corporate profile - suroj.in · pune industrial division ... weekly doctor’s visit for health...

139
CORPORATE PROFILE April 2018

Upload: nguyenhuong

Post on 22-May-2018

226 views

Category:

Documents


14 download

TRANSCRIPT

Page 1: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

CORPORATE PROFILEApril 2018

Page 2: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

2

OUR PURPOSE

To Strengthen the Infrastructure Fabricby aligning Our Passion, Resources and Capabilities

With Customer Growth.

Passion

Page 3: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

3

ABOUT US

o SUROJ Private Limited Company

o Pune Industrial Division 2004-2013 (as industrial division of Rajdeep, Pune)2013 onwards as SUROJ Buildcon Pvt Ltd, Pune

o Area of Operation Industrial, Petrochemical & Institutional including Utilities

o Type of Contracts Design & Built, Lumsum, EPC and Item Rate Contracts.

We SUROJ Buildcon Pvt. Ltd. stand behind our work through the moral and ethical principlesof honesty and trust, an approach governed by our impressive track record of over 14 yearsin construction industry.

The Pune Industrial Division has completed more than 110 projects totaling to Rs. 2700+Crores ($415 MIL) in Industrial, Petrochemical and Institutional Sector.

Page 4: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

4

OUR CORE VALUES

Organization Approach We are loyal We are hardworking We work with passion

Quality Approach We strive for excellence We innovate We adapt

People Approach We are caring We foster trust We encourage individual

growth and development

Page 5: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

5

OUR EXPERTISE

INDUSTRIALFOOD

PHARMACHEMICAL

AUTOMOBILEHEAVY ENGINEERING

WAREHOUSES

Page 6: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

6

OUR EXPERTISE

RESTORATION EPCINFRASTRUCTURE INSTITUTIONAL

Page 7: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

7

OUR CLIENTELE

Page 9: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

9

MANAGEMENT

Sachin R. BiyaniManaging Director

Ashirwad BhangeDirector (Technical)

Business DevelopmentTendering

Budgeting & Monitoring Information & Technology

Tushar AgarkarHead

(EPC Division)

ConceptualizationEngineering

Coordination

Sopan KhedekarSantosh Ghavte

Shyam JoshiDirectors (Operations)

Resource ManagementTask Management

Quality ManagementProcess ManagementSafety Management

Prakash YelmameDirector (Commercial)

