facilities construction - home | northside … construction n. no. or. ... plumbing rough-in and...

Post on 20-Mar-2018

217 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Facilities Construction

NNOORRTTHHSSIIDDEE IINNDDEEPPEENNDDEENNTT SSCCHHOOOOLL DDIISSTTRRIICCTT

Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS

Ceasar Ponce, A.I.A. EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING

Paul Megerle DIRECTOR OF FACILITIES CONSTRUCTION

2010 BOND

June 2015

Kallison Ranch High School

KALLISON RANCH HIGH SCHOOL

Architect – Garza Bomberger & Associates Project Architect – Roy Lewis NISD Project Manager – Jim Berg Contractor – Joeris General Contractor GMP - $110,800,000.00 Construction Period – October 2014 – May 2017 (25% Complete) Project Scope – New 2800 Student High School

Building Permit and Notice to Proceed issued October 8, 2014. Site Construction began October 14, 2014. Site Grading, Piers, 1st ,2nd and 3rd Floor Framing and Columns, Underground Utilities in progress. Interior CMU partitions ongoing. Electrical, plumbing rough-in and hydronic piping started. Foundation Piers complete. Ductwork started.

KALLISON RANCH HIGH SCHOOL Aerial View (May 19, 2015)

KALLISON RANCH HIGH SCHOOL Front Entrance

KALLISON RANCH HIGH SCHOOL (June 8, 2015)

KALLISON RANCH HIGH SCHOOL (June 8, 2015)

KALLISON RANCH HIGH SCHOOL (June 8, 2015)

BOLDT ELEMENTARY SCHOOL (Formerly REDBIRD RANCH)

Architect – Noonan Rittimann Project Architect – John Rittimann NISD Project Manager – Thomas Curiel Contractor – Joeris General Contractor Construction Cost - $20,590,731.00 Construction Period – February 2014 – June 16, 2015 (96% Complete) Project Scope – New 800 Student Elementary School

Final punch inspections and misc. MEP and painting in final stages.

BOLDT ELEMENTARY SCHOOL (Formerly REDBIRD RANCH) Aerial View (May 19, 2015)

BOLDT ELEMENTARY SCHOOL Front Entrance Perspective

BOLDT ELEMENTARY SCHOOL (Formerly REDBIRD RANCH) (June 10, 2015)

BOLDT ELEMENTARY SCHOOL (Formerly REDBIRD RANCH) (May 29, 2015)

BOLDT ELEMENTARY SCHOOL (Formerly REDBIRD RANCH) (May 29, 2015)

ELEMENTARY SCHOOL ISMS – (Integrated Security Mgmt System)

Consultant – Combs Consulting Group NISD Project Manager – Charles Pereira Contractor – Convergint Technologies Contract Amount – $13,422,826.29 Adjusted Contract Amount - $14,014,006.38 Total Contract Completed - $12,008,197.99 Contract Balance to Finish - $2,005,808.39 Construction Period – January 23,2013 – October 2015 Project Scope – Provide security surveillance cameras, access control

and integrate the existing intrusion alarm, motion and glass break sensors at all (75) elementary schools and (2) middle schools.

(90% Complete)

ELEMENTARY SCHOOL ISMS – (Integrated Security Mgmt System)

Project Scope – continues

75 Elementary School Campuses have Punch List inspections completed

2 Middle School Campuses have Punch List inspections completed

75 Elementary School Campuses have Equipment and Software training

2 Middle School Campuses have Equipment and Software training

70 Campuses have Substantial Completion Certificates issued. 77 Campuses are cut over Integrated and have received training. 65 Close-Out documents have been received.

NORTHSIDE SPORTS GYM

Architect – Marmon Mok Project Architect – Monty Howard NISD Project Manager – Thomas Curiel Contractor – Bartlett Cocke General Contractor Construction Budget – $26,326,724.00 Construction Period – May 2015 – October 2016 (1% Complete) Project Scope – Provide a District-Wide Sports Gymnasium at the Farris

Complex. GMP approved at the April Board Meeting. Site work demolition and grading in progress.

