Page 1: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

company

profilewww.kioku.pro

Page 2: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

CEOMessage from

Here in KIOKU, and by extension, HAKYDA, we believe in quality. We believe in achieving best results. We believe that doing our best will satisfy us and help us grow.

This is the reason we, as a company, have grown from a small group of dedicated professionals to a multicultural team of various trades, handling projects of high complexity with same enthusiasm as on Day One.

OUR TRUE SUCCESSHINGES ON OUR RESOURCE

MANAGEMENT AND INTEGRATED BUSINESS

APPROACH

CONTENTSTABLE OF

Our human capital is our strength, hence we nurture and protect it through training initiatives and stringent HSE system

Learn about our Business

Message from CEO

Our Mission, Vision and Structure

Our Milestones

Our Clients

We are in numbers

Key Licenses

Key Certificates

Case Study: Main Contractor

Case Study: BIM Designer

Case Study: BIM Designer

Case Study: Interior Works

Case Study: Interior Works

Case Study: Subcontractor

Case Study: Subcontractor

Health Safety & Environment

01

02

03

04

05-06

07-08

09

10

11-12

13-14

15-16

17-18

19-20

21-22

23-24

25-26

LEARN AboutOur BUSINESS

HAKYDA Group was established in 2014, and has since

expanded into trade, oil and gas, IT and construction

spheres, successfully delivering every project as per

highest expectations of our clients in Central Asia.

Hakyda Group employs 150+ people full-time, and

positions itself as uniquely global company, paying

highest regards to nurturing and protecting its human

capital through training initiatives and stringent HSE

system.

KIOKU Construction, as a daughter company, aims to

bring the same high standards of business approach

that make HAKYDA stand out in the region.

KIOKU Building Contracting LLC is a sister company of

HAKYDA Group of companies, and is its acting

representative in UAE construction market.

Azat SHAHANOVCEO of HAKYDA and

KIOKU Group

1 2

We are proud to be as energetic as ever, and leveraging on our core resources, we are ready for new challanges.

As such, KIOKU Building Contracting aspires to fulfil the highest quality standards that our esteemed clients came to expect from us.

Page 3: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

To be the sustainable, transformative and technologically innovative construction leader in the MENA region

OUR vision

100%

Turnkey projects, General contracting, subcontracting, commissioning

VERTICAL INTEGRATION

CONSTRUCTION

As a group of companies, we pride ourselves with vertical integration in our construction projects, and we use this as a competitive advantage, because:

We have a chance to control all

the units, and get products and

services exactly as we want

Having the whole process in our

command allows us to manage

and track the progress successfully

As we command all processes ourselves,

we remove the middlemen, hence

offering better prices and saving

resources to our clients

To push the limits of technology, innovation and management to bring unparalleled value to stakeholders, hence securing trust and recognition

To deliver projects with highest quality and on time, above the expectation of our clients.

OUR mission

Сlient satisfaction Quality HSE Accountability Technological know-how

OUR drivers

HAKYDA Group of companies

HAKYDATURKMENISTAN

KIOKUUNITED ARAB EMIRATES

KIOKU INTERNATIONAL FZ-LLCgeneral trading

KIOKU IT SERVICES LLCIT and Computer systems,

surveilance

KIOKU BUILDING CONTRACTING LCCgeneral contracting and construction

company STRUCTURE

ARIF TURKMEN HJ

construction, general trading

MUKADDES UGUR HJelectric and mechanical systems

HAKYDA HJ

advertising

Computer systems, IT systems, surveilLance installation, networking and maintenance

IT SOLUTIONS

International trade and supply

GENERAL TRADING

Design, installation and commissioning

MECHANICAL, ELECTRICAL AND PLUMBING (MEP)

Reinforced Concrete and Steel structure design, Site supervision, Quality Control