FinanceAccounts

Procurement Inventory

Vehicle & Maintenance

Health, Safety & Environment Human Resources

Page 10: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

10

HARYANA

MADHYA PRADESH

TELANGANA

ANDHRA PRADESH

GUJARAT

MAHARASHTRA

GOA

KARNATAKA

PRESENCE ACROSS NATION

Page 11: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

11

FINANCIAL GROWTH

*** All Amounts are in Crore

Page 12: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

12

OUR EMPLOYEE STRENGTH

Technical / Execution Nos Supporting Nos

Management 5 Marketing/Liasioning 1

Tender & Estimation 11 Accounts Management 4

Project Management 14 Account Executive 34

Resident Engineer/APM 23 HRD/Administration 71

Sr. Engineer 12 Purchase 7

Site Engineer 106 Store 52

Quality Control 17 Safety 70

Mechanical/Electrical 42 V & M 185

Quantity Surveyor 39

Supervisor/Technician 120

TOTAL 389 424

Page 13: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

13

PLANT & MACHINERIES

Name Quantity Name Quantity

Total Stations 05 RMC Plants (18/30/60 Cum) 05

Theodolite/Auto level 25 Transit Mixers 10

Excavators 20 Concrete Pumps 03

Loader/JCB 04 Tough Riders 46

Vibro/Static Rollers 06 RM 800/500 Mixers 34

Water Tanker 06 Tower Cranes/Hydra 08

Tippers/HYWA 40 Scissor Lifts 04

Bar Cutting & Bending Machines 30 Articulated Boom Lift 01

DG Sets(15 to 180 KVA) 15 Weigh Bridge 03

Shuttering Material 13000 Sqm Tractor with trolley 05

Page 14: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

14

REPEAT ORDERS

Sr. No. Client Total Orders Sr. No. Client Total Orders

1 SIEMENS 9 Nos 13 Privilege Industries 3 Nos2 ITC 9 Nos 14 KSPG 3 Nos3 Colgate Palmolive 5 Nos 15 CPF 3 Nos4 Bridgestone Tyres 5 Nos 16 Minda 3 Nos5 Indospace 5 Nos 17 SSWL 3 Nos6 Indian Smelting 5 Nos 18 Holtec Asia 3 Nos7 SUZLON 4 Nos 19 KSB Pumps 2 Nos8 Unichem 4 Nos 20 IIM 2 Nos9 Godrej 4 Nos 21 Carlsberg 2 Nos

10 Symbiosis 4 Nos 22 Novozymes 2 Nos11 Alstom 4 Nos 23 Embassy 6 Nos12 Thermax 3 Nos 24 MRF 2 Nos

26 WangFeng 2 NosNote: 70% of our Turnover comes through existing Clients/PMC/Architects

Page 15: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

15

ONGOING PROJECTS

Sr.No. Name of Work Value of Contract

Value of Work Completed % completion

1 Land Development, Civil, Infrastructure and MEP works for Embassy Industrial Park, Chakan, Dist: Pune 130 53 40.77

2 Land Development & Infrastructure work for NovozymesSouth Asia Pvt. Ltd, Patalganga, Maharashtra 71 44 61.97

3 Civil, Infrastructure works for Thermax Ltd, Sricity, AP 31 19.52 62.97

4 Civil, Structural and Infrastructure works for PPG Asian paints Pvt Ltd, Dahej, Gujarat 68 25.17 37.01

5 Civil, Structural and Infrastructure works for Jubilant Life Sciences Ltd, Bharuch, Gujarat. 30 1.5 5.00

6 Land Development works for MRF Ltd, Dahej, Gujarat 31.5 12.5 39.68

7 Civil, Structural & Architectural Works including Interior works INDRIYA GREEN FIELD Project At Sricity, Andhra Pradesh 101 0 0.00

8 Land Development, Civil & Structure Works for Green Filed project for M/s Mane India Pvt, Ltd. At GIDC Dahej, Gujarat 41 2.05 5.00

9 Civil & Infrastructure works Parle Agro Ltd, Sricity 21 10.41 48.49

10Civil & Convention Steel Work (“the Work”) for proposed Auto GI, Protective Coatings & Resin manufacturing Facility –Berger Paints India Limited, Pune, Jejuri 92 0

0.00

Page 16: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

LANDMARKS / FOOTPRINTS

Page 17: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

17

NOVOZYMES SOUTH ASIA PVT. LTD, PATALGANGA

Page 18: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

18

EMBASSY INDUSTRIAL PARK, CHAKAN

Page 19: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

19

CARLSBERG INDIA LTD, MYSURU

Page 20: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

20

COLGATE PALMOLIVE INDIA PVT LTD, SANAND

Page 21: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

21

THERMAX, SRICITY

Page 22: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

22

KSB PUMPS LTD, SHIRWAL

Page 23: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

23

KSB PUMPS LTD, SHIRWAL

Page 24: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

24

SCA HYGIENE,RANJANGAON

Page 25: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

25

SCA HYGIENE,RANJANGAON

Page 26: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

26

THERMAX – SHIRWAL, SATARA

Page 27: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

27

THERMAX – SHIRWAL, SATARA

Page 28: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

28

THERMAX – SHIRWAL, SATARA

Page 29: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

29

BRIDGESTONE INDIA PVT LTD

Page 30: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

30

COLGATE-PALMOLIVE - PI, SRICITY

Page 31: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

31

COLGATE-PALMOLIVE - PII, SRICITY

Page 32: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

32

PEPSICO HOLDINGS PVT LTD, SRICITY

Page 33: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

33

PEPSICO HOLDINGS PVT LTD, SRICITY

Page 34: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

34

HINDUSTAN AERONATIC LIMITED, NASHIK

Page 35: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

35

CHAROEN POKPHAND (INDIA) PVT LTD (CPF-THAILAND)

