corporate profile - suroj.in · pune industrial division ... weekly doctor’s visit for health...
Post on 22-May-2018
226 Views
Preview:
TRANSCRIPT
CORPORATE PROFILEApril 2018
2
OUR PURPOSE
To Strengthen the Infrastructure Fabricby aligning Our Passion, Resources and Capabilities
With Customer Growth.
Passion
3
ABOUT US
o SUROJ Private Limited Company
o Pune Industrial Division 2004-2013 (as industrial division of Rajdeep, Pune)2013 onwards as SUROJ Buildcon Pvt Ltd, Pune
o Area of Operation Industrial, Petrochemical & Institutional including Utilities
o Type of Contracts Design & Built, Lumsum, EPC and Item Rate Contracts.
We SUROJ Buildcon Pvt. Ltd. stand behind our work through the moral and ethical principlesof honesty and trust, an approach governed by our impressive track record of over 14 yearsin construction industry.
The Pune Industrial Division has completed more than 110 projects totaling to Rs. 2700+Crores ($415 MIL) in Industrial, Petrochemical and Institutional Sector.
4
OUR CORE VALUES
Organization Approach We are loyal We are hardworking We work with passion
Quality Approach We strive for excellence We innovate We adapt
People Approach We are caring We foster trust We encourage individual
growth and development
5
OUR EXPERTISE
INDUSTRIALFOOD
PHARMACHEMICAL
AUTOMOBILEHEAVY ENGINEERING
WAREHOUSES
6
OUR EXPERTISE
RESTORATION EPCINFRASTRUCTURE INSTITUTIONAL
7
OUR CLIENTELE
8
OUR PMC & ARCHITECT’S BASE
9
MANAGEMENT
Sachin R. BiyaniManaging Director
Ashirwad BhangeDirector (Technical)
Business DevelopmentTendering
Budgeting & Monitoring Information & Technology
Tushar AgarkarHead
(EPC Division)
ConceptualizationEngineering
Coordination
Sopan KhedekarSantosh Ghavte
Shyam JoshiDirectors (Operations)
Resource ManagementTask Management
Quality ManagementProcess ManagementSafety Management
Prakash YelmameDirector (Commercial)
FinanceAccounts
Procurement Inventory
Vehicle & Maintenance
Health, Safety & Environment Human Resources
10
HARYANA
MADHYA PRADESH
TELANGANA
ANDHRA PRADESH
GUJARAT
MAHARASHTRA
GOA
KARNATAKA
PRESENCE ACROSS NATION
11
FINANCIAL GROWTH
*** All Amounts are in Crore
12
OUR EMPLOYEE STRENGTH
Technical / Execution Nos Supporting Nos
Management 5 Marketing/Liasioning 1
Tender & Estimation 11 Accounts Management 4
Project Management 14 Account Executive 34
Resident Engineer/APM 23 HRD/Administration 71
Sr. Engineer 12 Purchase 7
Site Engineer 106 Store 52
Quality Control 17 Safety 70
Mechanical/Electrical 42 V & M 185
Quantity Surveyor 39
Supervisor/Technician 120
TOTAL 389 424
13
PLANT & MACHINERIES
Name Quantity Name Quantity
Total Stations 05 RMC Plants (18/30/60 Cum) 05
Theodolite/Auto level 25 Transit Mixers 10
Excavators 20 Concrete Pumps 03
Loader/JCB 04 Tough Riders 46
Vibro/Static Rollers 06 RM 800/500 Mixers 34