SPORTS GYM Site Plan

NORTHSIDE SPORTS GYM – Plaza View

NORTHSIDE SPORTS GYM – Entry View

NORTHSIDE SPORTS GYM – Seating View

NORTHSIDE SPORTS GYM – Corner View

VILLAGE at WESTPOINTE EAST ELEMENTARY SCHOOL

Architect – Noonan Rittimann Project Architect – John Rittimann NISD Project Manager – Chris Parker Contractor – Bartlett Cocke General Contractor Construction Amount - $25,371,707.00 Construction Period – April 2015 – June 30, 2016 (4% Complete) Project Scope – New 800 Student Elementary School

Building layout and pad construction in progress. Pier drilling and concrete form work in progress. Permanent permit approved by COSA. Underground utilities in progress.

VILLAGE at WESTPOINTE EAST ELEMENTARY SCHOOL (Front Entrance)

VILLAGE at WESTPOINTE EAST ELEMENTARY Aerial View (June 8, 2015)

VILLAGE at WESTPOINTE EAST ELEMENTARY SITE PLAN (May 5, 2015)

FM 471 # 3 ELEMENTARY SCHOOL

Architect – O’Neill Conrad Oppelt Project Architect – Mark Oppelt NISD Project Manager – Marilyn Sevedge Contractor – Joeris General Contractor Contract Amount - $24,615,127.00 Construction Period – April 2015 – June 30, 2016 (6% Complete) Project Scope – New 800 Student Elementary School

Conditional permit issued for foundation issued (including piers, underground utilities, excluding fire line). Pier drilling in progress. Site grading and pilot channel in progress.

FM 471 # 3 ELEMENTARY SCHOOL Aerial View (May 19, 2015)

FM 471 # 3 ELEMENTARY SCHOOL Front Entrance

FM 471 # 3 ELEMENTARY SCHOOL Site Plan

O’CONNOR HIGH SCHOOL AG UPGRADES

Architect – Shawn Kaarlsen & Associates Project Architect – Shawn Kaarlsen NISD Project Manager – Chris Parker Contractor – Baron-Long Construction, LTD Contract Amount - $818,000.00 Construction Period – March 2015 – July 2015 (18% Complete) Project Scope - Reconfigure Barns and Shop Renovation.

Classroom framing in progress. Pen panels installed at “R” building. Heaters and plumbing installation in progress.

O’CONNOR HIGH SCHOOL AG UPGRADES (“R” Building Plan)

O’CONNOR HIGH SCHOOL AG UPGRADES (“S” Building Plan)

O’CONNOR HIGH SCHOOL AG UPGRADES (“N and Q” Building Plans)

O’CONNOR HIGH SCHOOL AG UPGRADES (June 8, 2015)

O’CONNOR HIGH SCHOOL AG UPGRADES (June 8, 2015)

SECURITY LOBBIES AT (8) CAMPUSES

Architect – NextGen Architects Project Architect – Joel Hernandez NISD Project Manager – Marilyn Sevedge Contractor – Marksmen Construction Contract Budget - $1,047,775.00 Construction Period – March 2015 – August 3, 2015 (10% Complete) Project Scope – New Security Lobby for (8) Elementary Schools

Under construction has begun. Demo work near completion. CMU underway and millwork is being delivered.

SECURITY LOBBIES AT (8) CAMPUSES - McDermott Elementary (June 10, 2015)

SECURITY LOBBIES AT (8) CAMPUSES - Meadow Village Elementary (June 10, 2015)

SECURITY LOBBIES AT (8) CAMPUSES – Valley Hi Elementary (June 10, 2015)

NEFF MIDDLE SCHOOL ADA / WINDOW REPLACEMENT

Architect – Garza Architects Project Architect – Jesse Garza NISD Project Manager – Thomas Curiel Contractor – D.L. Bandy Construction Amount - $3,565,000.00 Construction Period – May 2015 – October 2015 (1% Complete) Project Scope – Window Replacement ADA Upgrade; ALE Renovation and

Drainage. Demolition and abatement underway.

