company
profilewww.kioku.pro
CEOMessage from
Here in KIOKU, and by extension, HAKYDA, we believe in quality. We believe in achieving best results. We believe that doing our best will satisfy us and help us grow.
This is the reason we, as a company, have grown from a small group of dedicated professionals to a multicultural team of various trades, handling projects of high complexity with same enthusiasm as on Day One.
OUR TRUE SUCCESSHINGES ON OUR RESOURCE
MANAGEMENT AND INTEGRATED BUSINESS
APPROACH
CONTENTSTABLE OF
Our human capital is our strength, hence we nurture and protect it through training initiatives and stringent HSE system
Learn about our Business
Message from CEO
Our Mission, Vision and Structure
Our Milestones
Our Clients
We are in numbers
Key Licenses
Key Certificates
Case Study: Main Contractor
Case Study: BIM Designer
Case Study: BIM Designer
Case Study: Interior Works
Case Study: Interior Works
Case Study: Subcontractor
Case Study: Subcontractor
Health Safety & Environment
01
02
03
04
05-06
07-08
09
10
11-12
13-14
15-16
17-18
19-20
21-22
23-24
25-26
LEARN AboutOur BUSINESS
HAKYDA Group was established in 2014, and has since
expanded into trade, oil and gas, IT and construction
spheres, successfully delivering every project as per
highest expectations of our clients in Central Asia.
Hakyda Group employs 150+ people full-time, and
positions itself as uniquely global company, paying
highest regards to nurturing and protecting its human
capital through training initiatives and stringent HSE
system.
KIOKU Construction, as a daughter company, aims to
bring the same high standards of business approach
that make HAKYDA stand out in the region.
KIOKU Building Contracting LLC is a sister company of
HAKYDA Group of companies, and is its acting
representative in UAE construction market.
Azat SHAHANOVCEO of HAKYDA and
KIOKU Group
1 2
We are proud to be as energetic as ever, and leveraging on our core resources, we are ready for new challanges.
As such, KIOKU Building Contracting aspires to fulfil the highest quality standards that our esteemed clients came to expect from us.
To be the sustainable, transformative and technologically innovative construction leader in the MENA region
OUR vision
100%
Turnkey projects, General contracting, subcontracting, commissioning
VERTICAL INTEGRATION
CONSTRUCTION
As a group of companies, we pride ourselves with vertical integration in our construction projects, and we use this as a competitive advantage, because:
We have a chance to control all
the units, and get products and
services exactly as we want
Having the whole process in our
command allows us to manage
and track the progress successfully
As we command all processes ourselves,
we remove the middlemen, hence
offering better prices and saving
resources to our clients
To push the limits of technology, innovation and management to bring unparalleled value to stakeholders, hence securing trust and recognition
To deliver projects with highest quality and on time, above the expectation of our clients.
