April 30, 2020April 01, 2020 to
Period Covered in Report
C O N S T R U C T I O N R E P O R T
COMPILED BY
CONSTRUCTION ENGINEER
BY COUNTY
Table of Contents
Report of Construction Engineer 3
Projects Completed - Final Estimate Not Processed 4
Projects Under Construction 51
Contracts Awarded - NTP Not Processed 154
ODOT Residency Directory 163
Construction Status Report Page 2
Activity for Month of April 2020
Number of
Contracts Amount PaidContract Amount
Contracts Finaled 20 36,981,377.10 36,967,299.98
Contracts Completed 16 40,996,644.73 40,997,924.38
NTP Issued 25 0.00 53,149,908.51
Contracts Awarded 29 0.00 60,083,221.95
Contracts Let 43 0.00 83,397,796.43
Status of Construction Projects as of April 30, 2020
Number of
Contracts Amount PaidContract Amount
Contracts Completed, Final Estimate Not Paid 284 1,236,391,214.47 1,210,976,496.55
Contracts Under Construction 402 1,189,082,863.87 2,201,732,117.62
Contracts Awarded, NTP Not Processed 52 0.00 105,145,237.33
Active Contracts 738 2,425,474,078.34 3,517,853,851.50
Construction Status Report Page 3
AdairCounty: Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
28652(04) CO.RD.
CIRB-201D(022)RB
Orendorf, Barry
Residency:Contract: 160405
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:02/22/2018Completion Date:
Final Est Sub:Letting Date:
$619,500.64
11/17/2016
01200
SALLISAW
BRIDGE AND APPROACHES COUNTY ROAD
(NS-466): OVER SALLISAW CREEK, 3.8 MILES
SOUTH OF SH-100 NEAR STILLWELL. PROJECT
LENGTH = 0.208 MILE
26290(04) US-62
STP-101B(088)SS
Orendorf, Barry
Residency:Contract: 170250
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount:12/05/2019Completion Date:
Final Est Sub:Letting Date:
$2,031,387.91
09/21/2017
01200
SALLISAW
BRIDGE AND APPROACHES US-62: OVER
DENNISON HOLLOW CREEK, 4.0 MILES EAST OF
THE CHEROKEE COUNTY LINE NEAR CHRISTIE.
PROJECT LENGTH = 0.340 MILE
34218(04) SH-100
STP-201C(040)TR
Orendorf, Barry
Residency:Contract: 190311
Contractor: ADVANCED WORKZONE SERVICES, LLC
Engineer:
Contract Amount:03/05/2020Completion Date:
Final Est Sub:Letting Date:
$22,990.00
10/17/2019
01200
SALLISAW
SAFETY IMPROVEMENT (SCHOOL ZONE) SH-100:
FROM THE SH-59 JUNCTION, EXTEND EAST IN
STILWELL. PROJECT LENGTH = 1.666 MILES
AlfalfaCounty: Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
28032(04) SH-58
ACSTP-202C(029)SS
Dodgion, Richard
Residency:Contract: 160069
Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Contract Amount:12/06/2018Completion Date:
Final Est Sub:Letting Date:
$2,697,204.35
02/18/2016
06100
BUFFALO
BRIDGE AND APPROACHES SH-58: OVER
MEDICINE LODGE RIVER OVERFLOW, 1.1 MILES
EAST OF THE SH-8 JUNCTION NEAR CHEROKEE.
PROJECT LENGTH = 0.225 MILE.
27943(04) SH-8
STP-202C(033)
Dodgion, Richard
Residency:Contract: 170112
Contractor: L & M CONTRACTORS, INC.
Engineer:
Contract Amount:01/16/2020Completion Date:
Final Est Sub:Letting Date:
$2,388,858.65
03/16/2017
06100
BUFFALO
BRIDGE AND APPROACHES SH-8: OVER
DRIFTWOOD CREEK, 0.9 MILES NORTH OF THE
SH-11 JUNCTION NEAR BURLINGTON. PROJECT
LENGTH = 0.251 MILE
AtokaCounty: Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 4
29925(04) CO.RD.
CIRB-203C(033)RB
CED3
Residency:Contract: 170305
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount:10/18/2018Completion Date:
Final Est Sub:Letting Date:
$490,121.95
10/19/2017
02013
CIRCUIT ENGR. DISTR. # 3
BRIDGE AND APPROACHES COUNTY ROAD
(NS-4005): OVER DOYAL CREEK, 0.1 MILE NORTH
OF WESLEY ROAD NEAR STRINGTOWN.
PROJECT LENGTH = 0.171 MILE.
31169(04) CO.RD.
CIRB-203D(034)RB
CED3
Residency:Contract: 170366
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount:04/18/2019Completion Date:
Final Est Sub:Letting Date:
$1,280,688.63
11/16/2017
02013
CIRCUIT ENGR. DISTR. # 3
US-69/US-75 JUNCTION NEAR ATOKA.
BRIDGE AND APPROACHES COUNTY ROAD
(E-1844/DAIRY LN): OVER UNION PACIFIC
RAILROAD, 0.2 MILES SOUTHEAST OF THE
US-69/US-75 JUNCTION NEAR ATOKA. PROJECT
LENGTH = 0.159 MILE
29951(04) COUNTY RO
CIRB-203C(067)RB
CED3
Residency:Contract: 190001
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:02/13/2020Completion Date:
Final Est Sub:Letting Date:
$1,215,397.45
01/17/2019
02013
CIRCUIT ENGR. DISTR. # 3
GRADE, DRAIN, AND SURFACE COUNTY ROAD
(EW-186/BOGGY DEPOT ROAD): FROM 0.9 MILES
WEST OF THE US-69 JUNCTION, EXTEND EAST
NEAR TUSHKA. PROJECT LENGTH = 0.912 MILE
29923(04) COUNTY RO
STP-203D(069)CI
CED3
Residency:Contract: 190066
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount:11/30/2019Completion Date:
Final Est Sub:Letting Date:
$515,823.80
02/14/2019
02013
CIRCUIT ENGR. DISTR. # 3
BRIDGE AND APPROACHES COUNTY ROAD
(EW-167): OVER NOLLEYTUBBY CREEK, 4.4
MILES WEST OF THE PITTSBURG COUNTY LINE
NEAR WESLEY. PROJECT LENGTH = 0.191 MILE
BeckhamCounty: Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
23243(04) SH-30
STPY-105C(124)SS/STPY-10*
Sawyer, Dax
Residency:Contract: 130149
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount:02/02/2017Completion Date:
Final Est Sub: 07/18/2019Letting Date:
$9,666,421.56
06/19/2014
05100
CLINTON
*5C(183)
GRADE, DRAIN, SURFACE, BRIDGE AND
APPROACHES SH-30: OVER THE NORTH FORK
OF THE RED RIVER, 5.0 MILES NORTH OF I-40.
PROJECT LENGTH = 1.310 MILES.
24354(04) I-40
ACNHPPI-4000(022)(028)SS
Sawyer, Dax
Residency:Contract: 160160
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount:08/15/2017Completion Date:
Final Est Sub:Letting Date:
$11,066,589.87
05/19/2016
05100
CLINTON
RESURFACE (ASPHALT) AND BRIDGE REPAIR
I-40: FROM 0.3 MILE EAST OF SH-30, EXTEND
EAST NEAR SAYRE. PROJECT LENGTH = 9.395
MILES.
Construction Status Report Page 5
27023(04) I-40
SSP-4000(041)SS/SBR-4000*
Sawyer, Dax
Residency:Contract: 170061
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount:10/19/2018Completion Date:
Final Est Sub: Letting Date:
$9,629,728.25
02/16/2017
05100
CLINTON
*(038)SB
RESURFACE (ASPHALT) AND BRIDGE
REHABILITATION I-40: FROM SH-34 SOUTH,
EXTEND EAST NEAR ELK CITY. PROJECT
LENGTH = 6.853 MILES.
24352(04) SH-152
SSP-105C(147)SS
Holley, Terri
Residency:Contract: 170115
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount:12/27/2018Completion Date:
Final Est Sub: Letting Date:
$4,227,399.73
03/16/2017
05200
ALTUS
GRADE, DRAIN, SURFACE, AND BRIDGE SH-152:
FROM SH-6, EXTEND EAST NEAR ELK CITY.
PROJECT LENGTH = 3.758 MILES.
31775(04) CO.RD.
SBR-4000(034)SB
Sawyer, Dax
Residency:Contract: 170217
Contractor: OBC, INC.
Engineer:
Contract Amount:03/01/2018Completion Date:
Final Est Sub: 08/08/2019Letting Date:
$1,849,841.75
07/20/2017
05100
CLINTON
BRIDGE REHABILITATION COUNTY ROAD
(CEMETERY ROAD): OVER I-40, 1.9 MILES
NORTHEAST OF I-40B NEAR SAYRE. PROJECT
LENGTH = 0.142 MILE.
30694(04) COUNTY RO
STP-205D(075)CI
CED7
Residency:Contract: 180258
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount:07/30/2019Completion Date:
Final Est Sub: 03/31/2020Letting Date:
$450,626.00
08/16/2018
05005
CIRCUIT ENGR. DISTR. # 7
BRIDGE AND APPROACHES COUNTY ROAD
(EW-123): OVER SAND CREEK, 0.9 MILES WEST
OF THE US-283 JUNCTION NEAR SAYRE.
PROJECT LENGTH = 0.180 MILE
27900(08) I-40B
NHPP-205N(083)RW
Sawyer, Dax
Residency:Contract: 180342
Contractor: M & M WRECKING, INC.
Engineer:
Contract Amount:07/11/2019Completion Date:
Final Est Sub: 11/06/2019Letting Date:
$47,000.01
11/15/2018
05100
CLINTON
RIGHT-OF-WAY CLEARANCE I-40B: OVER ELK
CREEK, 0.2 MILES EAST OF THE SH-6 JUNCTION
IN ELK CITY. PROJECT LENGTH = 0.17 MILE
PREQUALIFICATION FOR THIS PROJECT HAS
BEEN WAIVED. BOTH BID EXPRESS AND
WRITTEN BIDS WILL BE ACCE
31112(04) SH-34
STP-205F(082)3P
Holley, Terri
Residency:Contract: 190068
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount:11/16/2019Completion Date:
Final Est Sub: 02/04/2020Letting Date:
$2,516,314.44
06/20/2019
05200
ALTUS
RESURFACE (ASPHALT) SH-34: FROM THE
US-283 JUNCTION, EXTEND NORTH NEAR
WILLOW. PROJECT LENGTH = 10.43 MILES
BlaineCounty: Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 6
27950(04) SH-51
STP-206C(053)PM
Sawyer, Dax
Residency:Contract: 180154
Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount:09/18/2019Completion Date:
Final Est Sub: Letting Date:
$3,381,458.44
05/17/2018
05100
CLINTON
8 JUNCTION IN CANTON.
BRIDGE AND APPROACHES SH-51: OVER NORTH
CANADIAN RIVER AND OVERFLOW, 0.4 MILES
AND 0.6 MILES EAST OF THE SH-58 JUNCTION IN
CANTON. PROJECT LENGTH = 0.378 MILE
27903(04) SH-8
ACSTP-206C(043)PM
Sawyer, Dax
Residency:Contract: 180217
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount:09/05/2019Completion Date:
Final Est Sub: Letting Date:
$3,598,708.87
04/19/2018
05100
CLINTON
AND 12.4 MI S OF THE SH-51 JCT NEAR OKEENE AND HITCHCOCK.
BRIDGE AND APPROACHES AND BRIDGE
REHABILITATION SH-8: OVER SPRING CREEK
AND UNNAMED CREEKS, 1.0 MI, 10.9 MI, AND 12.4
MI S OF THE SH-51 JCT NEAR OKEENE AND
HITCHCOCK. PROJECT LENGTH = 0.592 MILE
31711(04) SH-51A
STP-206B(055)3P
Sawyer, Dax
Residency:Contract: 190069
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount:02/17/2020Completion Date:
Final Est Sub: Letting Date:
$2,658,520.55
06/20/2019
05100
CLINTON
RESURFACE (ASPHALT) SH-51A: FROM THE
SH-51 SPUR JUNCTION, EXTEND NORTH NEAR
CANTON. PROJECT LENGTH = 7.57 MILES
BryanCounty: Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
28101(04) US-69
NHG-013N(144)(145)TR
Bishop, Justin
Residency:Contract: 110371
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Contract Amount:11/16/2012Completion Date:
Final Est Sub: 10/07/2019Letting Date:
$2,001,222.50
08/18/2011
02300
MADILL
SAFETY IMPROVEMENT (CABLE BARRIER AND
GUARDRAIL) US-69: FROM THE
OKLAHOMA/TEXAS STATE LINE, EXTEND NORTH.
28193(04) US-70
NHPP-022N(218)3P
Bishop, Justin
Residency:Contract: 190070
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:11/05/2019Completion Date:
Final Est Sub: Letting Date:
$2,143,435.00
03/14/2019
02300
MADILL
RESURFACE (ASPHALT) US-70: FROM 5.4 MILES
WEST OF THE US-70 BYPASS, EXTEND EAST
NEAR DURANT. PROJECT LENGTH = 5.30 MILES
CaddoCounty: Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
01817(09) SH-152
ACSTP-208C(041)SS
Knight, Reese
Residency:Contract: 160278
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:06/20/2019Completion Date:
Final Est Sub: 12/18/2019Letting Date:
$9,214,596.05
08/18/2016
07300
ANADARKO
GRADE, DRAIN, AND SURFACE SH-152: FROM 0.4
MILES WEST OF THE SH-146 JUNCTION, EXTEND
EAST NEAR BINGER. PROJECT LENGTH = 2.46
MILES
Construction Status Report Page 7
24092(04) SH-58
STP-208C(052)SS
Knight, Reese
Residency:Contract: 170218
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:03/25/2020Completion Date:
Final Est Sub: Letting Date:
$5,338,036.82
11/16/2017
07300
ANADARKO
WIDEN AND RESURFACE SH-58: FROM SH-152,
EXTEND NORTH NEAR EAKLEY. PROJECT
LENGTH = 5.890 MILES
32828(04) US-281
STP-208B(067)3P
Knight, Reese
Residency:Contract: 190107
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:03/30/2020Completion Date:
Final Est Sub: 04/20/2020Letting Date:
$1,961,515.80
03/14/2019
07300
ANADARKO
RESURFACE (ASPHALT) US-281: FROM 0.01
MILES WEST OF THE SH-152 JUNCTION, EXTEND
WEST NEAR BINGER. PROJECT LENGTH = 4.10
MILES
33453(04) US-281
STP-208B(064)3P
Knight, Reese
Residency:Contract: 190194
Contractor: T & G CONSTRUCTION, INC.
Engineer:
Contract Amount:11/11/2019Completion Date:
Final Est Sub: 01/06/2020Letting Date:
$875,398.60
06/20/2019
07300
ANADARKO
RESURFACE (ASPHALT) US-281: FROM 6.6 MILES
SOUTH OF THE SH-152 JUNCTION, EXTEND
NORTH NEAR GRACEMONT. PROJECT LENGTH =
2.350 MILES
CanadianCounty: Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
24424(07) I-40
IMY-040-4(436)/IMY-040-4*
Brooks, Jonathan
Residency:Contract: 130003
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Contract Amount:06/10/2016Completion Date:
Final Est Sub: 10/14/2019Letting Date:
$48,167,910.63
01/17/2013
04200
YUKON
*(435)138/SBR-109N(182)SB
RECONSTRUCT - ADDED LANES, BRIDGE AND
APPROACHES I-40: FROM MILE MARKER 136,
EXTEND EAST TO MILE MARKER 140. SH-4
(MUSTANG ROAD): OVER I-40. PROJECT
LENGTH = 4.664 MILES.
27858(04) CO.RD.
CIRB-209D(063)RB
Brooks, Jonathan
Residency:Contract: 170368
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount:03/10/2019Completion Date:
Final Est Sub: Letting Date:
$4,378,548.90
11/16/2017
04200
YUKON
EXTEND SOUTH NEAR EL RENO.
GRADE, DRAIN, AND SURFACE COUNTY ROAD
(NS-274/CALUMET ROAD): FROM 0.2 MILES
SOUTH OF THE I-40 INTERSECTION, EXTEND
SOUTH NEAR EL RENO. PROJECT LENGTH =
4.336 MILES
33736(04) SH-3
NHPP-209N(066)3P
Brooks, Jonathan
Residency:Contract: 180321
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:09/27/2019Completion Date:
Final Est Sub: Letting Date:
$4,253,278.50
10/18/2018
04200
YUKON
RESURFACE (ASPHALT) SH-3: FROM THE SH-4
JUNCTION, EXTEND NORTHWEST NEAR
PIEDMONT. PROJECT LENGTH = 6.12 MILES
CarterCounty: Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 8
24104(04) SH-53
ACSTP-110C(189)(192)SS
Fuhrmann, Chris
Residency:Contract: 170009
Contractor: TREAS CONSTRUCTION, INC.
Engineer:
Contract Amount:04/24/2020Completion Date:
Final Est Sub: 04/24/2020Letting Date:
$7,798,865.79
08/17/2017
07200
ARDMORE
GRADE, DRAIN, BRIDGE, AND APPROACHES
SH-53: FROM 6.8 MILES EAST OF SH-76
JUNCTION, EXTEND EAST NEAR SPRINGER.
PROJECT LENGTH = 7.670 MILES
28782(04) MULTIPLE
STP-208F(068)PM
TETR
Residency:Contract: 190193
Contractor: PACIFIC PAINTING COMPANY, INC.
Engineer:
Contract Amount:03/05/2020Completion Date:
Final Est Sub:Letting Date:
$316,371.36
06/20/2019
07002
TETRA TECH
BRIDGE PAINTING I-35/I-35 FRONTAGE
ROAD/US-277/COUNTY ROAD (E2000): AT
MULTIPLE LOCATIONS IN DIVISION VII. PROJECT
LENGTH = 0.00
31308(04) SH-53
SBR-210C(069)SB
Fuhrmann, Chris
Residency:Contract: 190208
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Engineer:
Contract Amount:04/24/2020Completion Date:
Final Est Sub:Letting Date:
$458,934.10
07/25/2019
07200
ARDMORE
BRIDGE REHABILITATION SH-53: OVER BIG
BRANCH CREEK, 5.5 MILES EAST OF THE US-77
JUNCTION NEAR GENE AUTRY. PROJECT
LENGTH = 0.085 MILE
CherokeeCounty: Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
24824(04) CO.RD.
CIRB-111C(119)RB
Hagerman, Jeremy
Residency:Contract: 130265
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:05/14/2016Completion Date:
Final Est Sub:Letting Date:
$3,559,547.93
08/22/2013
01100
MUSKOGEE
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY
ROAD (NS-441): BEGIN 3.8 MILES SOUTH AND 2.3
MILES WEST OF SH-51/SH-80 JUNCTION, EXTEND
NORTH OVER RATTLESNAKE CREEK
TRIBUTARY. PROJECT LENGTH = 1.338 MILES.
23138(04) SH-51
ACSTP-111B(090)SS
Hagerman, Jeremy
Residency:Contract: 160279
Contractor: OBC, INC.
Engineer:
Contract Amount:05/13/2019Completion Date:
Final Est Sub:Letting Date:
$6,737,488.16
10/20/2016
01100
MUSKOGEE
BRIDGE AND APPROACHES SH-51: OVER
FOURTEEN MILE CREEK, 5.0 MILES EAST OF THE
WAGONER COUNTY LINE. PROJECT LENGTH =
0.870 MILE.
31680(04) US-62
HISPG-211B(018)TR
Orendorf, Barry
Residency:Contract: 160351
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:09/15/2017Completion Date:
Final Est Sub:Letting Date:
$434,626.34
10/20/2016
01200
SALLISAW
SAFETY IMPROVEMENT (CABLE BARRIER AND
GUARDRAIL) US-62: FROM 4.2 MILES EAST OF
THE SH-10 JUNCTION, EXTEND EAST NEAR
ELDON. PROJECT LENGTH = 1.470 MILES
ChoctawCounty: Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 9
29965(04) CRYSTAL R
STP-212C(043)CI
CED3
Residency:Contract: 180322
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:08/26/2019Completion Date:
Final Est Sub: Letting Date:
$698,934.20
10/18/2018
02013
CIRCUIT ENGR. DISTR. # 3
RESURFACE (ASPHALT) COUNTY ROAD
(CRYSTAL ROAD/NS-401): FROM 2.5 MILES
NORTH OF THE US-70 JUNCTION, EXTEND
NORTH NEAR BOSWELL. PROJECT LENGTH =
2.500 MILES
31225(04) COUNTY RO
CIRB-212D(037)RB
CED3
Residency:Contract: 180348
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount:06/28/2019Completion Date:
Final Est Sub: Letting Date:
$157,414.16
11/15/2018
02013
CIRCUIT ENGR. DISTR. # 3
BRIDGE AND APPROACHES COUNTY ROAD
(NS-435): OVER UNNAMED CREEK, 0.7 MILES
SOUTH OF THE SH-109 JUNCTION NEAR
FROGVILLE. PROJECT LENGTH = 0.123 MILE
23144(15) MULTIPLE
STP-264C(064)PM
Nored, John
Residency:Contract: 190160
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount:12/10/2019Completion Date:
Final Est Sub: 04/20/2020Letting Date:
$51,718.00
04/18/2019
02100
ANTLERS
BRIDGE WATER PROOF SEAL
US-70/SH-2/SH-32/SH-48/SH-63/SH-109: AT
MULTIPLE LOCATIONS IN DIVISION II. PROJECT
LENGTH = 0.000 MILE
CimarronCounty: Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
31688(04) US-56
BSAP-213N(015)FM
TETR
Residency:Contract: 170011
Contractor: UNIFIED SERVICES OF TEXAS, INC.
Engineer:
Contract Amount:10/25/2018Completion Date:
Final Est Sub: 08/15/2019Letting Date:
$2,942,104.22
01/19/2017
06002
TETRA TECH
WEIGH STATION US-56: BOISE CITY WEIGH
STATION, 0.7 MILES WEST OF US-287.
24826(08) COUNTY RO
CIRB-213C(024)RB
Michael, Charles
Residency:Contract: 190034
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount:04/02/2020Completion Date:
Final Est Sub: Letting Date:
$2,999,125.73
01/17/2019
06200
GUYMON
GRADE, DRAIN, AND SURFACE COUNTY ROADS
(EW-35/NS-53): EW-35, FROM THE NS-53
JUNCTION EXTEND EAST. NS-53, FROM THE
TEXAS STATE LINE EXTEND NORTH. PROJECT
LENGTH = 3.371 MILES
26975(06) MULTIPLE
STP-230F(032)PM
Dodgion, Richard
Residency:Contract: 190213
Contractor: JLT CONTRACTING, LLC
Engineer:
Contract Amount:04/30/2020Completion Date:
Final Est Sub: Letting Date:
$186,826.15
07/25/2019
06100
BUFFALO
BRIDGE WATER PROOF SEAL
US-56/US-60/US-183/US-270/US-385/SH-3/SH-8/SH-
11/SH-34: AT MULTIPLE LOCATIONS IN DIVISION
VI. PROJECT LENGTH = 0.000 MILE
ClevelandCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 10
09031(08) I-35
IM-NHIY-0035-2(289)109
Malave, Luis
Residency:Contract: 120328
Contractor: ALLEN CONTRACTING, INC./ MANHATTAN ROAD & BRIDGE (JV)
Engineer:
Contract Amount:08/02/2017Completion Date:
Final Est Sub: Letting Date:
$28,887,284.36
10/18/2012
03200
PURCELL
GRADE, DRAIN, SURFACE, AND BRIDGE I-35:
SINGLE POINT URBAN INTERCHANGE (SPUI) AT
MAIN STREET IN THE CITY OF NORMAN.
PROJECT LENGTH = 1.491 MILES.
20266(04) SH-09
SSP-114N(099)SS
JACOBS
Residency:Contract: 140089
Contractor: ALLEN CONTRACTING, INC.
Engineer:
Contract Amount:09/10/2015Completion Date:
Final Est Sub: 03/12/2020Letting Date:
$9,587,991.29
02/20/2014
03004
JACOBS ENGINEERING
GRADE, DRAIN, SURFACE, AND BRIDGE SH-9:
FROM JUST WEST OF 24TH AVE. S.E., EXTEND
EAST IN NORMAN. PROJECT LENGTH = 1.506
MILES.
