For Post-Occupancy Operations and Maintenance

Virtual Project Management ‐ Solutions for Success 1

BIM Is A Paradigm Shiftg

Virtual Project Management ‐ Solutions for Success 2

CCAEA BIM Facilities Agendag1. Overview of BIM (the really big picture)2. BIM as part of CAFM system (user interface)3. Getting Project Information (data, data, data)g j ( , , )4. Using the Vela System (on site, real-time)5 Prototype Example (how to use it)5. Prototype Example (how to use it)6. Q and A (real project example)

Virtual Project Management ‐ Solutions for Success 3

1. BIM OVERVIEW1. BIM OVERVIEW

Virtual Project Management ‐ Solutions for Success 4

(old) CAD versus (new) BIM( ) ( )

Full Parametric Database

2DDrafting Tool

Li i d

3DVisualization 

Limited Data

Tool

Virtual Project Management ‐ Solutions for Success 5

BIM Promises Information

• Better knowledge, fewer surprises, less cost Visualization

• Better, more confident decisions, fewer changes

Collaboration• Better communication, integrated project , g p j

teams, less conflict

Virtual Project Management ‐ Solutions for Success 6

BIM’s Life Cycle - Planning to Using

ImplementingImplementing UsingUsingPlanningPlanning

Functional and Operational Needs

S N d

Architecture 

Design

Demand/Prevent Maintenance

E i t Space Needs

Existing Conditions Assessment

Estimate

Schedule

Funding

Equipment Replacement

Space Utilization

Environmental Goals

Architectural Programming

Bidding

Construction

Project Close‐out

Modernization

Energy Management

Asset Management Budget and Schedule

Site selection

Project Close‐out

Virtual Project Management ‐ Solutions for Success 7

The “Model” is Many Models

Clash

Concept Visualize Simulate Analyze Realize Operate

LogisticsRevit Architecture

Revit 

Clash Detection

E ti t

Logistics

Schedules

Affi itStructure

Revit MEP

FM Software

Navis Works

Estimates

Schedules

Plumbing

ShopDrwgAffinity

Onuma Revit MEP

AutoCAD Map 3D

Schedules

Design Re ie

HVAC

Structural

OPS

Map 3D ReviewAs‐Built

The CM manages Model integration

Virtual Project Management ‐ Solutions for Success 8

The CM manages Model integration

Model Grows: Concept to Realityynn

ing

nning

esign

esign

men

tsmen

ts

wings

wings

ation

ation

nges

nges

ction

ction

ancy

ancy

Plan

Plan DD

Docum

Docum

Shop

 Draw

Shop

 Draw

Fabric

Fabric

Field Ch

anField Ch

an

Constru

Constru

Occup

Occup

SS FF

MACROMACRO MICROMICRO

Virtual Project Management ‐ Solutions for Success 9

Level of Development (LOD)( )LOD 100 Planning Model

Virtual Project Management ‐ Solutions for Success 10

Level of Development (LOD)( )LOD 200 Design

Virtual Project Management ‐ Solutions for Success 11

Level of Development (LOD)( )LOD 300 Construction Documents

Virtual Project Management ‐ Solutions for Success 12

Level of Development (LOD)( )LOD 400 Shop Drawings and LOD 500 As Built ModelsLOD 500 As-Built Models

Virtual Project Management ‐ Solutions for Success 13

Level of Development (LOD)( )

Detail increases with each LOD100 200 300 400 & 500

Virtual Project Management ‐ Solutions for Success 14

Intelligent Drawingsg g

Virtual Project Management ‐ Solutions for Success 15

2. BIM AS PART OF CAFM2. BIM AS PART OF CAFM

Virtual Project Management ‐ Solutions for Success 16

Basic Elements of Facility Mgmty gProperty and 

AssetAsset Management

Preventative Energy

and Demand Maintenance

EnergyManagement

Facility Management Elements

Staff Utilization 

Space Management

Facility Management Elements

Management Renovation

Virtual Project Management ‐ Solutions for Success 17

Source of Data Existing or New

Existing Facilities NewFacilities

Upgrade or Expansion

New Construction

Facility Management 

Program

R t’As‐Built 

Model evolves from Project

Represent’vModel must be developed Translationp

Virtual Project Management ‐ Solutions for Success 18

BIMBIM‐‐based “Middleware”based “Middleware”ation

oordina

M

g & Co

A F M

thorin

C A

Model‐Based Facility Information 

Management

BIM Au

Virtual Project Management ‐ Solutions for Success 19

B

CDCR O&M Example

Model‐Based l

Statewide Automated 

Facility Information System

Property Management 

System

MS AccessDatabase

TririgaDatabase

NavisworksActive X Control

3D Viewer

Database

MS AccessReport Writer

Database

Report Writer

Existing SystemTririga-based

Vanir developednew system

Virtual Project Management ‐ Solutions for Success 20

Transition: As-Built Docs to O&M

“As-built”Model

O&M Manuals

VanirRecord

Drawings Warrantees

VanirModel-Based

Facility Information System

VanirAssembly

Shop Drawings Translation

Management

Excel Data

Construction Close-out Maintenance Use

Virtual Project Management ‐ Solutions for Success 21

Transition Process

Rooms3D Model

(Navisworks)