Water Tanker 06 Tower Cranes/Hydra 08
Tippers/HYWA 40 Scissor Lifts 04
Bar Cutting & Bending Machines 30 Articulated Boom Lift 01
DG Sets(15 to 180 KVA) 15 Weigh Bridge 03
Shuttering Material 13000 Sqm Tractor with trolley 05
14
REPEAT ORDERS
Sr. No. Client Total Orders Sr. No. Client Total Orders
1 SIEMENS 9 Nos 13 Privilege Industries 3 Nos2 ITC 9 Nos 14 KSPG 3 Nos3 Colgate Palmolive 5 Nos 15 CPF 3 Nos4 Bridgestone Tyres 5 Nos 16 Minda 3 Nos5 Indospace 5 Nos 17 SSWL 3 Nos6 Indian Smelting 5 Nos 18 Holtec Asia 3 Nos7 SUZLON 4 Nos 19 KSB Pumps 2 Nos8 Unichem 4 Nos 20 IIM 2 Nos9 Godrej 4 Nos 21 Carlsberg 2 Nos
10 Symbiosis 4 Nos 22 Novozymes 2 Nos11 Alstom 4 Nos 23 Embassy 6 Nos12 Thermax 3 Nos 24 MRF 2 Nos
26 WangFeng 2 NosNote: 70% of our Turnover comes through existing Clients/PMC/Architects
15
ONGOING PROJECTS
Sr.No. Name of Work Value of Contract
Value of Work Completed % completion
1 Land Development, Civil, Infrastructure and MEP works for Embassy Industrial Park, Chakan, Dist: Pune 130 53 40.77
2 Land Development & Infrastructure work for NovozymesSouth Asia Pvt. Ltd, Patalganga, Maharashtra 71 44 61.97
3 Civil, Infrastructure works for Thermax Ltd, Sricity, AP 31 19.52 62.97
4 Civil, Structural and Infrastructure works for PPG Asian paints Pvt Ltd, Dahej, Gujarat 68 25.17 37.01
5 Civil, Structural and Infrastructure works for Jubilant Life Sciences Ltd, Bharuch, Gujarat. 30 1.5 5.00
6 Land Development works for MRF Ltd, Dahej, Gujarat 31.5 12.5 39.68
7 Civil, Structural & Architectural Works including Interior works INDRIYA GREEN FIELD Project At Sricity, Andhra Pradesh 101 0 0.00
8 Land Development, Civil & Structure Works for Green Filed project for M/s Mane India Pvt, Ltd. At GIDC Dahej, Gujarat 41 2.05 5.00
9 Civil & Infrastructure works Parle Agro Ltd, Sricity 21 10.41 48.49
10Civil & Convention Steel Work (“the Work”) for proposed Auto GI, Protective Coatings & Resin manufacturing Facility –Berger Paints India Limited, Pune, Jejuri 92 0
0.00
LANDMARKS / FOOTPRINTS
17
NOVOZYMES SOUTH ASIA PVT. LTD, PATALGANGA
18
EMBASSY INDUSTRIAL PARK, CHAKAN
19
CARLSBERG INDIA LTD, MYSURU
20
COLGATE PALMOLIVE INDIA PVT LTD, SANAND
21
THERMAX, SRICITY
22
KSB PUMPS LTD, SHIRWAL
23
KSB PUMPS LTD, SHIRWAL
24
SCA HYGIENE,RANJANGAON
25
SCA HYGIENE,RANJANGAON
26
THERMAX – SHIRWAL, SATARA
27
THERMAX – SHIRWAL, SATARA
28
THERMAX – SHIRWAL, SATARA
29
BRIDGESTONE INDIA PVT LTD
30
COLGATE-PALMOLIVE - PI, SRICITY
31
COLGATE-PALMOLIVE - PII, SRICITY
32
PEPSICO HOLDINGS PVT LTD, SRICITY
33
PEPSICO HOLDINGS PVT LTD, SRICITY
34
HINDUSTAN AERONATIC LIMITED, NASHIK
35
CHAROEN POKPHAND (INDIA) PVT LTD (CPF-THAILAND)
36
CHAROEN POKPHAND (INDIA) PVT LTD (CPF-THAILAND)
37
FERRING PHARMACEUTICALS PVT LTD, AMBERNATH
38
WANFENG ALLOY WHEELS INDIA PVT LTD, HARYANA
39
WANFENG ALLOY WHEELS INDIA PVT LTD, HARYANA
