CORPORATE PROFILEApril 2018

2

OUR PURPOSE

To Strengthen the Infrastructure Fabricby aligning Our Passion, Resources and Capabilities

With Customer Growth.

Passion

3

ABOUT US

o SUROJ Private Limited Company

o Pune Industrial Division 2004-2013 (as industrial division of Rajdeep, Pune)2013 onwards as SUROJ Buildcon Pvt Ltd, Pune

o Area of Operation Industrial, Petrochemical & Institutional including Utilities

o Type of Contracts Design & Built, Lumsum, EPC and Item Rate Contracts.

We SUROJ Buildcon Pvt. Ltd. stand behind our work through the moral and ethical principlesof honesty and trust, an approach governed by our impressive track record of over 14 yearsin construction industry.

The Pune Industrial Division has completed more than 110 projects totaling to Rs. 2700+Crores ($415 MIL) in Industrial, Petrochemical and Institutional Sector.

4

OUR CORE VALUES

Organization Approach We are loyal We are hardworking We work with passion

Quality Approach We strive for excellence We innovate We adapt

People Approach We are caring We foster trust We encourage individual

growth and development

5

OUR EXPERTISE

INDUSTRIALFOOD

PHARMACHEMICAL

AUTOMOBILEHEAVY ENGINEERING

WAREHOUSES

6

OUR EXPERTISE

RESTORATION EPCINFRASTRUCTURE INSTITUTIONAL

7

OUR CLIENTELE

9

MANAGEMENT

Sachin R. BiyaniManaging Director

Ashirwad BhangeDirector (Technical)

Business DevelopmentTendering

Budgeting & Monitoring Information & Technology

Tushar AgarkarHead

(EPC Division)

ConceptualizationEngineering

Coordination

Sopan KhedekarSantosh Ghavte

Shyam JoshiDirectors (Operations)

Resource ManagementTask Management

Quality ManagementProcess ManagementSafety Management

Prakash YelmameDirector (Commercial)

FinanceAccounts

Procurement Inventory

Vehicle & Maintenance

Health, Safety & Environment Human Resources

10

HARYANA

MADHYA PRADESH

TELANGANA

ANDHRA PRADESH

GUJARAT

MAHARASHTRA

GOA

KARNATAKA

PRESENCE ACROSS NATION

11

FINANCIAL GROWTH

*** All Amounts are in Crore

12

OUR EMPLOYEE STRENGTH

Technical / Execution Nos Supporting Nos

Management 5 Marketing/Liasioning 1

Tender & Estimation 11 Accounts Management 4

Project Management 14 Account Executive 34

Resident Engineer/APM 23 HRD/Administration 71

Sr. Engineer 12 Purchase 7

Site Engineer 106 Store 52

Quality Control 17 Safety 70

Mechanical/Electrical 42 V & M 185

Quantity Surveyor 39

Supervisor/Technician 120

TOTAL 389 424

13

PLANT & MACHINERIES

Name Quantity Name Quantity

Total Stations 05 RMC Plants (18/30/60 Cum) 05

Theodolite/Auto level 25 Transit Mixers 10

Excavators 20 Concrete Pumps 03

Loader/JCB 04 Tough Riders 46

Vibro/Static Rollers 06 RM 800/500 Mixers 34

Water Tanker 06 Tower Cranes/Hydra 08

Tippers/HYWA 40 Scissor Lifts 04

Bar Cutting & Bending Machines 30 Articulated Boom Lift 01

DG Sets(15 to 180 KVA) 15 Weigh Bridge 03

Shuttering Material 13000 Sqm Tractor with trolley 05

14

REPEAT ORDERS

Sr. No. Client Total Orders Sr. No. Client Total Orders

1 SIEMENS 9 Nos 13 Privilege Industries 3 Nos2 ITC 9 Nos 14 KSPG 3 Nos3 Colgate Palmolive 5 Nos 15 CPF 3 Nos4 Bridgestone Tyres 5 Nos 16 Minda 3 Nos5 Indospace 5 Nos 17 SSWL 3 Nos6 Indian Smelting 5 Nos 18 Holtec Asia 3 Nos7 SUZLON 4 Nos 19 KSB Pumps 2 Nos8 Unichem 4 Nos 20 IIM 2 Nos9 Godrej 4 Nos 21 Carlsberg 2 Nos

