Construction and Long-Term Performance of TransportationInfrastructure Constructed Using EPS Geofoam on Soft Soil
Sites in Salt Lake Valley, Utah
S. Bartlett, D. Negussey, C. Farnsworth, A. Stuedlein
-
8/2/2019 EPS2011-I15
2/34
-
8/2/2019 EPS2011-I15
3/34
I-15
I-15
I-80
I-80
I-215
I-80
I-215
I-215
I-15
Wasatch
Mountains
Great
SaltLake
Oquirrh
Mountains
-
8/2/2019 EPS2011-I15
4/34
Geotechnical Conditions
Subsurface Profile in Salt Lake Valley
SoftClay (10-
m thick)
0
5
10
15
20
25
30
35
40
0 5000 10000 15000 20000 25000 30000 35000 40000
CPT Tip Resistance, kPa
Depth(m)
Bonneville Clay
Alluvium
Pleistocene Alluvium
Cutler Clay
-
8/2/2019 EPS2011-I15
5/34
Geotechnical Conditions
Settlement Record
12 m
1.4 m
-
8/2/2019 EPS2011-I15
6/34
Geotechnologies
PV Drains
2-Stage MSE Walls
-
8/2/2019 EPS2011-I15
7/34
Geotechnologies
Lime Cement ColumnsEPS Geofoam
-
8/2/2019 EPS2011-I15
8/34
Geofoam Placement Areas
500 N
100 S
400 S
900 S
1300 S
State St
2100 S
3300 S
-
8/2/2019 EPS2011-I15
9/34
Primary Uses of Geofoam on the I-15 Project
Reduce Settlement to Protect Buried Utilities
Improve Slope Stability of Embankments
Rapid Construction in Time Critical Areas
-
8/2/2019 EPS2011-I15
10/34
EPS Density
Property ASTMTest
C 578
T e XI T e I T e VIII* Type II Type IX
NominalDensity
(kg/m3)
C303 / D1622 12 16 20 24 32
Minimum
Density
(kg/m3)
C303 / D
1622
11 15 18 22 29
* Type VIII was used for I-15 Reconstruction
-
8/2/2019 EPS2011-I15
11/34
Geotechnical Instrumentation
VW Pressure Cells
-
8/2/2019 EPS2011-I15
12/34
Geotechnical Instrumentation
Magnet Extensometers
LEVEL 0
LEVEL 4
LEVEL 2
LEVEL 6
-
8/2/2019 EPS2011-I15
13/34
Geotechnical Instrumentation
Horizontal Inclinometer
-
8/2/2019 EPS2011-I15
14/34
Geotechnical Instrumentation
Surveying
-
8/2/2019 EPS2011-I15
15/34
100 South Instrumentation Array
500 N
100 S
400 S
900 S
1300 S
State St
2100 S
3300 S
100 South
-
8/2/2019 EPS2011-I15
16/34
100 South Array
(Construction)
-
8/2/2019 EPS2011-I15
17/34
100 South Array
(cross-section view)
-
8/2/2019 EPS2011-I15
18/34
100 South Array
(profile view)
-
8/2/2019 EPS2011-I15
19/34
100 South Array
(Load and Pressure Cells)
-
8/2/2019 EPS2011-I15
20/34
100 South Array
(Vertical Strain)
-
8/2/2019 EPS2011-I15
21/34
100 South Array
(Creep Settlment)
-
8/2/2019 EPS2011-I15
22/34
-
8/2/2019 EPS2011-I15
23/34
3300 South Array
(Construction)
-
8/2/2019 EPS2011-I15
24/34
3300 South Geofoam Array
(Cross-Sectional View)
h
-
8/2/2019 EPS2011-I15
25/34
3300 South Array
(Load and Pressure Cells)
h
-
8/2/2019 EPS2011-I15
26/34
3300 South Array
(Vertical Settlement / Strain)
1 % vertical strain (end of construction)
3300 S h A
-
8/2/2019 EPS2011-I15
27/34
3300 South Array
(Creep Settlement)
-
8/2/2019 EPS2011-I15
28/34
State Street Instumentation
500 N
100 S
400 S
900 S
1300 S
State St
2100 S
3300 S
State Street
-
8/2/2019 EPS2011-I15
29/34
State Street Construction
State Street Array
-
8/2/2019 EPS2011-I15
30/34
State Street Array
St t St t A
-
8/2/2019 EPS2011-I15
31/34
State Street Array
(Pressure Cells Measurements)
-
8/2/2019 EPS2011-I15
32/34
Geotechnologies Settlement Performance
-
8/2/2019 EPS2011-I15
33/34
Conclusions
EPS geofoam exhibited the best overall settlement performance
of the I-15 geotechnologies
Compression, seating and inter-block gap closure of EPS
produced about 1 percent vertical deformation during
construction loading.
Vertical pressure levels are in reasonable agreement with
allowable design limits of about 30 kPa.
I-15 EPS embankment has undergone about 0.2 to 0.4 percent
creep deformation in a 10-year post construction period.
The 10-year design criterion has been met and the 50-year design
criterion of 1.5 percent total strain will most likely be met.
-
8/2/2019 EPS2011-I15
34/34
Questions