Ground breaking
May 6th, 2010
A pipe buried undergroud in this site
Preparing for the foundation
Going back to the village with a load of steel
put isnulation board down under the slab for radiant heat
Double steel beams
300-meter-long water pipe to heat the floor
Pouring the concrete
Finished slab
Working on the roof trussWorking on the roof truss
Lightweight steel structureLightweight steel structure
Straw boards made from natural materials
Waterproof floor paint exported to US.
Grand opening day: handing over the keyGrand opening day: handing over the key
NGO NGO workshopworkshop
Seniors’ teahouseSeniors’ teahouse