OUR mission
Сlient satisfaction Quality HSE Accountability Technological know-how
OUR drivers
HAKYDA Group of companies
HAKYDATURKMENISTAN
KIOKUUNITED ARAB EMIRATES
KIOKU INTERNATIONAL FZ-LLCgeneral trading
KIOKU IT SERVICES LLCIT and Computer systems,
surveilance
KIOKU BUILDING CONTRACTING LCCgeneral contracting and construction
company STRUCTURE
ARIF TURKMEN HJ
construction, general trading
MUKADDES UGUR HJelectric and mechanical systems
HAKYDA HJ
advertising
Computer systems, IT systems, surveilLance installation, networking and maintenance
IT SOLUTIONS
International trade and supply
GENERAL TRADING
Design, installation and commissioning
MECHANICAL, ELECTRICAL AND PLUMBING (MEP)
Reinforced Concrete and Steel structure design, Site supervision, Quality Control
CONSULTING
QUALITY TIMELINESS SAVINGS TO OUR CLIENTS
2014 2015 2016 2017 2018 2019
3 Subcontracts7 subcontracts
2 design contracts
OUR MILESTONES
9 subcontracts1 general contract5 design contracts
11 subcontracts1 general contract8 design contracts
1 offshoresubcontract
4 subcontracts2 general contracts9 design contracts
3 4
our constructionClients
BOUYGUES BATIMENT INTERNATIONAL
PETRONAS CARIGALI GAP INSAAT VE TAAHHUT
BELDA INSAAT, TAAHHUT VE TICARET
RONESANS HOLDING POLIMEKS HOLDING
CALIK HOLDING DOST INSAAT VE TAAHHUT VISOR INSAAT
BAHAR INSAAT SANAYI VE TICARET
TEPE TURKMEN INSAAT COTAM ENTERPRISES
our other
Client satisfaction
is our
most valuable
driver
DRAGON OIL COCA COLA BOTTLERS SCHLUMBERGER
CHINESE NATIONAL PETROLEUM COMPANY
TENARIS SCOMI
PACIFIC ATLANTIC EXPRESS
Clients
ATLAS COPCO
5 6
Certificates Projects Completed
Returning Customers
144 8186%
7 8
Ashgabat, TURKMENISTANKiyanly, TURKMENISTAN
Dubai, UAE
RAK, UAE
HIGH HEALTH, SAFETY AND ENVIRONMENT
COMPLIANCE
Full-time staff
150+
WHY US?
MULTIREGIONAL EXPERTISE
CORPORATE GOVERNANCEAND INTERNATIONAL
STANDARD COMPLIANCE
USD TURNOVER11 million
SAFE MANHOURS946,908
PROFESSIONAL AND EXPERIENCED
STAFF
we arein numbers
ourpresence
KEY TRADE KEY
G+4 BUILDING CONTRACTING LICENSE
AUTOMOTIVE TRADING LICENSE
LOGISTICS LICENSE
LICENSES
TAX CERTIFICATES
PRODUCT QUALITY COMPLIANCE CERTIFICATE
HSE COMPLIANCE CERTIFICATE
RECOMMENDATION LETTERS
CERTIFICATES
TOWARDS INTERNATIONALCERTIFICATIONS
9 10
G+1 BUILDING CONTRACTING DUBAI
GENERAL TRADING RAK
INFORMATION TECHNOLOGIES RAK
Our goal is to achieve ISO ratings in all processes
UNITED ARAB EMIRATES LICENSES
TURKMENISTAN LICENSES
ISO 9001:2008CERTIFICATE
GENERAL TRADING LICENSE
COMPLIANCE CERTIFICATES
OTHER CERTIFICATES
CASE STuDY
PERFORMANCE SUMMARY
430,000 M A N - H O U R S
W I T H O U T A C C I D E N T S
Health-safety-environemnt (HSE) was
taken as priority:
- accidents: 0
- incidents: 3
- near-misses: 18
For every incident, thorough case study
and extensive review was conducted,
followed by targeted HSE training
sessions and improved tool-box meetings.
18 monthsP R O J E C T D U R A T I O N
Project was delivered before time by
two weeks. S-curve was followed
successfully, with timely corrections
$4,900,000P R O J E C T C O S T
Lump-sum price included EPC. Project
was finilized without cost overruns.
Main contractor
kindergarten
Design was performed by in-house architectural and structural teams, with approval from Ministry of Construction
of Turkmenistan. Site supervision was performed by the Client officers. 145 people worked simulatenously at the
projects busiest point.
White marble facade works Concreting and structural works Earthworks and site organisation
Goverment of Turkmenistan, in the face of Ministry of Education, acted as the client for turn-key project for EPC of
Kindergarten for 200 places with improved comfort.
Project duration of 18 months, and lump sum of 4,900,000 US dollars was tendered, and won by HAKYDA HJ.