Rooms

Systems

Test Model

As‐Built(Revit)

Systems

MBFIS

Database(MS Access)

Customize

Test Data( )

Link Data

Virtual Project Management ‐ Solutions for Success 22

Post-Occupancy BIM UtilizationyConstruction As‐Built Models & Data

Maintain Change

Normal FM systemStandard Database

Revit or similarCivil 3DStandard Database

MBFIS or similar

R l t ff

Civil 3DNavisworks

T h t ff C lt tRegular staff Tech staff or Consultant

Virtual Project Management ‐ Solutions for Success 23

Useful Maintenance data Construction AsConstruction As--Built RecordsBuilt Records

S f S• Plans, Specifications, and Shop Drawings• Warrantees

O & M D t• O & M Data Demand/Preventative Maintenance ReportsDemand/Preventative Maintenance Reports

• Scheduled Maintenance • Work Order Processing

R D t Sh t• Room Data Sheets• Equipment Manufacturer’s Data

Virtual Project Management ‐ Solutions for Success 24

3. COLLECTING THE DATA3. COLLECTING THE DATA

Virtual Project Management ‐ Solutions for Success 25

Agency (VA) Standardsg y ( )

Every Object is unique and has individual data 

Virtual Project Management ‐ Solutions for Success 26

Agency (CDCR) Standardsg y ( )

Every Object is unique and has individual data

Virtual Project Management ‐ Solutions for Success 27

has individual data 

Basic Object Data Requiredj Common Name Unique Identifier Number Uniformat and/or Omni Classification Native Model Assembly Code Manufacturer Name Manufacturer Name Model Type/Number

Virtual Project Management ‐ Solutions for Success 28

ASTM Uniformat II ClassificationExample: VAV D3040

Level 1 Major Group Elements

Level 2 Group Elements

Level 3 Individual Elements

A SUBSTRUCTURE

B SHELL

C INTERIORSC INTERIORS

D SERVICES D30 HVAC D3040 Variable Air Volume Box

Virtual Project Management ‐ Solutions for Success 29

Volume Box

Omni ClassificationExample: VAV 23.36.16.xx.xx.xx.xx

Detailed numbering systemg y CSI division relationship Industry Foundation Class (IFC) Industry Foundation Class (IFC)

compatible

Virtual Project Management ‐ Solutions for Success 30

COBie Data Managementg National Institute of Building Sciences Whole Building Design Guide Construction Operations Building p g

Information Exchange (COBie)

Virtual Project Management ‐ Solutions for Success 31

COBie Data ManagementgC O B i e Specification

• Standardized format for data “handover”

F ll i d• Focus on collecting and transitioning:• Equipment lists

P d d h• Product data sheets

• Warranties

• Preventive Maintenance Schedules

i• Spare Parts Lists

• Etc…

• Begins at early design stage

Being Incorporated into

GSA BIM Guidelines

Virtual Project Management ‐ Solutions for Success 32

COBie 2 Spreadsheet

Virtual Project Management ‐ Solutions for Success 33

Model Development Review

Virtual Project Management ‐ Solutions for Success 34

Model Development Review

Virtual Project Management ‐ Solutions for Success 35

Model Development Review

Virtual Project Management ‐ Solutions for Success 36

4. MOCK-UP EXAMPLE4. MOCK UP EXAMPLE

Virtual Project Management ‐ Solutions for Success 37

Vela Systems for Field and Facility

Vela MobileVela Mobile™™ COLLECTCOLLECT

Vela Field Manager™Vela Field Manager™ MANAGEMANAGE

Vela Reports™Vela Reports™ REPORTREPORT

Virtual Project Management ‐ Solutions for Success 38

Vela Systems on the iPady

Extremely light10+ hr/battery / y16‐64 gb memory Fast startupAuto‐updatesAuto‐updatesRuggedized cases

Virtual Project Management ‐ Solutions for Success 39

Seamless Flow of Data

FieldFacility 

Field As‐Built Data

yManagement

Data

Vela Systems works inField construction andFacilities management

Virtual Project Management ‐ Solutions for Success 40

Facilities management

Virtual Project Management ‐ Solutions for Success 41

Vela Mobile iPad Overview

1. Complete a quality checklist related to a p q yconcrete pour

2. Lookup a construction document for reference3. Do a Punch-list of a room nearing completion4 Review and close out issues that have been4. Review and close out issues that have been

completed5 Upload all work to the Vela server for sharing5. Upload all work to the Vela server for sharing

and reporting

Virtual Project Management ‐ Solutions for Success 42

Vela Mobile iPad Overview

1. Complete quality checklist related to a concrete pour2. Lookup a construction document for referencep3. Do a Punch-list of a room nearing completion4. Review and close out issues that have been completedp5. Upload all work to the Vela server for sharing and reporting

