hurricane/media/files/h/hurricane-energy... · –repair and life extension (to allow up to 10...
Post on 13-May-2018
216 Views
Preview:
TRANSCRIPT
HurricaneBasement Reservoir Specialists
Annual General Meeting
7th June 2017
HUR-COR-SHA-PRS-0005-0
Hurricane | AGM | 07 June 2017
Agenda
2
1 Chairman’s Statement
2 CEO Update
3 Resolutions
4 Q&A
Hurricane | AGM | 07 June 2017
Chairman’s Statement
3
1 Chairman’s Statement
2 CEO Update
3 Resolutions
4 Q&A
Hurricane | AGM | 07 June 2017
Share Price Performance
4
Note: As at close 05-Jun-17
10
20
30
40
50
60
70
80
Reb
ase
d S
har
e P
rice
(G
Bp
)
Hurricane AIM O&G Brent 12 Months Ago Last Price % Movement
Hurricane (GBp) 16.97 46.25 172.5%
AIM O&G 1,076.70 1,323.39 22.9%
Brent (USD) 49.68 49.22 -0.9%
September - Lancaster Pilot Well Completion
March – Halifax Well Completion
December - Lincoln Well Completion
October - £74.4m Placing and Open Offer
September – OPEC Production Cap Announcement
October - Completion of 7Z Horizontal
Sidetrack
November – OPEC Production Cuts
Hurricane | AGM | 07 June 2017
Market Capitalisation – London Ranking
5
Note: As at close 05-Jun-17
-
500
1,000
1,500
2,000
2,500
3,000
3,500
Mar
ket
Cap
($
m)
AIM
Main Market
Premium Listing
FTSE 250 Constituent
Hurricane | AGM | 07 June 2017
CEO Update
6
1 Chairman’s Statement
2 CEO Update
3 Resolutions
4 Q&A
Hurricane | AGM | 07 June 2017
Lancaster Resources – Drilling Summary
7
Pre-Production Drilling 2016Proof of Concept 2014Initial Appraisal 2009 - 2010
205/21a-4– Confirmed presence of
light moveable oil– Confirmed presence of
an extensive oil column– Penetrated aquifer in
porous and permeable formation
205/21a-4Z– Two DSTs performed– Suspended for use as a
future producer/re-entry
205/21a-6 Horizontal Well– DST testing max flow of 9,800
stb/d with an Electrical Submersible Pump (ESP)
– Suspended to be a future producer
– PI of 160 STB/d/psi– No pressure barriers in reservoir
identified during testing– No formation water produced
205/21a-7 Pilot Well– DST testing max flow of 11,000 stb/d
with ESP support– Confirmed minimum oil water contact
of 1,678m (670m hydrocarbon column)– Penetrated aquifer interval is porous
and permeable– No pressure barriers in reservoir
identified during testing
Discovery
205/21a-7Z Horizontal Well– DST testing max sustainable flow of
15,375 stb/d with ESP support– Suspended to be second producer for
EPS– PI of 147 STB/d/psi– No formation water produced– No pressure barriers identified
Lancaster drilling history and key results
Hurricane | AGM | 07 June 2017
Lancaster Resources – Drilling Impact
8
TVDSS True Vertical Depth Subsea
OWC Oil Water Contact
ESP Electrical Submersible Pump
CPR Competent Persons Report
205/21a-6
205/21a-4 205/21a-4Z
205/21-1A
P1
36
8 B
loc
k B
ou
nd
ary
Max ESP rate 9,800 stb/d 205/21a-6 (2014)
Mobile oil swabbed 205/21a-4 1,597m TVDSS
205/21a-7Z
Max ESP rate 15,375 stb/d 205/21a-7Z (2016)
1,597m TVDSS(2017 CPR 1C OWC)
1,380m TVDSS(4-way dip closure)
1,678m TVDSS(2017 CPR 3C OWC)
Management View OWC 1,678m TVDSS1
1,653m TVDSS(2017 CPR 2C OWC)
205/21a-7
Wireline oil samples205/21a-7 Deepest at
1,669m TVDSS
Note: Indicative schematic, not to scale; References to CPR are to RPS May-17 CPR; 1.Hurricane management base case OWC and high case ODT in RPS May-17 CPR
• Hurricane’s 2016 Lancaster drilling was undertaken to further de-risk the asset ahead of FID and take advantage of a low operational cost base