09031(05) I-35
NHPPIY-0035-2(176)(304)
Malave, Luis
Residency:Contract: 140287
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount:05/23/2019Completion Date:
Final Est Sub: Letting Date:
$71,124,697.35
11/20/2014
03200
PURCELL
GRADE, DRAIN, SURFACE, AND BRIDGE I-35:
INTERCHANGE AT SH-9 AND LINDSEY STREET IN
NORMAN. PROJECT LENGTH = 1.036 MILES.
28810(04) CT.ST.
STP-114E(299)EH/STPG-114*
BCS
Residency:Contract: 170178
Contractor: RUDY CONSTRUCTION CO.
Engineer:
Contract Amount:11/15/2019Completion Date:
Final Est Sub: 02/28/2020Letting Date:
$3,052,446.98
05/18/2017
03018
BENCHMARK CONSTR. SERVS., LLC
*A(141)AG
ENHANCEMENT (STREETSCAPE) CITY STREET
(MAIN STREET): FROM JONES AVENUE, EXTEND
SOUTHWEST IN THE CITY OF NORMAN.
29289(04) CT.ST.
STP-214C(080)AG
ATKINS
Residency:Contract: 170313
Contractor: ALLEN CONTRACTING, INC.
Engineer:
Contract Amount:03/31/2019Completion Date:
Final Est Sub: Letting Date:
$2,794,653.90
10/19/2017
03010
ATKINS
GRADE, DRAIN, AND SURFACE CITY STREET
(12TH AVENUE SE): FROM 0.4 MILES SOUTH OF
SH-9, EXTEND NORTH IN THE CITY OF NORMAN.
PROJECT LENGTH = 0.530 MILE
24760(04) SH-9
ACSTP-114B(206)PM
Malave, Luis
Residency:Contract: 180126
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount:12/23/2019Completion Date:
Final Est Sub: Letting Date:
$5,328,788.81
03/15/2018
03200
PURCELL
BRIDGE AND APPROACHES SH-9: OVER LITTLE
RIVER, 12.5 MILES EAST OF US-77 IN NORMAN.
PROJECT LENGTH = 0.554 MILE
26836(04) CITY STRE
STP-114C(255)AG
EST
Residency:Contract: 180190
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount:03/26/2020Completion Date:
Final Est Sub: Letting Date:
$4,905,000.00
05/17/2018
03001
EST, INC.
INTERCHANGE IN THE CITY OF NORMAN.
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREET (MAIN STREET): OVER BROOKHAVEN
CREEK, 1.0 MILE WEST OF THE I-35
INTERCHANGE IN THE CITY OF NORMAN.
PROJECT LENGTH = 0.195 MILE
Construction Status Report Page 11
33414(04) SH-37
SBR-214C(086)SB
Malave, Luis
Residency:Contract: 180261
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount:12/09/2019Completion Date:
Final Est Sub: Letting Date:
$1,885,495.63
08/16/2018
03200
PURCELL
BRIDGE REHABILITATION SH-37: OVER I-35, 3.7
MILES WEST OF THE SH-77H JUNCTION NEAR
MOORE. PROJECT LENGTH = 0.082 MILE
31254(04) COUNTY RO
STP-214D(088)CI
Malave, Luis
Residency:Contract: 190005
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount:02/10/2020Completion Date:
Final Est Sub: Letting Date:
$294,990.00
01/17/2019
03200
PURCELL
BRIDGE AND APPROACHES COUNTY ROAD
(EW-133/SLAUGHTERVILLE RD): OVER UNNAMED
CREEK, 0.3 MILES WEST OF THE US-77
JUNCTION IN SLAUGHTERVILLE. PROJECT
LENGTH = 0.033 MILE
34637(04) CITY STRE
E-SAP-214N(100)ES
Malave, Luis
Residency:Contract: 200007
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Engineer:
Contract Amount:04/17/2020Completion Date:
Final Est Sub: Letting Date:
$49,576.65
01/16/2020
03200
PURCELL
BRIDGE REPAIR CITY STREET (INDIAN HILLS
ROAD): REPAIR VEHICLE IMPACT DAMAGE
OVER I-35, 3.6 MILES WEST OF SH-77H IN
NORMAN. PROJECT LENGTH = 0.000 MILE
CoalCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
20317(04) US-75
NHPP-215N(014)SS
Wade, Tony
Residency:Contract: 150129
Contractor: BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC.
Engineer:
Contract Amount:05/15/2017Completion Date:
Final Est Sub: Letting Date:
$2,005,154.27
04/16/2015
03100
ADA
BRIDGE AND APPROACHES US-75: OVER COAL
CREEK, 2.2 MILES NORTH OF THE ATOKA
COUNTY LINE. PROJECT LENGTH = 0.208 MILE.
27998(04) US-75
STP-215B(015)SS
Wade, Tony
Residency:Contract: 150130
Contractor: BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC.
Engineer:
Contract Amount:12/10/2016Completion Date:
Final Est Sub: 04/16/2020Letting Date:
$2,529,033.82
04/16/2015
03100
ADA
BRIDGE AND APPROACHES US-75: OVER ROCK
CREEK, 7.09 MILES NORTH OF SH-3. PROJECT
LENGTH = 0.416 MILE.
24944(08) CO.RD.
CIRB-215C(024)RB
Wade, Tony
Residency:Contract: 170119
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:07/30/2019Completion Date:
Final Est Sub: Letting Date:
$1,746,298.20
04/20/2017
03100
ADA
GRADE, DRAIN, AND SURFACE COUNTY ROAD
(NS-382/POLK ROAD): FROM 4.2 MILES NORTH
OF SH-31, EXTEND NORTH NEAR COALGATE.
PROJECT LENGTH = 1.561 MILES
Construction Status Report Page 12
22973(15) MULTIPLE
SSP-262C(040)SS
Wade, Tony
Residency:Contract: 170164
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount:07/24/2019Completion Date:
Final Est Sub: Letting Date:
$97,541.66
04/18/2019
03100
ADA
BRIDGE WATER PROOF SEAL
US-75/US-77/SH-19/SH-22/SH-59/SH-74/SH-76/SH-9
9: AT MULTIPLE LOCATIONS IN DIVISION III.
PROJECT LENGTH = 0.00 MILE
30011(04) CO.RD.
STP-215C(022)CI
Wade, Tony
Residency:Contract: 170253
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount:08/07/2019Completion Date:
Final Est Sub: Letting Date:
$516,623.15
08/17/2017
03100
ADA
BRIDGE AND APPROACHES COUNTY ROAD
(EW-1780): OVER WALNUT CREEK, 2.2 MILES
SOUTHWEST OF THE SH-48 INTERSECTION
NEAR BROMIDE. PROJECT LENGTH = 0.265 MILE
30013(04) COUNTY RO
STP-215D(030)CI
Wade, Tony
Residency:Contract: 180350
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount:09/12/2019Completion Date:
Final Est Sub: Letting Date:
$407,825.34
11/15/2018
03100
ADA
BRIDGE AND APPROACHES COUNTY ROAD
(EW-177): OVER UNNAMED CREEK, 2.74 MILES
WEST OF SH-75 NEAR LEHIGH. PROJECT
LENGTH = 0.247 MILE
33413(04) US-75
SSR-215N(029)SR
Wade, Tony
Residency:Contract: 190073
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:09/12/2019Completion Date:
Final Est Sub: Letting Date:
$720,294.34
02/14/2019
03100
ADA
RESURFACE (ASPHALT) US-75: FROM 0.8 MILES
NORTHWEST OF THE SH-31 JUNCTION, EXTEND
NORTHWEST NEAR COALGATE. PROJECT
LENGTH = 3.00 MILES
ComancheCounty: Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
23410(04) SH-07
STP-116B(137)MS
CEC
Residency:Contract: 170248
Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
Engineer:
Contract Amount:01/31/2020Completion Date:
Final Est Sub: Letting Date:
$8,319,903.28
08/17/2017
07003
CEC CORP.
GRADE, DRAIN, SURFACE, AND TRAFFIC SIGNAL
CITY STREET (SE 45TH STREET): FROM SH-7
(LEE BOULEVARD), EXTEND NORTH IN LAWTON.
PROJECT LENGTH = 1.292 MILES.
27050(04) I-44
NHPPI-216N(021)SS
CEC
Residency:Contract: 170342
Contractor: T & G CONSTRUCTION, INC.
Engineer:
Contract Amount:01/31/2020Completion Date:
Final Est Sub: Letting Date:
$6,680,994.79
11/16/2017
07003
CEC CORP.
INTERCHANGE I-44: AT THE US-62 INTERCHANGE
IN THE CITY OF LAWTON. PROJECT LENGTH =
0.961 MILE.
Construction Status Report Page 13
27968(04) US-277
STP-216C(072)SS
Roberts, Colton
Residency:Contract: 170371
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount:08/06/2019Completion Date:
Final Est Sub:Letting Date:
$2,834,368.61
11/16/2017
07100
DUNCAN
N.
BRIDGE AND APPROACHES US-277: OVER
SNAKE CREEK, 0.8 AND 0.9 MILE NORTH OF THE
COTTON COUNTY LINE NEAR LAWTON.
PROJECT LENGTH = 0.700 MILE.
29363(04) CO.RD.
CIRB-216D(075)RB
Roberts, Colton
Residency:Contract: 180043
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount:03/25/2019Completion Date:
Final Est Sub:Letting Date:
$499,590.70
01/18/2018
07100
DUNCAN
Y 115 NEAR INDIAHOMA.
BRIDGE AND APPROACHES COUNTY ROAD
(EW-168/BISHOP ROAD): OVER POST OAK
CREEK, 3.9 MILES WEST OF COUNTY HIGHWAY
115 NEAR INDIAHOMA. PROJECT LENGTH = 0.208
MILE
32795(04) COUNTY RO
SBR-4400(038)SB
Roberts, Colton
Residency:Contract: 190211
Contractor: BREWER CONSTRUCTION OKLAHOMA, LLC
Engineer:
Contract Amount:12/09/2019Completion Date:
Final Est Sub:Letting Date:
$342,957.40
07/25/2019
07100
DUNCAN
BRIDGE REHABILITATION COUNTY ROAD
(EW-171/PECAN ROAD): OVER I-44, 11.5 MILES
WEST OF SH-65 NEAR LAWTON. PROJECT
LENGTH = 0.000 MILE
CottonCounty: Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
28036(04) US-277
ACSTP-217C(029)SS
Roberts, Colton
Residency:Contract: 160315
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:09/23/2019Completion Date:
Final Est Sub:Letting Date:
$7,787,208.07
09/15/2016
07100
DUNCAN
BRIDGE AND APPROACHES US-277: OVER DEEP
RED CREEK AND OVERFLOWS, 0.7 MI, 1.0 MI AND
1.2 MI SOUTH OF THE H.E. BAILEY TURNPIKE
NEAR RANDLETT. PROJECT LENGTH = 1.124
MILES.
32035(08) COUNTY RO
ERSTP-217C(021)ER
Roberts, Colton
Residency:Contract: 180192
Contractor: BREWER CONSTRUCTION OKLAHOMA, LLC
Engineer:
Contract Amount:11/22/2019Completion Date:
Final Est Sub:Letting Date:
$857,999.59
07/19/2018
07100
DUNCAN
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY
ROAD (EW-198): OVER TRIBUTARY TO THE RED
RIVER, 1.9 MILES WEST OF THE SH-36 JUNCTION
NEAR DEVOL. PROJECT LENGTH = 0.206 MILE
CraigCounty: Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
24115(04) US-59
STP-118B(080)SS
Beats, Aaron
Residency:Contract: 150160
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:02/06/2019Completion Date:
Final Est Sub:Letting Date:
$5,040,025.51
05/21/2015
08300
CLAREMORE
BRIDGE AND APPROACHES - DIVISION VIII US-59:
OVER UNION PACIFIC RAILROAD, 1.1 MILES
NORTH OF SH-10 NEAR WELCH. PROJECT
LENGTH = 0.871 MILE.
Construction Status Report Page 14
27089(04) SH-82
STP-218C(037)SS
Beats, Aaron
Residency:Contract: 150258
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:08/01/2019Completion Date:
Final Est Sub: Letting Date:
$3,723,826.73
01/21/2016
08300
CLAREMORE
BRIDGE AND APPROACHES SH-82: OVER
LOCUST CREEK, 6.5 MILES NORTH OF THE
MAYES COUNTY LINE NEAR VINITA. PROJECT
LENGTH = 0.711 MILE.
27069(04) SH-10
ACSTP-218C(054)SS
Beats, Aaron
Residency:Contract: 170283
Contractor: B & B BRIDGE COMPANY, LLC
Engineer:
Contract Amount:12/13/2019Completion Date:
Final Est Sub: Letting Date:
$4,689,111.77
09/21/2017
08300
CLAREMORE
BRIDGE AND APPROACHES SH-10: OVER BIG
CREEK AND THE EAST FORK OF BIG CREEK, 1.7
MILES AND 2.7 MILES EAST OF THE NOWATA
COUNTY LINE. PROJECT LENGTH = 0.549 MILE
29068(04) SH-10
STP-218C(059)SS
Beats, Aaron
Residency:Contract: 170344
Contractor: B & B BRIDGE COMPANY, LLC
Engineer:
Contract Amount:10/28/2019Completion Date:
Final Est Sub: Letting Date:
$2,077,439.04
11/16/2017
08300
CLAREMORE
BRIDGE AND APPROACHES SH-10: OVER BIG
CABIN CREEK, 3.6 MILES WEST OF THE US-59
INTERSECTION NEAR WELCH. PROJECT LENGTH
= 0.186 MILE
21904(04) SH-2
NHPP-218N(033)PM
Beats, Aaron
Residency:Contract: 180280
Contractor: CROSSLAND HEAVY CONTRACTORS INC.
Engineer:
Contract Amount:04/27/2020Completion Date:
Final Est Sub: Letting Date:
$10,552,000.00
09/20/2018
08300
CLAREMORE
GRADE, DRAIN, AND SURFACE SH-2: FROM THE
US-60 JUNCTION, EXTEND NORTH IN VINITA.
PROJECT LENGTH = 1.257 MILES
CreekCounty: Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
27075(04) US-75A
ACSTP-219C(033)SS
Scott, Kalynn
Residency:Contract: 160245
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount:09/27/2019Completion Date:
Final Est Sub: Letting Date:
$8,084,675.09
09/15/2016
08400
SAND SPRINGS
BRIDGE AND APPROACHES US-75A: OVER BNSF
RAILROAD, 1.9 MILES NORTH OF THE
OKMULGEE COUNTY LINE NEAR MOUNDS.
PROJECT LENGTH = 0.667 MILE.
29408(04) CO.RD.
CIRB-219C(058)RB
GARV
Residency:Contract: 180006
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount:01/02/2020Completion Date:
Final Est Sub: 04/27/2020Letting Date:
$1,831,559.01
01/18/2018
08011
GARVER, LLC.
3.8 MI S OF SH-51 NEAR OILTON.
BRIDGE AND APPROACHES COUNTY ROAD
(NS-366/S. 449TH W. AVENUE): OVER
TRIBUTARIES TO BUCKEYE CREEK, 3.5 MI AND
3.8 MI S OF SH-51 NEAR OILTON. PROJECT
LENGTH = 0.572 MILE
Construction Status Report Page 15
30599(04) SH-99
SBR-219N(060)SB
Scott, Kalynn
Residency:Contract: 180159
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount:03/01/2020Completion Date:
Final Est Sub: Letting Date:
$1,788,000.00
07/19/2018
08400
SAND SPRINGS
BRIDGE AND APPROACHES SH-99: OVER
LAGOON CREEK, 0.5 MILES NORTH OF THE
SH-51 JUNCTION NEAR OILTON. PROJECT
LENGTH = 0.253 MILE
CusterCounty: Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
26490(04) I-40
NHPPIY-0040-3(082)SS/NHP*
Sawyer, Dax
Residency:Contract: 140092
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount:12/22/2015Completion Date:
Final Est Sub: Letting Date:
$16,738,134.68
02/20/2014
05100
CLINTON
*PIY-0040-3(085)
GRADE, DRAIN, SURFACE, AND BRIDGE
I-40/WASHINGTON AVENUE: ON I-40, FROM MILE
MARKER 76.6 TO 83.9; ON WASHINGTON
AVENUE, OVER I-40 IN WEATHERFORD.
PROJECT LENGTH = 7.714 MILES.
24427(05) I-40
NHPPI-0040-3(072)SS
Sawyer, Dax
Residency:Contract: 150051
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount:09/22/2017Completion Date:
Final Est Sub: Letting Date:
$10,440,306.71
02/19/2015
05100
CLINTON
RESURFACE AND BRIDGE REHABILITATION I-40:
FROM MILE MARKER 68.7 TO MILE MARKER 76.6.
PROJECT LENGTH = 7.899 MILES.
27911(06) CT.ST.
ACSTP-220B(040)SS
Sawyer, Dax
Residency:Contract: 160317
Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
Engineer:
Contract Amount:10/31/2019Completion Date:
Final Est Sub: Letting Date:
$4,985,476.71
01/19/2017
05100
CLINTON
GRADE, DRAIN, SURFACE, AND TRAFFIC SIGNAL
CITY STREETS (MAIN STREET/WASHINGTON
AVENUE): FROM 1.0 MILE EAST OF SH-54,
EXTEND EAST IN WEATHERFORD. PROJECT
LENGTH = 0.391 MILE.
30055(04) COUNTY RO
STP-220D(050)CI
Sawyer, Dax
Residency:Contract: 180161
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount:12/19/2019Completion Date:
Final Est Sub: Letting Date:
$661,388.50
11/15/2018
05100
CLINTON
BRIDGE AND APPROACHES COUNTY ROAD
(EW-88): OVER LITTLE DEER CREEK, 0.8 MILES
WEST OF THE SH-33 JUNCTION NEAR THOMAS.
PROJECT LENGTH = 0.199 MILE
29523(04) I-40
SSP-4000(067)PM
Sawyer, Dax
Residency:Contract: 190039
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount:03/12/2020Completion Date:
Final Est Sub: Letting Date:
$1,533,773.30
01/17/2019
05100
CLINTON
BRIDGE AND APPROACHES I-40 NORTH
FRONTAGE ROAD: OVER LITTLE DEEP CREEK,
1.0 MILE WEST OF THE CADDO COUNTY LINE
NEAR WEATHERFORD. PROJECT LENGTH =
0.094 MILE
Construction Status Report Page 16
29526(09) MULTIPLE
SSP-220F(065)SS
TETR
Residency:Contract: 190197
Contractor: POSEIDON CONSTRUCTION, INC.
Engineer:
Contract Amount:01/28/2020Completion Date:
Final Est Sub: Letting Date:
$420,665.00
06/20/2019
05002
TETRA TECH
BRIDGE PAINTING I-40B (EB)/I-40 FRONTAGE
ROAD/US-183/SH-115/COUNTY ROAD (EW-120):
AT MULTIPLE LOCATIONS IN DIVISION V.
PROJECT LENGTH = 0.00
DeweyCounty: Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
17671(34) US-270
NHPP-222N(027)
Sawyer, Dax
Residency:Contract: 170346
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount:09/18/2019Completion Date:
Final Est Sub: Letting Date:
$7,947,404.68
11/16/2017
05100
CLINTON
ING.
GRADE, DRAIN, AND SURFACE US-270: FROM 0.4
MILE SOUTHEAST OF THE SH-51 JUNCTION,
EXTEND NORTHEAST NEAR SEILING. PROJECT
LENGTH = 3.420 MILES.
06377(14) US-183
ACNHPP-122N(052)PM
Sawyer, Dax
Residency:Contract: 180131
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount:03/27/2020Completion Date:
Final Est Sub: Letting Date:
$4,077,383.41
03/15/2018
05100
CLINTON
ES
GRADE, DRAIN, SURFACE AND BRIDGE US-183:
FROM 7.3 MILES SOUTH OF THE US-60
JUNCTION, EXTEND PROJECT LENGTH = 1.181
MILES
GarvinCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
21786(04) SH-19
SSP-125B(112)SS
Wade, Tony
Residency:Contract: 130267
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount:12/12/2014Completion Date:
Final Est Sub: Letting Date:
$5,971,477.23
08/22/2013
03100
ADA
GRADE, DRAIN, SURFACE, AND BRIDGE SH-19:
OVER WASHITA RIVER, 1.72 MILES EAST OF
US-77, EXTEND EAST. PROJECT LENGTH = 0.681
MILE.
29615(04) I-35
SBR-225N(059)SB
Wade, Tony
Residency:Contract: 160134
Contractor: OBC, INC.
Engineer:
Contract Amount:07/25/2017Completion Date:
Final Est Sub: Letting Date:
$3,089,697.62
03/17/2016
03100
ADA
BRIDGE REHABILITATION I-35: OVER UNNAMED
CREEK, 0.4 MILE SOUTH OF SH-29 NEAR
WYNNEWOOD. PROJECT LENGTH = 0.258 MILE.
28929(04) SH-19
STP-225C(066)SS
Wade, Tony
Residency:Contract: 160412
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount:03/15/2018Completion Date:
Final Est Sub: Letting Date:
$1,315,000.00
11/17/2016
03100
ADA
BRIDGE AND APPROACHES SH-19: OVER BEEF
CREEK, 0.6 MILES EAST OF THE SH-74 JUNCTION
NEAR MAYSVILLE. PROJECT LENGTH = 0.057
MILE
Construction Status Report Page 17
29110(04) SH-17A
NHPPI-225N(001)SS
Wade, Tony
Residency:Contract: 170077
Contractor: M.J. HUGHES CONSTRUCTION, INC.
Engineer:
Contract Amount:12/31/2017Completion Date:
Final Est Sub: 04/22/2020Letting Date:
$2,161,373.46
02/16/2017
03100
ADA
BRIDGE REHABILITATION SH-17A: OVER I-35, 3.1
MILES WEST OF US-77 NEAR WYNNEWOOD.
PROJECT LENGTH = 0.159 MILE
29564(04) I-35
NHPPIY-225N-(045)
CEC
Residency:Contract: 170079
Contractor: OBC, INC.
Engineer:
Contract Amount:10/31/2018Completion Date:
Final Est Sub: Letting Date:
$2,276,522.83
02/16/2017
03003
CEC CORP.
BRIDGE REHABILITATION I-35: OVER RUSH
CREEK, 0.6 MILES SOUTH OF SH-19 IN PAULS
VALLEY. PROJECT LENGTH = 0.541 MILE
27999(04) US-77
STP-225C(072)PM
Malave, Luis
Residency:Contract: 180086
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount:09/25/2019Completion Date:
Final Est Sub: Letting Date:
$8,373,922.00
02/15/2018
03200
PURCELL
BRIDGE AND APPROACHES US-77: OVER
WASHITA RIVER, 1.5 MILES WEST OF THE SH-29
JUNCTION NEAR WYNNEWOOD. PROJECT
LENGTH = 0.944 MILE
29111(04) I-35
SSP-3500(071)PM
Malave, Luis
Residency:Contract: 180219
Contractor: A. M. COHRON & SON, INC.
Engineer:
Contract Amount:12/06/2019Completion Date:
Final Est Sub: Letting Date:
$2,278,614.41
08/16/2018
03200
PURCELL
I-35: OVER SHORT CREEK, 1.9 MILES NORTH OF
SH-145 NEAR PAOLI. PROJECT LENGTH = 0.082
MILE
24718(04) COUNTY RO
STP-125C(153)CI
Wade, Tony
Residency:Contract: 180353
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount:08/01/2019Completion Date:
Final Est Sub: Letting Date:
$522,972.50
11/15/2018
03100
ADA
BRIDGE AND APPROACHES COUNTY ROAD
(EW-161 ROAD): OVER LITTLE CANADIAN SANDY
CREEK, 0.8 MILES WEST OF THE PONTOTOC
COUNTY LINE. PROJECT LENGTH = 0.211 MILE
29608(04) I-35
SBR-3500(076)SB
Malave, Luis
Residency:Contract: 190076
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount:03/26/2020Completion Date:
Final Est Sub: Letting Date:
$609,925.77
02/14/2019
03200
PURCELL
BRIDGE REHABILITATION I-35: OVER COUNTY
ROAD (EW-161), 2.1 MILES NORTH OF SH-29
NEAR WYNNEWOOD. PROJECT LENGTH = 0.019
MILE
31840(04) I-35 (SB
NHPPI-3500-(051)SS
Malave, Luis
Residency:Contract: 190175
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:12/23/2019Completion Date:
Final Est Sub: 04/08/2020Letting Date:
$2,796,664.60
05/16/2019
03200
PURCELL
RESURFACE (ASPHALT) I-35 (SB LANES): FROM
THE SH-29 JUNCTION, EXTEND SOUTH NEAR
WYNNEWOOD. PROJECT LENGTH = 6.59 MILES
Construction Status Report Page 18
22973(16) MULTIPLE
STP-262F(054)PM
Wade, Tony
Residency:Contract: 190184
Contractor: GARY A. CRAIN, INC.
