etowah water & sewer authority 6th annual workshop fy14 ... · excellence integrity stewardship...

Post on 26-Aug-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

1

Etowah Water & Sewer Authority

6th Annual Workshop

FY14 PLANNING WORKSHOP

“The Road Less Traveled”

October 1-2, 2013

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

MEETING TOPICS

Tuesday - October 1, 2013 • Introduction

• Growth Indicators

• Flow Projections

• Recommended Operating Budget

• Recommended 10-Year Capital Improvements Program

• Recommended Comprehensive Funding Program

2

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

MEETING TOPICS

Wednesday, October 2, 2013

• “The Road Less Traveled“ Discussion

• Yearly Review

3

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

INTRODUCTION

PRIMARY PURPOSES: • Present recommended FY14 Operating Budget

• Present recommended FY14 Ten Year Capital

Improvements Program

• Present recommended FY14 Comprehensive Funding Program

• Strategic planning for future

ACTION ITEMS: • Work Session & Board Meeting – November 2013

4

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

INTRODUCTION

PRIMARY GOALS FOR PLANNING HORIZON:

• Strengthen the Authority’s service delivery

• Enhance operating revenue to cover operating expenses

and debt service

• Reduce the impact of economic variability on the

Authority (current & future)

• Respond to growth as it returns to Dawson County

5

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

“Two roads diverged in a wood, and I,

I took the one less traveled by,

And that has made all the difference.”

Robert Frost

INTRODUCTION

6

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

MEETING TOPICS

Tuesday – October 1, 2013 • Introduction

• Growth Indicators

• Flow Projections

• Recommended Operating Budget

• Recommended 10-Year Capital Improvements Program

• Recommended Comprehensive Funding Program

7

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

GROWTH

INDICATORS

8

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

980

1160

2322

3520

4539

5035 5035 5052 5064 5067

0

1,000

2,000

3,000

4,000

5,000

6,000

1986 1990 1995 2000 2005 2009 2010 2011 2012 2013*

Custo

mers

Fiscal Year

GROWTH INDICATORS

Water Customer Growth

Active Accounts

*As of September 1, 2013

9

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

24 39 53

110

212

337 340 354 355 360

0

50

100

150

200

250

300

350

400

1997 1998 1999 2000 2005 2009 2010 2011 2012 2013*

Custo

mers

Fiscal Year

GROWTH INDICATORS

Wastewater Customer Growth

Active Accounts

*As of September 1, 2013

10

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Water Meters Sold

33 11 18 11 5 7 4 2 2 6

245

224 217

193

100

22 24 23 17 22

0

50

100

150

200

250

300

1997 2000 2005 2007 2008 2009 2010 2011 2012 2013*

Mete

rs S

old

Fiscal Year

Commercial Residential

278

235

25 19

GROWTH INDICATORS

*As of September 1, 2013

235

105

204

29 28 28

11

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

New Wastewater Accounts

10

14

5

14

2

4

1 2

6

4 7

0

10

20

1997 1999 2000 2005 2010 2011 2012 2013*

Accoun

ts

Fiscal Year

Commercial Residential

GROWTH INDICATORS

*As of September 1, 2013

12

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Water Distribution System Summary

GROWTH INDICATORS

47.00 52.74

119.70

141.35

157.23

174.22 174.78 174.81

182.64

0

50

100

150

200

1986 1990 1995 2000 2005 2009 2010 2011 2012

Len

gth

in

Mil

es

Fiscal Year

13

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Wastewater Collection System Summary

GROWTH INDICATORS

7.21

8.23

13.41

21.5 21.95 22.54 22.58 22.58

0

5

10

15

20

25

1995 2000 2005 2008 2009 2010 2011 2012

Len

gth

in

Mil

es

Fiscal Year

Totals do not include 6.28 miles of gravity sewer constructed by Dawson County and maintained by Etowah Water & Sewer

Authority.