CONSULTING

QUALITY TIMELINESS SAVINGS TO OUR CLIENTS

2014 2015 2016 2017 2018 2019

3 Subcontracts7 subcontracts

2 design contracts

OUR MILESTONES

9 subcontracts1 general contract5 design contracts

11 subcontracts1 general contract8 design contracts

1 offshoresubcontract

4 subcontracts2 general contracts9 design contracts

3 4

Page 4: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

our constructionClients

BOUYGUES BATIMENT INTERNATIONAL

PETRONAS CARIGALI GAP INSAAT VE TAAHHUT

BELDA INSAAT, TAAHHUT VE TICARET

RONESANS HOLDING POLIMEKS HOLDING

CALIK HOLDING DOST INSAAT VE TAAHHUT VISOR INSAAT

BAHAR INSAAT SANAYI VE TICARET

TEPE TURKMEN INSAAT COTAM ENTERPRISES

our other

Client satisfaction

is our

most valuable

driver

DRAGON OIL COCA COLA BOTTLERS SCHLUMBERGER

CHINESE NATIONAL PETROLEUM COMPANY

TENARIS SCOMI

PACIFIC ATLANTIC EXPRESS

Clients

ATLAS COPCO

5 6

Page 5: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

Certificates Projects Completed

Returning Customers

144 8186%

7 8

Ashgabat, TURKMENISTANKiyanly, TURKMENISTAN

Dubai, UAE

RAK, UAE

HIGH HEALTH, SAFETY AND ENVIRONMENT

COMPLIANCE

Full-time staff

150+

WHY US?

MULTIREGIONAL EXPERTISE

CORPORATE GOVERNANCEAND INTERNATIONAL

STANDARD COMPLIANCE

USD TURNOVER11 million

SAFE MANHOURS946,908

PROFESSIONAL AND EXPERIENCED

STAFF

we arein numbers

ourpresence

Page 6: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

KEY TRADE KEY

G+4 BUILDING CONTRACTING LICENSE

AUTOMOTIVE TRADING LICENSE

LOGISTICS LICENSE

LICENSES

TAX CERTIFICATES

PRODUCT QUALITY COMPLIANCE CERTIFICATE

HSE COMPLIANCE CERTIFICATE

RECOMMENDATION LETTERS

CERTIFICATES

TOWARDS INTERNATIONALCERTIFICATIONS

9 10

G+1 BUILDING CONTRACTING DUBAI

GENERAL TRADING RAK

INFORMATION TECHNOLOGIES RAK

Our goal is to achieve ISO ratings in all processes

UNITED ARAB EMIRATES LICENSES

TURKMENISTAN LICENSES

ISO 9001:2008CERTIFICATE

GENERAL TRADING LICENSE

COMPLIANCE CERTIFICATES

OTHER CERTIFICATES

Page 7: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

CASE STuDY

PERFORMANCE SUMMARY

430,000 M A N - H O U R S

W I T H O U T A C C I D E N T S

Health-safety-environemnt (HSE) was

taken as priority:

- accidents: 0

- incidents: 3

- near-misses: 18

For every incident, thorough case study

and extensive review was conducted,

followed by targeted HSE training

sessions and improved tool-box meetings.

18 monthsP R O J E C T D U R A T I O N

Project was delivered before time by

two weeks. S-curve was followed

successfully, with timely corrections

$4,900,000P R O J E C T C O S T

Lump-sum price included EPC. Project

was finilized without cost overruns.

Main contractor

kindergarten

Design was performed by in-house architectural and structural teams, with approval from Ministry of Construction

of Turkmenistan. Site supervision was performed by the Client officers. 145 people worked simulatenously at the

projects busiest point.

White marble facade works Concreting and structural works Earthworks and site organisation

Goverment of Turkmenistan, in the face of Ministry of Education, acted as the client for turn-key project for EPC of

Kindergarten for 200 places with improved comfort.

Project duration of 18 months, and lump sum of 4,900,000 US dollars was tendered, and won by HAKYDA HJ.

Project consisted of three main blocks, technical block, a small gallery, landscaping and fencing. Overall, 12000 m2

of usable space was created in two levels. Project included classrooms, sleeping areas, small gymnasium, playing

grounds and canteen. Waterproo�ng and insulation

11 12

Page 8: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

CASE STuDY

PERFORMANCE SUMMARY

4,500 M A N - H O U R S

o f e n g i n e e r i n g w o r k

including the following trades:

- Architecture

- Reinforced Concrete Structure

- Mechanical Systems

- Electrical Systems

- Facade Works

- Steel Structure

- Partitions

- Special Systems

12 monthsD E S I G N D U R A T I O N

Design phase overlapped with

construction, hence simultaneous

design and site support was performed.