Engineer:
Contract Amount:10/28/2019Completion Date:
Final Est Sub:Letting Date:
$128,807.92
05/16/2019
03100
ADA
BRIDGE WATER PROOF SEAL
I-35/SH-9/SH-74/SH-76/SH-99A/COUNTY ROAD
(E-1685): AT MULTIPLE LOCATIONS IN DIVISION
III. PROJECT LENGTH = 0.000 MILE
33330(04) SH-76
SSR-225C(083)SR
Malave, Luis
Residency:Contract: 190231
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:12/10/2019Completion Date:
Final Est Sub:Letting Date:
$2,691,970.86
06/20/2019
03200
PURCELL
RESURFACE (UTBWC AND ASPHALT) SH-76:
FROM THE SH-29 JUNCTION, EXTEND NORTH
NEAR LINDSAY AND FOSTER. PROJECT LENGTH
- 11.00 MILES
GradyCounty: Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
33477(04) US-62
SBR-226B(074)SB
TETR
Residency:Contract: 180328
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount:10/31/2019Completion Date:
Final Est Sub:Letting Date:
$1,289,067.32
10/18/2018
07002
TETRA TECH
BRIDGE REHABILITATION US-62: OVER
STILLWATER CENTRAL RAILROAD. 2.3 MILES
WEST OF I-44 IN CHICKASHA. PROJECT LENGTH
= 0.00 MILE
33607(04) US-81
HSIPG-011N(102)TR
Roberts, Colton
Residency:Contract: 180329
Contractor: ACTION SAFETY SUPPLY CO., LLC
Engineer:
Contract Amount:12/12/2019Completion Date:
Final Est Sub:Letting Date:
$1,563,384.73
11/15/2018
07100
DUNCAN
SAFETY IMPROVEMENT (CABLE BARRIER) US-81:
FROM 5.0 MILES SOUTH OF THE US-277
JUNCTION, EXTEND NORTH NEAR NINNEKAH.
PROJECT LENGTH = 8.02 MILES
32833(04) SH-92
SSR-226C(075)SR
Knight, Reese
Residency:Contract: 190043
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount:10/31/2019Completion Date:
Final Est Sub: 04/27/2020Letting Date:
$1,224,600.00
01/17/2019
07300
ANADARKO
RESURFACE (ASPHALT) SH-92: FROM THE
US-62/US-277 JUNCTION, EXTEND NORTH NEAR
CHICKASHA. PROJECT LENGTH = 5.00 MILES
31952(04) US-62
STP-226B(076)3P
Knight, Reese
Residency:Contract: 190114
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount:02/03/2020Completion Date:
Final Est Sub: 02/11/2020Letting Date:
$2,018,070.00
03/14/2019
07300
ANADARKO
RESURFACE (ASPHALT) US-62: FROM 1.0 MILE
EAST OF THE CADDO COUNTY LINE, EXTEND
EAST NEAR CHICKASHA. PROJECT LENGTH =
6.49 MILES
Construction Status Report Page 19
34071(04) US-277
MC-226C(082)
Knight, Reese
Residency:Contract: 190151
Contractor: CGC, LLC.
Engineer:
Contract Amount:11/15/2019Completion Date:
Final Est Sub: 04/21/2020Letting Date:
$595,000.00
04/18/2019
07300
ANADARKO
PAVEMENT REHABILITATION (P.C. CONCRETE)
US-277/SH-37: US-277, AT THE INTERSECTION OF
MAIN STREET IN CYRIL. SH-37, FROM US-81
EXTEND EAST IN MINCO. PROJECT LENGTH =
0.17 MILE
GrantCounty: Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
24163(04) SH-11
STP-127B(107)(108)(109)*
Hoover, Jacob
Residency:Contract: 160413
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Contract Amount:11/30/2018Completion Date:
Final Est Sub: 04/20/2020Letting Date:
$12,986,834.47
11/17/2016
04300
ENID
(110)SS
SHOULDER IMPROVEMENT, RESURFACE
(ASPHALT), AND BRIDGE SH-11: FROM 7.9 MILES
WEST OF US-81, EXTEND EAST NEAR MEDFORD.
PROJECT LENGTH = 7.660 MILES.
GreerCounty: Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
15023(07) SH-6
ACSTP-128B(008)SS
Holley, Terri
Residency:Contract: 150370
Contractor: CASWELL CONTRACTING, INC/TOM HUDSON PAVING, INC. (JV)
Engineer:
Contract Amount:03/28/2018Completion Date:
Final Est Sub: 02/04/2020Letting Date:
$9,529,011.54
11/19/2015
05200
ALTUS
GRADE, DRAIN, AND SURFACE SH-6: FROM 1.0
MILE SOUTH OF SH-9 EXTEND NORTH IN
GRANITE. PROJECT LENGTH = 2.248 MILES.
32355(04) COUNTY RO
CIRB-248D(041)RB
CED3
Residency:Contract: 190118
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:02/06/2020Completion Date:
Final Est Sub: Letting Date:
$939,290.70
03/14/2019
02013
CIRCUIT ENGR. DISTR. # 3
RESURFACE (ASPHALT) COUNTY ROAD
(NS-359/BRIDGEVIEW ROAD): FROM THE SH-199
JUNCTION, EXTEND SOUTH NEAR LITTLE CITY.
PROJECT LENGTH = 4.000 MILES
HarmonCounty: Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
28768(04) SH-30
SSP-229C(010)SS
Holley, Terri
Residency:Contract: 170260
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount:10/17/2019Completion Date:
Final Est Sub: 12/16/2019Letting Date:
$7,279,068.09
11/16/2017
05200
ALTUS
BRIDGE AND APPROACHES SH-30: OVER SALT
FORK OF RED RIVER, 3.9 MILES SOUTH OF SH-9
NEAR HOLLIS. PROJECT LENGTH = 0.931 MILE
Construction Status Report Page 20
HarperCounty: Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
30614(04) US-270
SBR-230N(024)SB
Dodgion, Richard
Residency:Contract: 170348
Contractor: B & B BRIDGE COMPANY, LLC
Engineer:
Contract Amount:06/13/2019Completion Date:
Final Est Sub: 04/29/2020Letting Date:
$405,947.50
02/15/2018
06100
BUFFALO
BRIDGE REHABILITATION US-270: OVER
UNNAMED CREEK, 2.3 MILES WEST OF THE
US-283 INTERSECTION NEAR LAVERNE.
PROJECT LENGTH = 0.096 MILE
HaskellCounty: Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
28411(04) CO.RD.
CIRB-131C(114)RB
Orendorf, Barry
Residency:Contract: 130318
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:12/17/2015Completion Date:
Final Est Sub: 04/02/2020Letting Date:
$2,531,601.14
09/19/2013
01200
SALLISAW
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY
ROAD (EW-127): FROM 2.8 MILES WEST OF SH-2,
EXTEND EAST. PROJECT LENGTH = 2.640 MILES.
30417(04) SH-31
STPY-231C(029)(030)3P
Orendorf, Barry
Residency:Contract: 170083
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:04/04/2018Completion Date:
Final Est Sub: 04/02/2020Letting Date:
$1,427,769.80
03/16/2017
01200
SALLISAW
RESURFACE (ASPHALT) SH-31: FROM SH-2
EXTEND EAST, NEAR KINTA. SH-82: FROM 1.3 MI
SOUTH OF THE SH-31 JCT, EXTEND NORTH.
PROJECT LENGTH = 7.157 MILES
31194(04) MULTIPLE
STP-231C(033)CI
CE2
Residency:Contract: 180225
Contractor: T. MCDONALD CONSTRUCTION, INC.
Engineer:
Contract Amount:12/13/2019Completion Date:
Final Est Sub: Letting Date:
$1,861,859.80
06/14/2018
01017
CIRCUIT ENGR. DISTR. # 2
RESURFACE (ASPHALT) AND BRIDGE AND
APPROACHES COUNTY ROAD (KEOTA LANDING
ROAD/NS-455/8TH STREET): FROM THE SH-9
JUNCTION, EXTEND NORTH IN KEOTA. PROJECT
LENGTH = 3.845 MILES
31284(04) COUNTY RO
ACSTP-231D(038)CI
CE2
Residency:Contract: 180264
Contractor: B & B BRIDGE COMPANY, LLC
Engineer:
Contract Amount:08/31/2019Completion Date:
Final Est Sub: Letting Date:
$445,548.05
11/15/2018
01017
CIRCUIT ENGR. DISTR. # 2
BRIDGE AND APPROACHES COUNTY ROAD
(NS-450): OVER UNNAMED CREEK, 0.6 MILES
SOUTH OF THE SH-9 JUNCTION NEAR KEOTA.
PROJECT LENGTH = 0.208 MILE
32053(04) SH-2/SH-3
STP-231B(037)3P
Hagerman, Jeremy
Residency:Contract: 190078
Contractor: ROSSCON, LLC
Engineer:
Contract Amount:12/11/2019Completion Date:
Final Est Sub: Letting Date:
$1,178,877.50
05/16/2019
01100
MUSKOGEE
RESURFACE (ASPHALT) SH-2/SH-31: FROM THE
PITTSBURG COUNTY LINE, EXTEND EAST NEAR
KINITA. PROJECT LENGTH = 5.723 MILES
Construction Status Report Page 21
HughesCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
28939(04) SH-9
STP-232C(059)PM
JACOBS
Residency:Contract: 180195
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer:
Contract Amount:11/30/2019Completion Date:
Final Est Sub: 04/15/2020Letting Date:
$2,498,299.76
05/17/2018
03004
JACOBS ENGINEERING
BRIDGE AND APPROACHES SH-9: OVER FISH
CREEK, 0.4 MILES EAST OF THE SH-84 JUNCTION
NEAR DUSTIN. PROJECT LENGTH = 0.492 MILE
JacksonCounty: Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
24379(07) US-283
STP-133B(087)SS
Holley, Terri
Residency:Contract: 150136
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:01/19/2018Completion Date:
Final Est Sub: Letting Date:
$9,934,218.57
10/15/2015
05200
ALTUS
WIDEN, RESURFACE, AND BRIDGE US-283:
FROM 0.1 MILE SOUTH OF SH-5 EAST, EXTEND
NORTH NEAR ALTUS. PROJECT LENGTH = 6.099
MILES.
17014(06) CT.ST.
STP-033B(157)SG
Holley, Terri
Residency:Contract: 170174
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount:04/05/2019Completion Date:
Final Est Sub: 01/31/2020Letting Date:
$2,470,881.66
06/15/2017
05200
ALTUS
GRADE, DRAIN, AND SURFACE CITY STREET
(FALCON ROAD): FROM US-283, EXTEND EAST
IN ALTUS. PROJECT LENGTH = 0.921 MILE.
30407(04) US-62/SH-
NHPP-020N(044)3P
Holley, Terri
Residency:Contract: 180089
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount:02/19/2019Completion Date:
Final Est Sub: Letting Date:
$2,583,106.15
02/15/2018
05200
ALTUS
S.
RESURFACE (ASPHALT) US-62/SH-6: FROM THE
SH-34 JUNCTION, EXTEND EAST ON US-62 THEN
SOUTH ON SH-6 NEAR ALTUS. PROJECT LENGTH
= 13.390 MILES
JeffersonCounty: Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
27977(04) SH-79
STP-234B(014)SS
Roberts, Colton
Residency:Contract: 170123
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount:10/14/2019Completion Date:
Final Est Sub: Letting Date:
$11,164,064.48
03/16/2017
07100
DUNCAN
BRIDGE AND APPROACHES SH-79: OVER THE
RED RIVER, 0.5 MILE NORTH OF THE TEXAS
STATE LINE. PROJECT LENGTH = 1.189 MILES.
Construction Status Report Page 22
32835(04) US-70
SSR-234B(044)SR
Roberts, Colton
Residency:Contract: 190045
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:08/30/2019Completion Date:
Final Est Sub: 04/14/2020Letting Date:
$1,626,987.40
01/17/2019
07100
DUNCAN
RESURFACE (ASPHALT) US-70: FROM THE US-81
JUNCTION, EXTEND EAST NEAR WAURIKA.
PROJECT LENGTH = 7.99 MILES
31913(08) COUNTY RO
ERSTP-234C(033)CI
Roberts, Colton
Residency:Contract: 190141
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount:01/25/2020Completion Date:
Final Est Sub: Letting Date:
$433,988.30
03/14/2019
07100
DUNCAN
BRIDGE AND APPROACHES COUNTY ROAD
(EW-207): OVER TRIBUTARY TO RED RIVER, 3.3
MILES WEST OF THE US-81 JUNCTION NEAR
RYAN. PROJECT LENGTH = 0.082 MILE
JohnstonCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
27058(04) SH-22
STP-135C(135)SS
Wade, Tony
Residency:Contract: 150098
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount:05/23/2016Completion Date:
Final Est Sub: 12/11/2019Letting Date:
$2,489,951.32
03/19/2015
03100
ADA
BRIDGE AND APPROACHES SH-22: OVER
BUTCHER PEN CREEK, 4.3 MILES WEST OF
SH-78. PROJECT LENGTH = 0.321 MILE
23268(04) SH-99
ACSTP-135B(086)SS
Wade, Tony
Residency:Contract: 160250
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:12/10/2018Completion Date:
Final Est Sub: Letting Date:
$11,018,314.20
07/21/2016
03100
ADA
GRADE, DRAIN, SURFACE, AND BRIDGE SH-99:
FROM 5.64 MILES NORTH OF SH-22, EXTEND
NORTH NEAR TISHOMINGO. PROJECT LENGTH =
4.375 MILES.
28574(04) CO.RD.
STP-235C(020)CI
Wade, Tony
Residency:Contract: 160369
Contractor: OBC, INC.
Engineer:
Contract Amount:01/31/2019Completion Date:
Final Est Sub: Letting Date:
$4,352,723.36
10/20/2016
03100
ADA
BRIDGE AND APPROACHES COUNTY ROAD
(GREASY BEND ROAD): OVER THE WASHITA
RIVER, 1.4 MILES EAST OF THE CARTER COUNTY
LINE. PROJECT LENGTH = 0.478 MILE
17543(04) CO.RD.
CIRB-135C(020)RB
Wade, Tony
Residency:Contract: 170157
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:09/30/2019Completion Date:
Final Est Sub: Letting Date:
$2,557,873.81
04/20/2017
03100
ADA
GRADE, DRAIN, SURFACE, BRIDGE, AND
EROSION CONTROL. COUNTY ROAD (GREASY
BEND ROAD): OVER WASHITA RIVER, 5.0 MILES
EAST OF THE CARTER COUNTY LINE NEAR
MANNSVILLE. PROJECT LENGTH = 0.820 MILE
Construction Status Report Page 23
31380(04) SH-48A
STP-235C(035)PM
Wade, Tony
Residency:Contract: 180287
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount:12/31/2019Completion Date:
Final Est Sub:Letting Date:
$1,081,736.19
09/20/2018
03100
ADA
BRIDGE REHABILITATION SH-48A: OVER BIG
SANDY CREEK, 3.4 MILES WEST OF THE SH-48
JUNCTION NEAR MILBURN. PROJECT LENGTH =
0.1543 MILE
KingfisherCounty: Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
21858(04) SH-51
ACSTP-137C(051)SS/ACSTP-*
Hoover, Jacob
Residency:Contract: 160200
Contractor: MUNOZ CONSTRUCTION, INC.
Engineer:
Contract Amount:08/05/2019Completion Date:
Final Est Sub:Letting Date:
$6,606,846.50
05/19/2016
04300
ENID
*242C(045)SS
BRIDGE AND APPROACHES SH-51: OVER
SKELETON CREEK AND BRIDGE CREEK, 6.0
MILES WEST AND 3.8 MILES EAST OF SH-74
NEAR HENNESSEY. PROJECT LENGTH = 0.912
MILE.
30461(04) CO.RD.
STP-237C(032)CI
CED8
Residency:Contract: 160223
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount:09/13/2019Completion Date:
Final Est Sub:Letting Date:
$858,178.58
06/16/2016
04009
CIRCUIT ENGR. DISTR. # 8
BRIDGE AND APPROACHES COUNTY ROAD
(NS-274): OVER KINGFISHER CREEK, 0.9 MILE
SOUTH OF SH-3 NEAR KINGFISHER. PROJECT
LENGTH = 0.189 MILE.
29490(04) SH-33
STP-237B(033)SS
Hoover, Jacob
Residency:Contract: 160418
Contractor: RDNJ, INC. DBA A-TECH PAVING
Engineer:
Contract Amount:06/04/2018Completion Date:
Final Est Sub: 02/18/2020Letting Date:
$1,000,076.68
11/17/2016
04300
ENID
BRIDGE AND APPROACHES SH-33: OVER
FOREMAN CREEK, 10.2 MILES EAST OF THE
US-81 JUNCTION NEAR KINGFISHER. PROJECT
LENGTH = 0.067 MILE.
33655(04) US-81
SSR-237N(047)SR
Brooks, Jonathan
Residency:Contract: 180241
Contractor: SHELL CONSTRUCTION COMPANY INC.
Engineer:
Contract Amount:12/13/2019Completion Date:
Final Est Sub:Letting Date:
$609,875.28
07/19/2018
04200
YUKON
GRADE, DRAIN, AND SURFACE US-81: FROM 3.1
MILES NORTH OF THE CANADIAN COUNTY LINE,
EXTEND NORTH NEAR OKARCHE. PROJECT
LENGTH = 0.300 MILE
KiowaCounty: Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
28999(04) SH-44
ACSTP-238C(037)SS/STP-27*
ATKINS
Residency:Contract: 160320
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount:10/27/2019Completion Date:
Final Est Sub:Letting Date:
$3,321,240.72
09/15/2016
05010
ATKINS
*5C(035)SS
BRIDGE AND APPROACHES SH-44: OVER ELK
CREEK, ELK CREEK O'FLOW, AND DRY ELK
CREEK, 7.6 MI, 7.8 MI AND 11.4 MILES NORTH OF
SH-9 NEAR SENTINEL. PROJECT LENGTH = 0.410
MILE.
Construction Status Report Page 24
32947(04) SH-115
HSIPG-238C(041)AD
Holley, Terri
Residency:Contract: 180197
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount:09/06/2019Completion Date:
Final Est Sub: 11/08/2019Letting Date:
$836,299.75
05/17/2018
05200
ALTUS
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
SH-115: AT THE INTERSECTION OF SH-9, IN
MOUNTAIN VIEW. PROJECT LENGTH = 0.35 MILE
LatimerCounty: Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
31231(04) CO.RD.
STP-239C(026)CI
CED3
Residency:Contract: 170026
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:01/08/2019Completion Date:
Final Est Sub: Letting Date:
$1,055,044.90
01/19/2017
02013
CIRCUIT ENGR. DISTR. # 3
GRADE, DRAIN, AND SURFACE COUNTY ROAD
(DRUMB ROAD): FROM THE PITTSBURG COUNTY
LINE, EXTEND NORTHEAST NEAR WILBURTON.
PROJECT LENGTH = 1.174 MILES.
20922(04) US-270
ACSTP-139B(049)SS
Plymate, Larry
Residency:Contract: 170280
Contractor: KOLB GRADING, LLC
Engineer:
Contract Amount:12/11/2019Completion Date:
Final Est Sub: Letting Date:
$5,477,511.60
08/17/2017
02400
MCALESTER
GRADE, DRAIN, AND SURFACE US-270: FROM 2.5
MILES EAST OF THE PITTSBURG COUNTY LINE,
EXTEND EAST NEAR GOWEN. PROJECT LENGTH
= 0.830 MILE
29946(04) CO.RD.
STP-239D(032)CI
CED3
Residency:Contract: 170319
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount:02/19/2019Completion Date:
Final Est Sub: Letting Date:
$414,307.66
10/19/2017
02013
CIRCUIT ENGR. DISTR. # 3
BRIDGE AND APPROACHES COUNTY ROAD
(EW-1470/SW LIMESTONE ROAD): OVER
LIMESTONE CREEK, 3.6 MILES SW OF THE
US-270 JUNCTION NEAR WILBURTON. PROJECT
LENGTH = 0.113 MILE.
27138(04) SH-1
STP-239C(029)
Davis, Tim
Residency:Contract: 180011
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount:01/31/2020Completion Date:
Final Est Sub: 03/26/2020Letting Date:
$6,249,000.91
01/18/2018
02200
HEAVENER
E SH-2 JUNCTION NEAR TALAHINA.
BRIDGE AND APPROACHES SH-1: OVER
BUFFALO CREEK AND OVERFLOWS, 2.6 MI, 2.7
MI, 2.9 MI, AND 3.2 MI EAST OF THE SH-2
JUNCTION NEAR TALAHINA. PROJECT LENGTH =
1.023 MILES
29976(04) CO.RD.
ACSTP-239D(034)CI
CED3
Residency:Contract: 180134
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount:02/19/2019Completion Date:
Final Est Sub: Letting Date:
$534,170.34
03/15/2018
02013
CIRCUIT ENGR. DISTR. # 3
UNTY LINE NEAR HARTSHORNE.
BRIDGE AND APPROACHES COUNTY ROAD
(EW-1490/LINWOOD LANE): OVER PIT CREEK, 1.4
MILES EAST OF THE PITTSBURG COUNTY LINE
NEAR HARTSHORNE. PROJECT LENGTH = 0.142
MILE
Le FloreCounty: Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 25
27029(04) US-59
STP-240C(31)(29)SS/SBR-2*
Davis, Tim
Residency:Contract: 150205
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer:
Contract Amount:05/22/2019Completion Date:
Final Est Sub: Letting Date:
$12,483,862.80
07/23/2015
02200
HEAVENER
*45C(4)SB/SBR-240N(22)SB/NHPP-240N(32)SS
BRIDGE AND APPROACHES & BRIDGE
REHABILITATION US-259/US-59/SH-63: AT
MULTIPLE BRIDGE LOCATIONS IN DIVISION II.
PROJECT LENGTH = 0.889 MILE.
32955(04) US-59
ACNHPP-240N(064)3P
Davis, Tim
Residency:Contract: 180288
Contractor: JOB CONSTRUCTION CO., INC.
Engineer:
Contract Amount:12/19/2019Completion Date:
Final Est Sub: 04/09/2020Letting Date:
$1,336,596.48
09/20/2018
02200
HEAVENER
RESURFACE (ASPHALT) AND PEDESTRIAN
IMPROVEMENTS (SIDEWALKS) US-59: FROM 2.0
MILES SOUTH OF THE SH-128 JUNCTION,
EXTEND NORTH IN HEAVENER. PROJECT
LENGTH = 2.369 MILES
24333(10) US-70/SH-
NHPP-207N(081)PM
Davis, Tim
Residency:Contract: 190191
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Contract Amount:04/29/2020Completion Date:
Final Est Sub: Letting Date:
$634,308.07
06/20/2019
02200
HEAVENER
JOINT SEAL/REPAIR US-70/SH-112: OVER US-59,
RAILROAD, AND LAKE TEXOMA, AT MULTIPLE
LOCATIONS IN DIVISION II. PROJECT LENGTH =
0.00 MILE
LincolnCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
24228(10) SH-62
ACSTP-141C(232)(168)(171*
TETR
Residency:Contract: 160188
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount:07/24/2018Completion Date:
Final Est Sub: Letting Date:
$22,560,549.77
04/21/2016
03002
TETRA TECH
*(224)SS
GRADE, DRAIN, SURFACE, AND BRIDGE SH-102:
FROM 0.2 MI NORTH OF US-62, EXT NORTH NEAR
MIDWAY. US-62: FROM 3.65 MI WEST OF SH-102,
EXT EAST NEAR MIDWAY. PROJECT LENGTH =
6.370 MILES.
28925(04) US-62
STP-241C(052)SS
Helton, Matthew
Residency:Contract: 170263
Contractor: T. MCDONALD CONSTRUCTION, INC.
Engineer:
Contract Amount:12/20/2019Completion Date:
Final Est Sub: 04/20/2020Letting Date:
$1,514,040.01
01/18/2018
03300
WEWOKA
N.