Virtual Project Management ‐ Solutions for Success 43

Virtual Project Management ‐ Solutions for Success 44

Virtual Project Management ‐ Solutions for Success 45

Virtual Project Management ‐ Solutions for Success 46

Vela Mobile iPad Overview

1. Complete a quality checklist related to a concrete pour2. Lookup a construction document for referencep3. Do a Punch-list of a room nearing completion4. Review and close out issues that have been completedp5. Upload all work to the Vela server for sharing and

reporting

Virtual Project Management ‐ Solutions for Success 47

Virtual Project Management ‐ Solutions for Success 48

Virtual Project Management ‐ Solutions for Success 49

Virtual Project Management ‐ Solutions for Success 50

Virtual Project Management ‐ Solutions for Success 51

Vela Mobile iPad Overview

1. Complete a quality checklist related to a concrete pour2. Lookup a construction document for referencep3. Do a Punch-list of a room nearing completion4. Review and close out issues that have been completedp5. Upload all work to the Vela server for sharing and

reporting

Virtual Project Management ‐ Solutions for Success 52

Virtual Project Management ‐ Solutions for Success 53

Virtual Project Management ‐ Solutions for Success 54

Virtual Project Management ‐ Solutions for Success 55

Vela Mobile iPad Overview

1. Complete a quality checklist related to a concrete pour2. Lookup a construction document for referencep3. Do a Punch-list of a room nearing completion4. Review and close out issues that have been completedp5. Upload all work to the Vela server for sharing and reporting

Virtual Project Management ‐ Solutions for Success 56

Virtual Project Management ‐ Solutions for Success 57

Virtual Project Management ‐ Solutions for Success 58

Virtual Project Management ‐ Solutions for Success 59

Vela Mobile iPad Overview

1. Complete a quality checklist related to a concrete pour2. Lookup a construction document for referencep3. Do a Punch-list of a room nearing completion4. Review and close out issues that have been completedp5. Upload work to the Vela server for sharing / reporting

Virtual Project Management ‐ Solutions for Success 60

Virtual Project Management ‐ Solutions for Success 61

Virtual Project Management ‐ Solutions for Success 62

Virtual Project Management ‐ Solutions for Success 63

5. MOCK-UP EXAMPLE5. MOCK UP EXAMPLE

Virtual Project Management ‐ Solutions for Success 64

Highland Hospital Replacement Project

Oakland, Alameda County, California 80,000 SF, medical office/administration 300,000 SF acute care tower, $430,000,000 D-B Contract Clark with Smith Group D B Team Clark with Smith Group D-B Team

Virtual Project Management ‐ Solutions for Success 65

Highlandg

Virtual Project Management ‐ Solutions for Success 66

Highlandg

Virtual Project Management ‐ Solutions for Success 67

Highlandg

Virtual Project Management ‐ Solutions for Success 68

Highland Acute Care towerg

Virtual Project Management ‐ Solutions for Success 69

Highland Satelite Building g g

Virtual Project Management ‐ Solutions for Success 70

MBFIS Mock-Up Video Highland video

Virtual Project Management ‐ Solutions for Success 71

SQ Lessons Learned Establish FM data criteria in design docs Monitor As-built process

• Non-parametric modeling causes extra work Room-based objects

• Every significant object you see in the roomEvery significant object you see in the room Floor-based objects

• All interstitial space systems• All interstitial space systems Link O&M submittals in digital format

Virtual Project Management ‐ Solutions for Success 72

BIM Resources NeededComputer: 

64bit, quad core 3.2GHz, 8 GB RAM, 5GB Free, , q , , ,Windows 7,  256 MB DirectX 9‐capable graphics card with Shader Model 3 

Software: Revit, Navisworks, and “FM” software 

Projection HardwareProjection Hardware:Smartboard setup with HD, or HD LCD TV w/ SB

Staffing:Staffing:“FM” : normal computer skillsRevit: technically trained is best 

Virtual Project Management ‐ Solutions for Success 73

6. Q&A - SQ EXAMPLE6. Q&A SQ EXAMPLE

Virtual Project Management ‐ Solutions for Success 74

Central Health Services Buildingg California Department of Corrections and

R h bilit tiRehabilitation Court mandated new healthcare acute

care clinic San Quentin State Prison Design-Build, HP+HOK 132 000 square feet 5 story 132,000 square feet, 5-story $120 million

Virtual Project Management ‐ Solutions for Success 75

Central Health Services BuildinggVanir Developed

M d l B d F ilit I f ti S tModel-Based Facility Information System

Preventative and Demand Maintenance O & M Documentation

Based on As-Built Models fromHensel Phelps/HOK, Design Build Team

Virtual Project Management ‐ Solutions for Success 76

Central Health Services Buildingg

Virtual Project Management ‐ Solutions for Success 77

For Post-Occupancy Maintenance and Operations

Virtual Project Management ‐ Solutions for Success 78