14

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Utilities Protection Center Locates

3,076

3,701

2,585

1,474 1,391

1,673

2,305

1,574

0

500

1000

1500

2000

2500

3000

3500

4000

2006 2007 2008 2009 2010 2011 2012 2013*

Locate

s

Calendar Year

GROWTH INDICATORS

* As of September 1, 2013

15

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Operating Revenue Profile

GROWTH INDICATORS

2.47 2.60 2.87

3.22 3.57

3.17

0.49 0.51

0.55

0.63

0.69

0.74

0.18 0.15

0.12

0.18

0.12

0.13

0

1

2

3

4

5

FY08 Actual FY09 Actual FY10 Actual FY11 Actual FY12 Actual FY13

Projected

Water Sales Sewer Sales Other

Mil

lions o

f D

oll

ars

$3.54

$4.04

$3.14 $3.26

$4.03

16

$4.38

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Water Billing Volumes

83 71 67 72 76 78

301

282 281 300 288

261

0

50

100

150

200

250

300

350

400

450

2008 2009 2010 2011 2012 2013*

Mil

lion

s o

f G

all

on

s

Fiscal Year Commercial Residential

384

372

348 353

364

339

*Projected FY13 Billing Volumes

GROWTH INDICATORS

17

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Wastewater Billing Volumes

62 57 57

61 63 65

7

8 6 6

7 7

0

25

50

75

100

2008 2009 2010 2011 2012 2013*

Mil

lion

s o

f G

all

on

s

Fiscal Year Commercial Residential

69 65

63 67

69 72

*Projected FY13 Billing Volumes

GROWTH INDICATORS

18

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Water Comparison Profile*

Water Customers

75%

25%

76%

24%

94%

6%

: Residential

: Commercial

Water Revenue

Water Use

Active Accounts

*As of September 1, 2013

GROWTH INDICATORS

19

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

10%

90%

10%

90%

49% 51%

Wastewater Comparison Profile*

Sewer Customers

Sewer Revenue

Sewer Use

Active Accounts

*As of September 1, 2013

GROWTH INDICATORS

: Residential

: Commercial

20

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Balanced Customer Base

Ten Largest System Customers

Name % of

Billing Revenue

Dawson Leased LLC 5.78%

Chelsea GCA Realty (Outlet Mall) 3.28%

Impulse Manufacturing 1.63%

Walmart 1.41%

Riverwood Properties 1.33%

Applebee’s 0.84%

Celeste Properties 0.79%

Super 8 Motel 0.64%

Ryan’s Family Steakhouse 0.63%

North Georgia Premium Carwash 0.62%

GROWTH INDICATORS

21

* As of September 1, 2013

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Customer Base History

GROWTH INDICATORS

22

Year

End Customer

Billing

Percentage

Year

End Customer

Billing

Percentage

Year

End Customer

Billing

Percentage

2008

Dawson Leased LLC

(Apartments) 3.80% 2009 Dawson Leased LLC (Apartments) 4.29% 2010 Dawson Leased LLC (Apartments) 3.98%

Chelsea GCA Realty (Outlet

Mall) 3.37% Chelsea GCA Realty (Outlet Mall) 3.39% Chelsea GCA Realty (Outlet Mall) 2.47%

Walmart 1.78% Walmart 1.81% Walmart 1.55%

Riverwood Properties (Moe’s) 1.10% Riverwood Properties (Moe’s) 1.28% Riverwood Properties (Moe’s) 1.39%

Bubbles Carwash 1.04%

Celeste Properties (White

Interiors) 0.84%

Celeste Properties (White

Interiors) 1.01%

Best Western 0.85% Bubbles Carwash 0.69% Ryan’s Family Steakhouse 0.72%

Ready Mix USA 0.51% Dawson County Park and Rec. 0.64% Applebee's 0.72%

FCC Inc 0.48% Southern Catholic College 0.63% Rare Hospitality (Longhorns) 0.61%

Ernst Cobb County Inc 0.38% Shade Tree Trailer Park 0.38% Ruby Tuesdays 0.54%

Lumpkin County Water

Authority 0.27%

Lumpkin County Water

Authority 0.36% Kroger 0.54%

Year

End Customer

Billing

Percentage

Year

End Customer

Billing

Percentage

Year

End Customer

Billing

Percentage

2011

Dawson Leased LLC

(Apartments) 4.04% 2012 Dawson Leased LLC (Apartments) 4.52% 2013* Dawson Leased LLC (Apartments) 5.78%