GRADE, DRAIN, SURFACE, AND EROSION US-62:
FROM 1.0 MILE WEST OF US-177 INTERSECTION,
EXTEND EAST NEAR JACKTOWN. PROJECT
LENGTH = 0.426 MILE
28202(04) US-62
STP-241C(060)3P
Helton, Matthew
Residency:Contract: 190199
Contractor: EMERY SAPP & SONS, INC.
Engineer:
Contract Amount:01/08/2020Completion Date:
Final Est Sub: Letting Date:
$2,027,247.08
06/20/2019
03300
WEWOKA
RESURFACE (A.C. AND P.C.) US-62: FROM THE
SH-99 JUNCTION, EXTEND EAST IN PRAGUE.
PROJECT LENGTH = 3.60 MILES
LoganCounty: Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 26
21860(04) SH-33
ACSTP-242C(046)SS
Mitchell, Matt
Residency:Contract: 160290
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount:07/17/2019Completion Date:
Final Est Sub: Letting Date:
$17,235,548.53
09/15/2016
04500
STILLWATER
BRIDGE AND APPROACHES SH-33: OVER
COTTONWOOD CREEK AND BNSF RAILROAD, 0.2
MILE WEST OF SH-77 IN GUTHRIE. PROJECT
LENGTH = 0.794 MILE.
32379(04) CO.RD.
ACERSTP-242C(056)ER
CEC
Residency:Contract: 160439
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount:01/03/2020Completion Date:
Final Est Sub: Letting Date:
$1,025,064.43
11/17/2016
04003
CEC CORP.
BRIDGE AND APPROACHES COUNTY ROAD
(EW-84/SEWARD ROAD): OVER COTTONWOOD
CREEK, 4.3 MILES WEST OF US-77 NEAR
GUTHRIE. PROJECT LENGTH = 0.249 MILE.
27103(04) US-77
STP-242C(055)PM
Mitchell, Matt
Residency:Contract: 170125
Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount:04/17/2020Completion Date:
Final Est Sub: Letting Date:
$5,452,151.90
05/17/2018
04500
STILLWATER
BRIDGE AND APPROACHES US-77: OVER THE
CIMARRON RIVER, 2.7 MILES NORTH OF SH-33
NEAR GUTHRIE. PROJECT LENGTH = 0.610 MILE
32640(04) CO.RD.
CIRB-242B(054)RB
ATKINS
Residency:Contract: 170179
Contractor: SCHWARZ PAVING CO., INC.
Engineer:
Contract Amount:10/15/2019Completion Date:
Final Est Sub: Letting Date:
$3,779,648.60
05/18/2017
04010
ATKINS
GRADE, DRAIN, AND SURFACE COUNTY ROAD
(COLTRANE ROAD): FROM 1.0 MILE NORTH OF
THE OKLAHOMA COUNTY LINE EXTEND NORTH
NEAR EDMOND. PROJECT LENGTH = 2.083
MILES.
LoveCounty: Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
26502(04) SH-32
ACSTP-143C(093)SS
Fuhrmann, Chris
Residency:Contract: 160098
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:05/20/2019Completion Date:
Final Est Sub: 04/30/2020Letting Date:
$11,463,969.39
07/21/2016
07200
ARDMORE
GRADE, DRAIN, SURFACE, AND BRIDGE SH-32:
OVER MUD CREEK AND MUD CREEK
OVERFLOWS, 0.6 MILE EAST OF SH-89 NEAR
COURTNEY. PROJECT LENGTH = 1.287 MILES.
25447(04) CO.RD.
CIRB-143C(091)RB
Fuhrmann, Chris
Residency:Contract: 170322
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:11/19/2019Completion Date:
Final Est Sub: Letting Date:
$6,583,798.11
10/19/2017
07200
ARDMORE
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY
ROAD (OSWALT ROAD/EW-206): FROM SH-76,
EXTEND EAST NEAR ARDMORE. PROJECT
LENGTH = 6.025 MILES.
MajorCounty: Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 27
29446(04) US-60
STP-247B(017)
ZOA
Residency:Contract: 170128
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount:08/28/2018Completion Date:
Final Est Sub: 03/16/2020Letting Date:
$5,360,055.79
03/16/2017
06021
OLSSON ASSOCIATES
BRIDGE AND APPROACHES US-60: OVER THE
NORTH CANADIAN RIVER, 2.2 MILES NORTH
OFUS-270 NEAR SEILING. PROJECT LENGTH =
0.851 MILE
MarshallCounty: Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
29988(04) COUNTY RO
CIRB-248D(040)RB
CED3
Residency:Contract: 190010
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:07/12/2019Completion Date:
Final Est Sub: 03/20/2020Letting Date:
$793,297.48
01/17/2019
02013
CIRCUIT ENGR. DISTR. # 3
RESURFACE (ASPHALT) COUNTY ROAD (SHAY
ROAD): 2.8 MILES NORTH OF THE TEXAS STATE
LINE NEAR WILLIS. PROJECT LENGTH = 3.500
MILES
30418(04) SH-99
SSR-248C(046)SR
Bishop, Justin
Residency:Contract: 190011
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:03/02/2020Completion Date:
Final Est Sub: Letting Date:
$2,965,802.00
01/17/2019
02300
MADILL
RESURFACE (ASPHALT) SH-99: FROM 3.5 MILES
SOUTH OF THE SH-32 JUNCTION, EXTEND
NORTH NEAR KINGSTON. PROJECT LENGTH =
8.00 MILES
MayesCounty: Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
31944(05) US-69/US-
SSP-249F(038)SS
TETR
Residency:Contract: 170159
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Contract Amount:09/20/2019Completion Date:
Final Est Sub: 04/07/2020Letting Date:
$1,785,647.90
01/18/2018
08002
TETRA TECH
JOINT SEAL/REPAIR US-69/US-412: AT MULTIPLE
LOCATIONS IN DIVISION VIII.
McClainCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
01964(06) SH-76
ACSTP-144C(001)SS
JACOBS
Residency:Contract: 160142
Contractor: MUNOZ CONSTRUCTION, INC.
Engineer:
Contract Amount:05/31/2018Completion Date:
Final Est Sub: 04/06/2020Letting Date:
$6,557,900.51
03/17/2016
03004
JACOBS ENGINEERING
GRADE, DRAIN, SURFACE, AND BRIDGE SH-76:
FROM 0.1 MILE SOUTH OF SH-74B, EXTEND
NORTH NEAR BLANCHARD. PROJECT LENGTH =
2.162 MILES.
Construction Status Report Page 28
32742(04) SH-74B
SBR-244C(060)SB
GARV
Residency:Contract: 180169
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount:04/02/2020Completion Date:
Final Est Sub:Letting Date:
$843,437.51
04/19/2018
03011
GARVER, LLC.
BRIDGE REHABILITATION SH-74B: OVER
BUFFALO CREEK, 2.4 MILES EAST OF THE SH-76
JUNCTION NEAR BLANCHARD. PROJECT
LENGTH = 0.148 MILE
McCurtainCounty: Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
25828(04) CO.RD.
ACSTP-145D(179)CI
CED3
Residency:Contract: 170172
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount:10/30/2018Completion Date:
Final Est Sub: 02/21/2020Letting Date:
$1,075,678.93
05/18/2017
02013
CIRCUIT ENGR. DISTR. # 3
BRIDGE AND APPROACHES COUNTY ROAD
(EW-174): OVER BIG EAGLE CREEK, 1.1 MILES
WEST OF US-259 NEAR SMITHVILLE. PROJECT
LENGTH = 0.217 MILE
25468(04) CO.RD.
CIRB-145C(172)RB
CED3
Residency:Contract: 170353
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount:01/03/2019Completion Date:
Final Est Sub:Letting Date:
$1,215,001.38
11/16/2017
02013
CIRCUIT ENGR. DISTR. # 3
BRIDGE AND APPROACHES COUNTY ROAD
(EW-208): OVER YANUBBEE CREEK, 1.6 MILES
EAST OF US-259 NEAR BROKEN BOW. PROJECT
LENGTH = 0.397 MILE
McIntoshCounty: Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
30787(04) US-69
HSIPG-246N(011)TR
CEC
Residency:Contract: 140300
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:01/28/2017Completion Date:
Final Est Sub:Letting Date:
$3,780,404.96
11/20/2014
01003
CEC CORP.
SAFETY IMPROVEMENTS (CABLE BARRIER)
US-69: BEGIN AT THE MUSKOGEE COUNTY LINE,
EXTEND SOUTH. PROJECT LENGTH = 14.100
MILES.
25103(04) CO.RD.
CIRB-146C(101)RB
CE2
Residency:Contract: 160039
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:06/24/2017Completion Date:
Final Est Sub:Letting Date:
$2,212,168.11
01/21/2016
01017
CIRCUIT ENGR. DISTR. # 2
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY
ROAD (EW-103/NS-423): FROM OLD US-69,
EXTEND EAST THEN NORTH NEAR CHECOTAH.
PROJECT LENGTH = 3.638 MILES.
26289(04) I-40
ACNHPPI-4000(029)SS
JACOBS
Residency:Contract: 160170
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:10/01/2018Completion Date:
Final Est Sub:Letting Date:
$13,056,622.86
04/21/2016
01004
JACOBS ENGINEERING
RESURFACE (ASPHALT) I-40: FROM THE
OKMULGEE COUNTY LINE, EXTEND EAST NEAR
CHECOTAH. PROJECT LENGTH = 7.971 MILES.
Construction Status Report Page 29
29374(04) CO.RD.
STP-246C(030)CI
CE2
Residency:Contract: 170374
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount:04/29/2020Completion Date:
Final Est Sub: Letting Date:
$1,108,167.04
11/16/2017
01017
CIRCUIT ENGR. DISTR. # 2
ND EAST.
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY
ROAD (EW-115): FROM 4.8 MILES WEST OF THE
MUSKOGEE COUNTY LINE, EXTEND EAST.
PROJECT LENGTH = 0.408 MILE
29750(07) US-266
SSR-246C(033)SR
Hagerman, Jeremy
Residency:Contract: 180015
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount:11/15/2018Completion Date:
Final Est Sub: 04/30/2020Letting Date:
$653,068.64
01/18/2018
01100
MUSKOGEE
RESURFACE (ASPHALT) US-266: FROM THE
SH-72 JUNCTION, EXTEND WEST NEAR
CHECOTAH. PROJECT LENGTH = 3.02 MILES
29387(04) COUNTY RO
ACSTP-246D(035)CI
Hagerman, Jeremy
Residency:Contract: 180056
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount:10/03/2019Completion Date:
Final Est Sub: 02/24/2020Letting Date:
$395,086.64
04/19/2018
01100
MUSKOGEE
BRIDGE AND APPROACHES COUNTY ROAD
(EW-112): OVER MUD CREEK, 8.9 MILES EAST OF
US-69 NEAR TEXANNA. PROJECT LENGTH =
0.132 MILE
27113(04) US-69
NHPPI-NBIP(512)SS
EST
Residency:Contract: 190365
Contractor: EURO PAINT, LLC
Engineer:
Contract Amount:03/16/2020Completion Date:
Final Est Sub: Letting Date:
$541,002.00
11/14/2019
01001
EST, INC.
BRIDGE PAINTING US-69: OVER I-40, 1.2 MILES
SOUTH OF US-266 NEAR CHECOTAH. PROJECT
LENGTH = 0.000 MILE
MurrayCounty: Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
30363(04) CO.RD.
NHPPI-3500(060)SS
Fuhrmann, Chris
Residency:Contract: 170355
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:04/30/2019Completion Date:
Final Est Sub: 04/30/2020Letting Date:
$3,686,657.50
11/16/2017
07200
ARDMORE
INE NEAR DAVIS.
BRIDGE AND APPROACHES COUNTY ROAD
(ROCK CRUSHER ROAD): OVER I-35, 1.8 MILES
SOUTHEAST OF THE GARVIN COUNTY LINE
NEAR DAVIS. PROJECT LENGTH = 0.363 MILE.
28440(04) COUNTY RO
STP-250D(019)CI
Fuhrmann, Chris
Residency:Contract: 180245
Contractor: WYATT CONTRACTING, INC.
Engineer:
Contract Amount:12/13/2019Completion Date:
Final Est Sub: 11/05/2019Letting Date:
$984,789.18
11/15/2018
07200
ARDMORE
BRIDGE AND APPROACHES COUNTY ROAD
(EW-1780): OVER BRANCH CREEK, 0.7 MILES
WEST OF THE US-177 JUNCTION NEAR
SULPHUR. PROJECT LENGTH = 0.151 MILE
Construction Status Report Page 30
33614(04) SH-7
NHPP-250N(020)3B
Fuhrmann, Chris
Residency:Contract: 180290
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Engineer:
Contract Amount:11/19/2019Completion Date:
Final Est Sub: 12/05/2019Letting Date:
$833,221.76
09/20/2018
07200
ARDMORE
JOINT SEAL/REPAIR SH-7 (EB): OVER WASHITA
RIVER, 0.8 MILES WEST OF THE US-77 JUNCTION
NEAR DAVIS. PROJECT LENGTH = 0.00 MILE
29397(04) COUNTY RO
CIRB-250C(021)RB
ZSRB
Residency:Contract: 190140
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount:04/15/2020Completion Date:
Final Est Sub: 04/20/2020Letting Date:
$1,078,664.70
03/14/2019
07022
SMITH ROBERTS BALDISCHWILER, LLC
BRIDGE AND APPROACHES COUNTY ROAD
(NS-328): OVER COLBERT CREEK, 0.6 MILES
SOUTH OF THE SH-7 JUNCTION NEAR DAVIS.
PROJECT LENGTH = 0.301 MILE
MuskogeeCounty: Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
30583(04) US-64
SBR-251N(050)SB
Hagerman, Jeremy
Residency:Contract: 160044
Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
Engineer:
Contract Amount:06/11/2018Completion Date:
Final Est Sub: Letting Date:
$1,818,806.71
01/21/2016
01100
MUSKOGEE
BRIDGE REHABILITATION US-64: OVER SH-165
IN MUSKOGEE.
28954(04) US-62
ACSTP-251B(029)SS
Hagerman, Jeremy
Residency:Contract: 160203
Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount:10/30/2017Completion Date:
Final Est Sub: 04/30/2020Letting Date:
$1,845,070.21
05/19/2016
01100
MUSKOGEE
BRIDGE REHABILITATION US-62: OVER CLOUD
CREEK, 1.5 MILES EAST OF THE SH-16 JUNCTION
NEAR MUSKOGEE. PROJECT LENGTH = 0.237
MILE.
27956(04) US-62
ACSTP-251B(058)SS
Hagerman, Jeremy
Residency:Contract: 160323
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:02/04/2019Completion Date:
Final Est Sub: Letting Date:
$5,221,126.20
09/15/2016
01100
MUSKOGEE
GRADE, DRAIN, SURFACE, AND INTERSECTION
MODIFICATION US-62/SH-10: FROM 2.2 MILES
EAST OF THE MUSKOGEE TURNPIKE (SH-165),
EXTEND EAST IN FORT GIBSON. PROJECT
LENGTH = 4.408 MILES.
31163(04) CO.RD.
STP-251D(080)CI
CE2
Residency:Contract: 170270
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:04/11/2019Completion Date:
Final Est Sub: Letting Date:
$303,462.43
08/17/2017
01017
CIRCUIT ENGR. DISTR. # 2
BRIDGE AND APPROACHES COUNTY ROAD
(NS-432): OVER UNNAMED CREEK, 3.6 MILES
NORTH OF I-40 NEAR WARNER. PROJECT
LENGTH = 0.189 MILE
Construction Status Report Page 31
31383(04) SH-2
STP-251C(084)3P
Hagerman, Jeremy
Residency:Contract: 180096
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount:05/09/2019Completion Date:
Final Est Sub: 04/23/2020Letting Date:
$2,515,300.46
02/15/2018
01100
MUSKOGEE
RESURFACE (ASPHALT) US-64/SH-2: FROM THE
I-40 INTERCHANGE, EXTEND NORTH NEAR
WARNER. PROJECT LENGTH = 6.374 MILES
32837(04) US-64
ACSTPY-251E(075)AD
Hagerman, Jeremy
Residency:Contract: 180136
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount:01/29/2019Completion Date:
Final Est Sub: 04/23/2020Letting Date:
$279,296.33
03/15/2018
01100
MUSKOGEE
TH = 0.494 MILE
RESURFACE (ASPHALT) AND PEDESTRIAN
IMPROVEMENTS US-64: FROM THE SH-104
JUNCTION, EXTEND SOUTH IN HASKELL.
PROJECT LENGTH = 0.494 MILE
NobleCounty: Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
31189(04) CO.RD.
ACSTP-252C(043)CI
CED8
Residency:Contract: 180137
Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.
Engineer:
Contract Amount:08/27/2019Completion Date:
Final Est Sub: Letting Date:
$1,590,475.40
03/15/2018
04009
CIRCUIT ENGR. DISTR. # 8
GRADE, DRAIN, AND SURFACE COUNTY ROAD
(EW-58/CR 310): FROM THE SH-86 JUNCTION,
EXTEND EAST NEAR PERRY. PROJECT LENGTH
= 2.01 MILES
29867(04) COUNTY RO
CIRB-252D(019)RB
CED8
Residency:Contract: 180227
Contractor: B & B BRIDGE COMPANY, LLC
Engineer:
Contract Amount:02/11/2020Completion Date:
Final Est Sub: Letting Date:
$429,155.24
11/15/2018
04009
CIRCUIT ENGR. DISTR. # 8
BRIDGE AND APPROACHES COUNTY ROAD
(NS-330): OVER MULE CREEK, 1.3 MILES NORTH
OF THE US-64 JUNCTION NEAR SUMNER.
PROJECT LENGTH = 0.170 MILE
OkfuskeeCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
28919(04) SH-48
STP-254C(035)
Helton, Matthew
Residency:Contract: 170132
Contractor: TREAS CONSTRUCTION, INC.
Engineer:
Contract Amount:11/04/2019Completion Date:
Final Est Sub: Letting Date:
$3,416,591.36
06/15/2017
03300
WEWOKA
BRIDGE AND APPROACHES SH-48: OVER
WALNUT CREEK AND LITTLE WALNUT CREEK,
6.0 MILES AND 6.5 MILES NORTH OF US-62 NEAR
CASTLE. PROJECT LENGTH = 0.610 MILE.
32966(04) SH-62
ACHSIPG-254C(039)AD
Helton, Matthew
Residency:Contract: 180138
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount:12/26/2019Completion Date:
Final Est Sub: Letting Date:
$954,264.68
03/15/2018
03300
WEWOKA
9TH ST THEN N ON MAIN ST IN PADEN.
PEDESTRIAN IMPROVEMENTS (SIDEWALK) SH-62
(9TH STREET)/MAIN STREET: FROM 3.1 MI E OF
THE LINCOLN C/L, EXTEND E ON SH-62/9TH ST
THEN N ON MAIN ST IN PADEN.
Construction Status Report Page 32
33324(04) I-40/US-7
SAP-254N(042)
Wade, Tony
Residency:Contract: 180163
Contractor: RESTEK, INC.
Engineer:
Contract Amount:12/12/2018Completion Date:
Final Est Sub: 03/12/2020Letting Date:
$95,857.40
04/19/2018
03100
ADA
IAN RIVER.
BRIDGE REPAIR I-40/US-75: I-40, REPAIR
VEHICLE IMPACT DAMAGE OVER SH-27. US-75,
REPAIR VEHICLE IMPACT DAMAGE OVER
CANADIAN RIVER.
OklahomaCounty: Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
17428(60) CT.ST.
OKC-XTWN(048)(006)SS
Harlin, Chris
Residency:Contract: 150026
Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
Engineer:
Contract Amount:02/02/2017Completion Date:
Final Est Sub: Letting Date:
$40,611,253.81
01/22/2015
04600
OKLAHOMA CITY
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREET (OKC BOULEVARD): E.K. GAYLORD
BLVD. FROM RENO AVE., EXTEND SOUTH. OKC
BOULEVARD AND 3RD ST. FROM B.N.S.F.
RAILROAD, EXTEND EAST TO NORTHBOUND I-35.
PROJECT LENGTH = 1.184
25909(48) I-35
HSIPG-255F(180)IT
Brooks, Jonathan
Residency:Contract: 150340
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Contract Amount:07/31/2018Completion Date:
Final Est Sub: 02/28/2020Letting Date:
$3,771,714.50
05/19/2016
04200
YUKON
SAFETY IMPROVEMENT (DYNAMIC MESSAGE
SIGN AND CCTV PROJECT)
I-35/I-40/I-44/US-69/US-271: AT MULTIPLE
LOCATIONS ON THE OKLAHOMA STATE LINE.
09032(20) I-240
ACNHPPI-2400-(004)SS
Harlin, Chris
Residency:Contract: 160046
Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
Engineer:
Contract Amount:09/11/2017Completion Date:
Final Est Sub: 06/28/2019Letting Date:
$11,958,193.19
01/21/2016
04600
OKLAHOMA CITY
GRADE, DRAIN, AND SURFACE I-240: FROM
SANTA FE AVENUE, EXTEND EAST IN
OKLAHOMA CITY. PROJECT LENGTH = 0.484
MILE.
30277(04) CT.ST.
STP-255C(343)AG
Hubbard, Tom
Residency:Contract: 160147
Contractor: ALLEN CONTRACTING, INC.
Engineer:
Contract Amount:10/23/2017Completion Date:
Final Est Sub: Letting Date:
$11,798,388.72
04/21/2016
04400
EDMOND
GRADE, DRAIN, SURFACE, AND TRAFFIC SIGNAL
CITY STREET (COVELL ROAD): AT THE
INTERSECTION OF SOONER ROAD IN THE CITY
OF EDMOND. PROJECT LENGTH = 1.032 MILES.
24364(04) CT.ST.
STP-155B(614)AG
Harlin, Chris
Residency:Contract: 160379
Contractor: SCHWARZ PAVING CO., INC.
Engineer:
Contract Amount:05/31/2018Completion Date:
Final Est Sub: 02/25/2020Letting Date:
$8,844,680.81
10/20/2016
04600
OKLAHOMA CITY
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREETS (SE 15TH STREET): FROM 0.2 MILE
WEST OF WESTMINISTER ROAD, EXTEND EAST
IN MIDWEST CITY AND CHOCTAW. PROJECT
LENGTH = 1.405 MILES.
Construction Status Report Page 33
30635(04) SH-152
SBR-255N(416)SB
Harlin, Chris
Residency:Contract: 160385
Contractor: RESTEK, INC.
Engineer:
Contract Amount:09/15/2017Completion Date:
Final Est Sub: 08/01/2019Letting Date:
$966,416.19
10/20/2016
04600
OKLAHOMA CITY
BRIDGE REHABILITATION SH-152: OVER
PORTLAND AVENUE, 0.6 MI NW, 0.6 MI W, AND
1.1 MI NW OF THE I-44 INTERCHANGE IN
OKLAHOMA CITY.
31476(04) CT.ST.
STP-255B(337)AG
Harlin, Chris
Residency:Contract: 160388
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Contract Amount:01/09/2018Completion Date:
Final Est Sub: 04/14/2020Letting Date:
$2,344,841.28
10/20/2016
04600
OKLAHOMA CITY
RESURFACE (ASPHALT) AND PEDESTRIAN
IMPROVEMENTS CITY STREET (SE 15TH
STREET): FROM MIDWEST BOULEVARD, EXTEND
WEST IN MIDWEST CITY. PROJECT LENGTH =
1.560 MILES.
09032(17) I-240/I-3
NHPPI-0240-1(358)004SS
Harlin, Chris
Residency:Contract: 160425
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Contract Amount:06/30/2018Completion Date:
Final Est Sub: 04/16/2020Letting Date:
$10,629,506.29
11/17/2016
04600
OKLAHOMA CITY
GRADE, DRAIN, AND SURFACE I-240/I-35: FROM
SHIELDS BOULEVARD, EXTEND EAST ON I-240
THEN SOUTH ON I-35 IN OKLAHOMA CITY.
PROJECT LENGTH = 0.962 MILE.
24357(04) SH-66
STPY-155C(611)
Hubbard, Tom
Residency:Contract: 170035
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount:08/10/2018Completion Date:
Final Est Sub:Letting Date:
$4,046,765.06
02/16/2017
04400
EDMOND
WIDEN, RESURFACE, AND BRIDGE SH-66: FROM
THE LINCOLN COUNTY LINE, EXTEND WEST IN
LUTHER. PROJECT LENGTH = 2.286 MILES
31526(04) CT.ST.
