fdot presentation template - option 1
Post on 04-Oct-2021
3 Views
Preview:
TRANSCRIPT
DISTRICT 1BARTOW
VIRTUAL PUBLIC HEARING
December 8, 2020
US 41 (SR 45) from Beneva Road toSR 72/Stickney Point Road
Financial Project ID: 433550-4-52-01 & 433550-4-52-02 | 433550-5-52-01 &
433550-5-52-02 | 440685-1-52-01
Michael Johnson, P.E. GEC Consultant Project Manager
District One Project Management Office Florida Department of Transportation
This meeting is being recorded.
The recording will be posted on the project website.
All attendees will be placed in ‘Listen Only’
mode throughout the meeting.
3
For technical issues, visit GoToWebinar online at:
Or through your confirmation email, click on
check system requirements (below):
4
Support.goto.com
Information for Dial-in Attendees
Dial-in listeners Paper copy of meeting presentation
(requested or downloaded before the meeting)
swflroads.com/us41/benevatocaribbean | swflroads.com/us41/caribbeantostickneypoint 6
We want your input during the meeting!
We will address some of your
comments during the meeting, however all
correspondence will be posted on the website later.
Type your comments in the
control panel Questions pane.
?
7
Public Comment
3. 863-519-2834
Type comments in the Questions
pane on the control panel.
After meeting
?During meeting
2. Florida Department of Transportation801 N. Broadway Ave.Bartow, FL 33830
1. Michael.Johnson@dot.state.fl.us
swflroads.com/us41/benevatocaribbeanswflroads.com/us41/caribbeantostickneypoint 8
Public Comment
All registrants will receive a link to the meeting
recording.
All comments and questions are part of the
Public Record.
Please submit your comments by December 21
9
Public Notice
Department or project webpageEmails to project contacts listProperty owner/tenant letters
Social mediaNewspaperFlorida Administrative Register
10
Title VI Information
The Florida Department of Transportation solicits public participation without regard to race, color, national origin, age, sex, religion, disability, or
family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI may do so by contacting:
Cynthia Sykes, FDOT District One Title VI Coordinator Email: Cynthia.Sykes@dot.state.fl.us
TITLE VI INFORMATION
11
Florida Department of Transportation
In 2016/2017 a study was conducted to determine what improvements were needed to create a multi-modal corridor. This includes improvements for bicyclist, pedestrians, transit, and vehicles.
Public Involvement conducted for the project included:
Metropolitan Planning Organization (MPO) Citizen’s Advisory Committee on May 6, 2019
MPO Technical Advisory Committee on May 6, 2019
MPO Bike, Ped, Trails Advisory Committee on May 6, 2019
Public Information Workshop on January 24, 2017
GoToWebinar Public Meetingon November 4, 2020
Project Background
14
Florida Department of Transportation
Restripe the 12’ travel lanes to 11’ travel lanes
Resurface the road to change the paved shoulders from 4 feet to 6 feet to provide 6-foot-wide buffered bike lanes
v
Widen right turn lanes to provide 6-foot-wide bike lane “key hole”
Project Scope
6’
15
Florida Department of Transportation
Construct 6-foot-wide concrete sidewalks on both sides of the roadway
Review driveway widths and reduce to meet current standards where required
Project Scope
Provide sidewalks over creek crossings
16
Florida Department of Transportation Project Scope
Modifications to the signalized intersections include: Replacement of the signal at SR 72 / Stickney Point Road Adjusting signal head locations at Gulf Gate Drive Add or adjusting the crosswalks Providing ADA (Americans with Disabilities Act) enhancements Add intersection lighting
Corridor lighting Lighting already exists on east side of the road Add lighting to west side of the road
Modify drainage structures to accommodate improvements
Construct concrete bus pads and bus shelter pads in coordination with Sarasota County Area Transit (SCAT)
17
Florida Department of Transportation Project Scope