40
CORNING, CHAKAN (SPECIFICATION AS PER FM STANDARD)
41
EATON TRUCK TRANSMISSION (I) PVT LTD
42
ITC LIMITED, MYSURU
43
ITC LIMITED, MYSURU
44
ITC LIMITED, BANGALORE
45
ITC LIMITED, BANGALORE
46
ITC LIMITED, BANGALORE
47
ITC LIMITED, AMBERNATH
48
ITC LIMITED, HYDERABAD
49
MRF, PONDA, GOA
50
SSWL, MEHSANA, GUJARAT
51
SSWL, MEHSANA, GUJARAT
52
SIEMENS LTD, AURANGABAD
53
SIEMENS LTD, VERNA ,GOA
54
INDOSPACE, CHAKAN
55
INDOSPACE, CHAKAN
56
ALSTOM TRANPORT INDIA LTD, SRICITY
57
KSPG AUTOMOTIVE PVT LTD, SUPA
58
HIRSHVOGEL COMPONENTS INDIA PVT LTD, SANASWADI
59
MUKUND BEKEART INDIA PVT LTD, LONAND, SATARA
60
SANY HEAVY INDUSTRY (I) PVT LTD, CHAKAN
61
SOKTAS INDIA PVT LTD, KOLHAPUR
62
CUMMINS INDIA LTD, PUNE
63
CUMMINS INDIA LTD, PUNE
64
GODREJ INDIA LTD, AMBERNATH
65
GODREJ INDIA LTD, AMBERNATH
66
GODREJ INDIA LTD, VALIA, GUJARAT
67
PREVILEGE INDUSTRIES, SATARA
68
MANGALORE REFINERY PETROCHEMICALS LIMITED
69
MANGALORE REFINERY PETROCHEMICALS LIMITED
70
VELLORE INSTITUTE OF TECHNOLOGY, BHOPAL
71
SYMBIOSIS – HOSTEL BUILDING, INDORE
72
SYMBIOSIS – ENGINEERING BLOCK, INDORE
73
INDIAN INSTITUTE OF MANAGEMENT, INDORE (MP)
74
INDIAN INSTITUTE OF MANAGEMENT, INDORE (MP)
75
INDIAN INSTITUTE OF MANAGEMENT, INDORE (MP)
76
ASIAN PAINTS LTD, MYSURU
77
BRIDGESTONE INDIA LTD, CHAKAN
78
THERMAX LIMITED, SHIRWAL
ADOPTION OF LATEST TECHNOLOGY & METHODS
80
ADOPTION OF LATEST TECHNOLOGY AND CONSTRUCTION METHODS
The adoption of latest Technological Plant and Equipment's, construction
methods lead to the Safe & faster construction with reduction in the
manpower, which is the critical problem in the construction industry. The
latest Plant & Equipment's and construction methods as implemented by us
for the Industrial fast track constructions.
81
LASEAR SCREED FLOORING
82
SYSTEM FORMWORK
83
SYSTEM FORMWORK
84
SYSTEM FORMWORK FOR SLAB
85
ALUMINUM PANEL FORMWORK
86
SELF COMPACTING CONCRETE
87
SELF COMPACTING CONCRETE
88
ARMOURED FLOOR JOINTS
SIGNATURE ALFABETA_EDGE
89
MODULAR WATER TANK
90
MODULAR WATER TANK
91
FIRE RATED DRY WALL
92
FIRE RATED DRY WALL
93
DRY WALL
94
WAFFLE WALL
95
DRY WALLS & TOILET CUBICLES
96
PRECASTING
SITE INFRASTRUCTURE & OH&S SYSTEM
98
SITE ORGANOGRAMDirector
(Project Management)
Project Manager
Quantity Survey
Quantity SurveyorPlanning Engineer
Surveyor
Execution Team(Civil / MEP)
ARE/APMSr. EngineerSite Engineer
Supervisor / Formen
Support Team
Store Accounts
ProcurementAdministration
Vehicle & Maintenance
Quality Assurance & Quality Control
Health, Safety & Environment
99
SITE ESTABLISHMENT
100
SITE ESTABLISHMENT
101
102
OH&S ON SITE IMPLEMENTATION THROUGH
o Safety infrastructure
o Safety equipment and protective appliances
o Safety awareness & motivation
o Signages & pictorial awareness
o Site inspection
o Work permit for working at hazardous area.
