filming schedule day 2 ig2_

Post on 14-Apr-2017

71 Views

Category:

Entertainment & Humor

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Filming Schedule

Date: 04.05.12

Filming Time: 8pm onwardsCrew: Ashleigh Darlington, Charlotte Bracken, Carrie Deans, Cesca Haig and Liam Belch.Equipment: Camera, Tripod, lighting

Location #4 Tabitha’s BathroomCharacters needed: Tabitha, young girlInterior or Exterior: INT.Day or Night:Costume/Props Needed:

NightTabitha – pyjamas. Young girl – pyjamas.Props – tooth brush, mirror

Location #5 Tabitha’s gardenCharacters needed: young girlInterior or Exterior: EXT.Day or Night:Costume/Props Needed:

Middle of the nightprops – bread knife

Location #6 Tabitha’s bedroomCharacters needed: Tabitha, young girlInterior or Exterior: INT.Day or Night:Costume/Props Needed:

Middle of the nightProps: mirror, bed, rope

top related