10 Symbiosis 4 Nos 22 Novozymes 2 Nos11 Alstom 4 Nos 23 Embassy 6 Nos12 Thermax 3 Nos 24 MRF 2 Nos

26 WangFeng 2 NosNote: 70% of our Turnover comes through existing Clients/PMC/Architects

15

ONGOING PROJECTS

Sr.No. Name of Work Value of Contract

Value of Work Completed % completion

1 Land Development, Civil, Infrastructure and MEP works for Embassy Industrial Park, Chakan, Dist: Pune 130 53 40.77

2 Land Development & Infrastructure work for NovozymesSouth Asia Pvt. Ltd, Patalganga, Maharashtra 71 44 61.97

3 Civil, Infrastructure works for Thermax Ltd, Sricity, AP 31 19.52 62.97

4 Civil, Structural and Infrastructure works for PPG Asian paints Pvt Ltd, Dahej, Gujarat 68 25.17 37.01

5 Civil, Structural and Infrastructure works for Jubilant Life Sciences Ltd, Bharuch, Gujarat. 30 1.5 5.00

6 Land Development works for MRF Ltd, Dahej, Gujarat 31.5 12.5 39.68

7 Civil, Structural & Architectural Works including Interior works INDRIYA GREEN FIELD Project At Sricity, Andhra Pradesh 101 0 0.00

8 Land Development, Civil & Structure Works for Green Filed project for M/s Mane India Pvt, Ltd. At GIDC Dahej, Gujarat 41 2.05 5.00

9 Civil & Infrastructure works Parle Agro Ltd, Sricity 21 10.41 48.49

10Civil & Convention Steel Work (“the Work”) for proposed Auto GI, Protective Coatings & Resin manufacturing Facility –Berger Paints India Limited, Pune, Jejuri 92 0

0.00

LANDMARKS / FOOTPRINTS

17

NOVOZYMES SOUTH ASIA PVT. LTD, PATALGANGA

18

EMBASSY INDUSTRIAL PARK, CHAKAN

19

CARLSBERG INDIA LTD, MYSURU

20

COLGATE PALMOLIVE INDIA PVT LTD, SANAND

21

THERMAX, SRICITY

22

KSB PUMPS LTD, SHIRWAL

23

KSB PUMPS LTD, SHIRWAL

24

SCA HYGIENE,RANJANGAON

25

SCA HYGIENE,RANJANGAON

26

THERMAX – SHIRWAL, SATARA

27

THERMAX – SHIRWAL, SATARA

28

THERMAX – SHIRWAL, SATARA

29

BRIDGESTONE INDIA PVT LTD

30

COLGATE-PALMOLIVE - PI, SRICITY

31

COLGATE-PALMOLIVE - PII, SRICITY

32

PEPSICO HOLDINGS PVT LTD, SRICITY

33

PEPSICO HOLDINGS PVT LTD, SRICITY

34

HINDUSTAN AERONATIC LIMITED, NASHIK

35

CHAROEN POKPHAND (INDIA) PVT LTD (CPF-THAILAND)

36

CHAROEN POKPHAND (INDIA) PVT LTD (CPF-THAILAND)

37

FERRING PHARMACEUTICALS PVT LTD, AMBERNATH

38

WANFENG ALLOY WHEELS INDIA PVT LTD, HARYANA

39

WANFENG ALLOY WHEELS INDIA PVT LTD, HARYANA

40

CORNING, CHAKAN (SPECIFICATION AS PER FM STANDARD)

