#ConnectingCommunites

Current Construction

Projects

Tampa-xway.com

#ConnectingCommunites

Selmon West Extension

Selmonextension.com

SELMON

EXTENSION

SELMONEXTENSION

SELMONEXTENSION

By the Numbers

#ConnectingCommunites

South Selmon Safety Project

Tampa-xway.com.com

BEFORE

CURRENT

RENDERING

#ConnectingCommunites

THEA PD&E Studies

Selmonstudies.com

SOUTH SELMON

PD&E

South

Selmon

PD&E

Project

Location

Schedule

Continuous

OutreachContinuous community

outreach is integrated

into every step of the

project to ensure

meaningful participation

in the process.

SOUTH

SELMON PD&E

Upcoming Outreach

September 2020

Alternatives Webinar www.selmonstudies.com

Fall 2020

Information SessionTBD

SOUTH

SELMON PD&E

WHITING STREETPD&E STUDY

Whiting Street PD&E Project Location

1 PD&EStudy

Schedule

WHITING STREETPD&ESTUDY

Selmon East

PD&EStudy

Selmon East PD&E Project Location

1 PD&EStudy

Schedule

Selmon East

PD&E Study

Nebraska AvenuePD&E STUDY

Nebraska Avenue PD&E Project Location

1 PD&EStudy

Nebraska

Avenue Study

limits shown

in yellow

Twiggs Street

Design Build

project limits

shown in

green

#ConnectingCommunites

THEA Community

Enhancement Projects

Tampa-xway.com

UNDERPASS

IMPROVEMENT

Community Projects

MORRISON GATEWAY PROJECT

CURRENT VIEW

SELMON

GREENWAY

ENHANCEMENTS

SELMON GREENWAY UPDATE

Next Phase of Enhancements –Currently in design, Construction programmed for FY22

Jefferson Triangle Lot – to be redeveloped into pocket park as part of Whiting/Ramp project

Remaining Enhancements -Design programmed to begin FY22

Adamo Section Enhancements –to be determined based on area plans and development