• 205/21a-7 data confirmed the Company’s interpretation of an extensive oil column and productive reservoir
• 205/21a-7z confirmed the productivity potential of the reservoir and was successfully suspended as a horizontal producer completing the well stock ahead of FID
Lancaster well schematic
Hurricane | AGM | 07 June 2017
Lancaster Resources – New CPR
Source: RPS Nov-2013 CPR; RPS May-2017 CPR; Note that PRMS advises that arithmetic addition of resources is not statistically correct; 2. Reserves designation assumes regulatory approval and project sanction of the Lancaster EPS
CaseInitially In-Place
Volumes Reserves Potential Reserves1
Contingent Resources
Reserves + Contingent Resources
6-year EPS only 10-year EPS FFD
Low / 1P / 1C 1,571 28.1 44.5 129.1 157.1
Best / 2P / 2C 2,326 37.3 62.1 486.1 523.4
High / 3P / 3C 3,333 49.3 88.7 1,116.7 1,166.0
60 200
437
28 37 49 129
486
1,117
157
523
1,166
-
400
800
1,200
1C 1C/1P 2C 2C/2P 3C 3C/3P
Re
serv
es
/ R
eso
urc
es
(mm
stb
)
RPS CPR 2013 Resources RPS CPR 2017 Reserves RPS CPR 2017 Resources
162%
162%
167%
Evolution of reserves and resources at Lancaster (Oil, gross/net, mmstb)
In Place Volumes quoted on an on block basis (based on P1368). Quoted values are totals of probabilistic volumes for Rona, Victory and Basement reservoirs. Assumes that operations continue without interruption with the FPSO remaining on station for the duration of the EPS.
1. Reserves based on EPS duration of 6 years. Under the scenario where the EPS is extended to 10 years, additional volumes would qualify as reserves, as indicated. In this event 1C, 2C, 3C quoted above would drop by 16.4, 24.8 and 39.4 mmstb respectively.
RPS classify Lancaster Contingent Resources as ‘Development Unclarified or On Hold’, these resources are associated with potential full field development based on analogue recovery factors without applying any secondary recovery techniques
Updated CPR Figures (Oil, gross/net, mmstb)
New CPR supports the Company’s view of an extensive oil column and productive reservoir, increasing Lancaster resources by over 160% and allocating 37 – 621 mmstb to 2P reserves2
9
Hurricane | AGM | 07 June 2017
Lincoln Result
10
• Lincoln is a discovery having encountered a 660m TVD minimum hydrocarbon column
• The reservoir is highly fractured and demonstrably permeable with an average porosity consistent with Lancaster
Note: 1. Hurricane management base case OWC and high case ODT in RPS May-17 CPR
Lancaster OWC 1,678m1 TVDSS
Structural closure 1,820m TVDSS
Pre-drill ODT based on well 205/26-1, 2,135m TVDSS
Hurricane revised ODT based on well 205/26b-12, 2,258m
TVDSS
Hurricane | AGM | 07 June 2017
Lincoln & Warwick Potential Single Accumulation
• The Company believes that the penetrated ODT indicates that:
a) Lincoln and Warwick are probably a single hydrocarbon accumulation (“Greater Warwick Area” / GWA), and
b) Lancaster and Lincoln are separate accumulations
• Further technical work is ongoing ahead of a new CPR in which Lincoln and Warwick resource estimates will be provided
Lancaster OWC 1,678m1 TVDSS
Note: 1.Hurricane management base case OWC and high case ODT in RPS May-17 CPR
11
Hurricane | AGM | 07 June 2017
Halifax Result
12
Lancaster OWC 1,678m1 TVDSS
Hydrocarbon Thickness 1,156m
TVT (minimum)
Cenozoic undiff.