Chelsea GCA Realty (Outlet

Mall) 2.55% Chelsea GCA Realty (Outlet Mall) 3.08% Chelsea GCA Realty (Outlet Mall) 3.28%

Walmart 1.21% Walmart 1.36% Impulse Manufacturing 1.63%

Riverwood Properties (Moe's) 1.17% Impulse Manufacturing 1.04% Walmart 1.41%

Impulse Manufacturing 1.16% Racetrac Petroleum 0.89% Riverwood Properties (Moe’s) 1.33%

Best Western 0.73% Dawson Co. Board of Ed 0.87% Applebee's 0.84%

Applebee's 0.64% Home Depot 0.75%

Celeste Properties (White

Interiors) 0.79%

Rare Hospitality (Longhorns) 0.63% Dawson County Park and Rec. 0.54% Super 8 Motel 0.64%

North GA Premium Carwash 0.54% Ryan’s Family Steakhouse 0.52% Ryan’s Family Steakhouse 0.63%

Dawson County Park and Rec. 0.46% Ruby Tuesday 0.50% North GA Premium Carwash 0.62%

*As of September 1, 2013

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

MEETING TOPICS

Tuesday – October 1, 2013 • Introduction

• Growth Indicators

• Flow Projections

• Recommended Operating Budget

• Recommended 10-Year Capital Improvements Program

• Recommended Comprehensive Funding Program

23

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

FLOW

PROJECTIONS

24

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

0.49 0.8

1.38

2.12 2.22

1.84 2.06 2.07

1.75

0.26

0.46

0.94

1.35 1.21 1.23 1.29 1.33

1.27

0

0.5

1

1.5

2

2.5

3

3.5

4

1992 1995 2000 2005 2009 2010 2011 2012 2013*

Mil

lio

ns

of

Ga

llo

ns

Calendar Year

Maximum Day

Annual Average Day

Water Pumped To System

FLOW PROJECTIONS

25

*As of September 1, 2013

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

FLOW PROJECTIONS

Long-term Projected Maximum Day Water Demands

and Treatment Capacity

3

5.5

11

17.5

0

5

10

15

20

2000 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050

MG

D

Calendar Year

Existing Maximum Day Water Pumped to System

Projected Maximum Day Water Demands - High

Projected Maximum Day Water Demands - Moderate

Projected Maximum Day Water Demands - Low

Existing Treatment Capacity

Planned Treatment Capacity

26

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

FLOW PROJECTIONS

Short-term Projected Maximum Day Water Demands

and Treatment Capacity

3

5.5

0

1

2

3

4

5

6

7

2005 2010 2015 2020 2025

MG

D

Calendar Year

Existing Maximum Day Water Pumped to System

Projected Maximum Day Water Demands - High

Projected Maximum Day Water Demands - Moderate

Projected Maximum Day Water Demands - Low

Existing Treatment Capacity

Projected Demands (Financial Model)

27

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

WASTEWATER

PROJECTIONS

28

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

0.08

0.17

0.24 0.24 0.26 0.26

0.24

0.29

0.05

0.15

0.20

0.23 0.23 0.22 0.22

0.20

0

0.1

0.2

0.3

1997 2000 2005 2009 2010 2011 2012 2013*

Mil

lio

ns

of

Ga

llo

ns

Calendar Year

Maximum Month-Average Day

Annual Average Day

Wastewater Treated

FLOW PROJECTIONS

29

*As of September 1, 2013

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Long-term Projected Wastewater Flows