STP-255D(419)AG
Hubbard, Tom
Residency:Contract: 170038
Contractor: M.J. HUGHES CONSTRUCTION, INC.
Engineer:
Contract Amount:11/03/2017Completion Date:
Final Est Sub: 01/15/2020Letting Date:
$914,777.72
02/16/2017
04400
EDMOND
BRIDGE REHABILITATION CITY STREET (RENO
AVENUE): OVER CHERRY CREEK, 0.3 MILE EAST
OF SUNNYLANE ROAD IN THE CITY OF DEL CITY.
PROJECT LENGTH = 0.056 MILE.
32261(05) US-62
ACERSTP-255N(358)ER
Hubbard, Tom
Residency:Contract: 170134
Contractor: CP3 ENTERPRISES, INC.
Engineer:
Contract Amount:08/16/2019Completion Date:
Final Est Sub:Letting Date:
$612,210.14
01/17/2019
04400
EDMOND
BANK PROTECTION US-62: OVER THE NORTH
CANADIAN RIVER, 0.4 MILES NORTHEAST OF
THE SH-270 JUNCTION NEAR HARRAH. PROJECT
LENGTH = 0.00 MILE
28767(04) CT.ST.
CIRB-155C(917)CO
Brooks, Jonathan
Residency:Contract: 170176
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount:11/07/2018Completion Date:
Final Est Sub: 09/19/2019Letting Date:
$7,800,000.00
04/20/2017
04200
YUKON
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREET (NORTH MACARTHUR BOULEVARD):
FROM 3.0 MILES NORTH OF THE KILPATRICK
TURNPIKE, EXTEND NORTH IN EDMOND.
PROJECT LENGTH = 1.875 MILES.
Construction Status Report Page 34
31436(04) CT.ST.
TAP-255D(329)AG
Harlin, Chris
Residency:Contract: 170181
Contractor: PARATHON CONSTRUCTION, LLC
Engineer:
Contract Amount:08/09/2018Completion Date:
Final Est Sub: 04/16/2020Letting Date:
$644,640.18
05/18/2017
04600
OKLAHOMA CITY
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) CITY STREET (SE 29TH STREET
TRAIL): FROM SOONER ROAD, EXTEND EAST IN
MIDWEST CITY. PROJECT LENGTH = 1.050 MILES
PREQUALIFICATION FOR THIS PROJECT HAS
BEEN WAIVED. BOTH BID EX
31435(04) CT.ST.
TAP-255D(328)AG
Harlin, Chris
Residency:Contract: 170327
Contractor: CROSSLAND HEAVY CONTRACTORS INC.
Engineer:
Contract Amount:05/12/2018Completion Date:
Final Est Sub: Letting Date:
$525,980.00
10/19/2017
04600
OKLAHOMA CITY
ENHANCEMENT (TRAIL CONSTRUCTION)
RAILROAD CORRIDOR WITH TRAIL: FROM
S.E.15TH STREET, EXTEND NORTHWEST IN THE
CITY OF MIDWEST CITY. PROJECT LENGTH =
1.030 MILES PREQUALIFICATION FOR THIS
PROJECT HAS BEEN WAIVED. BOTH BID
30326(04) CT.ST.
STP-255B(360)AG
Brooks, Jonathan
Residency:Contract: 170358
Contractor: SCHWARZ PAVING CO., INC.
Engineer:
Contract Amount:09/20/2019Completion Date:
Final Est Sub: Letting Date:
$4,419,663.32
11/16/2017
04200
YUKON
MOND.
GRADE, DRAIN, AND SURFACE CITY STREET
(WESTERN AVENUE): FROM NW 178TH STREET,
EXTEND NORTH IN THE CITY OF EDMOND.
PROJECT LENGTH = 0.966 MILE
30444(06) I-40
NHPPI-3500-(062)SS
Harlin, Chris
Residency:Contract: 170359
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount:08/01/2018Completion Date:
Final Est Sub: 04/16/2020Letting Date:
$5,018,449.68
11/16/2017
04600
OKLAHOMA CITY
GRADE, DRAIN, AND SURFACE I-40: AT THE
I-35/I-235 INTERCHANGE IN OKLAHOMA CITY.
PROJECT LENGTH = 1.461 MILES
27905(04) I-235
NHPPI-2350-(007)PM
Hubbard, Tom
Residency:Contract: 180099
Contractor: RUDY CONSTRUCTION CO.
Engineer:
Contract Amount:03/20/2019Completion Date:
Final Est Sub: Letting Date:
$686,705.14
02/15/2018
04400
EDMOND
GRADE, DRAIN, AND SURFACE I-235:
NORTHBOUND OFF-RAMP TO NE 23RD STREET
IN THE CITY OF OKLAHOMA CITY. PROJECT
LENGTH = 0.141 MILE
30230(04) CITY STRE
STP-255A(450)AG
EST
Residency:Contract: 180101
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount:05/07/2019Completion Date:
Final Est Sub: Letting Date:
$2,868,868.00
04/19/2018
04001
EST, INC.
ND EAST IN OKLAHOMA CITY.
RESURFACE (ASPHALT) CITY STREET (WEST
MEMORIAL ROAD): FROM THE SH-74 (N
PORTLAND AVENUE) INTERSECTION, EXTEND
EAST IN OKLAHOMA CITY. PROJECT LENGTH =
2.075 MILES
31432(04) CT.ST.
TAP-255D(325)AG
Harlin, Chris
Residency:Contract: 180102
Contractor: SAC SERVICES, INC.
Engineer:
Contract Amount:08/30/2018Completion Date:
Final Est Sub: 04/07/2020Letting Date:
$73,629.50
02/15/2018
04600
OKLAHOMA CITY
PEDESTRIAN IMPROVEMENTS (BUS STOPS) CITY
STREETS: AT MULTIPLE LOCATIONS IN
OKLAHOMA CITY.
Construction Status Report Page 35
31568(04) CITY STRE
STPG-255A(459)AG
Harlin, Chris
Residency:Contract: 180105
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Contract Amount:02/11/2019Completion Date:
Final Est Sub: 04/22/2020Letting Date:
$81,345.75
04/19/2018
04600
OKLAHOMA CITY
TRAFFIC SIGNALS CITY STREET (MERIDIAN
AVENUE): BETWEEN NW 52ND STREET AND NW
53RD STREET, IN OKLAHOMA CITY.
30793(04) SH-66
HSIP-255N(257)TR
Brooks, Jonathan
Residency:Contract: 180266
Contractor: TRAFFIC SIGNALS, INC.
Engineer:
Contract Amount:06/24/2019Completion Date:
Final Est Sub: 03/10/2020Letting Date:
$72,936.79
08/16/2018
04200
YUKON
SAFETY IMPROVEMENT (SCHOOL SIGNS) SH-66
(NW 39TH STREET): AT THE INTERSECTION OF
GROVE AVENUE, IN THE CITY OF WARR ACRES.
PROJECT LENGTH = 0.00 MILE
31527(04) CITY STRE
STP-255D(442)AG
Brooks, Jonathan
Residency:Contract: 180267
Contractor: PBX CORPORATION
Engineer:
Contract Amount:07/23/2019Completion Date:
Final Est Sub: Letting Date:
$1,022,129.26
08/16/2018
04200
YUKON
BRIDGE REHABILITATION CITY STREET (NE 4TH
STREET): OVER CHERRY CREEK, 1.6 MILES
EAST OF I-35 IN DEL CITY. PROJECT LENGTH =
0.058 MILE
32592(04) COUNTY RO
STP-255C(464)CB
Harlin, Chris
Residency:Contract: 180269
Contractor: KLAVER CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount:08/01/2019Completion Date:
Final Est Sub: 04/23/2020Letting Date:
$396,325.79
08/16/2018
04600
OKLAHOMA CITY
BRIDGE AND APPROACHES COUNTY ROAD
(NS-328/NORTH HARRAH ROAD): OVER
UNNAMED CREEK, 0.8 MILES SOUTH OF I-44
(TURNER TURNPIKE) NEAR LUTHER. PROJECT
LENGTH = 0.081 MILE
31102(04) CITY STRE
STP-255C(430)AG
Harlin, Chris
Residency:Contract: 180293
Contractor: CROSSLAND HEAVY CONTRACTORS INC.
Engineer:
Contract Amount:02/05/2020Completion Date:
Final Est Sub: Letting Date:
$3,954,000.00
11/15/2018
04600
OKLAHOMA CITY
GRADE, DRAIN, SURFACE, AND SIDEWALKS CITY
STREET (BRITTON ROAD): FROM 0.4 MILES
EAST OF SH-74, EXTEND EAST IN THE CITY OF
THE VILLAGE. PROJECT LENGTH = 1.004 MILES
33616(05) SH-152/NE
STP-NBIP(526)3B
EST
Residency:Contract: 180295
Contractor: POSEIDON CONSTRUCTION, INC.
Engineer:
Contract Amount:11/04/2019Completion Date:
Final Est Sub: Letting Date:
$534,869.00
09/20/2018
04001
EST, INC.
BRIDGE PAINTING SH-152: OVER RAILROAD,
CITY STREET (NEWCASTLE ROAD), AND
UNNAMED CREEK, 1.4 MILES W OF THE I-44
INTERCHANGE IN OKC. PROJECT LENGTH = 0.00
MILE
32091(04) SH-3
NHPP-017N(252)3P
Brooks, Jonathan
Residency:Contract: 180333
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount:04/23/2020Completion Date:
Final Est Sub: Letting Date:
$6,076,769.00
04/18/2019
04200
YUKON
RESURFACE (ASPHALT) SH-3: FROM SH-74
EXTEND NORTHWEST, IN OKLAHOMA CITY.
PROJECT LENGTH = 6.860 MILES
Construction Status Report Page 36
33773(04) SH-74
ACSTP-255C(491)PM
Hubbard, Tom
Residency:Contract: 190159
Contractor: TRAFFIC SIGNALS, INC.
Engineer:
Contract Amount:10/25/2019Completion Date:
Final Est Sub: Letting Date:
$193,114.19
06/20/2019
04400
EDMOND
TRAFFIC SIGNAL, SIGNING, AND PAVEMENT
MARKING SH-74: AT THE INTERSECTION OF
WATERLOO ROAD, NEAR EDMOND. PROJECT
LENGTH = 0.47 MILE
28817(04) MID-AMERI
STP-155E(919)EH
Harlin, Chris
Residency:Contract: 190170
Contractor: REDLANDS CONTRACTING, LLC
Engineer:
Contract Amount:02/12/2020Completion Date:
Final Est Sub: Letting Date:
$674,201.15
04/18/2019
04600
OKLAHOMA CITY
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) MID-AMERICA TRAIL: FROM
THE INTERSECTION OF N. MIDWEST BLVD AND
NE 10TH ST, EXTEND NORTHWEST IN MIDWEST
CITY. PROJECT LENGTH = 0.653 MILE
OkmulgeeCounty: Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
27970(04) I-40
NHPPI-4000-(005)SS/HSIPI*
Hagerman, Jeremy
Residency:Contract: 150175
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Contract Amount:02/01/2017Completion Date:
Final Est Sub: 02/07/2020Letting Date:
$15,602,123.20
05/21/2015
01100
MUSKOGEE
*G-0040-6(380)238TR
PAVEMENT REHABILITATION - DIVISION I
I-40/US-75B: ON I-40, FROM MILE MARKER 237.41
EXTEND EAST, AND ON US-75B, FROM I-40
EXTEND NORTHEAST IN HENRYETTA. PROJECT
LENGTH = 7.020 MILES.
21740(04) US-75
NHPP-256N(024)SS
Hagerman, Jeremy
Residency:Contract: 150265
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount:11/15/2018Completion Date:
Final Est Sub: Letting Date:
$29,671,928.47
08/20/2015
01100
MUSKOGEE
GRADE, DRAIN, SURFACE, AND BRIDGE US-75:
FROM 7.0 MILES NORTH OF I-40, EXTEND NORTH
NEAR OKMULGEE. PROJECT LENGTH = 2.538
MILES.
24369(04) US-75A
ACSTP-156C(136)SS
CEC
Residency:Contract: 160255
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:09/27/2019Completion Date:
Final Est Sub: Letting Date:
$16,214,688.52
07/21/2016
01003
CEC CORP.
GRADE, DRAIN, SURFACE, AND BRIDGE US-75A:
FROM 1.1 MILES NORTH OF THE SH-16
JUNCTION, EXTEND NORTH IN BEGGS.
PROJECT LENGTH = 7.511 MILES.
30126(04) CT.ST.
STP-256C(029)UR
Hagerman, Jeremy
Residency:Contract: 170040
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount:04/29/2019Completion Date:
Final Est Sub: Letting Date:
$1,310,188.90
04/20/2017
01100
MUSKOGEE
BRIDGE AND APPROACHES CITY STREET
(MUSKOGEE AVENUE): OVER OKMULGEE
CREEK, 0.1 MILE AND 0.3 MILE NORTH OF SH-56
IN THE CITY OF OKMULGEE. PROJECT LENGTH
= 0.238 MILE.
Construction Status Report Page 37
10465(04) SH-56
STP-256C(047)PM
ZPAA
Residency:Contract: 170360
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount:12/05/2019Completion Date:
Final Est Sub: Letting Date:
$2,990,615.00
06/14/2018
01020
POE AND ASSOCIATES
BRIDGE AND APPROACHES SH-56: OVER BRIER
CREEK AND TRIBUTARY, 0.4 MILES AND 0.6
MILES EAST OF THE OKFUSKEE COUNTY LINE.
PROJECT LENGTH = 0.606 MILE
32991(04) CT.ST.
TAP-256D(043)TP
Hagerman, Jeremy
Residency:Contract: 180140
Contractor: CROSSLAND HEAVY CONTRACTORS INC.
Engineer:
Contract Amount:03/22/2019Completion Date:
Final Est Sub: Letting Date:
$772,000.00
03/15/2018
01100
MUSKOGEE
E.
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
CITY STREET (OKMULGEE AVENUE): FROM 6TH
STREET, EXTEND NORTH IN THE CITY OF
OKMULGEE.
32054(04) SH-56 LOO
STP-256B(048)3P
Hagerman, Jeremy
Residency:Contract: 190088
Contractor: ROSSCON, LLC
Engineer:
Contract Amount:12/19/2019Completion Date:
Final Est Sub: Letting Date:
$1,131,689.75
05/16/2019
01100
MUSKOGEE
RESURFACE (ASPHALT) SH-56 LOOP: FROM THE
US-75 JUNCTION, EXTEND SOUTHEAST IN
OKMULGEE. PROJECT LENGTH = 3.59 MILES
34045(04) US-75 (SB
MC-256N(053)
Hagerman, Jeremy
Residency:Contract: 190126
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount:08/20/2019Completion Date:
Final Est Sub: 04/28/2020Letting Date:
$1,250,044.00
03/14/2019
01100
MUSKOGEE
RESURFACE (ASPHALT) US-75 (SB LANES):
FROM THE SH-16 JUNCTION, EXTEND NORTH
NEAR WINCHESTER. PROJECT LENGTH = 8.00
MILES
34046(04) I-40/US-7
MC-256N(054)
Hagerman, Jeremy
Residency:Contract: 190127
Contractor: KEYSTONE SERVICES, INC.
Engineer:
Contract Amount:10/14/2019Completion Date:
Final Est Sub: 03/16/2020Letting Date:
$360,333.90
03/14/2019
01100
MUSKOGEE
JOINT SEAL/REPAIR I-40/US-75: AT MULTIPLE
LOCATIONS IN DIVISION I. PROJECT LENGTH =
2.405 MILES
30651(04) MULTIPLE
STP-251F(098)PM
Hagerman, Jeremy
Residency:Contract: 190218
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount:12/19/2019Completion Date:
Final Est Sub: 03/17/2020Letting Date:
$112,473.53
07/25/2019
01100
MUSKOGEE
BRIDGE WATER PROOF SEAL I-40/US-62/US-64B
SB/US-75/SH-10/SH-51: AT MULTIPLE LOCATIONS
IN DIVISION I. PROJECT LENGTH = 0.000 MILE
31376(04) US-75B
SSR-256N(042)SR
Hagerman, Jeremy
Residency:Contract: 190235
Contractor: PARAGON CONTRACTORS, LLC
Engineer:
Contract Amount:12/15/2019Completion Date:
Final Est Sub: 03/09/2020Letting Date:
$407,704.00
07/25/2019
01100
MUSKOGEE
RESURFACE (ASPHALT) US-75B: FROM 0.7
MILES WEST OF US-62, EXTEND WEST IN
HENRYETTA. PROJECT LENGTH = 0.460 MILE
Construction Status Report Page 38
OsageCounty: Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
24287(04) US-60
NHPPY-257N(020)SS
Scott, Kalynn
Residency:Contract: 130395
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount:01/30/2017Completion Date:
Final Est Sub:Letting Date:
$36,982,702.17
11/21/2013
08400
SAND SPRINGS
GRADE, DRAIN, SURFACE, AND BRIDGE US-60:
FROM 2.0 MILES EAST OF SH-99, EXTEND EAST.
PROJECT LENGTH = 5.821 MILES.
24266(08) SH-11
SSP-257B(059)RW
Scott, Kalynn
Residency:Contract: 170271
Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC
Engineer:
Contract Amount:03/13/2020Completion Date:
Final Est Sub:Letting Date:
$67,025.00
09/21/2017
08400
SAND SPRINGS
RIGHT-OF-WAY CLEARANCE SH-11: FROM THE
WASHINGTON COUNTY LINE, EXTEND
NORTHWEST NEAR
SKIATOOK.PREQUALIFICATION FOR THIS
PROJECT HAS BEEN WAIVED. BOTH BID
EXPRESS AND WRITTEN BIDS WILL BE
ACCEPTABLE.
30704(04) CO.RD.
CIRB-257D(064)RB
GARV
Residency:Contract: 180023
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount:07/01/2019Completion Date:
Final Est Sub:Letting Date:
$910,474.85
01/18/2018
08011
GARVER, LLC.
BRIDGE AND APPROACHES COUNTY ROAD
(EW-33): OVER DOG THRESHER CREEK, 3.2
MILES WEST OF SH-11 NEAR BARNSDALL.
PROJECT LENGTH = 0.302 MILE
31940(04) SH-20
STP-257C(070)3P
Scott, Kalynn
Residency:Contract: 190128
Contractor: ROSSCON, LLC
Engineer:
Contract Amount:10/31/2019Completion Date:
Final Est Sub:Letting Date:
$1,706,222.68
06/20/2019
08400
SAND SPRINGS
RESURFACE (ASPHALT) SH-20: FROM THE SH-18
JUNCTION, EXTEND SOUTHEAST NEAR
RALSTON. PROJECT LENGTH = 7.890 MILES
PayneCounty: Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
26369(04) SH-51
SSP-160B(190)SS
Mitchell, Matt
Residency:Contract: 160231
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Contract Amount:09/30/2017Completion Date:
Final Est Sub:Letting Date:
$7,354,181.48
06/16/2016
04500
STILLWATER
BRIDGE AND APPROACHES SH-51 (6TH AVENUE):
OVER BOOMER CREEK, 0.02 MILE WEST OF THE
US-177 (PERKINS ROAD) INTERSECTION IN
STILLWATER. PROJECT LENGTH = 0.353 MILE.
32952(04) US-177
HSIPG-260N(060)AD
Mitchell, Matt
Residency:Contract: 180335
Contractor: MORTON CONSTRUCTION, INC.
Engineer:
Contract Amount:08/15/2019Completion Date:
Final Est Sub:Letting Date:
$498,481.03
10/18/2018
04500
STILLWATER
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
US-177: FROM 1.1 MILES SOUTH OF THE SH-51
JUNCTION, EXTEND NORTH IN STILLWATER.
PROJECT LENGTH = 1.231 MILES.
Construction Status Report Page 39
33011(04) CITY STRE
TAP-260D(033)TP
Mitchell, Matt
Residency:Contract: 190131
Contractor: T. MCDONALD CONSTRUCTION, INC.
Engineer:
Contract Amount:04/14/2020Completion Date:
Final Est Sub: Letting Date:
$1,440,019.50
03/14/2019
04500
STILLWATER
PEDESTRIAN IMPROVEMENTS (SIDEWALKS,
BRIDGE, AND CHANNEL) CITY STREET (DUCK
STREET): FROM MCELROY ROAD, EXTEND
SOUTH IN STILLWATER. PROJECT LENGTH =
0.000 MILE
PittsburgCounty: Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
28991(04) US-69
ACNHPP-261N(072)SS
Plymate, Larry
Residency:Contract: 170273
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount:08/27/2019Completion Date:
Final Est Sub: 04/22/2020Letting Date:
$5,212,465.15
08/17/2017
02400
MCALESTER
BRIDGE AND APPROACHES US-69(SB): OVER
US-69B, 2.9 MI NE OF THE INDIAN NATION TNPK.
US-69(NB): UNDER US-69, 2.9 MI NE OF INDIAN
NATION TNPK. PROJECT LENGTH = 0.646 MILE
32356(04) COUNTY RO
CIRB-261C(075)RB
CED3
Residency:Contract: 180209
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:08/16/2019Completion Date:
Final Est Sub: Letting Date:
$2,139,498.28
01/17/2019
02013
CIRCUIT ENGR. DISTR. # 3
RESURFACE (ASPHALT) COUNTY ROAD
(ASHLAND ROAD): FROM 0.3 MILES WEST OF
US-69, EXTEND WEST NEAR KIOWA. PROJECT
LENGTH = 7.130 MILES
PontotocCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
30674(04) CO.RD.
ACSTP-262C(042)CI
Wade, Tony
Residency:Contract: 170274
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:05/02/2019Completion Date:
Final Est Sub: Letting Date:
$4,171,637.46
08/17/2017
03100
ADA
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY
ROAD (EW-157): FROM SH-1, EXTEND WEST
NEAR ADA. PROJECT LENGTH = 4.289 MILES
31831(04) SH-1
SSR-262B(047)SR
Wade, Tony
Residency:Contract: 180028
Contractor: SCHIRALLI CONSTRUCTION CORP.
Engineer:
Contract Amount:04/30/2019Completion Date:
Final Est Sub: Letting Date:
$564,025.63
01/18/2018
03100
ADA
RESURFACE (A.C. AND P.C.) SH-1: FROM THE
SH-99 JUNCTION, EXTEND EAST IN ADA.
PROJECT LENGTH = 3.640 MILES
33753(04) SH-48
SSR-262B(051)SR
Wade, Tony
Residency:Contract: 180300
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:07/15/2019Completion Date:
Final Est Sub: Letting Date:
$786,640.00
09/20/2018
03100
ADA
RESURFACE (ASPHALT) SH-48: FROM THE COAL
COUNTY LINE, EXTEND NORTH NEAR
STONEWALL. PROJECT LENGTH = 5.000 MILES
Construction Status Report Page 40
32768(04) SH-1
STP-262C(052)3P
Wade, Tony
Residency:Contract: 190092
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:11/14/2019Completion Date:
Final Est Sub: Letting Date:
$3,146,973.08
06/20/2019
03100
ADA
RESURFACE (ASPHALT) SH-1: FROM 0.2 MILES
NORTH OF THE CHICKASAW TURNPIKE, EXTEND
NORTHEAST NEAR ROFF. PROJECT LENGTH =
8.00 MILES
33756(04) SH-48
STP-262C(055)3P
Wade, Tony
Residency:Contract: 190201
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount:11/05/2019Completion Date:
Final Est Sub: Letting Date:
$684,496.90
06/20/2019
03100
ADA
RESURFACE (ASPHALT) SH-48: FROM 5.2 MILES
NORTH OF THE COAL COUNTY LINE, EXTEND
NORTH NEAR JAYDEE. PROJECT LENGTH = 4.00
MILES
PottawatomieCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
32976(04) PEDESTRIA
TAP-263D(049)TP
Wade, Tony
Residency:Contract: 180144
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount:02/15/2019Completion Date:
Final Est Sub: 12/11/2019Letting Date:
$175,128.00
03/15/2018
03100
ADA
ELM STREET IN THE TOWN OF ASHER.
