ceda 2010 ict review - nbn co … · ceda 2010 ict review. mike quigley. ceo nbn co. 9 july 2010....

Post on 12-Oct-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

0

CEDA 2010 ICT Review

Mike Quigley

CEO NBN Co

9 July 2010

1

Australia – At least 90% Fibre Coverage

Fibre Serving AreaFibre Serving Are

2

Physical Infrastructure Representation

3

Network dimensions – replicating modules

4

‘Real’ Fibre Serving

Areas - Adelaide

5

First and Second Release SitesSouth Australia

6

7

Australia – wireless coverage

Fibre Serving Area

Wireless coverage

8

NBN Co Wireless Access Delivery

End User

Premises

EFS

NNI RSP

Wireless Access Node

BASE

STATIONWireless

NTU

PoI

Connectivity

VC

SHARED AMONG

MULTIPLE END-USERS

DEDICATED

TO SINGLE

END-USER

• Similar approach to Fibre Access Service

• L2 connection for RSPs at PoI

• Connectivity Link from NNI to Packet Gateway

• Access Link to from Packet Gateway to NTU

• Fibre and Microwave from Packet gateway to BS

• CPE likely to comprise outdoor antenna and indoor NTU

• 2-4 Ethernet ports + VoIP IAD typically available

PACKET

GATEWAY

9

Fibre network + wireless + satellite

10

NBNCo Satellite Network

Capacity: 200k+ end users

Speed: 12 Mbit / 1(2) Mbit

Frequency: 30 GHz / 20 GHz

Spectrum use: 1.5+ GHz with four frequency reuse scheme

Gateways: Aprox.10

Antennas: Two Per Gateway (minimum)

11

NBN – new applications for business

S

12

NBN – new health applications

13

Fibre penetration in key economies

Source:FTTH Council, 2010

http://ftthcouncil.com/en/newsroom/2010/02/26/g-20-need-to-speed-up-on-fiber-to-the-home

14

top related