and Treatment Capacity

FLOW PROJECTIONS

0.5

1

2.5

7.5

5.5

0

2.5

5

7.5

10

2000 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050

MG

D

Calendar Years Existing Maximum Month-Average Day Flows

Projected Flow - High

Projected Flow - Moderate

Projected Flow - Low

Permitted Treatment Capacity

Planned Treatment Capacity

30

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Short-term Projected Wastewater Flows

and Treatment Capacity

FLOW PROJECTIONS

0.3

0.5

1

0

1

2

3

2005 2010 2015 2020 2025

MG

D

Calendar Years

Existing Maximum Month-Average Day Flows

Projected Flow - High

Projected Flow - Moderate

Projected Flow - Low

Permitted Treatment Capacity

Projected Flow (Financial Model)

31

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

MEETING TOPICS

Tuesday – October 1, 2012 • Introduction

• Growth Indicators

• Flow Projections

• Recommended Operating Budget

• Recommended 10-Year Capital Improvements Program

• Recommended Comprehensive Funding Program

32

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

RECOMMENDED

OPERATING BUDGET

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

YEAR OF ACCOMPLISHMENTS

• Prepared Annual Report for FY2012

• Completed 2” and larger meter change outs with staff

• Educated and promoted customers use of Customer Service

Portal

• Optimized customer service payment interface with Billing

Document Specialist

• Improved Water Meter Leak Detection and Leak Adjustment

Programs

• Continued scanning of all old and active Authority files into

Laserfiche Program

• Designed, bid, and managed FY2013 Water Main Improvements

34

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

• Developed contract documents for Water Storage Tank

Maintenance Program

• Develop in-house Right-of-Way Maintenance Program

• Continue to enhance systems reliability with improved

Preventative Maintenance Programs

• Develop Certification Program for each Department

• Continue working with Georgia EPD for lab certification

• Upgraded and improved phone call management and handling

• Hampton Creek WRF Sludge Handling

35

YEAR OF ACCOMPLISHMENTS

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

• Develop Sanitary Sewer System Preventative Maintenance

Program

• Complete lab certification

• Educate and promote use of our website and online bill payment

by our customers

• Designed, bid, and manage FY2014 water main improvements

• Designed, bid, and manage GA 400 Continuous Flow Intersection

Utility Improvements

36

FY14 GOALS AND OBJECTIVES

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

• Implement Industrial Pretreatment Program

• Complete 404 permitting phase of Russell Reservoir Project

• Bid and award Water Storage Tank Maintenance Program

37

FY14 GOALS AND OBJECTIVES

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

OPERATING BUDGET

FY 2014 FY 2013 % Difference

Total Operating Revenue $4,665,900 $4,404,900 6% $261,000

Total Operating Expenses $3,361,442 $3,360,250 0% $1,192

Net Operating Income $1,304,458 $1,044,650 25% $259,808

*In FY2013 we projected FY2014 Operating Expenses: $3,464,148 (Savings = $102,706)

Total Non Operating Revenues $798,311 $765,036 4% $33,275

Total Non Operating Expenses $2,385,002 $2,390,372 0% -$5,370

Net Non Operating Income ($1,586,691) ($1,625,336) 4% $27,905

Transfer from Fund Balance $282,233 $580,686 -51% -$298,453

PROJECTED OPERATING BUDGET SUMMARY

38

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

OPERATING BUDGET

FY 2014 FY 2013 % Difference

Water & Wastewater $4,431,000 $4,220,000 5% $211,000

Tap Fees $21,150 $21,150 0% $0

Late Fees $50,000 $50,000 0% $0

Service Charges $65,800 $65,800 0% $0

Other Income $65,000 $15,000 333% $50,000

Sprinkler Fee $32,950 $32,950 0% $0

Total Revenue $4,665,900 $4,404,900 6% $261,000

OPERATING BUDGET SUMMARY

39

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

OPERATING BUDGET

FY 2014 FY 2013 % Difference Salaries $1,264,000 $1,304,000 -3% -$40,000 Overtime $45,500 $56,500 -19% -$11,000 Performance Increases $37,617 $0 $37,617 Employee Benefits $515,350 $477,000 8% $38,350 Certifications $7,500 $7,500 0% $0 Meters $12,500 $12,500 0% $0 Insurance $82,000 $80,000 2% $2,000 Repairs & Maintenance $98,500 $98,500 0% $0 Sludge Disposal $18,000 $18,000 0% $0 Utilities $348,000 $352,500 -1% -$4,500 Supplies $150,000 $150,000 0% $0 Chemicals $65,000 $65,000 0% $0 Auto $80,850 $87,850 -8% -$7,000 Public Relations $18,000 $18,000 0% $0