Page 36: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

36

CHAROEN POKPHAND (INDIA) PVT LTD (CPF-THAILAND)

Page 37: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

37

FERRING PHARMACEUTICALS PVT LTD, AMBERNATH

Page 38: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

38

WANFENG ALLOY WHEELS INDIA PVT LTD, HARYANA

Page 39: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

39

WANFENG ALLOY WHEELS INDIA PVT LTD, HARYANA

Page 40: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

40

CORNING, CHAKAN (SPECIFICATION AS PER FM STANDARD)

Page 41: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

41

EATON TRUCK TRANSMISSION (I) PVT LTD

Page 42: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

42

ITC LIMITED, MYSURU

Page 43: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

43

ITC LIMITED, MYSURU

Page 44: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

44

ITC LIMITED, BANGALORE

Page 45: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

45

ITC LIMITED, BANGALORE

Page 46: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

46

ITC LIMITED, BANGALORE

Page 47: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

47

ITC LIMITED, AMBERNATH

Page 48: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

48

ITC LIMITED, HYDERABAD

Page 49: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

49

MRF, PONDA, GOA

Page 50: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

50

SSWL, MEHSANA, GUJARAT

Page 51: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

51

SSWL, MEHSANA, GUJARAT

Page 52: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

52

SIEMENS LTD, AURANGABAD

Page 53: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

53

SIEMENS LTD, VERNA ,GOA

Page 54: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

54

INDOSPACE, CHAKAN

Page 55: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

55

INDOSPACE, CHAKAN

Page 56: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

56

ALSTOM TRANPORT INDIA LTD, SRICITY

Page 57: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

57

KSPG AUTOMOTIVE PVT LTD, SUPA

Page 58: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

58

HIRSHVOGEL COMPONENTS INDIA PVT LTD, SANASWADI

Page 59: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

59

MUKUND BEKEART INDIA PVT LTD, LONAND, SATARA

Page 60: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

60

SANY HEAVY INDUSTRY (I) PVT LTD, CHAKAN

Page 61: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

61

SOKTAS INDIA PVT LTD, KOLHAPUR

Page 62: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

62

CUMMINS INDIA LTD, PUNE

Page 63: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

63

CUMMINS INDIA LTD, PUNE

Page 64: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

64

GODREJ INDIA LTD, AMBERNATH

Page 65: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

65

GODREJ INDIA LTD, AMBERNATH

Page 66: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

66

GODREJ INDIA LTD, VALIA, GUJARAT

Page 67: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

67

PREVILEGE INDUSTRIES, SATARA

Page 68: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

68

MANGALORE REFINERY PETROCHEMICALS LIMITED

Page 69: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

69

MANGALORE REFINERY PETROCHEMICALS LIMITED

Page 70: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

70

VELLORE INSTITUTE OF TECHNOLOGY, BHOPAL

Page 71: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

71

SYMBIOSIS – HOSTEL BUILDING, INDORE

Page 72: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

72

SYMBIOSIS – ENGINEERING BLOCK, INDORE

Page 73: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

73

INDIAN INSTITUTE OF MANAGEMENT, INDORE (MP)

Page 74: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

74

INDIAN INSTITUTE OF MANAGEMENT, INDORE (MP)

Page 75: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

75

INDIAN INSTITUTE OF MANAGEMENT, INDORE (MP)

Page 76: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

76

ASIAN PAINTS LTD, MYSURU

Page 77: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

77

BRIDGESTONE INDIA LTD, CHAKAN

Page 78: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

78

THERMAX LIMITED, SHIRWAL

Page 79: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

ADOPTION OF LATEST TECHNOLOGY & METHODS

Page 80: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

80

ADOPTION OF LATEST TECHNOLOGY AND CONSTRUCTION METHODS

The adoption of latest Technological Plant and Equipment's, construction

methods lead to the Safe & faster construction with reduction in the

manpower, which is the critical problem in the construction industry. The

latest Plant & Equipment's and construction methods as implemented by us

for the Industrial fast track constructions.

