ferrisgymnasium centralenergyplant noparking ... · parkinglot closuredates parkingspace closure:...

Post on 29-Jul-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

MusicHall

FerrisGym

nasium

AustinArts

CentralEnergyPlant

Keep

FireHydrant

Clear(typ)

NOPA

RKING

(temporarymovable

barra

destobe

installedhere)

EmergencyVe

hicleRoute(atleastone

tobe

maintainedatalltimes)

ConstructionFencing

(tobe

phased)

TRINITYPH

ASE2ST

EAMLINEREP

LACEM

ENT

LOGISTICSPL

AN

FireHydrant(mustrem

ainclear

atalltimes)

Vault#1

Vault

#1a

OldVa

ult#1

Vault4a

VaultorH

andH

ole

New

SteamPiping

(3ea)

Vault4a

EmergencyEg

ress

Access/Egressat

southdoorof

AustinArtswillbe

temporarilyclosed

from7/25/19thru

10/11/19

TemporaryPa

vedWalk

AlternativePipe

Storageand

Laydow

nArea

(GrassyArea

across

from

CentralPlant)

EmergencyAssemblyArea

#1

EmergencyAssemblyArea

#2

ConstructionTrailer

ParkingLotC

losure:

5/20/19through9/20/19

Gates

Quad

Entrance

Closure:

8/4/19

through

11/15/19

PrimaryLaydow

nandPipe

Storage

Area

6/3/19

through11/15/19

ParkingLot

ClosureDates

ParkingSp

ace

Closure:

5/20/19through

9/13/19

Existing

Vault4

OldVa

ultt

Vault#1

1#

top related