FacilitiesUpdate

Palos Verdes PeninsulaBoard of Education MeetingDecember 9, 2015

1

CompletedProjects

2

3

Peninsula High School Teen Court

4

BEFORE

5

AFTER

6

JUDGES BENCH

JURY BOX

PalosVerdesIntermediateSchool

7

Eagle Scout Project

8

Girl Scout Project

9

10

Replacement of lockers in the 800 Building.Project funded by Booster Club and PTA.

11

UpcomingProjects

12

MiralesteIntermediateSchool

13

14

Lunada BayLittleLeague

15

16Aerial View of Lunada Bay Little League Major Field ‐ South

LBLLARTIFICIALTURF• Inner field project on the Major Field only• Cost $27,542• Benefits

• Safety to all participants• Condition of field• LBLL Participants• Challenger Program

• Physical Disabilities, including wheelchairs

• Reduction in water costs approximately 30%• Reduction in overall maintenance costs approximately 40%

• Expansion of Artificial Turf• Proven Cost Savings• Further Fundraising