PROJECTED OPERATING EXPENSES

40

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

OPERATING BUDGET

FY 2014 FY 2013 % Difference Advertising $12,500 $6,500 92% $6,000 Travel & Food $32,500 $32,500 0% $0 Telephone $37,925 $45,800 -17% -$7,875 Office Supplies $19,200 $23,200 -17% -$4,000 Postage $29,700 $29,700 0% $0 Legal & Accounting $56,000 $56,000 0% $0 Provision for Bad Debt $0 $12,000 -100% -$12,000 Rent $1,600 $0 0% $1,600 Government Fees $12,500 $30,500 -59% $18,000 Contract Labor $305,000 $273,000 12% $32,000 Schooling & Fees $24,900 $37,900 -34% -$13,000 Engineering $11,000 $5,000 120% $6,000 Bank Charges $28,000 $33,000 -15% -$5,000

PROJECTED OPERATING EXPENSES

41

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

OPERATING BUDGET

FY 2014 FY 2013 % Difference

Uniforms $7,800 $7,800 0% $0

Contingency $30,000 $30,000 0% $0

Board Reimbursement $10,000 $10,000 0% $0

Total Operating Expenses $3,361,442 $3,360,250 0% $1,192

Net Operating Income $1,304,458 $1,044,650 25% $259,808

PROJECTED OPERATING EXPENSES

42

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

OPERATING BUDGET

FY 2014 FY 2013 % Difference

Investment Income $42,000 $70,000 -40% -$28,000

CRF Water $197,325 $131,550 50% $65,775

CRF Wastewater $118,850 $95,080 25% $23,770

New Development $30,000 $30,000 0% $0

2012 County Bond $96,136 $101,506 -5% -$5,370

Build America Bond $197,100 $219,000 -10% -$21,900

Credits and Easements $0 $0 0% $0

Operational Reserve $74,000 $74,000 0% $0

Interest Income - 1200 Acres $42,900 $42,900 0% $0

Service Charge on Presales $0 $1,000 -100% -$1,000

Total Non Operating Revenues $798,311 $765,036 4% $33,275

PROJECTED NON-OPERATING REVENUE

43

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

OPERATING BUDGET

FY 2014 FY 2013 % Difference

Interest $2,171,966 $ 2,171,966 0% $0

Interest Expense – 1200 Acres $42,900 $42,900 0% $0

2012 County Bond $96,136 $101,506 -5% -$5,370

Operational Reserve $74,000 $74,000 0% $0

Total Non Operating Expenses $2,385,002 $2,390,372 0% -$5,370

Transfer from Fund Balance $282,233 $580,686 -51% -$298,453

Net Income (Before Depreciation) $0 $0

PROJECTED NON-OPERATING EXPENSES

44

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

OPERATING BUDGET

FY 2013 FY 2012b % Difference

Amortization & Depreciation $1,650,000 $1,600,000 3% $50,000

Amortization $113,000 $75,000 51% $38,000

Total $1,763,000 $1,675,000 5% $88,000

Total Net Income (Loss) -$1,763,000 -$1,675,000 5% -$88,000

PROJECTED NON-OPERATING EXPENSES

45

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

MEETING TOPICS

Tuesday – October 1, 2013 • Introduction

• Growth Indicators

• Flow Projections

• Recommended Operating Budget

• Recommended 10-Year Capital Improvements Program

• Recommended Comprehensive Funding Program

46

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

RECOMMENDED

10-YEAR CAPITAL

IMPROVEMENTS

PROGRAM

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

10-YEAR CAPITAL

IMPROVEMENTS PROGRAM

• Hightower Water Treatment Facility $ 2,200,000

• Russell Creek Reservoir 29,350,000

• Water Main Improvements 4,929,000

– S.R.53/GA400 Utilities Relocation

• Distribution System Improvements 1,850,000

– Water Distribution Storage Tanks Maintenance Program

– Right of Way Clearing & Maintenance

– Lumpkin Campground Elevated Storage Tank