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) PEDESTRIAL TRAIL: AT ASHER
PUBLIC SCHOOL, BETWEEN MAIN STREET AND
ELM STREET IN THE TOWN OF ASHER. PROJECT
LENGTH = 0.25 MILE
29569(04) US-270
SSP-263B(062)PM
Helton, Matthew
Residency:Contract: 180301
Contractor: PBX CORPORATION
Engineer:
Contract Amount:04/28/2020Completion Date:
Final Est Sub: Letting Date:
$1,860,996.72
09/20/2018
03300
WEWOKA
BRIDGE REHABILITATION US-270: OVER
US-270B, 1.5 MILES NORTH OF THE SH-3E/SH-18
INTERCHANGE IN SHAWNEE. PROJECT LENGTH
= 0.042 MILE
32990(04) MULTIPLE
TAP-263D(065)TP
Helton, Matthew
Residency:Contract: 190057
Contractor: RUDY CONSTRUCTION CO.
Engineer:
Contract Amount:10/25/2019Completion Date:
Final Est Sub: 04/20/2020Letting Date:
$149,843.40
01/17/2019
03300
WEWOKA
PEDESTRIAN IMPROVEMENTS (SIDEWALKS) AT
MULTIPLE LOCATIONS IN THE CITY OF MCLOUD.
PROJECT LENGTH = 0.222 MILE.
34670(04) I-40 EB
MC-4000(103)
Helton, Matthew
Residency:Contract: 200135
Contractor: CGC, LLC.
Engineer:
Contract Amount:04/24/2020Completion Date:
Final Est Sub: Letting Date:
$68,973.00
02/20/2020
03300
WEWOKA
RESURFACE (ASPHALT) I-40 EB: FROM 2.0 MILES
EAST OF THE US-177 INTERCHANGE, EXTEND
EAST NEAR SHAWNEE. PROJECT LENGTH =
0.019 MILE
PushmatahaCounty: Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 41
29918(04) CO.RD.
CIRB-264D(041)RB
CED3
Residency:Contract: 170209
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount:04/11/2018Completion Date:
Final Est Sub: Letting Date:
$1,204,150.92
06/15/2017
02013
CIRCUIT ENGR. DISTR. # 3
BRIDGE AND APPROACHES COUNTY ROAD
(NS-4393): OVER BLACK FORK CREEK, 0.8 MILES
SOUTH OF SH-144 NEAR NASHOBA. PROJECT
LENGTH = 0.236 MILE
RogersCounty: Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
33220(04) US-169
STP-272F(228)3B
TETR
Residency:Contract: 180075
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount:09/23/2019Completion Date:
Final Est Sub: Letting Date:
$1,580,103.68
01/18/2018
08002
TETRA TECH
JOINT SEAL/REPAIR US-169: AT MULTIPLE
LOCATIONS IN DIVISION VIII.
31480(34) CITY STRE
SRS-266E(035)ST
C&KI
Residency:Contract: 180303
Contractor: GRADE LINE CONSTRUCTION, LLC
Engineer:
Contract Amount:04/29/2020Completion Date:
Final Est Sub: Letting Date:
$389,108.52
06/20/2019
08007
CRAIG & KEITHLINE, INC.
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
CITY STREETS ('A' ST NW/E COMMERCIAL ST/S
4215 RD): FROM INOLA ELEMENTARY SCHOOL
TO INOLA MIDDLE SCHOOL IN INOLA. PROJECT
LENGTH = 1.170 MILES
31941(04) SH-28
STP-266C(067)3P
Beats, Aaron
Residency:Contract: 190134
Contractor: ROSSCON, LLC
Engineer:
Contract Amount:02/27/2020Completion Date:
Final Est Sub: Letting Date:
$892,389.50
05/16/2019
08300
CLAREMORE
RESURFACE (ASPHALT) SH-28: FROM THE SH-66
JUNCTION, EXTEND SOUTH NEAR CHELSEA.
PROJECT LENGTH = 4.11 MILES
SeminoleCounty: Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
28911(04) SH-56
STP-267C(045)SS
Wade, Tony
Residency:Contract: 180033
Contractor: TREAS CONSTRUCTION, INC.
Engineer:
Contract Amount:10/31/2019Completion Date:
Final Est Sub: Letting Date:
$2,976,295.58
02/15/2018
03100
ADA
NAWA.
GRADE, DRAIN, SURFACE, AND BRIDGE SH-56:
OVER JUMPER CREEK, 1.3 MILES EAST OF THE
SH-99 INTERSECTION NEAR KONAWA. PROJECT
LENGTH = 0.568 MILE
33006(04) PEDESTRIA
TAP-263D(050)TP
Wade, Tony
Residency:Contract: 180145
Contractor: BISHOP CONSTRUCTION, LLC
Engineer:
Contract Amount:04/30/2019Completion Date:
Final Est Sub: Letting Date:
$280,698.00
03/15/2018
03100
ADA
TAYLOR AVE IN MAUD.
PEDESTRIAN IMPROVEMENTS (TRAIL AND
SIDEWALK) PEDESTRIAN TRAIL: AT MAUD
PUBLIC SCHOOL, BETWEEN HARRIS AVE AND
TAYLOR AVE IN MAUD. PROJECT LENGTH = 0.410
MILE
Construction Status Report Page 42
33329(04) US-270
STP-267A(074)3P
Helton, Matthew
Residency:Contract: 180305
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:12/10/2019Completion Date:
Final Est Sub: 04/03/2020Letting Date:
$978,972.57
09/20/2018
03300
WEWOKA
RESURFACE (ASPHALT) US-270: FROM SH-9,
EXTEND SOUTHEAST IN SEMINOLE. PROJECT
LENGTH = 2.39 MILES
34039(04) US-270
MC-267C(079)
Helton, Matthew
Residency:Contract: 190135
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount:01/13/2020Completion Date:
Final Est Sub: 04/23/2020Letting Date:
$402,530.00
06/20/2019
03300
WEWOKA
RESURFACE (ASPHALT) US-270: FROM THE
US-377 JUNCTION, EXTEND EAST IN SEMINOLE.
PROJECT LENGTH = 0.206 MILE
SequoyahCounty: Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
25434(04) CO.RD.
CIRB-168C(190)RB
Orendorf, Barry
Residency:Contract: 150402
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:11/14/2018Completion Date:
Final Est Sub: Letting Date:
$2,499,565.09
11/19/2015
01200
SALLISAW
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY
ROAD (NS-462): OVER BRUSHY CREEK, 6.5
MILES NORTH OF SH-64 NEAR SALLISAW.
PROJECT LENGTH = 0.464 MILE
28515(04) CO.RD.
CIRB-268C(037)RB
Orendorf, Barry
Residency:Contract: 160207
Contractor: TREAS CONSTRUCTION, INC.
Engineer:
Contract Amount:12/20/2019Completion Date:
Final Est Sub: 03/09/2020Letting Date:
$2,947,508.69
05/19/2016
01200
SALLISAW
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY
ROAD (EW-112): FROM 0.1 MILES SOUTH OF
US-64, EXTEND SOUTHEAST THEN EAST NEAR
MULDROW. PROJECT LENGTH = 3.995 MILES
32223(04) CO.RD.
ERSTP-268C(025)ER
TETR
Residency:Contract: 160398
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount:12/09/2017Completion Date:
Final Est Sub: Letting Date:
$748,033.36
10/20/2016
01002
TETRA TECH
GRADE, DRAIN, AND SURFACE COUNTY ROAD
(INDIAN ROAD): FROM 1.1 MILES NORTHEAST OF
THE SH-10A JUNCTION, EXTEND EAST NEAR
TENKILLER STATE PARK. PROJECT LENGTH =
0.227 MILE.
StephensCounty: Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
20316(23) US-81
NHPP-269N(020)SS
Roberts, Colton
Residency:Contract: 150310
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:03/07/2018Completion Date:
Final Est Sub: Letting Date:
$15,567,066.97
09/17/2015
07100
DUNCAN
GRADE, DRAIN, SURFACE, AND BRIDGE US-81:
FROM 0.2 MILE SOUTH OF SEMINOLE ROAD,
EXTEND NORTHWEST TO SH-7 (DUNCAN
BYPASS) IN DUNCAN. PROJECT LENGTH = 1.608
MILES.
Construction Status Report Page 43
20316(04) US-81
ACNHPP-011N(100)SS
Roberts, Colton
Residency:Contract: 160261
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount:03/03/2020Completion Date:
Final Est Sub:Letting Date:
$14,336,306.11
07/21/2016
07100
DUNCAN
GRADE, DRAIN, SURFACE, AND BRIDGE US-81:
FROM CHEROKEE ROAD, EXTEND NORTH NEAR
DUNCAN. PROJECT LENGTH = 1.123 MILES.
32402(04) SH-7
SBR-269N(038)SB
Roberts, Colton
Residency:Contract: 160262
Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
Engineer:
Contract Amount:03/31/2018Completion Date:
Final Est Sub:Letting Date:
$2,431,662.08
07/21/2016
07100
DUNCAN
BRIDGE REHABILITATION SH-7: OVER 7TH
STREET AND UNION PACIFIC RAILROAD, 0.7 MILE
EAST OF THE US-81 JUNCTION IN DUNCAN.
TexasCounty: Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
33657(04) US-54/SH-
STP-270F(035)3B
Michael, Charles
Residency:Contract: 180306
Contractor: RESTEK, INC.
Engineer:
Contract Amount:10/01/2019Completion Date:
Final Est Sub: 04/10/2020Letting Date:
$338,543.30
11/15/2018
06200
GUYMON
JOINT SEAL/REPAIR US-54/SH-3/SH-95/SH-136: AT
MULTIPLE LOCATIONS IN DIVISION VI. PROJECT
LENGTH = 0.00 MILE
TulsaCounty: Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
26300(06) I-244
NHPPIY-0244-2(501)(504)(*
Arnold, Bruce
Residency:Contract: 140304
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Contract Amount:11/15/2017Completion Date:
Final Est Sub:Letting Date:
$36,170,934.33
10/16/2014
08100
TULSA
*507)
PAVEMENT AND BRIDGE REHABILITATION I-244:
BEGIN 1.5 MILES EAST OF US-75, EXTEND EAST.
PROJECT LENGTH = 2.939 MILES.
28883(04) US-64
NHPP-272N(094)SS
Scott, Kalynn
Residency:Contract: 150272
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount:07/10/2019Completion Date:
Final Est Sub:Letting Date:
$5,894,292.84
08/20/2015
08400
SAND SPRINGS
BRIDGE REHABILITATION US-64: OVER 161ST W.
AVE AND 193RD W. AVE, 4.6 MI SOUTHEAST OF
THE OSAGE COUNTY LINE IN SAND SPRINGS.
PROJECT LENGTH = 2.201 MILES.
21899(04) I-44
ACNHPPI-4400-(438)SS
Arnold, Bruce
Residency:Contract: 160333
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount:12/19/2018Completion Date:
Final Est Sub:Letting Date:
$29,559,681.69
09/15/2016
08100
TULSA
GRADE, DRAIN, SURFACE, AND BRIDGE I-44:
FROM 1.0 MILE EAST OF THE I-244
INTERCHANGE, EXTEND WEST IN THE CITY OF
TULSA. PROJECT LENGTH = 1.155 MILES.
Construction Status Report Page 44
28872(04) IS-44
ACNHPPI-4400-(016)(014)(*
Arnold, Bruce
Residency:Contract: 170053
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount:07/21/2018Completion Date:
Final Est Sub: Letting Date:
$5,833,000.00
01/19/2017
08100
TULSA
*015)SS
BRIDGE REHABILITATION I-44/GILCREASE
EXPWY RAMP: OVER I-244, CITY ST, CNTY RD,
TSU RR AND BNSF RR, AT MULTIPLE LOCATIONS
IN TULSA. PROJECT LENGTH = 0.170 MILE.
25211(04) CT.ST.
STP-172B(399(398)(456)IG
ATKINS
Residency:Contract: 170103
Contractor: NABHOLZ CONSTRUCTION CORPORATION
Engineer:
Contract Amount:06/24/2019Completion Date:
Final Est Sub: Letting Date:
$10,544,739.61
02/16/2017
08010
ATKINS
GRADE, DRAIN, SURFACE, AND TRAFFIC
SIGNALS CITY STREET (W MAIN STREET/W. 96TH
STREET): FROM US-75, EXTEND EAST IN THE
CITY OF JENKS. PROJECT LENGTH = 2.218
MILES.
27937(04) US-64
STP-272C(202)
CEC
Residency:Contract: 170141
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount:11/06/2019Completion Date:
Final Est Sub: Letting Date:
$3,901,904.47
03/16/2017
08003
CEC CORP.
BRIDGE AND APPROACHES US-64: OVER SNAKE
CREEK, 4.8 MILES SOUTH AND EAST OF THE
SH-67 JUNCTION IN BIXBY. PROJECT LENGTH =
0.823 MILE.
28865(04) CT.ST.
ACNHPPI-4440-(002)(003)S*
Arnold, Bruce
Residency:Contract: 170142
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount:11/15/2019Completion Date:
Final Est Sub: Letting Date:
$9,256,000.00
03/16/2017
08100
TULSA
*S/NHPPI-4440-(004)SS/ACNHPP-272N(149)SS
BRIDGE REHABILITATION CITY STREETS: OVER
I-444 AND US-75, AT MULTIPLE LOCATIONS IN
THE CITY OF TULSA. PROJECT LENGTH = 0.240
MILE.
31672(04) US-169
NHPP-272A(126)3B/SSP-272*
Arnold, Bruce
Residency:Contract: 170144
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount:09/29/2018Completion Date:
Final Est Sub: Letting Date:
$5,915,032.62
03/16/2017
08100
TULSA
*N(203)SS/STP-272A(174)3B
RESURFACE (ASPHALT) AND JOINT SEAL
REPAIR US-169: AT MULTIPLE LOCATIONS IN
DIVISION VIII. PROJECT LENGTH = 6.789 MILES
28876(04) US-75
NHPPI-4400-(013)SS/NHPP-*
Arnold, Bruce
Residency:Contract: 170241
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount:05/31/2019Completion Date:
Final Est Sub: Letting Date:
$2,923,000.00
09/21/2017
08100
TULSA
BRIDGE REHABILITATION US-75: OVER I-44, 2.0
MI EAST OF I-244 AND OVER SW BOULEVARD
AND TSU RAILROAD IN TULSA. PROJECT
LENGTH = 0.465 MILE
27015(04) US-64
NHPP-272N(204)SS
CEC
Residency:Contract: 170243
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount:10/02/2019Completion Date:
Final Est Sub: Letting Date:
$7,484,532.13
07/20/2017
08003
CEC CORP.
BRIDGE AND APPROACHES US-64: OVER
SH-151, 0.3 MILE SOUTHEAST OF THE OSAGE
COUNTY LINE NEAR SAND SPRINGS. PROJECT
LENGTH = 1.021 MILES.
Construction Status Report Page 45
28884(04) US-64
ACNHPP-272N(200)SS
Scott, Kalynn
Residency:Contract: 170295
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount:10/22/2019Completion Date:
Final Est Sub: Letting Date:
$3,067,000.00
10/19/2017
08400
SAND SPRINGS
BRIDGE REHABILITATION US-64: OVER 97TH W.
AVENUE (ADAMS ROAD), 0.8 MILES EAST OF THE
SH-97 JUNCTION IN SAND SPRINGS. PROJECT
LENGTH = 0.082 MILE
23708(06) CT.ST.
SEC1934-272C(223)TI
GARV
Residency:Contract: 170341
Contractor: TRAFFIC & LIGHTING SYSTEMS, LLC
Engineer:
Contract Amount:11/12/2019Completion Date:
Final Est Sub: 04/27/2020Letting Date:
$1,974,263.25
10/19/2017
08011
GARVER, LLC.
TRAFFIC SIGNALS CITY STREETS: AT MULTIPLE
LOCATIONS IN THE CITY OF TULSA.
28878(04) US-64/SH-
NHPP-272N(231)SS
Arnold, Bruce
Residency:Contract: 170383
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount:11/13/2018Completion Date:
Final Est Sub: Letting Date:
$1,589,652.87
11/16/2017
08100
TULSA
BRIDGE REHABILITATION US-64/SH-51: OVER
SHERIDAN ROAD, 0.5 MILES NORTH OF I-44 IN
THE CITY OF TULSA. PROJECT LENGTH = 0.202
MILE
30598(04) SH-20
SBR-272A(162)SB
Arnold, Bruce
Residency:Contract: 180072
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount:12/23/2019Completion Date:
Final Est Sub: Letting Date:
$1,528,721.91
01/18/2018
08100
TULSA
BRIDGE REHABILITATION SH-20: OVER BIRD
CREEK. 0.4 MILES EAST OF THE SH-11
INTERSECTION NEAR SKIATOOK. PROJECT
LENGTH = 0.229 MILE
31944(06) US-64
SSP-272F(240)PM
C&KI
Residency:Contract: 180119
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount:11/05/2019Completion Date:
Final Est Sub: 03/17/2020Letting Date:
$1,229,758.68
02/15/2018
08007
CRAIG & KEITHLINE, INC.
ION IN BIXBY.
JOINT SEAL/REPAIR US-64: OVER ARKANSAS
RIVER AND ARKANSAS RIVER O'FLOW, 0.8 MILES
AND 1.0 MILE NORTH OF THE SH-67 JUNCTION IN
BIXBY.
28859(04) CT.ST.
ACNHPPI-2440-(017)FP
Arnold, Bruce
Residency:Contract: 180148
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount:08/30/2019Completion Date:
Final Est Sub: Letting Date:
$5,224,452.68
03/15/2018
08100
TULSA
BRIDGE AND APPROACHES CITY STREET (129TH
E AVENUE): OVER I-244, 0.5 MILES NORTH OF
I-44 IN TULSA. PROJECT LENGTH = 0.282 MILE
33035(04) CITY STRE
TAP-272E(233)IG
ZPAA
Residency:Contract: 180212
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount:09/03/2019Completion Date:
Final Est Sub: 01/31/2020Letting Date:
$550,590.00
06/14/2018
08020
POE AND ASSOCIATES
SAFETY IMPROVEMENT (BIKEWAY STRIPING
AND SIGNAGE) CITY STREETS: AT MULTIPLE
LOCATIONS IN THE CITY OF BROKEN ARROW.
PROJECT LENGTH = 0.000 MILE
Construction Status Report Page 46
33577(04) MULTIPLE
STP-272F(252)3B
ATKINS
Residency:Contract: 180310
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Contract Amount:08/06/2019Completion Date:
Final Est Sub: Letting Date:
$1,023,938.89
11/15/2018
08010
ATKINS
JOINT SEAL/REPAIR I-44/US-75/US-75A/SH-117:
AT MULTIPLE LOCATIONS IN DIVISION VIII.
PROJECT LENGTH = 0.00 MILE
31938(05) I-44
SSP-4400(033)PM
GARV
Residency:Contract: 180338
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount:02/07/2020Completion Date:
Final Est Sub: Letting Date:
$3,547,000.00
10/18/2018
08011
GARVER, LLC.
RESURFACE (ASPHALT) AND JOINT/SEAL
REPAIR I-44: FROM 0.4 MILES EAST OF THE I-244
INTERCHANGE, EXTEND EAST IN TULSA.
PROJECT LENGTH = 1.953 MILES
32702(04) US-169 RA
HSIP-272N(255)PM
Arnold, Bruce
Residency:Contract: 180363
Contractor: TRAFFIC & LIGHTING SYSTEMS, LLC
Engineer:
Contract Amount:12/12/2019Completion Date:
Final Est Sub: Letting Date:
$575,322.10
11/15/2018
08100
TULSA
INTERSECTION MODIFICATION AND TRAFFIC
SIGNAL US-169 RAMPS: AT THE INTERSECTION
OF EAST 46TH STREET NORTH (SH-266), IN THE
CITY OF TULSA. PROJECT LENGTH = 0.570 MILE
34229(05) US-169
E-SAP-4400(060)ES
GARV
Residency:Contract: 190337
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount:02/07/2020Completion Date:
Final Est Sub: Letting Date:
$587,000.00
09/19/2019
08011
GARVER, LLC.
BRIDGE REPAIR US-169: REPAIR VEHICLE
IMPACT DAMAGE OVER I-44, 2.7 MILES EAST OF
THE SH-51 JUNCTION IN TULSA. PROJECT
LENGTH = 0.000 MILE
34389(04) US-64
MC-272N(288)
Arnold, Bruce
Residency:Contract: 190385
Contractor: PBX CORPORATION
Engineer:
Contract Amount:03/18/2020Completion Date:
Final Est Sub: Letting Date:
$83,953.64
11/14/2019
08100
TULSA
BRIDGE REPAIR I-44/US-64: I-44, OVER ELWOOD
AVE AND ARKANSAS RIV 0.7 MI E OF US-75.
US-64, OVER ARKANSAS RIV 4.5 MI S OF CREEK
TPK. PROJECT LENGTH = 0.00 MILE
WagonerCounty: Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
28905(04) CT.ST.
STPY-173C(177)MS
GARV
Residency:Contract: 160067
Contractor: PARAGON CONTRACTORS, LLC
Engineer:
Contract Amount:07/26/2019Completion Date:
Final Est Sub: 03/17/2020Letting Date:
$2,811,811.00
01/21/2016
01011
GARVER, LLC.
GRADE, DRAIN, AND SURFACE CITY STREETS:
ON 257TH E AVE, FROM SH-51 EXTEND NORTH
THEN EAST ON 101ST STREET IN COWETA.
PROJECT LENGTH = 0.817 MILE.
Construction Status Report Page 47
25489(04) CO.RD.
CIRB-173C(146)RB
GARV
Residency:Contract: 160268
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount:03/24/2020Completion Date:
Final Est Sub:Letting Date:
$2,887,499.15
07/21/2016
01011
GARVER, LLC.
GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY
ROAD (INDIAN ROAD/161ST STREET SOUTH):
FROM 2.0 MILES WEST OF SH-72, EXTEND EAST
NEAR COWETA. PROJECT LENGTH = 1.542
MILES.
28504(04) COUNTY RO
ACSTP-273C(048)CI
ZPAA
Residency:Contract: 180273
Contractor: B & B BRIDGE COMPANY, LLC
Engineer:
Contract Amount:03/06/2020Completion Date:
Final Est Sub:Letting Date:
$1,474,531.25
11/15/2018
01020
POE AND ASSOCIATES
BRIDGE AND APPROACHES COUNTY ROAD
(NS-4170): OVER FIFE CREEK, 1.6 MILES NORTH
OF THE SH-51 JUNCTION NEAR COWETA.
PROJECT LENGTH = 0.245 MILE
33041(04) SH-51
TAP-273A(049)IG
Hagerman, Jeremy
Residency:Contract: 190063
Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC
Engineer:
Contract Amount:11/06/2019Completion Date:
Final Est Sub:Letting Date:
$383,318.00
03/14/2019
01100
MUSKOGEE
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
SH-51: FROM 0.4 MILES SOUTHEAST OF THE
SH-72 JUNCTION, EXTEND EAST IN COWETA.
PROJECT LENGTH = 0.98 MILE
WashingtonCounty: Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
29825(04) US-60
SBR-274N(014)SB
Arnold, Bruce
Residency:Contract: 170277
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount:07/05/2019Completion Date:
Final Est Sub:Letting Date:
$2,617,000.00
02/15/2018
08100
TULSA
BRIDGE REHABILITATION US-60: OVER CANEY
RIVER, 2.1 MILES EAST OF THE OSAGE COUNTY
LINE IN BARTLESVILLE. PROJECT LENGTH =
0.158 MILE
32692(04) US-75
NHPP-274N(022)PM
C&KI
Residency:Contract: 180230
Contractor: KEYSTONE SERVICES, INC.
Engineer:
Contract Amount:09/05/2019Completion Date:
Final Est Sub:Letting Date:
$678,421.47
06/14/2018
08007
CRAIG & KEITHLINE, INC.
INTERSECTION MODIFICATION US-75: FROM 11.8
MILES NORTH OF THE TULSA COUNTY LINE,
EXTEND NORTH NEAR BARTLESVILLE. PROJECT
LENGTH = 0.286 MILE
WashitaCounty: Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
31783(04) CO.RD.
SBR-4000(036)SB
Sawyer, Dax
Residency:Contract: 160438
Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount:12/07/2017Completion Date:
Final Est Sub: 04/28/2020Letting Date:
$1,458,401.62
11/17/2016
05100
CLINTON
BRIDGE REHABILITATION COUNTY ROAD
(CANUTE ROAD): OVER I-40, 5.0 MILES EAST OF
THE BECKHAM COUNTY LINE IN CANUTE.
PROJECT LENGTH = 0.127 MILE.