Page 81: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

81

LASEAR SCREED FLOORING

Page 82: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

82

SYSTEM FORMWORK

Page 83: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

83

SYSTEM FORMWORK

Page 84: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

84

SYSTEM FORMWORK FOR SLAB

Page 85: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

85

ALUMINUM PANEL FORMWORK

Page 86: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

86

SELF COMPACTING CONCRETE

Page 87: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

87

SELF COMPACTING CONCRETE

Page 88: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

88

ARMOURED FLOOR JOINTS

SIGNATURE ALFABETA_EDGE

Page 89: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

89

MODULAR WATER TANK

Page 90: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

90

MODULAR WATER TANK

Page 91: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

91

FIRE RATED DRY WALL

Page 92: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

92

FIRE RATED DRY WALL

Page 93: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

93

DRY WALL

Page 94: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

94

WAFFLE WALL

Page 95: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

95

DRY WALLS & TOILET CUBICLES

Page 96: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

96

PRECASTING

Page 97: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

SITE INFRASTRUCTURE & OH&S SYSTEM

Page 98: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

98

SITE ORGANOGRAMDirector

(Project Management)

Project Manager

Quantity Survey

Quantity SurveyorPlanning Engineer

Surveyor

Execution Team(Civil / MEP)

ARE/APMSr. EngineerSite Engineer

Supervisor / Formen

Support Team

Store Accounts

ProcurementAdministration

Vehicle & Maintenance

Quality Assurance & Quality Control

Health, Safety & Environment

Page 99: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

99

SITE ESTABLISHMENT

Page 100: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

100

SITE ESTABLISHMENT

Page 101: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

101

Page 102: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

102

OH&S ON SITE IMPLEMENTATION THROUGH

o Safety infrastructure

o Safety equipment and protective appliances

o Safety awareness & motivation

o Signages & pictorial awareness

o Site inspection

o Work permit for working at hazardous area.

