hdr engineering, inc rock rip-rap splash pad
Post on 11-May-2022
3 Views
Preview:
TRANSCRIPT
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHGHG
HGHGHGHGHGHGHGHGHG
HGHG
HG
HG
HG
HG
155.
03'
250.
00'
(TO
CE
NT
ER
OF
WA
LL P
IPE
PIL
E A
ND
ALI
GN
ME
NT
LIN
E
WP-3
149.
97'
BERM RELOCATION,TOP EL +39.0'
BENCH AT EL +32.0'
BULKHEAD CUT-OFF WALL
CHANNEL TOE
RIP-RAP COLLECTOR SWALE
0.25%0.25%0.25% 0.25%
ROCK RIP-RAP"SPLASH PAD"
SPILMAN ISLAND BASELINESTA: 55+96.23,OFF:-106.00', LT.EL: 24.25'
SPILMAN ISLAND BASELINESTA: 53+92.74,OFF: -104.3', LT.EL: 24.75'
SPILMAN ISLAND BASELINESTA: 49+79.85,
OFF : -106.75', LT.EL: 24.75'
SPILMAN ISLAND BASELINESTA: 52+00.01,OFF: -106.01', LT.EL: 24.25'
SPILMAN ISLAND BASELINESTA: 57+90.88,OFF:-106.47', LT.EL: 24.75'
PORT OF HOUSTONAUTHORITY
95% REVIEW
N
H
OHS T O
U
FT
OPR
O
UOTS U
AS
XT E,
THR
TYI
OON A
95% REVIEW
HOUSTON SHIPCHANNEL (HSC)EXPANSIONCHANNELIMPROVEMENTPROJECT (ECIP)
HDR Engineering, INC
TBPELS Firm
Registration No. F-754
DESIGN PREPARED BY:
C90-D13-P11-007
C-513
PROJECT 11PACKAGE #7
This Document Is Released ForThe Purpose Of Interim ReviewUnder The Authority Of DAVIDR. BROYLES, P.E., 11727112/08/20. It Is Not To Be UsedFor Construction, Bidding, OrPermit Purposes.
D. BROYLES
J. THORPE
S. McCOY
12/08/2020
SEGMENT 3
A
ENLARGED BULKHEAD WALL ALIGNMENT CONTROL PLANA
ENLARGEDPROPOSED CIVILSITE PLAN (2 OF 4)
MA
TC
H L
INE
, SE
E D
WG
C-5
14
MA
TC
H L
INE
, S
EE
DW
G C
-512
GENERAL NOTES
B
S-532
B
S-532
C
S-533
C
S-533
E 3
2390
00
E 3
2391
00
E 3
2392
00
E 3
2393
00
E 3
2394
00
E 3
2395
00
E 3
2391
00
E 3
2390
00
E 3
2392
00
E 3
2393
00
E 3
2394
00
N 13817800
N 13817700
N 13817600
N 13817500
N 13817900
N 13818000
E 3
2389
00
E 3
2395
00
E 3
2396
00
E 3
2397
00
N 13817400
E 3
2396
00
E 3
2397
00
E 3
2398
00
N 13817800
N 13817700
N 13817600
N 13817500
N 13817900
N 13818000
N 13818100
BARBOURS CUTCHANNEL STATIONING
BULKHEAD CUT-OFF WALL
STATION CONTROL LEGEND
A
S-521
BULKHEAD CUT-OFFWALL STATIONING
ALIGNMENT LINE(CENTERLINE OF PIPEPILES)
DMPA SIDE
WATERSIDE
1. REFER TO GENERAL NOTES ON SHEET G-003THROUGH G-005.
2. REFER TO CONTRACT DOCUMENTS FOR SOILBORING LOG INFORMATION.
3. FOR BULKHEAD WALL DESIGN CRITERIA SEE SHEETG-006.
4. REFER TO SHEET C-511 FOR WORKING POINTSTATION CONTROL LEGEND. WORK SHEETS C-511THRU C-515 WITH STRUCTURAL SHEETS S-502 THRUS-506.
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
155.
03'
250.
00'
(TO
CE
NT
ER
OF
WA
LL P
IPE
PIL
E A
ND
ALI
GN
ME
NT
LIN
E14
9.97
'
BENCH AT EL +32.0'
BULKHEAD CUT-OFF WALL
CHANNEL TOE
ROCK RIP-RAP SPLASHPAD & SPREADER
0.23%0.23%0.23%0.23%
RIP-RAP COLLECTOR SWALE
SPILMAN ISLAND BASELINESTA: 43+86.52,OFF: -105.96LEL: 28.25'
SPILMAN ISLAND BASELINESTA: 41+70.01,OFF: -106.0LEL: 27.75'
SPILMAN ISLAND BASELINESTA: 48+16.17,OFF: -105.98LEL: 28.25'
BERM RELOCATION,TOP EL +39.0'
SPILMAN ISLAND BASELINESTA: 46+01.41,
OFF: -106.0LEL: 27.75'
A
ENLARGED BULKHEAD WALL ALIGNMENT CONTROL PLANA
ENLARGEDPROPOSED CIVILSITE PLAN (3 OF 4)
MA
TC
H L
INE
, SE
E D
WG
C-5
15
MA
TC
H L
INE
, S
EE
DW
G C
-513
GENERAL NOTESC
S-533
C
S-533
E 3
2398
00
E 3
2399
00
E 3
2400
00
E 3
2401
00
N 13817800
N 13817900
N 13818000
N 13818100
N 13818200
N 13817700
N 13817600
E 3
2402
00
E 3
2403
00
E 3
2404
00
E 3
2405
00
E 3
2406
00
N 13817800
N 13817900
N 13818000
N 13818100
N 13818200
N 13817700N 13817600
N 13818300
E 3
2399
00
E 3
2400
00
E 3
2401
00
E 3
2402
00
E 3
2403
00
E 3
2404
00
E 3
2405
00
E 3
2406
00
E 3
2407
00
BULKHEAD CUT-OFF WALL
STATION CONTROL LEGEND
N 13818400
DMPA SIDE
WATERSIDE
PORT OF HOUSTONAUTHORITY
95% REVIEW
N
H
OHS T O
U
FT
OPR
O
UOTS U
AS
XT E,
THR
TYI
OON A
95% REVIEW
HOUSTON SHIPCHANNEL (HSC)EXPANSIONCHANNELIMPROVEMENTPROJECT (ECIP)
HDR Engineering, INC
TBPELS Firm
Registration No. F-754
DESIGN PREPARED BY:
C90-D13-P11-007
C-514
PROJECT 11PACKAGE #7
This Document Is Released ForThe Purpose Of Interim ReviewUnder The Authority Of DAVIDR. BROYLES, P.E., 11727112/08/20. It Is Not To Be UsedFor Construction, Bidding, OrPermit Purposes.
D. BROYLES
J. THORPE
S. McCOY
12/08/2020
SEGMENT 3
1. REFER TO GENERAL NOTES ON SHEET G-003THROUGH G-005.
2. REFER TO CONTRACT DOCUMENTS FOR SOILBORING LOG INFORMATION.
3. FOR BULKHEAD WALL DESIGN CRITERIA SEE SHEETG-006.
4. REFER TO SHEET C-511 FOR WORKING POINTSTATION CONTROL LEGEND. WORK SHEETS C-511THRU C-515 WITH STRUCTURAL SHEETS S-502 THRUS-506.
BARBOURS CUTCHANNEL STATIONING
BULKHEAD CUT-OFFWALL STATIONING
ALIGNMENT LINE(CENTERLINE OFPIPE PILES)
top related