    Construction and Long-Term Performance of TransportationInfrastructure Constructed Using EPS Geofoam on Soft Soil

    Sites in Salt Lake Valley, Utah

    S. Bartlett, D. Negussey, C. Farnsworth, A. Stuedlein

  • 8/2/2019 EPS2011-I15

    2/34

  • 8/2/2019 EPS2011-I15

    3/34

    I-15

    I-15

    I-80

    I-80

    I-215

    I-80

    I-215

    I-215

    I-15

    Wasatch

    Mountains

    Great

    SaltLake

    Oquirrh

    Mountains

  • 8/2/2019 EPS2011-I15

    4/34

    Geotechnical Conditions

    Subsurface Profile in Salt Lake Valley

    SoftClay (10-

    m thick)

    0

    5

    10

    15

    20

    25

    30

    35

    40

    0 5000 10000 15000 20000 25000 30000 35000 40000

    CPT Tip Resistance, kPa

    Depth(m)

    Bonneville Clay

    Alluvium

    Pleistocene Alluvium

    Cutler Clay

  • 8/2/2019 EPS2011-I15

    5/34

    Geotechnical Conditions

    Settlement Record

    12 m

    1.4 m

  • 8/2/2019 EPS2011-I15

    6/34

    Geotechnologies

    PV Drains

    2-Stage MSE Walls

  • 8/2/2019 EPS2011-I15

    7/34

    Geotechnologies

    Lime Cement ColumnsEPS Geofoam

  • 8/2/2019 EPS2011-I15

    8/34

    Geofoam Placement Areas

    500 N

    100 S

    400 S

    900 S

    1300 S

    State St

    2100 S

    3300 S

  • 8/2/2019 EPS2011-I15

    9/34

    Primary Uses of Geofoam on the I-15 Project

    Reduce Settlement to Protect Buried Utilities

    Improve Slope Stability of Embankments

    Rapid Construction in Time Critical Areas

  • 8/2/2019 EPS2011-I15

    10/34

    EPS Density

    Property ASTMTest

    C 578

    T e XI T e I T e VIII* Type II Type IX

    NominalDensity

    (kg/m3)

    C303 / D1622 12 16 20 24 32

    Minimum

    Density

    (kg/m3)

    C303 / D

    1622

    11 15 18 22 29

    * Type VIII was used for I-15 Reconstruction

  • 8/2/2019 EPS2011-I15

    11/34

    Geotechnical Instrumentation

    VW Pressure Cells

  • 8/2/2019 EPS2011-I15

    12/34

    Geotechnical Instrumentation

    Magnet Extensometers

    LEVEL 0

    LEVEL 4

    LEVEL 2

    LEVEL 6

  • 8/2/2019 EPS2011-I15

    13/34

    Geotechnical Instrumentation

    Horizontal Inclinometer

  • 8/2/2019 EPS2011-I15

    14/34

    Geotechnical Instrumentation

    Surveying

  • 8/2/2019 EPS2011-I15

    15/34

    100 South Instrumentation Array

    500 N

    100 S

    400 S

    900 S

    1300 S

    State St

    2100 S

    3300 S

    100 South

  • 8/2/2019 EPS2011-I15

    16/34

    100 South Array

    (Construction)

  • 8/2/2019 EPS2011-I15

    17/34

    100 South Array

    (cross-section view)

  • 8/2/2019 EPS2011-I15

    18/34

    100 South Array

    (profile view)

  • 8/2/2019 EPS2011-I15

    19/34

    100 South Array

    (Load and Pressure Cells)

  • 8/2/2019 EPS2011-I15

    20/34

    100 South Array

    (Vertical Strain)

  • 8/2/2019 EPS2011-I15

    21/34

    100 South Array

    (Creep Settlment)

  • 8/2/2019 EPS2011-I15

    22/34

  • 8/2/2019 EPS2011-I15

    23/34

    3300 South Array

    (Construction)

  • 8/2/2019 EPS2011-I15

    24/34

    3300 South Geofoam Array

    (Cross-Sectional View)

    h

  • 8/2/2019 EPS2011-I15

    25/34

    3300 South Array

    (Load and Pressure Cells)

    h

  • 8/2/2019 EPS2011-I15

    26/34

    3300 South Array

    (Vertical Settlement / Strain)

    1 % vertical strain (end of construction)

    3300 S h A

  • 8/2/2019 EPS2011-I15

    27/34

    3300 South Array

    (Creep Settlement)

  • 8/2/2019 EPS2011-I15

    28/34

    State Street Instumentation

    500 N

    100 S

    400 S

    900 S

    1300 S

    State St

    2100 S

    3300 S

    State Street

  • 8/2/2019 EPS2011-I15

    29/34

    State Street Construction

    State Street Array

  • 8/2/2019 EPS2011-I15

    30/34

    State Street Array

    St t St t A

  • 8/2/2019 EPS2011-I15

    31/34

    State Street Array

    (Pressure Cells Measurements)

  • 8/2/2019 EPS2011-I15

    32/34

    Geotechnologies Settlement Performance

  • 8/2/2019 EPS2011-I15

    33/34

    Conclusions

    EPS geofoam exhibited the best overall settlement performance

    of the I-15 geotechnologies

    Compression, seating and inter-block gap closure of EPS

    produced about 1 percent vertical deformation during

    construction loading.

    Vertical pressure levels are in reasonable agreement with

    allowable design limits of about 30 kPa.

    I-15 EPS embankment has undergone about 0.2 to 0.4 percent

    creep deformation in a 10-year post construction period.

    The 10-year design criterion has been met and the 50-year design

    criterion of 1.5 percent total strain will most likely be met.