41

EATON TRUCK TRANSMISSION (I) PVT LTD

42

ITC LIMITED, MYSURU

43

ITC LIMITED, MYSURU

44

ITC LIMITED, BANGALORE

45

ITC LIMITED, BANGALORE

46

ITC LIMITED, BANGALORE

47

ITC LIMITED, AMBERNATH

48

ITC LIMITED, HYDERABAD

49

MRF, PONDA, GOA

50

SSWL, MEHSANA, GUJARAT

51

SSWL, MEHSANA, GUJARAT

52

SIEMENS LTD, AURANGABAD

53

SIEMENS LTD, VERNA ,GOA

54

INDOSPACE, CHAKAN

55

INDOSPACE, CHAKAN

56

ALSTOM TRANPORT INDIA LTD, SRICITY

57

KSPG AUTOMOTIVE PVT LTD, SUPA

58

HIRSHVOGEL COMPONENTS INDIA PVT LTD, SANASWADI

59

MUKUND BEKEART INDIA PVT LTD, LONAND, SATARA

60

SANY HEAVY INDUSTRY (I) PVT LTD, CHAKAN

61

SOKTAS INDIA PVT LTD, KOLHAPUR

62

CUMMINS INDIA LTD, PUNE

63

CUMMINS INDIA LTD, PUNE

64

GODREJ INDIA LTD, AMBERNATH

65

GODREJ INDIA LTD, AMBERNATH

66

GODREJ INDIA LTD, VALIA, GUJARAT

67

PREVILEGE INDUSTRIES, SATARA

68

MANGALORE REFINERY PETROCHEMICALS LIMITED

69

MANGALORE REFINERY PETROCHEMICALS LIMITED

70

VELLORE INSTITUTE OF TECHNOLOGY, BHOPAL

71

SYMBIOSIS – HOSTEL BUILDING, INDORE

72

SYMBIOSIS – ENGINEERING BLOCK, INDORE

73

INDIAN INSTITUTE OF MANAGEMENT, INDORE (MP)

74

INDIAN INSTITUTE OF MANAGEMENT, INDORE (MP)

75

INDIAN INSTITUTE OF MANAGEMENT, INDORE (MP)

76

ASIAN PAINTS LTD, MYSURU

77

BRIDGESTONE INDIA LTD, CHAKAN

78

THERMAX LIMITED, SHIRWAL

ADOPTION OF LATEST TECHNOLOGY & METHODS

80

ADOPTION OF LATEST TECHNOLOGY AND CONSTRUCTION METHODS

The adoption of latest Technological Plant and Equipment's, construction

methods lead to the Safe & faster construction with reduction in the

manpower, which is the critical problem in the construction industry. The

latest Plant & Equipment's and construction methods as implemented by us

for the Industrial fast track constructions.

81

LASEAR SCREED FLOORING

82

SYSTEM FORMWORK

83

SYSTEM FORMWORK

84

SYSTEM FORMWORK FOR SLAB

85

ALUMINUM PANEL FORMWORK

86

SELF COMPACTING CONCRETE

87

SELF COMPACTING CONCRETE

88

ARMOURED FLOOR JOINTS

SIGNATURE ALFABETA_EDGE

89

MODULAR WATER TANK

90

MODULAR WATER TANK

91

FIRE RATED DRY WALL

92

FIRE RATED DRY WALL

93

DRY WALL

94

WAFFLE WALL

95

DRY WALLS & TOILET CUBICLES

96

PRECASTING

SITE INFRASTRUCTURE & OH&S SYSTEM

98

SITE ORGANOGRAMDirector

(Project Management)

Project Manager

Quantity Survey

Quantity SurveyorPlanning Engineer

Surveyor

Execution Team(Civil / MEP)

ARE/APMSr. EngineerSite Engineer

Supervisor / Formen

Support Team

Store Accounts

ProcurementAdministration

Vehicle & Maintenance

Quality Assurance & Quality Control

Health, Safety & Environment

99

SITE ESTABLISHMENT

100

SITE ESTABLISHMENT

101

102

OH&S ON SITE IMPLEMENTATION THROUGH

o Safety infrastructure

o Safety equipment and protective appliances

o Safety awareness & motivation

o Signages & pictorial awareness

o Site inspection

o Work permit for working at hazardous area.

