commission européenne 1 -1- the preparation of the ops 2007 – 2013 – a good opportunity to...
Post on 27-Mar-2015
212 Views
Preview:
TRANSCRIPT
Commission européenne--11--
The Preparation of the OP‘s2007 – 2013 – a good opportunity
to avoid red tape!
Commission européenne--22--
Impact of Red Tape on:
• Effectivity
• Efficiency
• Attractivity
Influence on
• Publicity
• Additionality
Commission européenne--33--
Red Tape in Practice
• Administration– Guidelines– Regulations
• Project Promoters
• Monitoring and Reporting
Commission européenne--44--
Results in the public administration
• Double work (at least)
• Overload of information
• Stop of payments
• N+2 losses
• Demotivation of staff
Commission européenne--55--
Results at project level:
• Only managable by „bigger“ organisations
• Overload of „work“ compared to the results
Influence on
• Image
• Selection of project promoters
Commission européenne--66--
Red tape in monitoring
• Ambitious but not realistic
• Not co-ordinated
• Late in place
• Overload with evaluation
Commission européenne--77--
Solutions for the Public Administration
• Reduce the number of Intermediate Bodys
• Less instruments …
• Stable structures …
• Investment in human capital
More space in the General Regulation
Commission européenne--88--
Solutions at project level:• Less project types• Easy to manage and to monitor• Capped/limited commitments
Examples:• Vocational training vouchers • Consulting products• Local social capital
Commission européenne--99--
Solutions for Monitoring
Make monitoring simple for PP and PA
• Monitoring is not evaluation!
• Concentration on the necessary (-80%)
• Connect financial and physical monitoring!
Commission européenne--1010--
Conclusion:The start of the next programming period is a good opportunity to– simplify monitoring, reporting and evaluation for
project and programme manager– concentrate on less and more efficient instruments– increase transparency right from the start.
Communication is crucial!!!
top related