• Halifax is a discovery encountering a hydrocarbon column in excess of 1km TVT
• Despite this success, there were challenges in achieving a successful DST which the Company attributes to formation damage
• The Company suspended the well with the objective of a future re-entry to confirm hydrocarbon flow to surface and/or oil water contact
• The reservoir is highly fractured and has fracture and porosity characteristics consistent with Lancaster
Note: 1.Hurricane management base case OWC and high case ODT in RPS May-17 CPR
Hurricane | AGM | 07 June 2017
Summary of the 2016-2017 Drilling Campaign
• Campaign completed on budget
• Lancaster operations successfully de-risked the Lancaster field resource ahead of FID resulting in a substantial uplift in resource volumes, assignment of reserves1 and the realisation of the well stock required for the EPS
• Lincoln resulted in a discovery which the Company believes supports Lincoln and Warwick being a single hydrocarbon accumulation (GWA) which, if proven to be productive, could prove to be a larger resource than the Lancaster field
• The Halifax data evaluated so far give the Company confidence that the encountered hydrocarbon is associated with a permeable fracture network. This interpretation is expected to be supported through an optimally planned re-entry and further formation evaluation
• The 205/21a-7 and Halifax well results support the Company’s view that the Greater Lancaster Area “GLA” represents a significant and continuous hydrocarbon accumulation and is progressing its analysis, planning and commercial efforts with the objective of confirming this interpretation
13
Note: 1. Reserves designation assumes regulatory approval and project sanction of the Lancaster EPS
Hurricane | AGM | 07 June 2017
Ongoing Subsurface Work
14
• Integrated data evaluation of Lincoln and Halifax ahead of a revised CPR
– This work includes on-going studies comprising:
Core, special core, NMR, petrophysical, geochemical and other specialist third party analysis
Revised fault mapping of the GLA and GWA
• Lancaster
– Next phase of reservoir simulation of the Lancaster field
– Further seismic fault modelling
– Ongoing work in support of EPS
• Once the above has been completed, work will focus on:
– Review of Halifax, with respect to developing a re-entry programme
Hurricane | AGM | 07 June 2017
EPS Status & Target Timeline
15
Overview of key milestonesLLI commitment and fabrication
FPSO arrival in yard
Delivery of buoy and mooring system
Subsea equipment installation
FPSO arrival on field
1
2
3
4
5
2016 2017 2018 2019
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Complete FEED 1
LLI Commitment (Trees and Controls)
FEED 2
GeoTech and GeoPhys Surveys
LLI Commitment (FPSO & SURF)
FPSO Upgrade Yard Contract Award
FPSO Aoka Mizu arrival in Upgrade Yard
Re-enter and Complete Wells 6&7Z (Window)
Delivery of Mooring System
Boulder Clearance (TBA) (Window)
Mooring System Installation (Window)
SURF Installation (Window)
FPSO Ready for Sail Away
FPSO Arrival in Field (Window)
Buoy Hook-Up (Following FPSO Arrival)
Ready for Start-up (Following Buoy Hook-up)
First Oil
1
2
3
4
5
Hurricane | AGM | 07 June 2017
EPS Status & Target Timeline
16
2016 2017 2018 2019
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
LLI Commitment (Trees and Controls) 1LLI commitment and fabrication
• Xmas trees currently on TechnipFMC production line
1
Note: Top photo is of one of Hurricane’s trees on the production line, bottom photo shows an example of a similar completed tree
Hurricane | AGM | 07 June 2017
EPS Status & Target Timeline
17
2016 2017 2018 2019
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
FPSO Aoka Mizu arrival in Upgrade Yard 2FPSO arrival in conversion yard2
• Scope includes:
– Repair and life extension (to allow up to 10 years on field)
– New mooring system and turret buoy (turret system in FPSO already exists)
– Limited vessel and marine upgrades (primarily greenwater protection)
– Limited topsides upgrades
New Buoy & New HV Swivel
VSD Cabinets
Additional Lifeboats
Inlet Heater & Fuel Gas Compressor
Replace:1 x thruster + 1 x Generator Additional Steam Generator
Repaint Vessel
Greenwater Protection
Green areas on schematic illustrate planned modifications
Hurricane | AGM | 07 June 2017
EPS Status & Target Timeline
18
2016 2017 2018 2019
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Delivery of Mooring System 3Delivery of buoy and mooring system3
He
igh
t of 1
1 L
on
do
n B
us
es
~ 5
0m
10m
New mooring system
• 3x4 mooring system
• Chain/wire legs, (1170m of chain & wire) links and shackles
• 12 drag anchors (37 te each) or piles (100 to 130 te each)