o Good house keeping

o Safety reviews

103

SAFETY MANAGEMENT

(Managing Director)SACHIN BIYANI

LEAD SAFETY PROJECT MANAGER

SAFETY LEEDNight Shift

SAFETY LEEDDay Shift

FIRST AID SAFETY IMPLEMENTATION

ACCIDENT MANAGEMENT

FIRE PREVENTIONN SECURITY

SAFETY SUPERVISOR

SAFETY SUPERVISOR

SAFETY SUPERVISOR

TRAINING

104

OH&S IMPLIMENTATIONS

Category Identification Induction Identification

Vehicle Information Check List

105

OH&S PRACTICES

WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS

106

OH&S PRACTICES

107

OH&S PRACTICES

Barricading for Deep Excavation Caution Boards

Proper Access Proper Access

108

OH&S PRACTICES

Spot the Hazard

Flagman Labour Entry Corridor

109

OH&S PRACTICES

Edge Protection

Height Work Access Wheel Chok System

Fall Protection

110

OH&S PRACTICES

Safety Net For Fall Protection

111

OH&S PRACTICES

Use Life Line At Height

112

OH&S PRACTICES

Contaminated Soil Removing & Collecting for Disposal

Dust Control SystemCovering while Transportation

113

OH&S PRACTICES

114

OH&S AWARENESS PROGRAME

115

OH&S AWARENESS PROGRAME

116

OH&S AWARENESS PROGRAME – MOCK DRILL

117

OH&S AWARENESS PROGRAME – MOCK DRILL

118

OH&S AWARENESS PROGRAME

REWARDS & RECOGNITION

120

REWARDS & RECOGNITION

121

REWARDS & RECOGNITION

122

REWARDS & RECOGNITION

123

REWARDS & RECOGNITION

124

REWARDS & RECOGNITION

125

REWARDS & RECOGNITION

126

REWARDS & RECOGNITION

127

REWARDS & RECOGNITION

128

REWARDS & RECOGNITION

129

REWARDS & RECOGNITION

QUALITY MANAGEMENT SYSTEM

131

QUALITY MANAGEMENT SYSTEM

An established system of Quality Assurance and Control will be implemented followed

to achieve the following:

a) Quality Assurance Plan will be frozen at the initial stage of the project which will

act as the datum line for the performance of the work.

b) Quality Control will be done in the approved format as stipulated in the QA Plan.

c) In process Checks

d) Best work practices and procurement process.

e) Explore new methods of work and ideas.

132

QUALITY MANAGEMENT SYSTEM - PROCESSThe QA & QC will be implemented through following

a) Document:

All pertinent incoming / outbound documents for the project will be

controlled in accordance with the document control procedure to facilitate

their effective recording and review.

b) Construction:

o Submission of method statements

o Works inspection checklist, Material Inspection checklist.

o Mock up for Approval

o Management systems and implementation

o Surveillance and site inspection

133

QUALITY MANAGEMENT SYSTEM - PROCESSo Corrective action/ Compliance report

o Control on Non-conforming Products

o Change order Management

o Supervision, inspection and test jointly with PMC/Clients

o Close out/Handover procedures.

c) Close out Procedures

o Punch / Snag list attended and closed

o Testing and

o Certificates certified by consultants

o Hand over of O & M Manuals

o Hand over of as-built drawings, guarantee certificates etc

134

QA & QC PRACTICES

ACHIVEMENT OF THE TEAM

136

ACHIVEMENT OF THE TEAM1. KSB Pumps,Pune : Infra & Civil works to be completed in 9 Months

2. SIEMENS, Aurangabad: Received Bonus for Early completion of Project.

3. ITC Ltd, Malur, Bangalore: The first production started in 6 months.

4. ITC Ltd, Ranjangaon: The first chip line was operational in 5 months.

5. CUMMINS, India Ltd Pune: The Product (Engine) was produced in 7 months

6. SOKTAS, Kolhapur: The First 1 million of process cloth was produced in 8 months

7. SUZLON-ELIN, Chakan: The First Wind generator was produced in 9 months

8. Indian Smelting Refinery Ltd,Pune: The first casting was produced in 7 months

9. Asian Paints, Mysore: 19 Lacs Cum Earthwork completed in 7 months.

10. Thermax Babcock Wilcox Energy Solutions Pvt Ltd, Pune: Earthwork of 22 Lacs Cum was completed in 9 months.

11. Bridgestone India Ltd, Chakan: Earthwork of 16 Lacs cum was completed in 8 months

OUR STRENGTH

138

OUR STRENGTHo Integrated Team of Senior Managerial Staff having valuable and proven experience

in the related field more than 20 years.

o Executed similar fast track projects in recent past.

o Facilitating a team approach among all parties involved on the project.

o Familiar to the Latest Methods/Techniques for economization of the project cost.

o The Project Manager with financial authority will be deputed at individual sites.

o Post-Construction Service

o Establishing the Documentations.

o Providing supports, resources, maintenance team during defect liability period

THANK YOU !