ID Task Mode Task Name Duration Start Finish PredeceResource Names 1 AUTOMATED HANDRAIL SYSTEM 29 days Wed 7/22/15 Wed 8/19/15 2 Transport Material to the site 1 day Wed 7/22/15 Wed 7/22/15 3 Steel Fabrication 14 days Thu 7/23/15 Wed 8/5/15 4 Main frame structure 10 days Thu 7/23/15 Sat 8/1/15 2 5 Handrail System 4 days Sun 8/2/15 Wed 8/5/15 4 6 Staircase System 4 days Mon 7/27/15 Thu 7/30/15 5 7 Site Erection 18 days Sun 8/2/15 Wed 8/19/15 8 Installation of Steel frame structure 4 days Sun 8/2/15 Wed 8/5/15 4 9 Fixing of Handrail 2 days Sun 8/9/15 Mon 8/10/15 8 10 Fixing of staircase 3 days Tue 8/11/15 Thu 8/13/15 9 11 Fixing of Hydraulic system 2 days Tue 8/18/15 Wed 8/19/15 10 12 Fixing of Electrical system 1 day Fri 8/14/15 Fri 8/14/15 10 13 Completion and Commissioning 1 day Sat 8/15/15 Sat 8/15/15 12 8/15 F T W T M S S F August Septe Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress DESIGN FABRICATION INSTALLATION AND COMMISSIONING OF AUTOMATED HANDRAIL SYSTEM Page 1 Project: Project Schedule - Auto Date: Wed 7/22/15

Upload: rantharu-attanayake

Post on 19-Aug-2015

213 views

Category:

Documents


1 download

DESCRIPTION

fyi

TRANSCRIPT

ID Task ModeTask Name Duration Start Finish PredeceResource Names1 AUTOMATEDHANDRAILSYSTEM 29days Wed7/22/15 Wed8/19/152 TransportMaterialtothesite 1day Wed7/22/15 Wed7/22/153 SteelFabrication 14days Thu7/23/15 Wed8/5/154 Mainframestructure 10days Thu7/23/15 Sat8/1/15 25 HandrailSystem 4days Sun8/2/15 Wed8/5/15 46 StaircaseSystem 4days Mon7/27/15 Thu7/30/15 57 SiteErection 18days Sun8/2/15 Wed8/19/158 InstallationofSteelframestructure 4days Sun8/2/15 Wed8/5/15 49 FixingofHandrail 2days Sun8/9/15 Mon8/10/15 810 Fixingofstaircase 3days Tue8/11/15 Thu8/13/15 911 FixingofHydraulicsystem 2days Tue8/18/15 Wed8/19/15 1012 FixingofElectricalsystem 1day Fri8/14/15 Fri8/14/15 1013 CompletionandCommissioning 1day Sat8/15/15 Sat8/15/15 128/15F T W T M S S FAugust SepteTaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressDESIGN FABRICATION INSTALLATION AND COMMISSIONING OF AUTOMATED HANDRAIL SYSTEMPage 1Project: Project Schedule - AutoDate: Wed 7/22/15