o Good house keeping

o Safety reviews

Page 103: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

103

SAFETY MANAGEMENT

(Managing Director)SACHIN BIYANI

LEAD SAFETY PROJECT MANAGER

SAFETY LEEDNight Shift

SAFETY LEEDDay Shift

FIRST AID SAFETY IMPLEMENTATION

ACCIDENT MANAGEMENT

FIRE PREVENTIONN SECURITY

SAFETY SUPERVISOR

SAFETY SUPERVISOR

SAFETY SUPERVISOR

TRAINING

Page 104: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

104

OH&S IMPLIMENTATIONS

Category Identification Induction Identification

Vehicle Information Check List

Page 105: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

105

OH&S PRACTICES

WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS

Page 106: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

106

OH&S PRACTICES

Page 107: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

107

OH&S PRACTICES

Barricading for Deep Excavation Caution Boards

Proper Access Proper Access

Page 108: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

108

OH&S PRACTICES

Spot the Hazard

Flagman Labour Entry Corridor

Page 109: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

109

OH&S PRACTICES

Edge Protection

Height Work Access Wheel Chok System

Fall Protection

Page 110: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

110

OH&S PRACTICES

Safety Net For Fall Protection

Page 111: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

111

OH&S PRACTICES

Use Life Line At Height

Page 112: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

112

OH&S PRACTICES

Contaminated Soil Removing & Collecting for Disposal

Dust Control SystemCovering while Transportation

Page 113: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

113

OH&S PRACTICES

Page 114: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

114

OH&S AWARENESS PROGRAME

Page 115: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

115

OH&S AWARENESS PROGRAME

Page 116: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

116

OH&S AWARENESS PROGRAME – MOCK DRILL

Page 117: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

117

OH&S AWARENESS PROGRAME – MOCK DRILL

Page 118: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

118

OH&S AWARENESS PROGRAME

Page 119: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

REWARDS & RECOGNITION

Page 120: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

120

REWARDS & RECOGNITION

Page 121: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

121

REWARDS & RECOGNITION

Page 122: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

122

REWARDS & RECOGNITION

Page 123: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

123

REWARDS & RECOGNITION

Page 124: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

124

REWARDS & RECOGNITION

Page 125: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

125

REWARDS & RECOGNITION

Page 126: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

126

REWARDS & RECOGNITION

Page 127: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

127

REWARDS & RECOGNITION

Page 128: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

128

REWARDS & RECOGNITION

Page 129: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

129

REWARDS & RECOGNITION

Page 130: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

QUALITY MANAGEMENT SYSTEM

Page 131: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

131

QUALITY MANAGEMENT SYSTEM

An established system of Quality Assurance and Control will be implemented followed

to achieve the following:

a) Quality Assurance Plan will be frozen at the initial stage of the project which will

act as the datum line for the performance of the work.

b) Quality Control will be done in the approved format as stipulated in the QA Plan.

c) In process Checks

d) Best work practices and procurement process.

e) Explore new methods of work and ideas.

Page 132: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

132

QUALITY MANAGEMENT SYSTEM - PROCESSThe QA & QC will be implemented through following

a) Document:

All pertinent incoming / outbound documents for the project will be

controlled in accordance with the document control procedure to facilitate

their effective recording and review.

b) Construction:

o Submission of method statements

o Works inspection checklist, Material Inspection checklist.

o Mock up for Approval

o Management systems and implementation

o Surveillance and site inspection

Page 133: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

133

QUALITY MANAGEMENT SYSTEM - PROCESSo Corrective action/ Compliance report

o Control on Non-conforming Products

o Change order Management

o Supervision, inspection and test jointly with PMC/Clients

o Close out/Handover procedures.

c) Close out Procedures

o Punch / Snag list attended and closed

o Testing and

o Certificates certified by consultants

o Hand over of O & M Manuals

o Hand over of as-built drawings, guarantee certificates etc

Page 134: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

134

QA & QC PRACTICES

Page 135: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

ACHIVEMENT OF THE TEAM

Page 136: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

136

ACHIVEMENT OF THE TEAM1. KSB Pumps,Pune : Infra & Civil works to be completed in 9 Months

2. SIEMENS, Aurangabad: Received Bonus for Early completion of Project.

3. ITC Ltd, Malur, Bangalore: The first production started in 6 months.

4. ITC Ltd, Ranjangaon: The first chip line was operational in 5 months.

5. CUMMINS, India Ltd Pune: The Product (Engine) was produced in 7 months

6. SOKTAS, Kolhapur: The First 1 million of process cloth was produced in 8 months

7. SUZLON-ELIN, Chakan: The First Wind generator was produced in 9 months

8. Indian Smelting Refinery Ltd,Pune: The first casting was produced in 7 months

9. Asian Paints, Mysore: 19 Lacs Cum Earthwork completed in 7 months.

10. Thermax Babcock Wilcox Energy Solutions Pvt Ltd, Pune: Earthwork of 22 Lacs Cum was completed in 9 months.

11. Bridgestone India Ltd, Chakan: Earthwork of 16 Lacs cum was completed in 8 months

Page 137: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

OUR STRENGTH

Page 138: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

138

OUR STRENGTHo Integrated Team of Senior Managerial Staff having valuable and proven experience

in the related field more than 20 years.

o Executed similar fast track projects in recent past.

o Facilitating a team approach among all parties involved on the project.

o Familiar to the Latest Methods/Techniques for economization of the project cost.

o The Project Manager with financial authority will be deputed at individual sites.

o Post-Construction Service

o Establishing the Documentations.

o Providing supports, resources, maintenance team during defect liability period

Page 139: CORPORATE PROFILE - suroj.in · Pune Industrial Division ... WEEKLY DOCTOR’S VISIT FOR HEALTH CHECKS OF WORKERS. 106 ... o Corrective action/ Compliance report

THANK YOU !