hdr engineering, inc rock rip-rap splash pad
TRANSCRIPT
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHGHG
HGHGHGHGHGHGHGHGHG
HGHG
HG
HG
HG
HG
155.
03'
250.
00'
(TO
CE
NT
ER
OF
WA
LL P
IPE
PIL
E A
ND
ALI
GN
ME
NT
LIN
E
WP-3
149.
97'
BERM RELOCATION,TOP EL +39.0'
BENCH AT EL +32.0'
BULKHEAD CUT-OFF WALL
CHANNEL TOE
RIP-RAP COLLECTOR SWALE
0.25%0.25%0.25% 0.25%
ROCK RIP-RAP"SPLASH PAD"
SPILMAN ISLAND BASELINESTA: 55+96.23,OFF:-106.00', LT.EL: 24.25'
SPILMAN ISLAND BASELINESTA: 53+92.74,OFF: -104.3', LT.EL: 24.75'
SPILMAN ISLAND BASELINESTA: 49+79.85,
OFF : -106.75', LT.EL: 24.75'
SPILMAN ISLAND BASELINESTA: 52+00.01,OFF: -106.01', LT.EL: 24.25'
SPILMAN ISLAND BASELINESTA: 57+90.88,OFF:-106.47', LT.EL: 24.75'
PORT OF HOUSTONAUTHORITY
95% REVIEW
N
H
OHS T O
U
FT
OPR
O
UOTS U
AS
XT E,
THR
TYI
OON A
95% REVIEW
HOUSTON SHIPCHANNEL (HSC)EXPANSIONCHANNELIMPROVEMENTPROJECT (ECIP)
HDR Engineering, INC
TBPELS Firm
Registration No. F-754
DESIGN PREPARED BY:
C90-D13-P11-007
C-513
PROJECT 11PACKAGE #7
This Document Is Released ForThe Purpose Of Interim ReviewUnder The Authority Of DAVIDR. BROYLES, P.E., 11727112/08/20. It Is Not To Be UsedFor Construction, Bidding, OrPermit Purposes.
D. BROYLES
J. THORPE
S. McCOY
12/08/2020
SEGMENT 3
A
ENLARGED BULKHEAD WALL ALIGNMENT CONTROL PLANA
ENLARGEDPROPOSED CIVILSITE PLAN (2 OF 4)
MA
TC
H L
INE
, SE
E D
WG
C-5
14
MA
TC
H L
INE
, S
EE
DW
G C
-512
GENERAL NOTES
B
S-532
B
S-532
C
S-533
C
S-533
E 3
2390
00
E 3
2391
00
E 3
2392
00
E 3
2393
00
E 3
2394
00
E 3
2395
00
E 3
2391
00
E 3
2390
00
E 3
2392
00
E 3
2393
00
E 3
2394
00
N 13817800
N 13817700
N 13817600
N 13817500
N 13817900
N 13818000
E 3
2389
00
E 3
2395
00
E 3
2396
00
E 3
2397
00
N 13817400
E 3
2396
00
E 3
2397
00
E 3
2398
00
N 13817800
N 13817700
N 13817600
N 13817500
N 13817900
N 13818000
N 13818100
BARBOURS CUTCHANNEL STATIONING
BULKHEAD CUT-OFF WALL
STATION CONTROL LEGEND
A
S-521
BULKHEAD CUT-OFFWALL STATIONING
ALIGNMENT LINE(CENTERLINE OF PIPEPILES)
DMPA SIDE
WATERSIDE
1. REFER TO GENERAL NOTES ON SHEET G-003THROUGH G-005.
2. REFER TO CONTRACT DOCUMENTS FOR SOILBORING LOG INFORMATION.
3. FOR BULKHEAD WALL DESIGN CRITERIA SEE SHEETG-006.
4. REFER TO SHEET C-511 FOR WORKING POINTSTATION CONTROL LEGEND. WORK SHEETS C-511THRU C-515 WITH STRUCTURAL SHEETS S-502 THRUS-506.
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
HGHG
155.
03'
250.
00'
(TO
CE
NT
ER
OF
WA
LL P
IPE
PIL
E A
ND
ALI
GN
ME
NT
LIN
E14
9.97
'
BENCH AT EL +32.0'
BULKHEAD CUT-OFF WALL
CHANNEL TOE
ROCK RIP-RAP SPLASHPAD & SPREADER
0.23%0.23%0.23%0.23%
RIP-RAP COLLECTOR SWALE
SPILMAN ISLAND BASELINESTA: 43+86.52,OFF: -105.96LEL: 28.25'
SPILMAN ISLAND BASELINESTA: 41+70.01,OFF: -106.0LEL: 27.75'
SPILMAN ISLAND BASELINESTA: 48+16.17,OFF: -105.98LEL: 28.25'
BERM RELOCATION,TOP EL +39.0'
SPILMAN ISLAND BASELINESTA: 46+01.41,
OFF: -106.0LEL: 27.75'
A
ENLARGED BULKHEAD WALL ALIGNMENT CONTROL PLANA
ENLARGEDPROPOSED CIVILSITE PLAN (3 OF 4)
MA
TC
H L
INE
, SE
E D
WG
C-5
15
MA
TC
H L
INE
, S
EE
DW
G C
-513
GENERAL NOTESC
S-533
C
S-533
E 3
2398
00
E 3
2399
00
E 3
2400
00
E 3
2401
00
N 13817800
N 13817900
N 13818000
N 13818100
N 13818200
N 13817700
N 13817600
E 3
2402
00
E 3
2403
00
E 3
2404
00
E 3
2405
00
E 3
2406
00
N 13817800
N 13817900
N 13818000
N 13818100
N 13818200
N 13817700N 13817600
N 13818300
E 3
2399
00
E 3
2400
00
E 3
2401
00
E 3
2402
00
E 3
2403
00
E 3
2404
00
E 3
2405
00
E 3
2406
00
E 3
2407
00
BULKHEAD CUT-OFF WALL
STATION CONTROL LEGEND
N 13818400
DMPA SIDE
WATERSIDE
PORT OF HOUSTONAUTHORITY
95% REVIEW
N
H
OHS T O
U
FT
OPR
O
UOTS U
AS
XT E,
THR
TYI
OON A
95% REVIEW
HOUSTON SHIPCHANNEL (HSC)EXPANSIONCHANNELIMPROVEMENTPROJECT (ECIP)
HDR Engineering, INC
TBPELS Firm
Registration No. F-754
DESIGN PREPARED BY:
C90-D13-P11-007
C-514
PROJECT 11PACKAGE #7
This Document Is Released ForThe Purpose Of Interim ReviewUnder The Authority Of DAVIDR. BROYLES, P.E., 11727112/08/20. It Is Not To Be UsedFor Construction, Bidding, OrPermit Purposes.
D. BROYLES
J. THORPE
S. McCOY
12/08/2020
SEGMENT 3
1. REFER TO GENERAL NOTES ON SHEET G-003THROUGH G-005.
2. REFER TO CONTRACT DOCUMENTS FOR SOILBORING LOG INFORMATION.
3. FOR BULKHEAD WALL DESIGN CRITERIA SEE SHEETG-006.
4. REFER TO SHEET C-511 FOR WORKING POINTSTATION CONTROL LEGEND. WORK SHEETS C-511THRU C-515 WITH STRUCTURAL SHEETS S-502 THRUS-506.
BARBOURS CUTCHANNEL STATIONING
BULKHEAD CUT-OFFWALL STATIONING
ALIGNMENT LINE(CENTERLINE OFPIPE PILES)