NEFF MIDDLE SCHOOL ADA / WINDOW REPLACEMENT (Site Plan)

NEFF MIDDLE SCHOOL ADA / WINDOW REPLACEMENT (South Elevation)

NEFF MIDDLE SCHOOL ADA / WINDOW REPLACEMENT (North Elevation)

NEFF MIDDLE SCHOOL ADA / WINDOW REPLACEMENT (East Elevation)

NEFF MIDDLE SCHOOL ADA / WINDOW REPLACEMENT (June 10, 2015)

CLARK HS/ SCOBEE ES/ VILLARREAL ES - FLOORING REPLACEMENT

Architect – Chris Lammers Project Architect – Chris Lammers NISD Project Manager – Chris Parker Contractor – Gomez Floor Covering Construction Budget - $181,318.00 Construction Period – May 2015 – August 2015 (0% Complete) Project Scope – Replace Flooring

Meetings with campuses complete. Materials have been ordered and move out in progress.

MARY HULL ES/JORDAN MS/NEFF MS/PEASE MS/STEVENSON MS/TAFT HS – 2015 DOOR HARDWARE PROJECT

Architect – Munoz & Company Project Architect – Randy Hohlaus NISD Project Manager – Jim Berg Contractor – Central Builders Construction Budget - $406,620.00 Tentative Construction Period – May 29, 2015 – August 2015 (0% Complete) Project Scope – Improvements and Upgrades of Door Hardware for Safety

and Security. Notice of Award issued to Custom Builders April 29, 2015.

HOLMES HS/MARSHALL HS/NEFF MS/RAYBURN MS/HARDIN COMPLEX SOCCER FACILITY ATHLETIC UPGRADES & RENOVATIONS

Architect – NextGen Architects Project Architect – Joel Hernandez NISD Project Manager – Chris Parker Contractor – STI General Contractors Construction Budget - $1,387,000.00 Tentative Construction Period – June 1, 2015 – August 3, 2015 Project Scope – Renovate Athletic/PE Areas; Replace Soccer Field

Portable Building with Permanent Building. Construction documents complete. Proposals received May 6, 2015. Mobilization in progress.

RUDDER MIDDLE SCHOOL SCIENCE LAB ADDITION

Architect – Alamo Architects Project Architect – Jerry Lammers NISD Project Manager – Jim Berg Contractor – D.L. Bandy Contract Amount - $4,782,000.00 Tentative Construction Period – May 15, 2015 – August 1, 2016 Project Scope – New Science Classroom Addition and Renovation.

Notice of Award issued to D.L. Bandy April 29, 2015. Temporary fencing in place. Office set up and site work has begun.

RUDDER MIDDLE SCHOOL SCIENCE LAB ADDITION (New Site Plan)

RUDDER MIDDLE SCHOOL SCIENCE LAB ADDITION (Perspective)

RUDDER MIDDLE SCHOOL SCIENCE LAB ADDITION (1st Floor Plan)

RUDDER MIDDLE SCHOOL SCIENCE LAB ADDITION (2nd Floor Plan)

RUDDER MIDDLE SCHOOL SCIENCE LAB ADDITION (June 10. 2015)

LUNA MIDDLE SCHOOL CLASSROOM ADDITION

Architect – Garza Bomberger & Associates Project Architect – Roy Lewis NISD Project Manager – Thomas Curiel Contractor – Guido Brothers Construction Construction Amount - $3,198,000.00 Tentative Construction Period – June 2015 – June 2016 Project Scope – New Classroom Addition

LUNA MIDDLE SCHOOL CLASSROOM ADDITION (Site Plan)

LUNA MIDDLE SCHOOL CLASSROOM ADDITION (1st Floor Plan)

