EXHIBIT 1

SOUTH CARGO EAST SIDE DOOR REPLACEMENT July 2016

Page 2: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

2

CE26 CE25 CE24

SUITE 1

Page 3: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

3

SUITE 2

CE23 CE22 CE21

CE20 CE19 CE18

CE17

Page 4: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

4

SUITE 3

CE16 CE15 CE14 CE13

Partition Wall

Page 5: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

5

SUITE 4

CE12

Partition Wall

SUITE 5

CE11 CE10 CE9

Page 6: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

6

There is no door CE8.

SUITE 6 SUITE 7

CE7 CE6 CE5 CE4 CE3 CE2 CE1

Page 7: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

7

Suite 1 - CE26P Currently RH Manual Chain Operator Change to LH Operator 208V 3P. Mount to left of conduit and extend spring shaft (from center of door to end of extended shaft approximately 7’ 7”) GSP to provide power to operator disconnect

Page 8: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

8

Suite 1 - CE26P Note: Do not mount operator to RH wall, there is no lintel where block was cut out for store front.

Page 9: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

9

Suite 1 - CE25 Currently LH Electric – 208V 3P Go back with LH 208V 3P – Use existing disconnect.

Page 10: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

10

Suite 1 – CE24 Currently RH Manual Chain Operator Change to LH Electric 208V 3P GSP to provide power to disconnect

Page 11: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

11

Suite 2 – CE23 Currently no operator Change to LH electric 208V 3P GSP to re-route receptacle conduit

Page 12: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

12

Suite 2 – CE22 Currently RH 230V 1P operating on 208V 1P Change to RH 208V 3P GSP to provide power to operator disconnect

Page 13: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

13

Suite 2 – CE21P Currently RH 208V 1P Change to LH 208V 3P GSP to re-route 2 conduits GSP to provide power to new 3P operator disconnect

Page 14: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

14

Suite 2 – CE20 Currently RH Manual Chain Operator Change to RH electric 208V 3P GSP to provide power to operator disconnect

Page 15: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

15

Suite 2 – CE19 Currently RH Manual Chain Operator Change to RH electric 208V 3P GSP to provide power to operator disconnect

Page 16: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

16

Suite 2 – CE18 Currently RH Manual Chain Operator Change to RH electric 208V 3P GSP to provide power to operator disconnect

Page 17: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

17

Suite 2 – CE17 Currently RH Manual Chain Operator Change to RH electric 208V 3P GSP to provide power to operator disconnect

Page 18: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

18

Suite 3 - CE16P Currently RH Manual Chain Operator Go back with RH Manual Chain Operator

Page 19: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

19

Suite 3 - CE16P Note: Door not usable for loading/unloading with lift truck

Page 20: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

20

Suite 3 – CE15 Currently RH Electric 480V 3P Direct Coupled Gear Reducer Go back with RH 480V 3P operator Use existing disconnect

Page 21: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

21

Suite 3 – CE14 Currently RH Manual Chain Operator Change to LH Electric 480V 3P GSP to provide power to operator disconnect

Page 22: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

22

Suite 3 – CE13 Currently RH Manual Chain Operator Go back with RH Manual Chain Operator GSP to remove section of partition wall; Delta to move air compressor

Page 23: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

23

Suite 4 – CE12 Currently RH Manual Chain Operator Change to LH 480V 3P Operator GSP to provide power to operator disconnect (get power from Suite 3 – same breaker as CE12 & CE10)

Page 24: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

24

Suite 4 – CE11 Currently RH Manual Chain Operator Change to RH Electric 480V 3P Operator GSP to provide power to operator disconnect (get power from Suite 3 – same breaker as CE12 & CE10)

Page 25: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

25

Suite 4 – CE10 Currently RH Manual Chain Operator Change to RH 480V 3P Operator GSP to provide power to operator disconnect (get power from Suite 3 – Same breaker as CE11 & CE12)

Page 26: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

26

Suite 5 – CE9 Currently RH Manual Chain Operator Change to LH 208V 3P GSP to provide power to operator disconnect (tie onto circuit with CW5)

Page 27: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

27

There is no Door CE8

Suite 6 – CE7 Currently RH Manual Chain Operator Go back with RH Manual Chain Operator

Page 28: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

28

Suite 6 – CE7 Door not usable for loading/unloading with lift truck

Page 29: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

29

Suite 6 – CE6 (American) Currently RH Electric Operator – Chain driven Remove existing photo eye(s) (Change to constant contact) RE-USE EXISTING OPERATOR – REPLACE ALL OTHER COMPONENTS

Page 30: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

30

Suite 7 – CE5P Currently RH Manual Chain Operator Change to LH 208V 3P GSP to provide power to operator disconnect (put on same circuit as CE1)

Page 31: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

31

Suite 7 – CE4 Currently LH Electric 208V 3P Go back with LH Electric – 208V 3P Use existing disconnect

Page 32: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

32

Suite7 – CE3 Currently RH Electric 208V 3P Go back with RH Electric 208V 3P Use existing disconnect

Page 33: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

33

Suite 7 – CE2P Currently RH Electric – 208V 3P Go back with RH Electric - 208V 3P Use existing disconnect

Page 34: EXHIBIT 1 - GSP International Airportgspairport.com/site/user/files/39/Project---South... · 1 . EXHIBIT 1 . SOUTH CARGO EAST SIDE DOOR REPLACEMENT . July 2016 . 2 . CE26 CE25 CE24

34

Suite 7 – CE1 Currently RH Electric – 120V 1P Go back with RH Electric – 208V 3P GSP to provide power to 3P operator disconnect (use breaker currently used for air compressor)