Commission européenne -1- The Preparation of the OP‘s 2007 – 2013 – a good opportunity to avoid red tape!

Upload: timothy-wade

Post on 27-Mar-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Commission européenne 1 -1- The Preparation of the OPs 2007 – 2013 – a good opportunity to avoid red tape!

Commission européenne--11--

The Preparation of the OP‘s2007 – 2013 – a good opportunity

to avoid red tape!

Page 2: Commission européenne 1 -1- The Preparation of the OPs 2007 – 2013 – a good opportunity to avoid red tape!

Commission européenne--22--

Impact of Red Tape on:

• Effectivity

• Efficiency

• Attractivity

Influence on

• Publicity

• Additionality

Page 3: Commission européenne 1 -1- The Preparation of the OPs 2007 – 2013 – a good opportunity to avoid red tape!

Commission européenne--33--

Red Tape in Practice

• Administration– Guidelines– Regulations

• Project Promoters

• Monitoring and Reporting

Page 4: Commission européenne 1 -1- The Preparation of the OPs 2007 – 2013 – a good opportunity to avoid red tape!

Commission européenne--44--

Results in the public administration

• Double work (at least)

• Overload of information

• Stop of payments

• N+2 losses

• Demotivation of staff

Page 5: Commission européenne 1 -1- The Preparation of the OPs 2007 – 2013 – a good opportunity to avoid red tape!

Commission européenne--55--

Results at project level:

• Only managable by „bigger“ organisations

• Overload of „work“ compared to the results

Influence on

• Image

• Selection of project promoters

Page 6: Commission européenne 1 -1- The Preparation of the OPs 2007 – 2013 – a good opportunity to avoid red tape!

Commission européenne--66--

Red tape in monitoring

• Ambitious but not realistic

• Not co-ordinated

• Late in place

• Overload with evaluation

Page 7: Commission européenne 1 -1- The Preparation of the OPs 2007 – 2013 – a good opportunity to avoid red tape!

Commission européenne--77--

Solutions for the Public Administration

• Reduce the number of Intermediate Bodys

• Less instruments …

• Stable structures …

• Investment in human capital

More space in the General Regulation

Page 8: Commission européenne 1 -1- The Preparation of the OPs 2007 – 2013 – a good opportunity to avoid red tape!

Commission européenne--88--

Solutions at project level:• Less project types• Easy to manage and to monitor• Capped/limited commitments

Examples:• Vocational training vouchers • Consulting products• Local social capital

Page 9: Commission européenne 1 -1- The Preparation of the OPs 2007 – 2013 – a good opportunity to avoid red tape!

Commission européenne--99--

Solutions for Monitoring

Make monitoring simple for PP and PA

• Monitoring is not evaluation!

• Concentration on the necessary (-80%)

• Connect financial and physical monitoring!

Page 10: Commission européenne 1 -1- The Preparation of the OPs 2007 – 2013 – a good opportunity to avoid red tape!

Commission européenne--1010--

Conclusion:The start of the next programming period is a good opportunity to– simplify monitoring, reporting and evaluation for

project and programme manager– concentrate on less and more efficient instruments– increase transparency right from the start.

Communication is crucial!!!