• Water System Studies 750,000

– Watershed Protection Implementation

• Capital Equipment 1,000,000

• Miscellaneous Water System Projects 750,000

Total $40,829,000

WATER SYSTEM PROJECTS

48

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

10-YEAR CAPITAL

IMPROVEMENTS PROGRAM

• Dawson Forest Water Reclamation Facility $625,000

– Belt Press

– Liner in Pond B

• Sewerage System Improvements 1,500,000

• Miscellaneous Wastewater System Projects 500,000

Total $2,650,000

WASTEWATER SYSTEM PROJECTS

49

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

10-YEAR CAPITAL

IMPROVEMENTS PROGRAM

PROPOSED FY14 10-YEAR CIP

WATER SYSTEM PROJECTS $40,829,000

WASTEWATER SYSTEM PROJECTS $2,650,000

TOTAL $43,479,000

APPROVED FY13 10-YEAR CIP

WATER SYSTEM PROJECTS $ 36,975,000

WASTEWATER SYSTEM PROJECTS $ 2,875,000

TOTAL $ 39,850,000

50

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

MEETING TOPICS

Tuesday – October 1, 2013 • Introduction

• Growth Indicators

• Flow Projections

• Recommended Operating Budget

• Recommended 10-Year Capital Improvements Program

• Recommended Comprehensive Funding Program

51

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

RECOMMENDED

COMPREHENSIVE

FUNDING PROGRAM

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

FUNDING PROGRAM

• Models the financial performance of our system

– All revenues, all expenses (CIP and operating)

– Projected through 2023

• Reflects all capital spending needs

– Whether driven by growth, rehabilitation needs, regulatory requirements, or the economy

– Reflects when the need is expected to occur or when the project is financially feasible

Capital Improvements Financing Model

53

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Financing Plan Summary (2013 – 2022)

• FY13 funding sources:

– Cash funded capital $11,000,000

– Series 2010 Bond Funds $3,850,000

– Other $25,000,000

FUNDING PROGRAM

54

• FY14 funding sources:

– Cash funded capital $12,654,000

(Capital Recovery Fees $5,402,060)

– Series 2010 Bond Funds $3,850,000

– GEFA Funds $1,500,000

– Other $25,500,000

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Proposed Rate Increases for FY14

FY2013 Funding Program

FY 2014 Proposed Rate

Increases

(Effective

January 1, 2014)

FY2014 Funding Program

FY 2014 Proposed Rate

Increases

(Effective

January 1, 2014)

Water 5.5% 5.5%

Sewer 6.0% 6.0%

FUNDING PROGRAM

55

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

SERIES 2010 BOND COMPARISON

0

1

2

3

4

5

6

7

8

9

10

11

12

13

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Fiscal Year

Total 2010 Bond Revenue Total FY14 Planned Revenue

2010 Bond Operating Expenses FY14 Operating Expenses

2010 Bond Debt Service FY14 Total Expenses

56

Revenue and Expense Projections

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Water & Sewer Ending Cash Balance

FUNDING PROGRAM

57

$1,000,000

$1,500,000

$2,000,000

$2,500,000

$3,000,000

$3,500,000

$4,000,000

$4,500,000

$5,000,000

$5,500,000

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Bond Coverage

SERIES 2010 BOND COMPARISON

1.29

1.44

1.70

1.60

1.51

1.78

1.64

1.03

1.11

1.34 1.26

1.09

1.31

1.55

1.76

2.00

2.26

0

1

1

2

2

3

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2010 Bond Coverage Projection 2014 Bond Coverage Projection