Project consisted of three main blocks, technical block, a small gallery, landscaping and fencing. Overall, 12000 m2
of usable space was created in two levels. Project included classrooms, sleeping areas, small gymnasium, playing
grounds and canteen. Waterproo�ng and insulation
11 12
CASE STuDY
PERFORMANCE SUMMARY
4,500 M A N - H O U R S
o f e n g i n e e r i n g w o r k
including the following trades:
- Architecture
- Reinforced Concrete Structure
- Mechanical Systems
- Electrical Systems
- Facade Works
- Steel Structure
- Partitions
- Special Systems
12 monthsD E S I G N D U R A T I O N
Design phase overlapped with
construction, hence simultaneous
design and site support was performed.
$ 450,000P R O J E C T C O S T
Lump-sum price included preliminary
design and final design drawings for
all trades
BIM DESIGNER
regional centre
Design was performed by architectural, structural, mechanical and electrical teams with approval from
Ministry of Construction of Turkmenistan.
Timely clash detection
Design of building for regional centre for people’s assembly was tendered for lump sum of 500,000 USD, and
performed by teams of HAKYDA HJ.
The Building consisted of three main blocks, two support buildings and numerous galleries.
13 14
Autodesk REVIT was used to execute all design processes in BIM environment.
Design consisted of conception, liaising, and delivery of final drawings of all trades.
Clash detection was performed simultaneously with construction on site.
Next level detailingComplex inter-trade integration
CASE STuDY
PERFORMANCE SUMMARY
8,000 M A N - H O U R S
o f e n g i n e e r i n g w o r k
including the following trades:
- Architecture
- Reinforced Concrete Structure
- Mechanical Systems
- Electrical Systems
- Facade Works
- Steel Structure
- Partitions
- Special Systems
12 monthsD E S I G N D U R A T I O N
Design phase overlapped with
construction, hence simultaneous design
and site support was performed.
$ 870,000P R O J E C T C O S T
Lump-sum price included preliminary
design and final design drawings for
all trades
BIM DESIGNER
CONGRESS CENTRE
Design was performed by architectural, structural, mechanical and electrical teams with approval from
Ministry of Construction of Turkmenistan.
Interior detailing Timely clash detection
Government of Turkmenistan, in the face of Municipality of Ashgabat, acted as the client
for turn-key project for EPC of Congress Centre for VIP guests.
Design was tendered for lump sum of 900,000 USD, and performed by teams of HAKYDA HJ.
15 16
Autodesk REVIT was used to execute all design processes in BIM environment, from conception to delivery of
final drawings of all trades. Clash detection was performed simultaneously with construction on site. Any
feedback from site was quickly incorporated, and local peculiarities of project were handled timely and with
minimal cost overruns.
Complex inter-trade integration
CASE STuDY
PERFORMANCE SUMMARY
7,000 M A N - H O U R S
W I T H O U T A C C I D E N T S
Health-safety-environemnt (HSE) was
taken as priority:
- accidents: 0
- incidents: 0
- near-misses: 3
For every near-miss, teams were given
information in the daily toolbox meeting.
Separate meetings were conducted with
supervisors to forsee future risks.
2 monthsP R O J E C T D U R A T I O N
Project was delivered on time.
$450,000P R O J E C T C O S T
Lump-sum price, that included
construction and delivery of materials,
fittings and chandeliers
interior works
Golf club
Decorative tiling works Ceiling plasterboard works High-quality detailing
Golf Club, a two-story building in the outskirts of Ashgabat, was being built by private parties.
HAKYDA HJ was awarded the contract for interior decorations, that included construction and material
delivery for:
- Ceiling decorations, including support steel structures
- Wall decorations and cladding
- Floor stone and marble finishing
- Lights and fittings
17 18
CASE STuDY
PERFORMANCE SUMMARY
48,000 M A N - H O U R S
W I T H O U T A C C I D E N T S
Health-safety-environemnt (HSE) was
taken as priority:
- accidents: 0
- incidents: 0
- near-misses: 3
For every near-miss, teams were given
information in the daily toolbox meeting.
Separate meetings were conducted with
supervisors to forsee future risks.