New buoy
• New disconnectable buoy with riser slots and buoyancy for EPS and future incremental risers
– Weight 1,000 te
– Height 15 m
– Diameter 18 m
Turret
• Modified existing turret (see following slide), key dimensions:
– Main bearing diameter 13 m
– Overall height 50 m
– Overall weight 1,520 te
• Trial fit of new buoy scheduled for late Q1 2018
• Buoy and mooring system scheduled to be issued to installation contractor late Q2 2018
Hurricane | AGM | 07 June 2017
EPS Status & Target Timeline
19
2016 2017 2018 2019
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
SURF Installation (Window) 4Subsea equipment installation & well completions4
• Well completions and installation of subsea equipment to take place during summer 2018 weather window
• Subsea equipment installation to include:
– Installation of flowlines, manifold, umbilicals, risers
– Installation of buoy and mooring system
– Rock dumping and mattress placement
Hurricane | AGM | 07 June 2017
EPS Status & Target Timeline
20
2016 2017 2018 2019
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
FPSO Arrival in Field (Window)
First Oil
5FPSO arrival on field5
• Following installation of buoy, FPSO only needs a short period of calm weather to be able to hook-up
• Aoka Mizu is able to pull in buoy independently, without other support vessels
• First oil to follow shortly thereafter – target H1 2019
Hurricane | AGM | 07 June 2017
EPS Status & Target Timeline
21
2016 2017 2018 2019
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Complete FEED 1
LLI Commitment (Trees and Controls)
FEED 2
GeoTech and GeoPhys Surveys
LLI Commitment (FPSO & SURF)
FPSO Upgrade Yard Contract Award
FPSO Aoka Mizu arrival in Upgrade Yard
Re-enter and Complete Wells 6&7Z (Window)
Delivery of Mooring System
Boulder Clearance (TBA) (Window)
Mooring System Installation (Window)
SURF Installation (Window)
FPSO Ready for Sail Away
FPSO Arrival in Field (Window)
Buoy Hook-Up (Following FPSO Arrival)
Ready for Start-up (Following Buoy Hook-up)
First Oil
1
2
3
4
5
Overview of key milestonesLLI commitment and fabrication
FPSO arrival in yard
Delivery of buoy and mooring system
Subsea equipment installation
FPSO arrival on field
1
2
3
4
5
Hurricane | AGM | 07 June 2017
Staffing Development and Retention
22
• Resourcing to deliver FID is in place, including existing staff and core contractors and over 100 subcontractors
• Successful completion of FID will initiate a programme designed to approximately double the Company’s staff levels and increase the numbers of contractors to accommodate new skill sets related to the Field Operatorship of the Lancaster Phase 1 development and production prior to full field development
– The staffing process has already commenced and key personnel have already been identified to be employed/contracted on FID
• Successful attraction of a farm in partner will also result in the need for additional geoscience staff
• Attracting specialist and high quality staff is underpinned by the Company’s ability to provide a competitive remuneration package
Hurricane | AGM | 07 June 2017
Long Term Vision
23
• The Company’s long term vision is to optimise the value of its assets through a combination of:
– Progressing the Lancaster EPS and ultimately full field development
– Increasing resource base through further appraisal of other assets
– Attracting an industry partner
– Demonstrating, through production, the value of Hurricane’s resource base in order to generate the maximum value for the Company’s shareholders
• Benefits of an industry partner
– Acceleration of full field development of the Lancaster field through further appraisal drilling and provision of an operator for the full field development
– Execution of appraisal drilling to confirm:
Commerciality of Lincoln/Warwick (GWA)
Commerciality of Halifax and therefore the extent of the GLA
Commerciality of Whirlwind
Hurricane | AGM | 07 June 2017
Summary
24
• In 2016/2017 the Company delivered a highly successful drilling campaign
– Lancaster Pilot and sidetrack materially derisked the Lancaster field development, adding significant resources to the Company’s portfolio
– Lincoln and Halifax discoveries further support the Company’s belief in the Rona Ridge basement play
• EPS targeted for first oil in H1 2019
• Hurricane is in discussions regarding elements of the EPS funding and is currently considering the optimal combination of its options. No decision has yet been taken on the structure and timing of funding. The Company will provide a further update on the progress with the EPS and the associated funding as soon as possible.