58

Perc

enta

ge

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Water Rate Increase

SERIES 2010 BOND COMPARISON

6.5 6.5 6.5

7.0 7.0 7.0 7.0

5.5 5.5 5.5 5.5 5.5 5.5

4.0 4.0 4.0

0

1

2

3

4

5

6

7

8

2014 2015 2016 2017 2018 2019 2020 2021 2022

2010 Bond Plan FY14 Financial Plan 59

Perc

enta

ge

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Sewer Rate Increase

SERIES 2010 BOND COMPARISON

7.5 7.5 7.5

8.0 8.0 8.0 8.0

6.0 6.0 6.0 6.0 6.0 6.0

5.0 5.0 5.0

0

1

2

3

4

5

6

7

8

9

2014 2015 2016 2017 2018 2019 2020 2021 2022

2010 Bond Plan FY14 Financial Plan 60

Perc

enta

ge

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Typical Monthly Water Residential Bill

(5,000 Gallons)

FUNDING PROGRAM

45.26 47.75

50.37 53.15

56.07 59.15

61.52 63.98

66.54 69.20

$0.00

$10.00

$20.00

$30.00

$40.00

$50.00

$60.00

$70.00

$80.00

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2014 Financial Plan

61

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Typical Monthly Sewer Bill

(5,000 Gallons)

FUNDING PROGRAM

46.69 49.49

52.46 55.61

58.95

62.49 65.61

68.89 72.34

75.95

$0.00

$10.00

$20.00

$30.00

$40.00

$50.00

$60.00

$70.00

$80.00

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2014 Financial Plan

62

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Typical Monthly Water Residential Bill

(5,000 Gallons)

FUNDING PROGRAM

$0.00

$10.00

$20.00

$30.00

$40.00

$50.00

$60.00

$70.00

$80.00

Lum

pkin

Coun

ty

Dah

lon

ega

Daw

son

vil

le

(Outs

ide)

EW

SA

Pro

posed

EW

SA

Exis

tin

g

Gain

evil

le (O

uts

ide)

Jackson

Coun

ty

Bra

selt

on (O

uts

ide)

Fors

yth

Coun

ty

Chero

kee C

oun

ty

63

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

Typical Monthly Sewer Residential Bill

(5,000 Gallons)

FUNDING PROGRAM

$0.00

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

$35.00

$40.00

$45.00

$50.00

Dah

lon

ega

Jackson

Coun

ty

Daw

son

vil

le

(Outs

ide)

EW

SA

Pro

posed

EW

SA

Exis

tin

g

Gain

evil

le (O

uts

ide)

Bra

selt

on (O

uts

ide)

Chero

kee C

oun

ty

Fors

yth

Coun

ty

64

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

MEETING TOPICS

Wednesday – October 2, 2013

• “The Road Less Traveled” Discussion

• Yearly Review

65

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

THE ROAD LESS TRAVELED

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

MEETING TOPICS

Wednesday – October 2, 2013

• “The Road Less Traveled” Discussion

– City of Dawsonville – Russell Creek Reservoir – Water System Improvements – Other

67

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

CITY OF DAWSONVILLE

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

RUSSELL CREEK

RESERVOIR

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

RUSSELL CREEK RESERVOIR

U.S. Army Corps of Engineers • Wetlands & Stream Survey • Cumulative Impact Study • Population Projections • Revise Mitigation Plan Documentation • Final Case Document • 404 Permit GA Environmental Protection Division • Inter-basin Transfer Report • Drought Contingency Plan • Safe Yield Analysis • 401b Permit • Withdrawal Permit

71

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

RUSSELL CREEK RESERVOIR

72

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

WATER SYSTEM

IMPROVEMENTS

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

OTHER

EXCELLENCE INTEGRITY STEWARDSHIP COMMITMENT EFFICIENCY VISION

MEETING TOPICS

Wednesday – October 2, 2013

• “The Road Less Traveled” Discussion

• Yearly Review

77

top related