o Good house keeping
o Safety reviews
103
SAFETY MANAGEMENT
(Managing Director)SACHIN BIYANI
LEAD SAFETY PROJECT MANAGER
SAFETY LEEDNight Shift
SAFETY LEEDDay Shift
FIRST AID SAFETY IMPLEMENTATION
ACCIDENT MANAGEMENT
FIRE PREVENTIONN SECURITY
SAFETY SUPERVISOR
SAFETY SUPERVISOR
SAFETY SUPERVISOR
TRAINING
104
OH&S IMPLIMENTATIONS
Category Identification Induction Identification
Vehicle Information Check List
105
OH&S PRACTICES
WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS
106
OH&S PRACTICES
107
OH&S PRACTICES
Barricading for Deep Excavation Caution Boards
Proper Access Proper Access
108
OH&S PRACTICES
Spot the Hazard
Flagman Labour Entry Corridor
109
OH&S PRACTICES
Edge Protection
Height Work Access Wheel Chok System
Fall Protection
110
OH&S PRACTICES
Safety Net For Fall Protection
111
OH&S PRACTICES
Use Life Line At Height
112
OH&S PRACTICES
Contaminated Soil Removing & Collecting for Disposal
Dust Control SystemCovering while Transportation
113
OH&S PRACTICES
114
OH&S AWARENESS PROGRAME
115
OH&S AWARENESS PROGRAME
116
OH&S AWARENESS PROGRAME – MOCK DRILL
117
OH&S AWARENESS PROGRAME – MOCK DRILL
118
OH&S AWARENESS PROGRAME
REWARDS & RECOGNITION
120
REWARDS & RECOGNITION
121
REWARDS & RECOGNITION
122
REWARDS & RECOGNITION
123
REWARDS & RECOGNITION
124
REWARDS & RECOGNITION
125
REWARDS & RECOGNITION
126
REWARDS & RECOGNITION
127
REWARDS & RECOGNITION
128
REWARDS & RECOGNITION
129
REWARDS & RECOGNITION
QUALITY MANAGEMENT SYSTEM
131
QUALITY MANAGEMENT SYSTEM
An established system of Quality Assurance and Control will be implemented followed
to achieve the following:
a) Quality Assurance Plan will be frozen at the initial stage of the project which will
act as the datum line for the performance of the work.
b) Quality Control will be done in the approved format as stipulated in the QA Plan.
c) In process Checks
d) Best work practices and procurement process.
e) Explore new methods of work and ideas.
132
QUALITY MANAGEMENT SYSTEM - PROCESSThe QA & QC will be implemented through following
a) Document:
All pertinent incoming / outbound documents for the project will be
controlled in accordance with the document control procedure to facilitate
their effective recording and review.
b) Construction:
o Submission of method statements
o Works inspection checklist, Material Inspection checklist.
o Mock up for Approval
o Management systems and implementation
o Surveillance and site inspection
133
QUALITY MANAGEMENT SYSTEM - PROCESSo Corrective action/ Compliance report
o Control on Non-conforming Products
o Change order Management
o Supervision, inspection and test jointly with PMC/Clients
o Close out/Handover procedures.
c) Close out Procedures
o Punch / Snag list attended and closed
o Testing and
o Certificates certified by consultants
o Hand over of O & M Manuals
o Hand over of as-built drawings, guarantee certificates etc
134
QA & QC PRACTICES
ACHIVEMENT OF THE TEAM
136
ACHIVEMENT OF THE TEAM1. KSB Pumps,Pune : Infra & Civil works to be completed in 9 Months
2. SIEMENS, Aurangabad: Received Bonus for Early completion of Project.
3. ITC Ltd, Malur, Bangalore: The first production started in 6 months.
4. ITC Ltd, Ranjangaon: The first chip line was operational in 5 months.
5. CUMMINS, India Ltd Pune: The Product (Engine) was produced in 7 months
6. SOKTAS, Kolhapur: The First 1 million of process cloth was produced in 8 months
7. SUZLON-ELIN, Chakan: The First Wind generator was produced in 9 months
8. Indian Smelting Refinery Ltd,Pune: The first casting was produced in 7 months
9. Asian Paints, Mysore: 19 Lacs Cum Earthwork completed in 7 months.
10. Thermax Babcock Wilcox Energy Solutions Pvt Ltd, Pune: Earthwork of 22 Lacs Cum was completed in 9 months.
11. Bridgestone India Ltd, Chakan: Earthwork of 16 Lacs cum was completed in 8 months
OUR STRENGTH
138
OUR STRENGTHo Integrated Team of Senior Managerial Staff having valuable and proven experience
in the related field more than 20 years.
o Executed similar fast track projects in recent past.
o Facilitating a team approach among all parties involved on the project.
o Familiar to the Latest Methods/Techniques for economization of the project cost.
o The Project Manager with financial authority will be deputed at individual sites.
o Post-Construction Service
o Establishing the Documentations.
o Providing supports, resources, maintenance team during defect liability period
THANK YOU !