$ 450,000P R O J E C T C O S T

Lump-sum price included preliminary

design and final design drawings for

all trades

BIM DESIGNER

regional centre

Design was performed by architectural, structural, mechanical and electrical teams with approval from

Ministry of Construction of Turkmenistan.

Timely clash detection

Design of building for regional centre for people’s assembly was tendered for lump sum of 500,000 USD, and

performed by teams of HAKYDA HJ.

The Building consisted of three main blocks, two support buildings and numerous galleries.

13 14

Autodesk REVIT was used to execute all design processes in BIM environment.

Design consisted of conception, liaising, and delivery of final drawings of all trades.

Clash detection was performed simultaneously with construction on site.

Next level detailingComplex inter-trade integration

Page 9: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

CASE STuDY

PERFORMANCE SUMMARY

8,000 M A N - H O U R S

o f e n g i n e e r i n g w o r k

including the following trades:

- Architecture

- Reinforced Concrete Structure

- Mechanical Systems

- Electrical Systems

- Facade Works

- Steel Structure

- Partitions

- Special Systems

12 monthsD E S I G N D U R A T I O N

Design phase overlapped with

construction, hence simultaneous design

and site support was performed.

$ 870,000P R O J E C T C O S T

Lump-sum price included preliminary

design and final design drawings for

all trades

BIM DESIGNER

CONGRESS CENTRE

Design was performed by architectural, structural, mechanical and electrical teams with approval from

Ministry of Construction of Turkmenistan.

Interior detailing Timely clash detection

Government of Turkmenistan, in the face of Municipality of Ashgabat, acted as the client

for turn-key project for EPC of Congress Centre for VIP guests.

Design was tendered for lump sum of 900,000 USD, and performed by teams of HAKYDA HJ.

15 16

Autodesk REVIT was used to execute all design processes in BIM environment, from conception to delivery of

final drawings of all trades. Clash detection was performed simultaneously with construction on site. Any

feedback from site was quickly incorporated, and local peculiarities of project were handled timely and with

minimal cost overruns.

Complex inter-trade integration

Page 10: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

CASE STuDY

PERFORMANCE SUMMARY

7,000 M A N - H O U R S

W I T H O U T A C C I D E N T S

Health-safety-environemnt (HSE) was

taken as priority:

- accidents: 0

- incidents: 0

- near-misses: 3

For every near-miss, teams were given

information in the daily toolbox meeting.

Separate meetings were conducted with

supervisors to forsee future risks.

2 monthsP R O J E C T D U R A T I O N

Project was delivered on time.

$450,000P R O J E C T C O S T

Lump-sum price, that included

construction and delivery of materials,

fittings and chandeliers

interior works

Golf club

Decorative tiling works Ceiling plasterboard works High-quality detailing

Golf Club, a two-story building in the outskirts of Ashgabat, was being built by private parties.

HAKYDA HJ was awarded the contract for interior decorations, that included construction and material

delivery for:

- Ceiling decorations, including support steel structures

- Wall decorations and cladding

- Floor stone and marble finishing

- Lights and fittings

17 18

Page 11: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

CASE STuDY

PERFORMANCE SUMMARY

48,000 M A N - H O U R S

W I T H O U T A C C I D E N T S

Health-safety-environemnt (HSE) was

taken as priority:

- accidents: 0

- incidents: 0

- near-misses: 3

For every near-miss, teams were given

information in the daily toolbox meeting.

Separate meetings were conducted with

supervisors to forsee future risks.

7 monthsP R O J E C T D U R A T I O N

Project was delivered on time.

