chp govora, unit 7 - steinmueller.com · tel. +49 2261 78950-0 völklingen-fenne (fgd) wesseling...

Post on 03-Sep-2019

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

www.steinmueller.comTel. +49 2261 78950-0

Völklingen-Fenne (FGD)

Wesseling (SCR)

Novaky (FGD)

Hemweg (FGD)

Deuben(FGD)

Paroseni(FGD)Fusina

Maritsa East 3

Trbovlje

Ratcliffe on Soar(FGD)

Cottam

Pocerady

LesothoSOUTH AFRICA

Medupi(FGD)

Kusile (FGD)Pretoria

CHP Govora, Unit 7

Retrofi t with Effi ciency Increase of ElectrostaticPrecipitator (ESP)

Flue Gas Treatment

Achievements:

Dust: < 50 mg/m³ (originally 180 mg/m³)(STP @ 6 % O2)

Fuel : Romanian Lignite (a.r.)

LCV: 6.7 – 8.3 MJ/kg (1.6 - 2.0 Mcal/kg)w: 34 – 43 %a: 15 – 32 %S: 0.9 – 1.5 %

Boiler design: 420 t/h, 2-pass boiler

Scope of Supply:

• Flow cross-section enlarged by introducing new roof design

• Flow distribution improved by installing guide vanes

• Mechanically more robust electrodes installed

• High voltage system replaced

Selected Flue Gas Treatment References

of Steinmüller Engineering

Please contact us for further information.

Literature can be provided upon request

• Presentation on Steinmüller Engineering Conference 2013

• Steinmüller Engineering Workshop 2012 “Retrofi t with Effi ciency Increase of ESP”

Govora (ESP)

Steinmüller Engineering GmbH IHI Group Company

Fabrikstraße 5 • D-51643 Gummersbach • Germany

Tel: +49 2261 78950-0 Fax: +49 2261 78950-199

info@steinmueller.com www.steinmueller.com

Co

nce

pt/

Layo

ut:

tsi

tro

ne

med

ien

Gm

bH

& C

o. K

G, C

olo

gne

Edition 2015

top related