Music Hall Ferris Gymnasium Austin Arts Central Energy Plant Keep Fire Hydrant Clear (typ) NO PARKING (temporary movable barrades to be installed here) Emergency Vehicle Route (at least one to be maintained at all times) Construction Fencing (to be phased) TRINITY PHASE 2 STEAM LINE REPLACEMENT LOGISTICS PLAN Fire Hydrant (must remain clear at all times) Vault #1 Vault #1a Old Vault #1 Vault 4a Vault or HandHole New Steam Piping(3ea) Vault 4a Emergency Egress Access/Egress at south door of Austin Arts will be temporarily closed from 7/25/19 thru 10/11/19 Temporary Paved Walk Alternative Pipe Storage and Laydown Area (Grassy Area across from Central Plant) Emergency Assembly Area #1 Emergency Assembly Area #2 Construction Trailer Parking Lot Closure: 5/20/19 through 9/20/19 Gates Quad Entrance Closure: 8/4/19 through 11/15/19 Primary Laydown and Pipe Storage Area 6/3/19 through 11/15/19 Parking Lot Closure Dates Parking Space Closure: 5/20/19 through 9/13/19 Existing Vault 4 Old Vault t Vault #1 1 #

Upload: others

Post on 29-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FerrisGymnasium CentralEnergyPlant NOPARKING ... · ParkingLot ClosureDates ParkingSpace Closure: 5/20/19through 9/13/19 Existing Vault4 O l d Vaultt Vau l t #1 1 # Title: Trinity

MusicHall

FerrisGym

nasium

AustinArts

CentralEnergyPlant

Keep

FireHydrant

Clear(typ)

NOPA

RKING

(temporarymovable

barra

destobe

installedhere)

EmergencyVe

hicleRoute(atleastone

tobe

maintainedatalltimes)

ConstructionFencing

(tobe

phased)

TRINITYPH

ASE2ST

EAMLINEREP

LACEM

ENT

LOGISTICSPL

AN

FireHydrant(mustrem

ainclear

atalltimes)

Vault#1

Vault

#1a

OldVa

ult#1

Vault4a

VaultorH

andH

ole

New

SteamPiping

(3ea)

Vault4a

EmergencyEg

ress

Access/Egressat

southdoorof

AustinArtswillbe

temporarilyclosed

from7/25/19thru

10/11/19

TemporaryPa

vedWalk

AlternativePipe

Storageand

Laydow

nArea

(GrassyArea

across

from

CentralPlant)

EmergencyAssemblyArea

#1

EmergencyAssemblyArea

#2

ConstructionTrailer

ParkingLotC

losure:

5/20/19through9/20/19

Gates

Quad

Entrance

Closure:

8/4/19

through

11/15/19

PrimaryLaydow

nandPipe

Storage

Area

6/3/19

through11/15/19

ParkingLot

ClosureDates

ParkingSp

ace

Closure:

5/20/19through

9/13/19

Existing

Vault4

OldVa

ultt

Vault#1

1#