di kang le community center

Post on 14-Aug-2015

330 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Ground breaking

May 6th, 2010

A pipe buried undergroud in this site

Preparing for the foundation

Going back to the village with a load of steel

put isnulation board down under the slab for radiant heat

Double steel beams

300-meter-long water pipe to heat the floor

Pouring the concrete

Finished slab

Working on the roof trussWorking on the roof truss

Lightweight steel structureLightweight steel structure

Straw boards made from natural materials

Waterproof floor paint exported to US.

Grand opening day: handing over the keyGrand opening day: handing over the key

NGO NGO workshopworkshop

Seniors’ teahouseSeniors’ teahouse