DKO Architecture (NSW) Pty Ltd119 Redfern StreetRedfern, NSW 2016T +61 2 8346 4500info@DKO.com.auwww.DKO.com.auABN: 81956706590© DKO Architecture (NSW) Pty LtdExcept as allowed under copyright act, no part of thisdrawing may be reproduced or otherwise dealt withwithout written permission of DKO Architecture.

CkdBy DescriptionDateRev.

Scale

RevisionDA308Drawing Number

115272-8 Free Settlers Drive,Kellyville, NSW 2155

SectionsProject Name Gracewood Village Stg 3 Project Number

Drawing NameProject Address

Date

Client BaptistCare NSW

NSW: Nominated ArchitectsKoos de Keijzer 5767 | David Randerson 8542 B

1:200@ A1,December 2017

CivilWood & Grieve EngineersP_02 8484 7047Jacky.Lee@wge.com.au

DDAMGACP_02 9692 9322anthony@mgac.com.au

Fire EngineeringAffinity Fire EngineeringP_02 9194 0590todwyer@affinity-eng.com

Landscape ArchitectTaylor BrammerP_02 9387 8855ibrammer@taylorbrammer.com.au

Structural EngineeringWood & Grieve EngineersP_02 8484 700francis.toledo.silva@wge.com.au

Town PlannerDFP PlanningP_02 9980 6933erobertshaw@dfpplanning.com.au

TrafficTTPAP_02 9411 5660ross@ttpa.com.au

Arborist/BushfireTravers Bushfire & EcologyM_0408 25 280msheatherreid@traversecology.com.au

BCABM+GP_02 9211 7777paul@bmplusg.com.au

BASIXEfficient LivingP_02 9970 6181haylea@efficientliving.com.au

WasteLeigh DesignP_03 8516 5393leo@leighdesign.com.au

Combined Services EngineerJones NicholsonP_02 9521 3088DarrenL@jonesnicholson.com.au

Rev. Date By Ckd DescriptionP5P6P7P8

P9

A - Prelim

AB

9/27/201710/30/201710/30/201711/16/2017

11/24/2017

12/14/2017

12/15/20174/24/2018

PP

PPPP/IL/MR

PP

PPKL

MR

IL

IL/MR

IL/MR

IL/MRIL

Issue for Review - 88 Unit SchemeClient MeetingClient MeetingIssue for Review

Issue for Coordination

Issue for Development Application -PreliminaryIssue for Development ApplicationIssue for Section 75W

RL +58.900+60.000 +59.764

3.10

03.

100

3.10

03.

100

+60.500

+63.600

+66.700

+69.800

+72.900

+67.600

+70.700

+73.800

+76.900

+80.000

3.10

03.

100

3.10

03.

100

3.10

0

+64.500

RL +56.985

RL +60.900

RL +64.500

RL +62.500

2.900

2.875

4.940

12.018

13.338

10.800

0.8

2.0

2.1

0.700

Free

Set

tlers

Driv

e

Ruth

erfo

rd A

ve

Cluster 4Cluster 3

Cluster 216m Above

NGL

Garbage TruckEntry/Exit

Car Park

Car Park

Sit

e B

ou

nd

ary

Sit

e B

ou

nd

ary

Level 1

Level 2

Level 3

Level 4

Roof

Ground

Extent of ExistingApproval

Extent of ExistingApproval

16m AboveNGL

NaturalGround Line

CommunalSpace

NaturalGround LineRamp

1:6.5(15.4%)Ramp

1:16(6.25%)

GarbageDock

Ramp1:16

(6.25%)

4.5m HRV HEADROOM

4.5m HRV HEADROOM

Level 1

Level 2

Level 3

Level 4

Ground

2.900

RL +58.900

2.900

+67.600

+70.700

+73.800

+76.900

3.10

03.

100

3.10

03.

100

+64.500

3.10

03.

100

3.10

03.

100

+60.500

+63.600

+66.700

+69.800

+72.900

RL +56.900

RL +60.900

2.875

RL +64.500

RL +62.500

RL +60.500

17.804

19.324

19.892

21.412

15.284

17.572

1.80.5

0.7

1.9

1.7

Cluster 4Cluster 3

Cluster 2

Free

Set

tlers

Driv

e

Level 1

Level 2

Level 3

Level 4

Ground

Ruth

erfo

rd A

ve

Sit

e B

ou

nd

ary

Sit

e B

ou

nd

ary

Extent of ExistingApproval

Extent of ExistingApproval

Extent of ExistingApproval

16m AboveNGL

Car Park

16m AboveNGL

Car Park

Car Park

NaturalGround Line

Gatehouse

Gatehouse

CommunalSpace

CommunalSpace

Skylight

Skylight

Level 1

Level 2

Level 3

Level 4

Ground

CLUSTER 2

CLUSTER 3

CLUSTER 4

FREE SETTLERS DRIVE

RUTHERFORD AVENUE

0002295470Tracey CoolsVIC/BDAV/12/14735.715 December 2017

Free Settlers DriveKellyville, NSW2155

1 Section A1:200

2 Section B1:200

16/10/2017 PP IL Issue for Review - Revised Basement

P7

27/10/2017 ILPP

A

A

B

B