Construction Status Report Page 48
26480(04) SH-152
STPY-175C(109)
ATKINS
Residency:Contract: 170056
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount:08/19/2019Completion Date:
Final Est Sub: 02/04/2020Letting Date:
$1,770,139.98
01/19/2017
05010
ATKINS
BRIDGE AND APPROACHES SH-152: OVER TRAIL
CREEK, 4.2 MILES EAST OF THE BECKHAM
COUNTY LINE. PROJECT LENGTH = 0.342 MILE
30406(04) SH-152
STP-275C(042)3P
Sawyer, Dax
Residency:Contract: 180121
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount:06/21/2019Completion Date:
Final Est Sub:Letting Date:
$1,460,278.66
02/15/2018
05100
CLINTON
RESURFACE (ASPHALT) SH-152: FROM 5.23
MILES EAST OF SH-44, EXTEND EAST NEAR
CORDELL. PROJECT LENGTH = 5.19 MILES
27001(04) SH-152
STP-275C(043)PM
EST
Residency:Contract: 180231
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount:03/31/2020Completion Date:
Final Est Sub:Letting Date:
$2,270,084.19
06/14/2018
05001
EST, INC.
BRIDGE AND APPROACHES SH-152: OVER EAST
ELK CREEK, 0.1 MILES EAST OF THE SH-44
JUNCTION NEAR DILL CITY. PROJECT LENGTH =
0.280 MILE
27902(04) SH-55
STP-275C(044)PM
Holley, Terri
Residency:Contract: 180232
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount:10/09/2019Completion Date:
Final Est Sub: 03/26/2020Letting Date:
$2,450,354.55
06/14/2018
05200
ALTUS
BRIDGE AND APPROACHES SH-55: OVER LITTLE
ELK CREEK, 0.9 MILES WEST OF US-183 NEAR
ROCKY. PROJECT LENGTH = 0.437 MILE
33014(04) MAIN STRE
TAP-275E(047)TP
Sawyer, Dax
Residency:Contract: 180365
Contractor: SCHIRALLI CONSTRUCTION CORP.
Engineer:
Contract Amount:08/23/2019Completion Date:
Final Est Sub:Letting Date:
$277,554.70
11/15/2018
05100
CLINTON
PEDESTRIAN IMPROVEMENTS AND SIDEWALKS
CITY STREET (MAIN STREET): FROM 8TH
STREET, EXTEND NORTH IN THE TOWN OF
BESSIE. PROJECT LENGTH = 0.0871 MILE.
WoodsCounty: Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
30492(04) CO.RD.
STP-276C(025)CI
CED8
Residency:Contract: 170109
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Contract Amount:12/03/2018Completion Date:
Final Est Sub:Letting Date:
$2,444,095.65
02/16/2017
06009
CIRCUIT ENGR. DISTR. # 8
GRADE, DRAIN, AND SURFACE COUNTY ROAD
(NS-237): FROM 5 MILES NORTH OF US-64,
EXTEND NORTH NEAR ALVA. PROJECT LENGTH
= 2.964 MILES
Construction Status Report Page 49
28458(04) CO.RD.
CIRB-276C(027)RB
CED8
Residency:Contract: 170188
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Contract Amount:09/07/2018Completion Date:
Final Est Sub: 03/25/2020Letting Date:
$2,263,384.32
05/18/2017
06009
CIRCUIT ENGR. DISTR. # 8
BRIDGE AND APPROACHES COUNTY ROAD
(NS-2300): OVER UNNAMED CREEK, 2.8 MILES
NORTH OF US-64 NEAR ALVA. PROJECT LENGTH
= 1.022 MILES
WoodwardCounty: Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
28825(04) SH-34
ACSTP-277B(034)SS
Dodgion, Richard
Residency:Contract: 160343
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount:12/06/2019Completion Date:
Final Est Sub:Letting Date:
$5,717,619.96
09/15/2016
06100
BUFFALO
BRIDGE AND APPROACHES SH-34: OVER SOUTH
AND NORTH PERSIMMON CREEK, 4.9 MILES AND
7.6 MILES NORTH OF THE DEWEY COUNTY LINE.
PROJECT LENGTH = 0.601 MILE.
29475(04) SH50
SBR-277C(036)SB
Dodgion, Richard
Residency:Contract: 170364
Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Contract Amount:02/20/2020Completion Date:
Final Est Sub:Letting Date:
$945,011.35
02/15/2018
06100
BUFFALO
BRIDGE REHABILITATION SH-50: OVER BULL
CREEK, 2.8 MILES SOUTH OF THE US-412
JUNCTION NEAR MOORELAND. PROJECT
LENGTH = 0.127 MILE
29449(08) SH-34
STP-277B(045)PM
Dodgion, Richard
Residency:Contract: 180216
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount:02/10/2020Completion Date:
Final Est Sub: 04/29/2020Letting Date:
$704,522.00
05/17/2018
06100
BUFFALO
WOODWARD.
BRIDGE AND APPROACHES SH-34: OVER NORTH
CANADIAN RIVER OVERFLOW, 0.3 MILES SOUTH
OF THE SH-34C JUNCTION NEAR WOODWARD.
PROJECT LENGTH = 0.094 MILE
Construction Status Report Page 50
AdairCounty: Commissioner District: 1
Contracts Under Construction
27949(04) SH-51/SH-
SSP-201C(035)PM
Orendorf, Barry
$4,787,528.40
Residency:Contract: 180222
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 94 % ( 94 %)
Time Passed: 97 % ( 97 %)
Adjusted:
09/24/2018
$4,787,528.40
06/14/2018
07/20/2018
07/24/2018
01200
SALLISAW
400 400
11/05/2018
BRIDGE AND APPROACHES AND BRIDGE
REHABILITATION SH-51: OVER MULBERRY
HOLLOW, 4.3 MILES NORTHWEST OF US-59.
SH-100: OVER RUSSELL BRANCH CREEK, 4.5
MILES EAST OF US-59. PROJECT LENGTH =
0.235 MILE
16928(17) US-59
NHPP-101A(052)
Orendorf, Barry
$25,988,804.50
Residency:Contract: 180341
Contractor: EMERY SAPP & SONS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 73 % ( 73 %)
Time Passed: 83 % ( 83 %)
Adjusted:
03/05/2019
$25,980,193.74
11/15/2018
12/17/2018
02/06/2019
01200
SALLISAW
320 320
03/10/2019
GRADE, DRAIN, SURFACE, AND BRIDGE
US-59: FROM 6.4 MILES NORTH OF THE US-62
JUNCTION, EXTEND NORTH NEAR WATTS.
PROJECT LENGTH = 3.344 MILES
AlfalfaCounty: Commissioner District: 6
Contracts Under Construction
24124(07) US-64
ACSTP-102C(156)SS
Dodgion, Richard
$5,693,232.44
Residency:Contract: 180036
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 97 % ( 97 %)
Time Passed: 101 % ( 101 %)
Adjusted:
07/30/2018
$5,666,413.34
03/15/2018
04/09/2018
05/02/2018
ROKEE.
06100
BUFFALO
210 210
09/04/2018
GRADE, DRAIN, SURFACE, AND EROSION
US-64: FROM 0.8 MILES WEST OF THE SH-8
INTERSECTION, EXTEND WEST NEAR
CHEROKEE. PROJECT LENGTH = 3.422 MILES
Construction Status Report Page 51
24064(04) US-64
STP-102B(106)SS
Dodgion, Richard
$9,002,389.95
Residency:Contract: 190270
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 19 % ( 18 %)
Time Passed: 54 % ( 49 %)
Adjusted:
09/27/2019
$8,539,135.79
07/25/2019
08/14/2019
09/06/2019
06100
BUFFALO
270 295
12/02/2019
GRADE, DRAIN, SURFACE, EROSION
CONTROL, AND BRIDGE US-64: FROM 1.0 MILE
WEST OF THE SH-11 JUNCTION, EXTEND
EAST NEAR CHEROKEE. PROJECT LENGTH =
4.531 MILES
31769(04) COUNTY RO
STP-202C(037)CI
CED8
$2,703,544.46
Residency:Contract: 190272
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,703,544.46
09/19/2019
10/30/2019
11/04/2019
06009
CIRCUIT ENGR. DISTR. # 8
120 120
02/03/2020
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-33): FROM THE SH-45 JUNCTION,
EXTEND EAST IN GOLTRY. PROJECT LENGTH
= 2.798 MILES
17668(10) SH-8/SH-4
STP-102B(025)SS
Dodgion, Richard
$9,764,596.36
Residency:Contract: 200001
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$9,764,596.36
01/16/2020
02/14/2020
02/25/2020
06100
BUFFALO
260 260
06/01/2020
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-8/SH-45: SH-8, FROM 0.2 MILES NORTH OF
SH-45 EXTEND SOUTH NEAR CARMEN. SH-45,
FROM SH-8 EXTEND WEST IN CARMEN.
PROJECT LENGTH = 2.247 MILES
AtokaCounty: Commissioner District: 2
Contracts Under Construction
31192(04) COUNTY RO
CIRB-203C(068)RB
CED3
$1,624,247.05
Residency:Contract: 190002
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 38 % ( 38 %)
Time Passed: 39 % ( 39 %)
Adjusted:
03/05/2020
$1,624,247.05
01/17/2019
02/20/2019
02/28/2019
02013
CIRCUIT ENGR. DISTR. # 3
90 90
06/03/2019
RESURFACE (ASPHALT) COUNTY ROAD
(BOGGY DEPOT ROAD): FROM 8.0 MILES
WEST OF THE US-69 JUNCTION, EXTEND
EAST NEAR TUSHKA. PROJECT LENGTH =
7.138 MILES
Construction Status Report Page 52
31171(04) COUNTY RO
STP-203D(060)CI
CED3
$599,984.00
Residency:Contract: 190189
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 89 % ( 89 %)
Time Passed: 101 % ( 101 %)
Adjusted:
10/23/2019
$599,984.00
06/20/2019
07/11/2019
07/18/2019
02013
CIRCUIT ENGR. DISTR. # 3
90 90
11/04/2019
BRIDGE AND APPROACHES COUNTY ROAD
(SOUTH PECAN ROAD/NS-396.5): OVER
UNNAMED CREEK, 0.4 MILES SOUTH OF SH-3
NEAR LANE. PROJECT LENGTH = 0.109 MILES
30411(04) US-69
NHPP-013N(174)PM
Plymate, Larry
$19,290,546.42
Residency:Contract: 190275
Contractor: DUIT CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 5 % ( 5 %)
Time Passed: 10 % ( 10 %)
Adjusted:
03/02/2020
$19,290,546.42
10/17/2019
11/18/2019
11/21/2019
02400
MCALESTER
365 365
03/02/2020
GRADE, DRAIN, AND SURFACE US-69: FROM
0.4 MILES NORTH OF THE SH-22 JUNCTION,
EXTEND NORTH NEAR CADDO. PROJECT
LENGTH = 6.609 MILES
28947(04) US-69
NHPP-013N(170)PM
Plymate, Larry
$2,468,681.53
Residency:Contract: 200047
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,468,681.53
02/20/2020
03/13/2020
03/18/2020
02400
MCALESTER
165 165
09/08/2020
BRIDGE AND APPROACHES US-69
NORTHBOUND: OVER BUCK CREEK, 3.1
MILES SOUTH OF THE SH-131 JUNCTION
NEAR KIOWA. PROJECT LENGTH = 0.181 MILE
34254(04) US-69 NB
NHPP-013N(181)3P
Nored, John
$1,196,715.50
Residency:Contract: 200095
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,196,715.50
03/19/2020
04/15/2020
04/21/2020
02100
ANTLERS
30 30
06/01/2020
RESURFACE (ASPHALT) US-69 NB: FROM 5.3
MILES NORTH OF THE BRYAN COUNTY LINE,
EXTEND NORTH NEAR CANEY. PROJECT
LENGTH = 6.70 MILES
BeaverCounty: Commissioner District: 6
Contracts Under Construction
Construction Status Report Page 53
28344(04) COUNTY RO
STP-204C(027)CI
Michael, Charles
$716,428.76
Residency:Contract: 190003
Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 95 % ( 94 %)
Time Passed: 97 % ( 97 %)
Adjusted:
06/10/2019
$706,908.68
03/14/2019
04/15/2019
05/08/2019
06200
GUYMON
120 120
09/09/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-19): OVER CAMP CREEK, 7.6 MILES EAST
OF THE SH-23 JUNCTION NEAR BEAVER CITY.
PROJECT LENGTH = 0.330 MILE
33399(04) US-83
SSR-204B(029)SR
Michael, Charles
$2,514,617.50
Residency:Contract: 200048
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,514,617.50
02/20/2020
03/13/2020
03/18/2020
06200
GUYMON
Fixed Completion Date: 10/31/2020
RESURFACE (ASPHALT) US-83: FROM THE
TEXAS STATE LINE, EXTEND NORTH NEAR
BRYANS CORNER. PROJECT LENGTH = 7.000
MILES
33400(04) US-64
SSR-204B(030)SR
Michael, Charles
$1,428,352.50
Residency:Contract: 200049
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,428,352.50
02/20/2020
03/13/2020
03/18/2020
06200
GUYMON
Fixed Completion Date: 10/31/2020
RESURFACE (ASPHALT) US-64: FROM 7.99
MILES EAST OF THE US-270 JUNCTION,
EXTEND EAST NEAR KNOWLES. PROJECT
LENGTH = 8.300 MILES
BeckhamCounty: Commissioner District: 5
Contracts Under Construction
24839(04) CO.RD.
CIRB-105C(157)RB
CED7
$7,160,722.23
Residency:Contract: 170004
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 104 % ( 99 %)
Time Passed: 106 % ( 100 %)
Adjusted:
06/07/2017
$6,804,603.73
02/16/2017
03/21/2017
03/25/2017
05005
CIRCUIT ENGR. DISTR. # 7
270 287
07/03/2017
GRADE, DRAIN, SURFACE AND BRIDGE
COUNTY ROAD (RED HILLS ROAD/EW-117):
FROM SH-30, EXTEND EAST NEAR MAYFIELD.
PROJECT LENGTH = 6.830 MILES.
Construction Status Report Page 54
28775(04) SH-6
STP-205B(077)PM
Sawyer, Dax
$2,930,527.88
Residency:Contract: 180343
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 98 % ( 98 %)
Time Passed: 116 % ( 116 %)
Adjusted:
10/14/2019
$2,930,527.88
06/20/2019
07/11/2019
07/17/2019
05100
CLINTON
120 120
11/04/2019
BRIDGE AND APPROACHES SH-6: OVER
SADLER CREEK, 1.4 MILES AND 1.5 MILES
NORTH OF THE SH-55 JUNCTION NEAR ELK
CITY. PROJECT LENGTH = 0.254 MILE
30998(04) SH-6
ACNHPPI-4000(061)PM
Sawyer, Dax
$28,767,645.83
Residency:Contract: 190100
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 55 % ( 54 %)
Time Passed: 33 % ( 33 %)
Adjusted:
05/28/2019
$28,621,809.91
02/14/2019
03/14/2019
03/19/2019
05100
CLINTON
800 807
09/09/2019
GRADE, DRAIN, SURFACE, BRIDGE, AND
APPROACHES I-40B/SH-6: I-40B, FROM 1.1 MI
N OF I-40, EXT N. NEAR SAYRE. SH-6, OVER
I-40, 1.6 MILES SOUTH OF I-40B IN ELK CITY.
PROJECT LENGTH = 1.141 MILES
29004(04) I-40B
STP-205N(078)PM
Holley, Terri
$1,871,740.73
Residency:Contract: 190265
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 32 % ( 32 %)
Time Passed: 36 % ( 36 %)
Adjusted:
11/13/2019
$1,871,740.73
07/25/2019
08/20/2019
08/23/2019
05200
ALTUS
150 150
12/02/2019
BRIDGE AND APPROACHES I-40B: OVER EAST
FORK OF ELK CREEK, 1.1 MILES WEST OF
THE I-40 INTERCHANGE IN ELK CITY.
PROJECT LENGTH = 0.106 MILE
29005(04) I-40B
STP-205C(079)PM
Sawyer, Dax
$2,571,585.08
Residency:Contract: 190380
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 46 % ( 46 %)
Time Passed: 50 % ( 50 %)
Adjusted:
01/13/2020
$2,571,585.08
10/17/2019
11/08/2019
11/14/2019
05100
CLINTON
150 150
03/02/2020
I-40B: OVER LITTLE TURKEY CREEK, 0.2
MILES WEST OF THE SH-30 JUNCTION NEAR
ERICK. PROJECT LENGTH = 0.241 MILE
Construction Status Report Page 55
27900(04) I-40B
NHPP-205N(086)PM
Sawyer, Dax
$4,729,142.31
Residency:Contract: 200050
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$4,729,142.31
02/20/2020
03/13/2020
03/18/2020
05100
CLINTON
270 270
09/08/2020
BRIDGE AND APPROACHES I-40B: OVER ELK
CREEK, 0.2 MILES EAST OF THE SH-6
JUNCTION IN ELK CITY. PROJECT LENGTH =
0.201 MILE
BlaineCounty: Commissioner District: 5
Contracts Under Construction
30057(04) COUNTY RO
CIRB-206C(047)RB
CED7
$3,851,195.50
Residency:Contract: 180277
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 87 % ( 87 %)
Time Passed: 88 % ( 88 %)
Adjusted:
10/07/2019
$3,851,195.50
05/16/2019
06/12/2019
06/17/2019
05005
CIRCUIT ENGR. DISTR. # 7
150 150
10/07/2019
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-72): FROM 2.3 MILES EAST OF THE
SH-8 JUNCTION, EXTEND EAST NEAR
HITCHCOCK. PROJECT LENGTH = 4.019 MILES
32902(04) COUNTY RO
STP-206D(050)CI
CED7
$463,549.45
Residency:Contract: 180278
Contractor: WYATT CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 101 % ( 99 %)
Time Passed: 108 % ( 94 %)
Adjusted:
02/04/2019
$451,549.45
09/20/2018
10/16/2018
10/18/2018
05005
CIRCUIT ENGR. DISTR. # 7
60 69
02/04/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-65): OVER SPRING CREEK, 5.2 MILES
EAST OF THE SH-51 JUNCTION NEAR
OKEENE. PROJECT LENGTH = 0.127 MILE
31789(04) SH-51A
SBR-206B(060)SB
Sawyer, Dax
$1,139,531.17
Residency:Contract: 190144
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 120 % ( 93 %)
Time Passed: 102 % ( 68 %)
Adjusted:
09/10/2019
$880,990.57
04/18/2019
05/21/2019
05/24/2019
05100
CLINTON
90 135
09/09/2019
BRIDGE REHABILITATION SH-51A: OVER U.S.
GYPSUM ROAD, 2.4 MILES NORTH OF THE
SH-51 JUNCTION NEAR CANTON. PROJECT
LENGTH = 0.196 MILE
Construction Status Report Page 56
27913(10) SH-3
NHPP-017N(254)PM
Sawyer, Dax
$9,866,475.86
Residency:Contract: 190238
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 7 % ( 7 %)
Time Passed: 6 % ( 6 %)
Adjusted:
03/23/2020
$9,866,475.86
08/22/2019
09/19/2019
09/23/2019
05100
CLINTON
310 310
01/06/2020
GRADE, DRAIN, AND SURFACE SH-3: FROM
1.0 MILE EAST OF THE US-270 JUNCTION,
EXTEND EAST IN WATONGA. PROJECT
LENGTH = 4.109 MILES
27918(04) SH-8
STP-206C(044)SS
CEC
$2,390,112.46
Residency:Contract: 190340
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 55 % ( 55 %)
Time Passed: 38 % ( 38 %)
Adjusted:
02/17/2020
$2,390,112.46
11/14/2019
12/09/2019
12/12/2019
05003
CEC CORP.
130 130
03/02/2020
BRIDGE AND APPROACHES SH-8: OVER SALT
CREEK, 7.3 MILES SOUTH OF THE SH-51
JUNCTION NEAR HITCHCOCK. PROJECT
LENGTH = 0.226 MILE
30040(04) COUNTY RO
CIRB-206D(048)RB
CED7
$664,569.50
Residency:Contract: 200003
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 12 % ( 12 %)
Time Passed: 23 % ( 23 %)
Adjusted:
03/30/2020
$664,569.50
01/16/2020
02/18/2020
02/25/2020
05005
CIRCUIT ENGR. DISTR. # 7
75 75
06/01/2020
BRIDGE AND APPROACHES COUNTY ROAD
(NS-257): OVER TRIBUTARY OF SPRING
CREEK, 2.6 MILES SOUTH OF THE SH-51
JUNCTION NEAR OKEENE. PROJECT LENGTH
= 0.132 MILE
30044(04) COUNTY RO
CIRB-206D(049)RB
CED7
$524,788.65
Residency:Contract: 200004
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$524,788.65
01/16/2020
02/18/2020
02/25/2020
05005
CIRCUIT ENGR. DISTR. # 7
75 75
06/01/2020
BRIDGE AND APPROACHES COUNTY ROAD
(NS-251): OVER WEAVER CREEK, 1.9 MILES
SOUTH OF THE US-270 JUNCTION NEAR
WATONGA. PROJECT LENGTH = 0.123 MILE
BryanCounty: Commissioner District: 2
Contracts Under Construction
Construction Status Report Page 57
28003(07) SH-78
STP-207C(065)PM
Bishop, Justin
$15,449,865.59
Residency:Contract: 180235
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 62 % ( 62 %)
Time Passed: 50 % ( 50 %)
Adjusted:
07/08/2019
$15,439,206.76
04/18/2019
05/16/2019
05/21/2019
02300
MADILL
480 482
09/09/2019
BRIDGE AND APPROACHES SH-78: OVER THE
RED RIVER, ON THE TEXAS STATE LINE NEAR
YARNABY. PROJECT LENGTH = 1.126 MILES
29901(04) COUNTY RO
STP-207D(084)CI
CED3
$847,783.37
Residency:Contract: 180345
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 96 % ( 96 %)
Time Passed: 103 % ( 103 %)
Adjusted:
02/16/2019
$847,783.37
11/15/2018
12/17/2018
12/27/2018
02013
CIRCUIT ENGR. DISTR. # 3
120 120
01/21/2019
BRIDGE AND APPROACHES COUNTY ROAD
(NS-3705): OVER ISLAND BAYOU CREEK, 2.3
MILES NORTH OF THE SH-91 JUNCTION NEAR
CALERA. PROJECT LENGTH = 0.133 MILE
31855(04) US-69
NHPP-207N(085)FP
Bishop, Justin
$152,700,219.12
Residency:Contract: 190145
Contractor: DUIT CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 12 % ( 12 %)
Time Passed: 0 % ( 0 %)
Adjusted:
10/14/2019
$152,700,219.12
07/25/2019
08/21/2019
09/30/2019
02300
MADILL
1,250 1,250
02/01/2020
GRADE, DRAIN, SURFACE, AND BRIDGE
US-69: FROM 4.5 MILES SOUTHWEST OF THE
US-70 INTERCHANGE, EXTEND NORTHEAST
NEAR CALERA. PROJECT LENGTH = 4.086
MILES
24333(16) US-70
SSP-NBIP(527)PM
TETR
$364,978.00
Residency:Contract: 190192
Contractor: OMEGA COATINGS & CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 106 % ( 99 %)
Time Passed: 45 % ( 45 %)
Adjusted:
11/19/2019
$340,000.00
06/20/2019
07/17/2019
10/01/2019
02002
TETRA TECH
150 150
11/04/2019
BRIDGE PAINTING US-70: OVER LAKE
TEXOMA, 5.5 MILES EAST OF THE SH-32
JUNCTION NEAR KINGSTON. PROJECT
LENGTH = 0.00 MILE
Construction Status Report Page 58
34267(04) US-69
NHPP-207N(098)3P
Nored, John
$2,656,348.50
Residency:Contract: 200096
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,656,348.50
03/19/2020
04/15/2020
04/21/2020
02100
ANTLERS
45 45
06/01/2020
RESURFACE (ASPHALT) US-69: FROM 2.2
MILES NORTH OF THE US-70 JUNCTION,
EXTEND NORTH IN DURANT. PROJECT
LENGTH = 4.300 MILES
CaddoCounty: Commissioner District: 7
Contracts Under Construction
27039(04) SH-58
ACSTP-208C(048)(053)SS/S*
Knight, Reese
$13,737,798.13
Residency:Contract: 170252
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 99 %)
Time Passed: 122 % ( 108 %)
Adjusted:
12/06/2017
$13,390,014.14
09/21/2017
10/11/2017
10/16/2017
07300
ANADARKO
410 464
02/05/2018
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-58: FROM 0.2 MILE NORTH OF SH-9,
EXTEND NORTH IN CARNEGIE. PROJECT
LENGTH = 2.283 MILES.
