ID Task ModeTask Name Duration Start Finish PredeceResource Names1 AUTOMATEDHANDRAILSYSTEM 29days Wed7/22/15 Wed8/19/152 TransportMaterialtothesite 1day Wed7/22/15 Wed7/22/153 SteelFabrication 14days Thu7/23/15 Wed8/5/154 Mainframestructure 10days Thu7/23/15 Sat8/1/15 25 HandrailSystem 4days Sun8/2/15 Wed8/5/15 46 StaircaseSystem 4days Mon7/27/15 Thu7/30/15 57 SiteErection 18days Sun8/2/15 Wed8/19/158 InstallationofSteelframestructure 4days Sun8/2/15 Wed8/5/15 49 FixingofHandrail 2days Sun8/9/15 Mon8/10/15 810 Fixingofstaircase 3days Tue8/11/15 Thu8/13/15 911 FixingofHydraulicsystem 2days Tue8/18/15 Wed8/19/15 1012 FixingofElectricalsystem 1day Fri8/14/15 Fri8/14/15 1013 CompletionandCommissioning 1day Sat8/15/15 Sat8/15/15 128/15F T W T M S S FAugust SepteTaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressDESIGN FABRICATION INSTALLATION AND COMMISSIONING OF AUTOMATED HANDRAIL SYSTEMPage 1Project: Project Schedule - AutoDate: Wed 7/22/15

top related