LUNA MIDDLE SCHOOL CLASSROOM ADDITION (2nd Floor Plan)

LUNA MIDDLE SCHOOL CLASSROOM ADDITION (Elevation)

CHILD NUTRITION WAREHOUSE - Warehouse Renovation

Architect – Shawn Kaarlsen & Associates Project Architect – Shawn Kaarlsen NISD Project Manager – Marilyn Sevedge Contractor – TBD Construction Budget - $3,000,000.00 Tentative Construction Period – January 2016 – May 2016 Project Scope – Warehouse Renovation

GLENOAKS ELEMENTARY - Administration Upgrades

Architect – NextGen Architects Project Architect – Joel Hernandez NISD Project Manager – Marilyn Sevedge Contractor – TBD Construction Budget - $3,750,000.00 Tentative Construction Period – March 2016 – March 2017 Project Scope – Administration Upgrades

ALLEN ES CLASSROOM - (ADDITION/ADA/WINDOW UPGRADES)

Architect – Shawn Kaarlsen & Associates Project Architect – Shawn Kaarlsen NISD Project Manager – Chris Parker Contractor – TBD Construction Budget - $6,230,000.00 Tentative Construction Period – March 2016 – August 2016 Project Scope – Classroom Addition/ADA/Window Upgrades

CODY ES & LEON VALLEY ELEMENTARY - (CAFE & KITCHEN RENOVATIONS)

Architect – Garza Architects Project Architect – Jesse Garza NISD Project Manager – Tom Curiel Contractor – TBD Construction Budget - $6,500,000.00 Tentative Construction Period – February 2016 – August 2016 Project Scope – Renovations to Cafeteria and Kitchen

ZACHRY MS BUS CANOPY MODIFICATIONS

Architect – Alamo Architects Project Architect – Jerry Lammers NISD Project Manager – Jim Berg Contractor – TBD Construction Budget - $1,100,000.00 Tentative Construction Period – February 2016 – July 2016 Project Scope – Bus Canopy Modifications

LOCKE HILL ES, THORNTON ES, LEON VALLEY ES, POWELL ES, COON ES, MICHAEL ES, MARY HULL ES AND CABLE ES - (SECURITY LOBBIES)

Architect – NextGen Architects Project Architect – Joel Hernandez NISD Project Manager – Marilyn Sevedge Contractor – TBD Construction Budget - $480,000.00 Tentative Construction Period – January 2016 – August 2016 Project Scope – Security Lobbies

BLOCK AQUATICS – ROOFING PROJECT

Roofing Consultant – Hollon + Cannon Contractor – CT Construction Contract Amount – $45,998.00 Construction Period – June – August 14, 2015 (95% Complete) Project Scope – Roof Repair & Replacement

CARSON ELEMENTARY – ROOFING PROJECT

Roofing Consultant – Raba Kistner Contractor – Port Enterprises Contract Amount – $861,203.00 Construction Period – June – August 2015 (1% Complete) Project Scope – Roof Repair & Replacement.

Staging in progress.

CODY ELEMENTARY – ROOFING PROJECT

Roofing Consultant – Hollon + Cannon Contractor – Cram Roofing Contract Amount – $289,210.00 Construction Period – June – August 2015 (1% Complete) Project Scope – Roof Repair & Replacement.

Staging in progress.

JORDAN MIDDLE SCHOOL – ROOFING PROJECT

Roofing Consultant – Austech Engineering Contractor – Port Enterprises Contract Amount – $1,822,741.00 Construction Period – June – August 21, 2015 (5% Complete) Project Scope – Roof Repair & Waterproofing.

Staging in progress.

STEVENSON AND STINSON MIDDLE SCHOOL – ROOFING PROJECT

Roofing Consultant – Hollon + Cannon Contractor – Cram Roofing Contract Amount – $566,300.00 Construction Period – June – August 2015 (1% Complete) Project Scope – Roof Repair & Waterproofing.

Staging in progress.

top related