Dr. Dan Patterson delivered a sneak peek presentation of the soon-to-be-released Acumen 360. The presentation was first look at how Acumen 360 is capable of optimizing projects with its revolutionary scenario generating, criteria building and project integrating capabilities.

TRANSCRIPT

an introduction to Fuse 360

Goal-Based Optimization

Dr Dan Patterson PMP l CEO & Founder Acumen

enterprise project analysis

! Company introduction ! Introduction to Fuse

! Current project analysis platform ! Fuse 3.0 and Fuse 360

! Goal-based optimization ! Product demo ! Q&A

September 22, 2011

2

Presentation Overview

acumen proven project analytics Passion and dedication to helping to improve the practice of CPM scheduling & analysis ! 2o Year+ PPM legacy across

multiple industries ! Oracle, Deltek & MS partner ! Based in Austin, Texas ! Global presence

September 22, 2011

3

World Renowned Risk Assessment Workshops

Oracle Primavera Risk Analysis training

Acumen Fuse & Fuse 360: Enterprise Project Analysis

Software

! Today, thousands of users benefiting from Fuse ! Schedule, logic, performance, risk, EV analysis ! Wildly successful metric library and editor

! DCMA, Logic density™, Redundancy Index™, Baseline Compliance™, Logic Hotspots™

! Forensics ! Visualization: Fuse Ribbons™

! Launch of Fuse 3.0 and 360 on October 18 ! From application to an analytics platform ! 360 is the first of many analytics modules ! Schedule cleanser, fix MPP, P6 files in Fuse ! New: Goal-based optimization

September 22, 2011

4 Fuse 3.0 and 360 next generation analytics

Fuse 360 Goal-Based Project Optimizer

September 22, 2011

5

! Project Analysis benefit: ! Validate schedule quality, cost

forecast accuracy, risk realism ! Track project performance ! Trace/ pinpoint flawed logic ! Conduct forensic analysis about: ! Over 300 industry standard &

unique-to-Fuse metrics ! Same capabilities as core

Fuse product

Project Analysis

analysis three modules in one tool

September 22, 2011

6

! Schedule Cleanser benefit: ! Remove logic complexities ! Eliminate constraints ! Saves days of manual

cleansing about: ! Automatically generate fixed

MS Project & Primavera Schedules

! Compare to original schedule & pinpoint impact of cleanse

Metric Analysis

Schedule Cleanser

analysis three modules in one tool

September 22, 2011

7

! Goal-based optimization benefit: ! Create optimized scenarios ! Achieve schedule

acceleration in seconds ! Optimization based on your

inout ! about: ! Define your own goals &

means of achieving them ! Visualize accelerations in

timeline view

Metric Analysis

Logic Analysis

Forensic Analysis

analysis three modules in one tool

September 22, 2011

8

goal-based optimization Set Goal

•  e.g. reduce project duration by 3 months

Define Criteria

•  e.g. focus on engineering activities

Run Simulation

•  Generate optimized Scenario(s)

Analyze Scenarios

•  Use Fuse analytics to understand impact of optimization

September 22, 2011

9

! Objective ! create an accelerated

& optimized schedule ! to adopt intelligent

principles & criteria ! how does it work?

! Goals ! criteria sets ! Simulation ! analysis

setting acceleration goal

September 22, 2011

10

! Choose a ! target date ! % acceleration ! Duration acceleration ! Best scenario

possible ! Optionally cleanse

schedule ! Apply a set of criteria

(grouped into a script)

building a criteria set

September 22, 2011

11

! Define series of steps ! Steps contain rules:

! Duration reduction ! Calendar adjustment ! Lag reduction ! Constraint elimination

! Set priority ! Earliest/latest ! Longest ! Easiest/least resistance

! Optional filters ! e.g. only apply to engineering

! Editable libraries ! Shared/merged

run the simulation

September 22, 2011

12

! Run the acceleration simulation

! Fuse applies criteria during each iteration

! More & more aggressive “push” during each iteration until either: ! Goal is achieved ! Criteria are exhausted

! Manual or automatic granularity

September 22, 2011

13

accept or reject scenario ! number of days accelerated ! goal achieved or not? ! acceleration efficiency

schedule acceleration efficiency™ Example 1

! 2 day project acceleration ! requires 2 days of reduction ! Acceleration Efficiency =2/2 100%

September 22, 2011

14

Example 2

! 2 day project acceleration ! requires 2 days of reduction ! Acceleration Efficiency=2/3 67%

2 day project acceleration

2 day project acceleration

2 day activity reduction 2 day activity

reduction

1 day activity reduction

compare scenarios Fuse Forensics

! Identify changes ! Pinpoint impact of changes ! Defend changes made

September 22, 2011

15

Fuse Analysis

! Compare schedules ! Run Fuse metrics on scenarios ! Visualize scenario differences

September 22, 2011

16

integration schedule, cost, risk, ev

MS Project

P3/P6

Open Plan

Asta Cobra

Prism G2

PRA

Excel/XML

demo acumen fuse® software demonstration

September 22, 2011

17

www.projectacumen.com 1.512.291.6261