1

EXHIBIT 1

SOUTH CARGO EAST SIDE DOOR REPLACEMENT July 2016

2

CE26 CE25 CE24

SUITE 1

3

SUITE 2

CE23 CE22 CE21

CE20 CE19 CE18

CE17

4

SUITE 3

CE16 CE15 CE14 CE13

Partition Wall

5

SUITE 4

CE12

Partition Wall

SUITE 5

CE11 CE10 CE9

6

There is no door CE8.

SUITE 6 SUITE 7

CE7 CE6 CE5 CE4 CE3 CE2 CE1

7

Suite 1 - CE26P Currently RH Manual Chain Operator Change to LH Operator 208V 3P. Mount to left of conduit and extend spring shaft (from center of door to end of extended shaft approximately 7’ 7”) GSP to provide power to operator disconnect

8

Suite 1 - CE26P Note: Do not mount operator to RH wall, there is no lintel where block was cut out for store front.

9

Suite 1 - CE25 Currently LH Electric – 208V 3P Go back with LH 208V 3P – Use existing disconnect.

10

Suite 1 – CE24 Currently RH Manual Chain Operator Change to LH Electric 208V 3P GSP to provide power to disconnect

11

Suite 2 – CE23 Currently no operator Change to LH electric 208V 3P GSP to re-route receptacle conduit

12

Suite 2 – CE22 Currently RH 230V 1P operating on 208V 1P Change to RH 208V 3P GSP to provide power to operator disconnect

13

Suite 2 – CE21P Currently RH 208V 1P Change to LH 208V 3P GSP to re-route 2 conduits GSP to provide power to new 3P operator disconnect

14

Suite 2 – CE20 Currently RH Manual Chain Operator Change to RH electric 208V 3P GSP to provide power to operator disconnect

15

Suite 2 – CE19 Currently RH Manual Chain Operator Change to RH electric 208V 3P GSP to provide power to operator disconnect

16

Suite 2 – CE18 Currently RH Manual Chain Operator Change to RH electric 208V 3P GSP to provide power to operator disconnect

17

Suite 2 – CE17 Currently RH Manual Chain Operator Change to RH electric 208V 3P GSP to provide power to operator disconnect

18

Suite 3 - CE16P Currently RH Manual Chain Operator Go back with RH Manual Chain Operator

19

Suite 3 - CE16P Note: Door not usable for loading/unloading with lift truck

20

Suite 3 – CE15 Currently RH Electric 480V 3P Direct Coupled Gear Reducer Go back with RH 480V 3P operator Use existing disconnect

21

Suite 3 – CE14 Currently RH Manual Chain Operator Change to LH Electric 480V 3P GSP to provide power to operator disconnect

22

Suite 3 – CE13 Currently RH Manual Chain Operator Go back with RH Manual Chain Operator GSP to remove section of partition wall; Delta to move air compressor

23

Suite 4 – CE12 Currently RH Manual Chain Operator Change to LH 480V 3P Operator GSP to provide power to operator disconnect (get power from Suite 3 – same breaker as CE12 & CE10)

24

Suite 4 – CE11 Currently RH Manual Chain Operator Change to RH Electric 480V 3P Operator GSP to provide power to operator disconnect (get power from Suite 3 – same breaker as CE12 & CE10)

25

Suite 4 – CE10 Currently RH Manual Chain Operator Change to RH 480V 3P Operator GSP to provide power to operator disconnect (get power from Suite 3 – Same breaker as CE11 & CE12)

26

Suite 5 – CE9 Currently RH Manual Chain Operator Change to LH 208V 3P GSP to provide power to operator disconnect (tie onto circuit with CW5)

27

There is no Door CE8

Suite 6 – CE7 Currently RH Manual Chain Operator Go back with RH Manual Chain Operator

28

Suite 6 – CE7 Door not usable for loading/unloading with lift truck

29

Suite 6 – CE6 (American) Currently RH Electric Operator – Chain driven Remove existing photo eye(s) (Change to constant contact) RE-USE EXISTING OPERATOR – REPLACE ALL OTHER COMPONENTS

30

Suite 7 – CE5P Currently RH Manual Chain Operator Change to LH 208V 3P GSP to provide power to operator disconnect (put on same circuit as CE1)

31

Suite 7 – CE4 Currently LH Electric 208V 3P Go back with LH Electric – 208V 3P Use existing disconnect

32

Suite7 – CE3 Currently RH Electric 208V 3P Go back with RH Electric 208V 3P Use existing disconnect

33

Suite 7 – CE2P Currently RH Electric – 208V 3P Go back with RH Electric - 208V 3P Use existing disconnect

34

Suite 7 – CE1 Currently RH Electric – 120V 1P Go back with RH Electric – 208V 3P GSP to provide power to 3P operator disconnect (use breaker currently used for air compressor)