$1,600,000P R O J E C T C O S T

Lump-sum price, that included

construction and delivery of materials,

fittings and chandeliers

interior works

vip guesthouse

Decorative wall cladding Ceiling ornamentation works Floor stone/marble �nishing

HAKYDA HJ was awarded the contract for interior decorations of VIP Guesthouse, intended to house VIP delegations

for govermental activities., that included construction and material delivery for:

- Ceiling decorations, including support steel structures

- Wall decorations and cladding

- Floor stone and marble finishing

- Lights and fittings

19 20

Page 12: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

CASE STuDY

PERFORMANCE SUMMARY

25,000 M A N - H O U R S

W I T H O U T A C C I D E N T S

Health-safety-environemnt (HSE) was

taken as priority:

- accidents: 0

- incidents: 0

- near-misses: 2

For every near-miss, teams were given

information in the daily toolbox meeting.

Separate meetings were conducted with

supervisors to forsee future risks.

8 monthsP R O J E C T D U R A T I O N

Project was delivered on time, extra staff

were hired to respect the project timeline

$190,000P R O J E C T C O S T

Lump-sum price. Project was finilized

without cost overruns

Sub contractor

administrativebuilding

Contract included provision of materials and labor for masonry works of all floors. Masonry was to be executed

using Autoclaved aerated concrete (AAC) blocks.. Afterwards, plastering and painting works were conducted.

Autoclaved aerated concrete blocks Facade masonry works Two-story AAC masonry execution

Provintial Administrative Building was ordered by Akhal Municipality, that consists of two-story, one block

building of RC column-beam system.

Waterproo�ng and insulation

21 22

Page 13: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

CASE STuDY

PERFORMANCE SUMMARY

86,000 M A N - H O U R S

W I T H O U T A C C I D E N T S

Health-safety-environemnt (HSE) was

taken as priority:

- accidents: 0

- incidents: 0

- near-misses: 6

For every near-miss, teams were given

information in the daily toolbox meeting.

Separate meetings were conducted with

supervisors to forsee future risks.

12 monthsP R O J E C T D U R A T I O N

Project was delivered on time, extra staff

were hired to respect the project timeline

$1,300,000P R O J E C T C O S T

Lump-sum price. Project was finilized

without cost overruns

Sub contractor

firefightingbuilding

Contract included provision of materials and labor for masonry works for two floors. Masonry height was

4m, hollow bricks were used. Afterwards, plastering and painting works were conducted.

Secondary steel structure installation Partition wall core reinforcement Blockwork

For regional Firefighting Building construction, HAKYDA HJ was hired as subcontractor for masonry partitions,

including painting, and facade works.

Waterproo�ng and insulation

Also, facade works included fixation of support steel structure for composite aluminum panels. Composite

aluminum panels were delivered and installed considering stringent firefighting regulations.

23 24

Page 14: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

At KIOKU, we believe that the safety of human resources and assets will ensure the success of the project and

the company as a whole. We go to great lengths to implement OSHA regulations in our construction sites, and

keep track of statistical data to better understand and learn on incidents, accidents and near-misses.

HEALTH, SAFETY AND ENVIRONMENT

0% 0.017 0%

TOTAL RECORDABLE CASE FREQUENCY

(TRFC)

LOST TIME INJURY FREQUENCY (LTIF)

FATAL INCIDENT RATE (FIT)

Fatal Incident Rate =

Fatal Accidents x 100,000,000

-----------------------

Total Manhours Worked

Fatal Accidents: (FA) 0

Total Manhours Worked: 946,908

Lost Time Injury Frequency Rate =

Lost Time Injury x 1,000,000

---------------------

Total Manhours

Lost Time Injury (LTI): 17

Total Manhours Worked: 946,908

Restricted Work Day Case (RWDC): 0

Medical Treatment Case

(MTC): 1

Loss of Primary Containment

(LOPC): 0

Major Fire (MF): 0

25 26

Page 15: company profilekioku.pro/wp-content/uploads/2020/03/KIOKU-BC-Booklet.pdfTo be the sustainable, transformative and technologically innovative construction leader in the MENA region

www.kioku.pro

[email protected]

+971-5-649-73918

build

نحن نبني الثقةtrust

/company/kiokubc

+971-5-271-89529

115-020, CBD AlQouz,Dubai, UAE

we