faa national airspace system weather office jpdo weather ipt · mark andrews lisa bee operations...
Post on 16-Oct-2020
0 Views
Preview:
TRANSCRIPT
1
FAA National Airspace System Weather Office
JPDO Weather IPTLisa Bee
Director, FAA NAS Weather OfficeDeputy Lead, JPDO Weather IPT
September 12, 2005
Lisa.bee@faa.gov(202) 385-7697
2
Weather IPT Structure
ObservationsJohn Murray (NASA)
Mark Weber(Lincoln)
Systems EngArnold Lee (IAI)
Weather IPTMark AndrewsJohn McCarthy
Lisa Bee
PolicyRick heuwinkel (FAA)
IntegrationSteve Green (NASA)
Gene Wilhelm(CAASD)
ForecastBruce Carmichael
(NCAR)Kevin Johnston
(NWS)
Aircraft MitigationPaul Stough (NASA)
DisseminationKen Leonard (FAA)Richard Deininger
(Boeing)
TrainingAl Kaehn (NOAA)
Bill Phaneuf (ALPA)Jeremy Andrucyk
(NWS)
3
Air Traffic Organization
4
Weather Program Challenges
Institutional Change• Joint Planning and Development Organization (September 2003)• FAA Air Traffic Organization (February 2004)
1995 NRC Report, Activity Value Analysis, Interviews• FAA Weather Program is fragmented
– Lacks central coordination and prioritization– Too many systems with similar capabilities
• Wx R&D:– Implementation too slow– Not aligned with operational priorities– External User Input inadequate
• NAS-Wide Weather Requirements– No NAS-Wide set of weather requirements– No NAS-Wide requirement priorities established– No formal assignment of requirements to NWS– R&D not driven by operational requirements
5
FAAFlight Plan
ATO Strategic Management Plan
Enterprise Architecture
FAA Flight Plan
ATO StrategicManagement Plan
•Enterprise Architecture
•Aviation WeatherMission Needs Statement
•Aviation Weather Architecture Roadmap
•NAS Weather RequirementsF&E R&D OPS
2005
2010
2015
2020
NGATS2025
JPDO Weather IPT
6
FAAFlight Plan
ATO Strategic Management Plan
Enterprise Architecture
FAA Flight Plan
ATO StrategicManagement Plan
•Enterprise Architecture
•Aviation WeatherMission Needs Statement
•Aviation Weather Architecture Roadmap
•NAS Weather RequirementsF&E R&D OPS
2005
2010
2015
2020
NGATS2025
JPDO Weather IPT
Minimize impact of weather on the operations
7
FAAFlight Plan
ATO Strategic Management Plan
Enterprise Architecture
FAA Flight Plan
ATO StrategicManagement Plan
•Enterprise Architecture
•Aviation WeatherMission Needs Statement
•Aviation Weather Architecture Roadmap
•NAS Weather RequirementsF&E R&D OPS
2005
2010
2015
2020
NGATS2025
JPDO Weather IPT
Minimize impact of weather on the operations
ForecastConcept
CapabilitiesSystems
8
Weather Planning
9
Weather Planning
SafetyWilliam Davis
CommunicationsSandra Sanchez
Operations Planning
Charles Keegan
FinanceEugene Juba
Acquisition and Business ServicesDennis DeGaetano
En Route and Oceanic
Richard Day
TerminalDavid Johnson
Flight ServicesJames
Washington
System OperationsMichael Cirillo
Technical Operations
Steven Zaidman
InternationalVictoria Cox
Office of StrategyDavid Chin
Performance Analysis
Paula Lewis
System EngineeringJim Williams
Technology DevelopmentWilson Felder
Research and DevelopmentJoan Bauerlein
WJ Hughes Technical Center
Anne Harlan
NAS Weather Lisa Bee
Chief Operating Officer Russell Chew
JPDOCharles Keegan
Weather IPTMark Andrews
Lisa Bee
Operations Planning
Administration Brenda Willingham
Operations PlanningComptroller
Joe Martirone
Operational Evolution PlanGisele Mohler
AWTTConstruct
National Weather Service
AVSFlight Standards
10
Weather Planning
SafetyWilliam Davis
CommunicationsSandra Sanchez
Operations Planning
Charles Keegan
FinanceEugene Juba
Acquisition and Business ServicesDennis DeGaetano
En Route and Oceanic
Richard Day
TerminalDavid Johnson
Flight ServicesJames
Washington
System OperationsMichael Cirillo
Technical Operations
Steven Zaidman
InternationalVictoria Cox
Office of StrategyDavid Chin
Performance Analysis
Paula Lewis
System EngineeringJim Williams
Technology DevelopmentWilson Felder
Research and DevelopmentJoan Bauerlein
WJ Hughes Technical Center
Anne Harlan
NAS Weather Lisa Bee
Chief Operating Officer Russell Chew
JPDOCharles Keegan
Weather IPTMark Andrews
Lisa Bee
Operations Planning
Administration Brenda Willingham
Operations PlanningComptroller
Joe Martirone
Operational Evolution PlanGisele Mohler
AWTTConstruct
National Weather Service
AVSFlight Standards
11
Future Challenges
• Anticipating and Responding to a Changing NAS– Operational Environment– Economics – Politics
• Fiscal Constraints
• Shifting Culture and Policy– Within and Between Agencies, Operators, Airspace Users
top related