7 monthsP R O J E C T D U R A T I O N
Project was delivered on time.
$1,600,000P R O J E C T C O S T
Lump-sum price, that included
construction and delivery of materials,
fittings and chandeliers
interior works
vip guesthouse
Decorative wall cladding Ceiling ornamentation works Floor stone/marble �nishing
HAKYDA HJ was awarded the contract for interior decorations of VIP Guesthouse, intended to house VIP delegations
for govermental activities., that included construction and material delivery for:
- Ceiling decorations, including support steel structures
- Wall decorations and cladding
- Floor stone and marble finishing
- Lights and fittings
19 20
CASE STuDY
PERFORMANCE SUMMARY
25,000 M A N - H O U R S
W I T H O U T A C C I D E N T S
Health-safety-environemnt (HSE) was
taken as priority:
- accidents: 0
- incidents: 0
- near-misses: 2
For every near-miss, teams were given
information in the daily toolbox meeting.
Separate meetings were conducted with
supervisors to forsee future risks.
8 monthsP R O J E C T D U R A T I O N
Project was delivered on time, extra staff
were hired to respect the project timeline
$190,000P R O J E C T C O S T
Lump-sum price. Project was finilized
without cost overruns
Sub contractor
administrativebuilding
Contract included provision of materials and labor for masonry works of all floors. Masonry was to be executed
using Autoclaved aerated concrete (AAC) blocks.. Afterwards, plastering and painting works were conducted.
Autoclaved aerated concrete blocks Facade masonry works Two-story AAC masonry execution
Provintial Administrative Building was ordered by Akhal Municipality, that consists of two-story, one block
building of RC column-beam system.
Waterproo�ng and insulation
21 22
CASE STuDY
PERFORMANCE SUMMARY
86,000 M A N - H O U R S
W I T H O U T A C C I D E N T S
Health-safety-environemnt (HSE) was
taken as priority:
- accidents: 0
- incidents: 0
- near-misses: 6
For every near-miss, teams were given
information in the daily toolbox meeting.
Separate meetings were conducted with
supervisors to forsee future risks.
12 monthsP R O J E C T D U R A T I O N
Project was delivered on time, extra staff
were hired to respect the project timeline
$1,300,000P R O J E C T C O S T
Lump-sum price. Project was finilized
without cost overruns
Sub contractor
firefightingbuilding
Contract included provision of materials and labor for masonry works for two floors. Masonry height was
4m, hollow bricks were used. Afterwards, plastering and painting works were conducted.
Secondary steel structure installation Partition wall core reinforcement Blockwork
For regional Firefighting Building construction, HAKYDA HJ was hired as subcontractor for masonry partitions,
including painting, and facade works.
Waterproo�ng and insulation
Also, facade works included fixation of support steel structure for composite aluminum panels. Composite
aluminum panels were delivered and installed considering stringent firefighting regulations.
23 24
At KIOKU, we believe that the safety of human resources and assets will ensure the success of the project and
the company as a whole. We go to great lengths to implement OSHA regulations in our construction sites, and
keep track of statistical data to better understand and learn on incidents, accidents and near-misses.
HEALTH, SAFETY AND ENVIRONMENT
0% 0.017 0%
TOTAL RECORDABLE CASE FREQUENCY
(TRFC)
LOST TIME INJURY FREQUENCY (LTIF)
FATAL INCIDENT RATE (FIT)
Fatal Incident Rate =
Fatal Accidents x 100,000,000
-----------------------
Total Manhours Worked
Fatal Accidents: (FA) 0
Total Manhours Worked: 946,908
Lost Time Injury Frequency Rate =
Lost Time Injury x 1,000,000
---------------------
Total Manhours
Lost Time Injury (LTI): 17
Total Manhours Worked: 946,908
Restricted Work Day Case (RWDC): 0
Medical Treatment Case
(MTC): 1
Loss of Primary Containment
(LOPC): 0
Major Fire (MF): 0
25 26
www.kioku.pro