design development progress december 2005 new south county high school

Post on 27-Mar-2015

216 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Design Development Progress

December 2005NEW

SOUTH COUNTY

HIGH SCHOOL

Owner Information Fulton County Schools

Opening Date August 2008

Address/ Location Hall and Jones Road

Construction Budget $ 45,081,700 (Building: $34,081,700 & Site: $11,000,000)

Sq. Ft. $ 100.00/ sq. ft.

Architectural Firm R L Brown & Associates, Inc.

Design Requirements Parking : 628 spaces

Project Description The project consists of the construction of a multi-story HS building(s), which includes, but is not limited to: site improvements; administrative offices, classrooms & labs, cafeteria & kitchen, media center, gym, art suites, performance hall, out-door classrooms, bus and parent drop-off loops, landscaping, athletic venues, such as, football stadium & practice field, baseball and softball fields, tennis courts, and parking.

F.T.E. (Number of Students) 1875 (Core capacity of 2,500 F.T.E.)

Instructional Units (IU) 97

Programmed Area 252,457 Sq. ft.

Building Grossing Factor 1.35

Building Area 340,817 Sq. ft.

Special Programs

Psycho Ed Unit (Metro Program) South Fulton Regional – Psych-Ed & Special Ed Programs

ROTC 3 - Instructors Model

Career Technology Program Family & Consumer Sciences; Business Management; Information Technology; Diversified Tech; Excel/ Career Tech; Marketing; Auto Service Tech; Visual Communication and Design

New South County High School FACT SHEETFacts

Location Plan

Vicinity Plan

Site for High School

Site for Elem. School

New South County High School Site PlanSite Plan

Student Drop-off

Auditorium

QuickTime™ and aSorenson Video decompressorare needed to see this picture.

Entry Sequence

Entry

Entry VRML

Gallery

Media Room VRML

Cafeteria

Cafeteria VRML

Classroom View

Night View

top related