Hurricane | AGM | 07 June 2017
Resolutions
25
1 Chairman’s Statement
2 CEO Update
3 Resolutions
4 Q&A
Hurricane | AGM | 07 June 2017
Ordinary Resolutions (1)
26
1. To receive the Annual Report and Group Financial Statements of the Company and reports thereon of the directors and auditors for the year ended 31 December 2016.
2. To re-appoint Deloitte LLP as the Company's auditors until the next Annual General Meeting and to authorise the directors to agree their remuneration.
3. To re-elect Alistair Stobie as a director of the Company who retires by rotation pursuant to article 64 of the Company’s articles of association.
4. To re-elect Neil Platt as a director of the Company who retires by rotation pursuant to article 64 of the Company’s articles of association.
Hurricane | AGM | 07 June 2017
Ordinary Resolutions (2)
27
5. That, in accordance with section 551 of the Companies Act 2006 (Companies Act), the directors of the Company be generally and unconditionally authorised to exercise all the powers of the Company to allot shares in the Company (Shares) or grant rights to subscribe for, or to convert any security or other convertible instrument into, Shares (Rights) up to an aggregate nominal amount of £60,149.40. The authority conferred by this Ordinary Resolution 5 shall expire on the earlier of the conclusion of the 2018 Annual General Meeting of the Company and 30 June 2018, but the Company may before expiry make an offer or agreement which would or might require Shares to be allotted or Rights to be granted after the expiry date, and the directors of the Company may allot Shares or grant Rights in pursuance of such an offer or agreement as if the power conferred by this Ordinary Resolution 5 had not expired.
Ordinary Resolution 5 revokes and replaces all unexercised authorities previously granted to the directors to allot Shares or grant Rights but without prejudice to any allot
Hurricane | AGM | 07 June 2017
Special Resolution
28
6. To empower the directors, subject to the passing of Ordinary Resolution 5 and in accordance with section 570 of the Companies Act, to allot equity securities (as defined in section 560 of the Companies Act) for cash pursuant to the general authority conferred by Ordinary Resolution 5, as if section 561(1) of the Companies Act did not apply to any such allotment, provided that this power shall be limited to the allotment of equity securities up to an aggregate nominal amount of £60,149.40.
The relevant authority granted pursuant to this Special Resolution 6 shall, unless renewed, varied or revoked by the Company, expire on the earlier of the conclusion of the 2018 Annual General Meeting of the Company and 30 June 2018, save that the Company may, before such expiry, make an offer or agreement which would or might require equity securities to be allotted after such expiry and the directors may allot equity securities in pursuance of any such offer or agreement notwithstanding that the power conferred by this Special Resolution 6 has expired.
Hurricane | AGM | 07 June 2017
Q&A
29
1 Chairman’s Statement
2 CEO Update
3 Resolutions
4 Q&A
top related