zone 2 (Overreach)
Zone 1 (Underreach)
Zone 2 (Overreach)
Zone 1
Zone 2OR& Trip Brk
Zone 1
Zone 2OR &Trip Brk
Comm
Channel
Permit Permit
Page 13 © 2008 UTINNOVATION
SS – SS Modeling in IEC 61850
Comm
Channel
Zone 1
Zone 2OR& Trip Brk
PermitZone 1
Zone 2OR &Trip Brk
Permit
Protection IED
PDIS1
PDIS2
PTRC
PSCH
Trip Brk
Permit
Teleprot
Equipment
PSCH
RTPC
Protection IED
PDIS1
PDIS2
PTRC
PSCH
Trip Brk
Permit
Teleprot
Equipment
PSCH
RTPC
Comm
Channel
Gateway approach
Page 14 © 2008 UTINNOVATION
SS – CC communication – issues
■ Model extensions
■ Harmonization
■ SCL extension
■ Communication mappings
■ Communication topology
– Private dedicated link
– Private network
– Public network
– Use of VPN
Page 15 © 2008 UTINNOVATION
IED “ B“
LD6
LD5
Substation
Host with
Proxy
LD5
LD6
IED “ A“
LD2
LD1
LD1
LD2
Substation
RouterStation BusControl
Center (Client)
WAN
Seamless access to the substation
Page 16 © 2008 UTINNOVATION
Harmonization IEC 61850 with CIM – goal
■ Create the 61850 model automatically from CIM or vice versa
■ Establish the link between
– The attribute of a data in the IEC 61850 model
– The corresponding information in the CIM
– No specific configuration shall be required to create that link; i.e. all shall be based on the models defined
in the two standards
– This shall include a unambiguous mapping of different data types where required
Page 17 © 2008 UTINNOVATION
Information models
IEC 61968 / 61970
IEC 61850-7IEC 61850-6
Configuration Run Time
Page 18 © 2008 UTINNOVATION
Harmonization issues - configuration
■ Both CIM and IEC 61850 (SCL) contain a model that describes the connectivity (single line diagram)
■ Automatic import of information from one representation into the other
■ No duplicate manual entry of same information
■ The configuration information shall support the complete life cycle of the system, starting from planning
Page 19 © 2008 UTINNOVATION
Harmonization issues – process values
■ Both 61850 and CIM are defining standardized object models
■ Automatic mapping of the information between the two models
■ No loss of information; information defined in 61850 need to be available in CIM
Page 20 © 2008 UTINNOVATION
Gateway for 60870-5
■ 61850-80-1: Guideline to exchange information from a CDC based data model using IEC 60870-5-101 / -104
Station Controller & Gateway
Bay Controller
61850
101/104
61850
Protection
61850
■ Scope: connection of IEC 61850 devices to an IEC 60870-5-101/104 link
■ Mapping of IEC 61850 CDC on IEC 60870-5-104/101 ASDUs