Emergency and Contingency Modular Solutions

Mabey Group

Mabey Group

Mabey Bridge Mabey Inc Mabey Hire

Infrastructure Renewables Modular

About Mabey Bridge

• Headquarters in Chepstow, UK

• €100m turn-over

• 3 manufacturing plants

• 100,000 tonne annual capacity

• State-of-the-art robotic

manufacturing

• Operate 24/7, 51 weeks a year

• SHEQ Accredited

• Bridges, Towers, Monopiles, Girders

Our Facilities

Newhouse Farm, Chepstow, UK

Lydney, Gloucestershire, UK

Station Road, Chepstow, UK

Some Product Examples

PRIMERA CONFERENCIA INTERNACIONAL DE PUENTES – CHILE 2014 - FUTUROS DESAFÍOS: DISEÑO, CONSTRUCCIÓN Y MANTENIMIENTO

FIRST INTERNATIONAL BRIDGES CONFERENCE – CHILE 2014 - FUTURE CHALLENGES: DESIGN, CONSTRUCTION AND MAINTENANCE

Dirección de Vialidad de Chile / Chilean Road Administration

Our Products

• Modular • Reconfigurable • Containerised • Deliveries from stock • Simple to install

• Up to 81m span • Multi-span structures • Multi-lane • All type of loading

Applications: Contingency, Emergency and Military

Applications: Rural Infrastructure

Mabey Universal

Features

• Up to 81m spans* • 4.5m modules • Single, double or triple lane

roadways • Robust, durable, high fatigue

life • Heavy axle capabilities • Ideal to work in cold

temperature environments

Product: Mabey Universal Installation time: 5 Days using 6 men

Tretten 245 Road, Detour Bridge, Norway

Tretten 245 Road, Detour Bridge – Key points

• Bridge in use for 6 months – Oct 2011 to Apr 2012 • Installation by Statens Vegvesen Vegdirektoratet • 58m bridge with 2 lanes • Built to take traffic during construction of a new steel bridge • Constructed in 5 days • Reduced resources: 2 site managers + 4 construction crew • Limited work area for launching • Erection & assembly methodology design by client

Mabey Compact 200

Features

• Up to 61m spans* • 3.048m (10ft) modules • Single or two lane roadways • Highly flexible, excellent value • Ideal for work in temperatures

down to -20Cº • Military application – Logistic

Support Bridge (LSB) • NATO codified – NSN

Client: Ministerio de Obras Públicas, Región Los Lagos Solution: Mabey Compact 200

La Dificultad Bridge, Chile

La Dificultad Bridge, Chile – Key Points

• 61m clear span bridge with a single lane • Built on very difficult terrain in a remote area on the edge of a cliff (40

meters) • No intermediate or temporary supports could be used • Limited and non-levelled work site of 50m x 8m • Built in 10 Days • Limited resources:

• 1 Komatsu PC200 excavator • 1 John Deere 310 Retrocargador • 1 Mabey Bridge Supervisor • 1 Contractor Engineer • 10 construction assistants

OTHER

EXAMPLES

Client: NPRA Solution: Mabey Universal

Temporary railway bridge, Norway

Client: Armasuisse Product: C200 - LSB

Emergency Logistic Support Bridge, Switzerland

Client: Balfour Beatty Solution: Mabey Universal

Limehouse Link temporary bridge, UK

Client: Amt Der Karntner Landesregierung Solution: C200

Temporary Access Bridge, Austria

Client: Ankara Municipality Road Authority Solution: Mabey Universal

Temporary Flyover, Turkey

Client: UME Solution: C200 - LSB

Military Emergency Bridge, Spain

PROBLEMS

SOLUTIONS

Berbice River Bridge, Guyana

Client: Ministry of Public Works and Communication Solution: Mabey Compact 200, delivered in partnership with Bosch Rexroth B.V.

Crude oil transfer jetty, The Philippines

Client: Unioil Corporation Solution: Mabey Universal bridge used as a jetty to accommodate up to 6 oil tankers. 524m long in multiple spans with a 4.20m wide deck.

Longannet power plant, Scotland

Client: Scottish Power Solution: A combination of bridging and tower units used to support a coal conveyor. The conveyor support is 115m long with a width of 7.35m.

Bolt-a-Bin abutments/Pier, Canada

Partner: AIL Solution: Temporary abutments/pier .

Why us?

• World-Class Global Bridging Experts • 160 year heritage of engineering expertise • Through-life support services offered including; Design,

Erection, Engineering reach-back, Training and Maintenance

• Practical and creative solutions • Quick response • Financing tailored to the customer needs • Best after sales service in the market