emergency and contingency modular solutions - … about mabey bridge • headquarters in chepstow,...

33
Emergency and Contingency Modular Solutions

Upload: phamhanh

Post on 27-Apr-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Emergency and Contingency Modular Solutions

Page 2: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Mabey Group

Mabey Group

Mabey Bridge Mabey Inc Mabey Hire

Infrastructure Renewables Modular

Page 3: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

About Mabey Bridge

• Headquarters in Chepstow, UK

• €100m turn-over

• 3 manufacturing plants

• 100,000 tonne annual capacity

• State-of-the-art robotic

manufacturing

• Operate 24/7, 51 weeks a year

• SHEQ Accredited

• Bridges, Towers, Monopiles, Girders

Page 4: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Our Facilities

Newhouse Farm, Chepstow, UK

Lydney, Gloucestershire, UK

Station Road, Chepstow, UK

Page 5: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Some Product Examples

Page 6: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

PRIMERA CONFERENCIA INTERNACIONAL DE PUENTES – CHILE 2014 - FUTUROS DESAFÍOS: DISEÑO, CONSTRUCCIÓN Y MANTENIMIENTO

FIRST INTERNATIONAL BRIDGES CONFERENCE – CHILE 2014 - FUTURE CHALLENGES: DESIGN, CONSTRUCTION AND MAINTENANCE

Dirección de Vialidad de Chile / Chilean Road Administration

Page 7: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Our Products

• Modular • Reconfigurable • Containerised • Deliveries from stock • Simple to install

• Up to 81m span • Multi-span structures • Multi-lane • All type of loading

Page 8: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Applications: Contingency, Emergency and Military

Page 9: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Applications: Rural Infrastructure

Page 10: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Mabey Universal

Page 11: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Features

• Up to 81m spans* • 4.5m modules • Single, double or triple lane

roadways • Robust, durable, high fatigue

life • Heavy axle capabilities • Ideal to work in cold

temperature environments

Page 12: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Product: Mabey Universal Installation time: 5 Days using 6 men

Tretten 245 Road, Detour Bridge, Norway

Page 13: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Tretten 245 Road, Detour Bridge – Key points

• Bridge in use for 6 months – Oct 2011 to Apr 2012 • Installation by Statens Vegvesen Vegdirektoratet • 58m bridge with 2 lanes • Built to take traffic during construction of a new steel bridge • Constructed in 5 days • Reduced resources: 2 site managers + 4 construction crew • Limited work area for launching • Erection & assembly methodology design by client

Page 14: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity
Page 15: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Mabey Compact 200

Page 16: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Features

• Up to 61m spans* • 3.048m (10ft) modules • Single or two lane roadways • Highly flexible, excellent value • Ideal for work in temperatures

down to -20Cº • Military application – Logistic

Support Bridge (LSB) • NATO codified – NSN

Page 17: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Client: Ministerio de Obras Públicas, Región Los Lagos Solution: Mabey Compact 200

La Dificultad Bridge, Chile

Page 18: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

La Dificultad Bridge, Chile – Key Points

• 61m clear span bridge with a single lane • Built on very difficult terrain in a remote area on the edge of a cliff (40

meters) • No intermediate or temporary supports could be used • Limited and non-levelled work site of 50m x 8m • Built in 10 Days • Limited resources:

• 1 Komatsu PC200 excavator • 1 John Deere 310 Retrocargador • 1 Mabey Bridge Supervisor • 1 Contractor Engineer • 10 construction assistants

Page 19: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity
Page 20: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

OTHER

EXAMPLES

Page 21: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Client: NPRA Solution: Mabey Universal

Temporary railway bridge, Norway

Page 22: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Client: Armasuisse Product: C200 - LSB

Emergency Logistic Support Bridge, Switzerland

Page 23: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Client: Balfour Beatty Solution: Mabey Universal

Limehouse Link temporary bridge, UK

Page 24: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Client: Amt Der Karntner Landesregierung Solution: C200

Temporary Access Bridge, Austria

Page 25: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Client: Ankara Municipality Road Authority Solution: Mabey Universal

Temporary Flyover, Turkey

Page 26: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Client: UME Solution: C200 - LSB

Military Emergency Bridge, Spain

Page 27: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

PROBLEMS

SOLUTIONS

Page 28: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Berbice River Bridge, Guyana

Client: Ministry of Public Works and Communication Solution: Mabey Compact 200, delivered in partnership with Bosch Rexroth B.V.

Page 29: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Crude oil transfer jetty, The Philippines

Client: Unioil Corporation Solution: Mabey Universal bridge used as a jetty to accommodate up to 6 oil tankers. 524m long in multiple spans with a 4.20m wide deck.

Page 30: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Longannet power plant, Scotland

Client: Scottish Power Solution: A combination of bridging and tower units used to support a coal conveyor. The conveyor support is 115m long with a width of 7.35m.

Page 31: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Bolt-a-Bin abutments/Pier, Canada

Partner: AIL Solution: Temporary abutments/pier .

Page 32: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Why us?

• World-Class Global Bridging Experts • 160 year heritage of engineering expertise • Through-life support services offered including; Design,

Erection, Engineering reach-back, Training and Maintenance

• Practical and creative solutions • Quick response • Financing tailored to the customer needs • Best after sales service in the market

Page 33: Emergency and Contingency Modular Solutions - … About Mabey Bridge • Headquarters in Chepstow, UK • €100m turn-over • 3 manufacturing plants • 100,000 tonne annual capacity

Questions? www.mabeybridge.com