Pedestrian / Bicycle Accommodation at CreeksSegment 4 - Beneva Road to Caribbean Drive Construct pedestrian/bicycle facilities
over Oscar Creek by extending bridge culvert on east side
19
Florida Department of Transportation
20
Segment 5 - Caribbean Drive to SR 72 / Stickney Point Rd. Construct pedestrian/bicycle facilities over
Matheny Creek without culvert extensions
Project Scope
Pedestrian / Bicycle Accommodation at Creeks
Florida Department of Transportation Project Scope
Median Modifications(Access Management)
FDOT: https://www.fdot.gov/planning/systems/programs/sm/accman/default.shtm
FHWA: https://safety.fhwa.dot.gov/intersection/alter_design/pdf/fhwasa14069_mut_infoguide.pdf 21
Florida Department of Transportation
Corridor Crash History 484 total crashes between 2014 and 2018
219 from Beneva Road to Caribbean Drive 265 from Caribbean Drive to Stickney Point Road
78 total angle and left-turn crashes resulting in 35 injuries Project will reduce conflict points and improve visibility for turning vehicles Multimodal safety – sidewalk, bike lanes, transit connectivity
Four bike & four pedestrian total crashes resulting in three fatalities
Beneva Road to Caribbean Drive Caribbean Drive to SR 72
22
Florida Department of Transportation Project Scope
Median ModificationsSegments 4 and 5 Evaluate each median opening and determine
modification needed to improve safety.
23
Florida Department of Transportation
Median Modifications(Full Median Opening vs Directional Median Opening)
Project Scope
Directional Median OpeningFull Median Opening
24
Florida Department of Transportation
Median Modifications(Access Management)
Hobby Lobby Springfield Dr. /
Lake Pointe Blvd.
S Holiday Dr.
Beneva Rd.
Holiday Dr. N
Southpointe Dr. / Doud St.
NO CHANGE
Project Scope433550-4-52-02
25
Kia
Florida Department of Transportation
Median Modifications(Access Management)
Sandalwood Dr. / Kai Dr.
Pinehurst St.
Peterson Toyota
Brueckner Dr.
Caribbean Dr.
Project Scope433550-4-52-02
26
Florida Department of Transportation Project Scope
Median Modifications(Access Management)
Cass Way
Cass St.
Caribbean Dr.
Buccaneer Ln.
Upper Cove Ter.
433550-5-52-02
27
Florida Department of Transportation
Median Modifications(Access Management)
Reynolds St.
Baywood Dr.
SR 72 (Stickney Point Rd.)
Gulf Gate Dr.
Bispham Rd.
NO CHANGE
NO CHANGE
Buccaneer Ln.
Project Scope
NO CHANGE
433550-5-52-02
28
Mazda
Florida Department of Transportation
US 41 at SR 72(Stickney Point Road)
Remove free-flow right turn lanes Remove islands and
reconstruct curb and gutter at all corners
Right turn lanes controlled by signal
Shorter crosswalks curb to curb
Construct new signal New mast arms New intersection lighting
with crosswalk lighting
Project Scope
29
Bank
of A
mer
ica
Florida Statutes
This public hearing is held in accordance with Section 339.155, Florida Statutes; Section 339.199, Florida Statutes; and Section 120.525, Florida Statutes. This public hearing was advertised consistent with federal and state requirements and is conducted consistent with the Americans with Disabilities Act of 1990.
This hearing is held to give all interested people the right to understand the project and comment on their concerns to the department. Public participation at this hearing is encouraged and solicited without regard to race, color, religion, sex, age, national origin, disability or family status.
30
Mail or Email Comments to Us by December 21
Michael Johnson, PEGEC Consultant Project Manager
Florida Department of TransportationP.O. Box 1249
Bartow, FL 33831
863-519-2834
Michael.Johnson@dot.state.fl.us
Or submit through the websites at:swflroads.com/us41/benevatocaribbean
swflroads.com/us41/caribbeantostickneypoint 31
Florida Department of Transportation
Concept plans are available at:
Gulf Gate Public Library7112 Curtiss Ave, Sarasota, FL 34231.
Hours:Monday through Thursday 10 a.m. to 6 p.m.,
Friday and Saturday from 10 a.m. through 5 p.m. and closed Sunday
32
Florida Department of Transportation
top related