32931(04) SH-152
SBR-208C(057)SB
Knight, Reese
$3,408,534.35
Residency:Contract: 180318
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 100 %)
Time Passed: 186 % ( 119 %)
Adjusted:
02/20/2019
$3,322,665.90
10/18/2018
11/14/2018
11/19/2018
07300
ANADARKO
180 282
03/04/2019
BRIDGE REHABILITATION SH-152: OVER LAKE
CREEK OVERFLOW AND WILLOW CREEK, 2.2
MILES AND 7.3 MILES EAST OF THE SH-58
JUNCTION NEAR BINGER. PROJECT LENGTH
= 0.00 MILE
24134(09) MULTIPLE
STP-220F(063)PM
Sawyer, Dax
$68,592.00
Residency:Contract: 190143
Contractor: GARY A. CRAIN, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 89 % ( 89 %)
Time Passed: 73 % ( 73 %)
Adjusted:
07/31/2019
$68,592.00
04/18/2019
05/21/2019
05/24/2019
05100
CLINTON
30 30
09/09/2019
BRIDGE WATER PROOF SEAL
US-183/SH-58/SH-152/CANUTE
ROAD/CEMETERY ROAD: AT MULTIPLE
LOCATIONS IN DIVISION V. PROJECT LENGTH
= 0.00 MILE
Construction Status Report Page 59
32948(04) CITY STRE
HSIPG-208C(066)AD
Sawyer, Dax
$584,880.10
Residency:Contract: 190146
Contractor: REDLANDS CONTRACTING, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 92 % ( 92 %)
Time Passed: 83 % ( 83 %)
Adjusted:
09/09/2019
$584,880.10
04/18/2019
05/14/2019
05/23/2019
05100
CLINTON
180 180
09/09/2019
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
CITY STREETS (SH-58 (ARAPAHO AVE/MAIN
ST): SH-58, FROM 0.6 MI N OF I-40 EXT N.
MAIN ST, AT THE INT OF SH-58 IN HYDRO.
PROJECT LENGTH = 0.405 MILE
30175(04) US-281
STP-208B(075)PM
Knight, Reese
$1,925,913.72
Residency:Contract: 190341
Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 9 % ( 9 %)
Time Passed: 6 % ( 6 %)
Adjusted:
04/06/2020
$1,925,913.72
11/14/2019
12/13/2019
12/17/2019
07300
ANADARKO
180 180
04/06/2020
GRADE, DRAIN, AND SURFACE US-281: FROM
0.3 MILES SOUTH OF I-40, EXTEND SOUTH IN
HINTON. PROJECT LENGTH = 0.322 MILE
33453(06) US-281
NHPP-208N(073)3P
Knight, Reese
$1,257,109.52
Residency:Contract: 200098
Contractor: T & G CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,257,109.52
03/19/2020
04/20/2020
04/28/2020
07300
ANADARKO
45 45
08/03/2020
RESURFACE (ASPHALT) US-281: FROM THE
SH-152 JUNCTION, EXTEND SOUTH NEAR
BINGER. PROJECT LENGTH = 4.160 MILES
CanadianCounty: Commissioner District: 4
Contracts Under Construction
29257(04) I-40
NHPPIY-0040-4(441)
Brooks, Jonathan
$17,609,403.50
Residency:Contract: 150180
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 93 % ( 89 %)
Time Passed: 84 % ( 79 %)
Adjusted:
11/02/2015
$16,901,090.73
05/21/2015
06/10/2015
06/15/2015
04200
YUKON
365 385
11/02/2015
GRADE, DRAIN, SURFACE, AND BRIDGE -
DIVISION IV I-40: AT RADIO ROAD IN EL
RENO, 2.0 MILES EAST OF US-81. PROJECT
LENGTH = 0.444 MILE.
Construction Status Report Page 60
31441(04) CITY STRE
TAP-255A(334)AG
Brooks, Jonathan
$894,011.18
Residency:Contract: 180259
Contractor: CROSSLAND HEAVY CONTRACTORS INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 114 % ( 100 %)
Time Passed: 110 % ( 94 %)
Adjusted:
01/21/2019
$780,799.37
09/20/2018
10/16/2018
10/29/2018
04200
YUKON
120 141
02/04/2019
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) CITY STREETS: MAIN
ST(SH-66)/FRONTAGE RD/ CORNWELL
DR/POPLAR AVE/LAKESHORE DR: AT
MULTIPLE LOCATIONS IN YUKON. PROJECT
LENGTH = 1.946 MILES
31031(04) SH-3
SBR-209N(060)SB
Brooks, Jonathan
$2,680,357.48
Residency:Contract: 180346
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 98 %)
Time Passed: 153 % ( 114 %)
Adjusted:
04/15/2019
$2,598,285.73
11/15/2018
12/12/2018
12/17/2018
04200
YUKON
180 242
04/01/2019
BRIDGE REHABILITATION SH-3: OVER US-81,
2.5 MILES SOUTH OF THE KINGFISHER
COUNTY LINE NEAR OKARCHE. PROJECT
LENGTH = 0.270 MILE
04757(05) SH-4
STP-209C(067)PM
Brooks, Jonathan
$13,135,000.00
Residency:Contract: 190109
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 29 % ( 29 %)
Time Passed: 20 % ( 20 %)
Adjusted:
01/20/2020
$13,135,000.00
11/14/2019
12/13/2019
12/17/2019
04200
YUKON
360 360
04/06/2020
GRADE, DRAIN, SURFACE, AND BRIDGE SH-4:
FROM 1.5 MILES NORTH OF THE SH-66
JUNCTION, EXTEND NORTH IN YUKON.
PROJECT LENGTH = 1.803 MILES
31181(04) COUNTY RO
STP-209C(071)CI
Brooks, Jonathan
$1,474,405.26
Residency:Contract: 190173
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 50 % ( 50 %)
Time Passed: 79 % ( 79 %)
Adjusted:
11/18/2019
$1,473,205.26
05/16/2019
06/12/2019
06/18/2019
04200
YUKON
150 150
11/18/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-112): OVER ARAPAHO CREEK, 2.0 MILES
WEST OF THE US-81 JUNCTION NEAR UNION
CITY. PROJECT LENGTH = 0.378 MILE
Construction Status Report Page 61
27004(04) US-81 (I-
NHPP-209N(051)SS
Brooks, Jonathan
$9,983,088.28
Residency:Contract: 190312
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 16 % ( 16 %)
Time Passed: 10 % ( 10 %)
Adjusted:
02/10/2020
$9,983,088.28
10/17/2019
11/15/2019
12/11/2019
04200
YUKON
450 450
02/03/2020
BRIDGE AND APPROACHES US-81 (I-40B):
OVER THE UNION PACIFIC RAILROAD, 1.1
MILES NORTHWEST OF THE SH-66 JUNCTION
IN EL RENO. PROJECT LENGTH = 0.452 MILE
31439(04) CITY STRE
TAP-209E(076)AG
Brooks, Jonathan
$355,727.60
Residency:Contract: 190322
Contractor: RUDY CONSTRUCTION CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 20 % ( 20 %)
Time Passed: 32 % ( 32 %)
Adjusted:
03/02/2020
$355,727.60
10/17/2019
11/12/2019
11/15/2019
04200
YUKON
90 90
03/02/2020
PEDESTRIAN IMPROVEMENTS (BIKE ROUTE
AND SIDEWALKS) CITY STREETS (NW 36TH
ST/N. OVERHOLSER DR): NW 36TH ST, FROM
AMANDA DR EXT EAST. OVERHOLSER DR,
FROM NW 36TH ST EXT N. PROJECT LENGTH
= 1.260 MILES
27901(10) SH-152
STP-209C(080)PM
Brooks, Jonathan
$46,785.00
Residency:Contract: 200052
Contractor: RMR DEMOLITION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$46,785.00
02/20/2020
03/20/2020
03/24/2020
04200
YUKON
180 180
04/13/2020
RIGHT OF WAY CLEARANCE SH 152: FROM
THE US-81 JUNCTION, EXTEND EAST IN
UNION CITY. PROJECT LENGTH = 9.960
MILESPREQUALIFICATION FOR THIS
PROJECT HAS BEEN WAIVED. BOTH BID
EXPRESS AND WRITTEN BIDS WILL BE
ACCEPTED.
34664(04) CITY STRE
SAP-4000(101)ES
Brooks, Jonathan
$58,990.52
Residency:Contract: 200053
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$58,990.52
02/20/2020
03/13/2020
03/18/2020
04200
YUKON
35 35
05/11/2020
BRIDGE REPAIR CITY STREET (ALFADALE
ROAD): REPAIR VEHICLE IMPACT DAMAGE
OVER I-40, 1.0 MILE EAST OF US-81 IN EL
RENO. PROJECT LENGTH = 0.000 MILE
Construction Status Report Page 62
33889(04) SH-3
NHPP-209N(075)3P
Brooks, Jonathan
$3,794,837.24
Residency:Contract: 200099
Contractor: ATLAS PAVING COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$3,794,837.24
03/19/2020
04/20/2020
04/28/2020
04200
YUKON
90 90
07/06/2020
RESURFACE (ASPHALT) SH-3: FROM 4.0
MILES SOUTHEAST OF US-81, EXTEND
SOUTHEAST NEAR OKARCHE. PROJECT
LENGTH = 3.35 MILES
CarterCounty: Commissioner District: 7
Contracts Under Construction
24819(04) COUNTY RO
CIRB-110C(205)RB
Fuhrmann, Chris
$7,405,012.06
Residency:Contract: 180188
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 87 % ( 86 %)
Time Passed: 99 % ( 99 %)
Adjusted:
02/05/2019
$7,363,057.66
10/18/2018
11/15/2018
11/20/2018
07200
ARDMORE
300 300
03/04/2019
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (DOLESE QUARRY ROAD): FROM I-35,
EXTEND NORTH THEN WEST THEN NORTH
NEAR OVERBROOK. PROJECT LENGTH =
3.070 MILES
24104(07) SH-53
STP-210C(066)PM
Fuhrmann, Chris
$17,577,630.27
Residency:Contract: 180347
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 26 % ( 26 %)
Time Passed: 49 % ( 49 %)
Adjusted:
08/05/2019
$17,577,630.27
11/15/2018
12/12/2018
12/17/2018
07200
ARDMORE
350 350
08/05/2019
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-53: FROM 6.6 MILES EAST OF THE SH-76
JUNCTION, EXTEND EAST NEAR SPRINGER.
PROJECT LENGTH = 7.986 MILES
32977(04) MULTIPLE
TAP-210E(067)TP
EST
$827,379.99
Residency:Contract: 190033
Contractor: SCHIRALLI CONSTRUCTION CORP.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 105 % ( 99 %)
Time Passed: 99 % ( 99 %)
Adjusted:
06/03/2019
$783,773.25
01/17/2019
02/27/2019
03/11/2019
07001
EST, INC.
150 150
06/03/2019
PEDESTRIAN IMPROVEMENTS
(STREETSCAPE) EAST MAIN STREET/DEPOT
PARK PLAZA/DEPOT PARK TRAIL HEAD: AT
MULTIPLE LOCATIONS IN THE CITY OF
ARDMORE. PROJECT LENGTH = 0.11 MILE
PREQUALIFICATION FOR THIS PROJECT HAS
BEEN WAIVED. BOTH BID EXPRESS AND
WRITTEN BIDS WILL BE ACCEPTED.
Construction Status Report Page 63
30468(04) COUNTY RO
STP-210D(070)CI
Fuhrmann, Chris
$912,955.95
Residency:Contract: 190207
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 5 % ( 5 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$912,955.95
01/16/2020
02/18/2020
02/25/2020
07200
ARDMORE
100 100
06/01/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-176/CARGO ROAD): OVER RATLIFF WEST
CREEK, 0.8 MILES WEST OF THE SH-76
JUNCTION NEAR RATLIFF CITY. PROJECT
LENGTH = 0.156 MILE
32834(04) US-77
SSR-210C(072)SR
Fuhrmann, Chris
$1,768,631.50
Residency:Contract: 200005
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,768,631.50
01/16/2020
02/14/2020
02/25/2020
07200
ARDMORE
45 45
06/01/2020
RESURFACE (ASPHALT) US-77: FROM THE
LOVE COUNTY LINE, EXTEND NORTH NEAR
ARDMORE. PROJECT LENGTH = 4.720 MILES
33457(04) SH-76
SSR-210C(073)SR
Fuhrmann, Chris
$1,261,670.00
Residency:Contract: 200006
Contractor: SEAL MASTERS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,261,670.00
01/16/2020
02/14/2020
02/25/2020
07200
ARDMORE
45 45
06/01/2020
RESURFACE (ASPHALT) SH-76: FROM 7.96
MILES NORTH OF THE US-70 JUNCTION,
EXTEND NORTH NEAR HEALDTON. PROJECT
LENGTH = 4.73 MILES
32829(04) SH-199
STP-210B(074)3P
Fuhrmann, Chris
$858,544.43
Residency:Contract: 200100
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$858,544.43
03/19/2020
04/15/2020
04/21/2020
07200
ARDMORE
45 45
08/03/2020
RESURFACE (ASPHALT) SH-199: FROM 0.4
MILES EAST OF THE US-177 JUNCTION,
EXTEND EAST IN DICKSON. PROJECT
LENGTH = 2.630 MILES
CherokeeCounty: Commissioner District: 1
Contracts Under Construction
Construction Status Report Page 64
27038(04) SH-51
ACSTP-211B(023)SS
Orendorf, Barry
$2,398,511.37
Residency:Contract: 160243
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 82 % ( 82 %)
Time Passed: 445 % ( 295 %)
Adjusted:
12/05/2016
$2,398,511.37
07/21/2016
08/18/2016
08/24/2016
01200
SALLISAW
130 196
12/05/2016
BRIDGE AND APPROACHES SH-51: OVER
PECAN CREEK, 6.6 MILES EAST OF SH-80
NEAR TAHLEQUAH. PROJECT LENGTH =
0.438 MILE.
10437(04) SH-51
STP-011C(345)
Orendorf, Barry
$9,647,306.65
Residency:Contract: 180237
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 79 % ( 80 %)
Time Passed: 58 % ( 58 %)
Adjusted:
11/28/2018
$9,689,966.28
07/19/2018
08/17/2018
08/20/2018
01200
SALLISAW
480 476
12/03/2018
BRIDGE AND APPROACHES SH-51: OVER
ELDON CREEK AND BARON FORK CREEK, 0.2
MILES AND 0.4 MILES SOUTH OF THE US-62
JUNCTION NEAR ELDON. PROJECT LENGTH =
0.842 MILE
27111(09) US-62
SSP-211B(040)RW
Orendorf, Barry
$60,010.00
Residency:Contract: 190343
Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 83 % ( 83 %)
Time Passed: 28 % ( 28 %)
Adjusted:
01/06/2020
$60,010.00
11/14/2019
12/10/2019
12/17/2019
01200
SALLISAW
180 180
01/06/2020
RIGHT-OF-WAY CLEARANCE US-62: FROM 3.4
MILES EAST OF THE SH-82 JUNCTION,
EXTEND EAST NEAR TAHLEQUAH. PROJECT
LENGTH = 2.47 MILES PREQUALIFICATION
FOR THIS PROJECT HAS BEEN WAIVED.
BOTH BID EXPRESS AND WRITTEN BIDS WILL
BE ACCEPTED.
ChoctawCounty: Commissioner District: 2
Contracts Under Construction
24821(04) COUNTY RO
STP-112D(078)CI
CED3
$5,400,150.61
Residency:Contract: 180260
Contractor: H & H BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 47 % ( 47 %)
Time Passed: 78 % ( 78 %)
Adjusted:
04/01/2019
$5,366,503.67
11/15/2018
12/12/2018
01/25/2019
02013
CIRCUIT ENGR. DISTR. # 3
220 220
04/01/2019
BRIDGE AND APPROACHES COUNTY ROAD
(NS-4050): OVER MUDDY BOGGY CREEK, 4.7
MILES AND 5.0 MILES NORTH OF US-70 NEAR
BOSWELL. PROJECT LENGTH = 1.215 MILES
Construction Status Report Page 65
31219(04) COUNTY RO
CIRB-212D(044)RB
CED3
$449,234.32
Residency:Contract: 190004
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 91 % ( 91 %)
Time Passed: 83 % ( 83 %)
Adjusted:
09/16/2019
$449,234.32
05/16/2019
06/12/2019
06/17/2019
02013
CIRCUIT ENGR. DISTR. # 3
90 90
10/07/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-207): OVER UNNAMED CREEK, 0.6 MILES
EAST OF SH-93 NEAR HUGO. PROJECT
LENGTH = 0.176 MILE
32956(04) US-70B
HSIPG-212N(045)AD
Nored, John
$656,225.95
Residency:Contract: 190242
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 70 % ( 70 %)
Time Passed: 31 % ( 31 %)
Adjusted:
01/06/2020
$656,225.95
09/19/2019
10/25/2019
10/29/2019
02100
ANTLERS
75 75
02/03/2020
PEDESTRIAN IMPROVEMENT (SIDEWALKS)
US-70B: FROM 0.8 MILES NORTHWEST OF
THE US-70 JUNCTION, EXTEND WEST IN
HUGO. PROJECT LENGTH = 0.399 MILE
33944(04) US-70
SSR-022N(221)SR
Nored, John
$3,218,681.82
Residency:Contract: 200056
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$3,218,681.82
02/20/2020
03/11/2020
04/23/2020
02100
ANTLERS
60 60
06/01/2020
RESURFACE (ASPHALT) US-70/US-70B: US-70,
FROM 0.1 MI WEST OF US-271B EXT EAST.
US-70B, FROM THE INDIAN NATION TURNPIKE
EXT EAST NEAR HUGO. PROJECT LENGTH =
8.390 MILES
CimarronCounty: Commissioner District: 6
Contracts Under Construction
20941(04) MULTIPLE
NHPP-034N(001)PM
Michael, Charles
$10,793,088.44
Residency:Contract: 190383
Contractor: INTERSTATE HIGHWAY CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 6 % ( 6 %)
Time Passed: 3 % ( 3 %)
Adjusted:
04/06/2020
$10,793,088.44
11/14/2019
12/12/2019
01/14/2020
06200
GUYMON
290 290
04/06/2020
GRADE, DRAIN, AND SURFACE US-64
(CIMARRON AVE)/US-385/CITY STREET (MAIN
ST): FROM 0.3 MILES SOUTH OF THE SH-325
JCT, EXTEND NORTH IN BOISE CITY.
PROJECT LENGTH = 0.994 MILE
Construction Status Report Page 66
31774(04) COUNTY RO
STP-213C(026)CI
Michael, Charles
$2,137,444.60
Residency:Contract: 200089
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
04/09/2020
$2,137,444.60
02/20/2020
03/13/2020
03/18/2020
06200
GUYMON
120 120
07/06/2020
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-23): FROM THE US-385 JUNCTION,
EXTEND EAST NEAR BOISE CITY. PROJECT
LENGTH = 2.022 MILES
ClevelandCounty: Commissioner District: 3
Contracts Under Construction
29293(04) CT.ST.
STP-214B(042)(063)AG
ATKINS
$27,938,876.74
Residency:Contract: 160128
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 104 % ( 100 %)
Time Passed: 98 % ( 80 %)
Adjusted:
07/05/2016
$26,817,149.43
04/21/2016
05/10/2016
05/11/2016
03010
ATKINS
540 662
07/05/2016
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREET (LINDSEY STREET): FROM SW 24TH
AVENUE, EXTEND EAST IN THE CITY OF
NORMAN. PROJECT LENGTH = 1.247 MILES.
26879(04) SH-9
STP-114E(258)EH
ZOA
$802,048.75
Residency:Contract: 170312
Contractor: RDNJ, INC. DBA A-TECH PAVING
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 123 % ( 100 %)
Time Passed: 214 % ( 146 %)
Adjusted:
03/05/2018
$649,899.85
10/19/2017
11/20/2017
11/27/2017
03021
OLSSON ASSOCIATES
90 132
03/05/2018
ENHANCEMENT (TRAIL CONSTRUCTION)
SH-9: FROM 24TH AVENUE, EXTEND EAST IN
THE CITY OF NORMAN. PROJECT LENGTH =
1.100 MILES
32155(04) CITY STRE
NHPPI-3500(065)
BCS
$11,523,633.26
Residency:Contract: 180127
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 99 % ( 97 %)
Time Passed: 97 % ( 97 %)
Adjusted:
08/11/2018
$11,269,000.00
06/14/2018
07/20/2018
07/24/2018
03018
BENCHMARK CONSTR. SERVS., LLC
400 400
11/05/2018
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREET (SW 34TH STREET): OVER I-35 AND
LITTLE RIVER, 3.7 MILES AND 3.6 MILES WEST
OF SH-77H IN MOORE. PROJECT LENGTH =
0.737 MILE
Construction Status Report Page 67
30606(04) CITY STRE
STP-214B(091)AG
ZOA
$1,492,817.90
Residency:Contract: 190174
Contractor: CROSSLAND HEAVY CONTRACTORS INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 101 % ( 99 %)
Time Passed: 196 % ( 196 %)
Adjusted:
09/30/2019
$1,475,000.00
05/16/2019
06/18/2019
06/20/2019
03021
OLSSON ASSOCIATES
75 75
10/07/2019
INTERSECTION MODIFICATION AND TRAFFIC
SIGNAL CITY STREETS (24TH AVENUE NW):
AT THE INTERSECTION OF TEE DRIVE/TEE
CIR IN THE CITY OF NORMAN. PROJECT
LENGTH = 0.115 MILE
29300(04) CITY STRE
STP-214B(068)AG
EST
$9,436,999.90
Residency:Contract: 190195
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 32 % ( 32 %)
Time Passed: 43 % ( 41 %)
Adjusted:
09/23/2019
$9,437,000.00
06/20/2019
07/17/2019
07/25/2019
03001
EST, INC.
270 280
11/04/2019
GRADE, DRAIN, SURFACE, AND TRAFFIC
SIGNAL CITY STREET (24TH AVENUE): FROM
LINDSEY STREET, EXTEND NORTH IN THE
CITY OF NORMAN. PROJECT LENGTH = 1.795
MILES
32533(04) CITY STRE
NHPPG-214N(098)AG
Malave, Luis
$207,536.00
Residency:Contract: 190313
Contractor: TRAFFIC SIGNALS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
03/02/2020
$207,536.00
10/17/2019
11/18/2019
11/21/2019
03200
PURCELL
90 90
03/02/2020
TRAFFIC SIGNALS (FIBER OPTIC
INTERCONNECT UPGRADE) CITY STREET
(12TH AVENUE EAST): FROM THE ROBINSON
STREET INTERSECTION, EXTEND SOUTH IN
THE CITY OF NORMAN. PROJECT LENGTH =
0.00 MILE
34452(04) US-77 SB
SAP-214N(099)ES
Malave, Luis
$149,838.70
Residency:Contract: 190381
Contractor: RESTEK, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 79 % ( 73 %)
Time Passed: 110 % ( 88 %)
Adjusted:
02/29/2020
$139,338.70
10/17/2019
11/08/2019
11/15/2019
03200
PURCELL
21 26
03/02/2020
US-77 SB: REPAIR VEHICLE IMPACT DAMAGE
OVER I-35, 3.8 MILES SOUTH OF SH-37 IN
NORMAN. PROJECT LENGTH = 0.00 MILE
Construction Status Report Page 68
20997(04) US-77
STP-114C(111)SS
BCS
$11,580,500.00
Residency:Contract: 200057
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$11,580,500.00
02/20/2020
03/13/2020
03/18/2020
03018
BENCHMARK CONSTR. SERVS., LLC
300 300
07/06/2020
GRADE, DRAIN, AND SURFACE US-77: FROM
1.0 MILE NORTH OF THE SH-39 JUNCTION,
EXTEND NORTH IN LEXINGTON. PROJECT
LENGTH = 3.315 MILES
CoalCounty: Commissioner District: 3
Contracts Under Construction
29541(04) SH-43
STP-215C(017)SS
Wade, Tony
$2,207,086.69
Residency:Contract: 150330
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 97 % ( 94 %)
Time Passed: 400 % ( 234 %)
Adjusted:
06/24/2016
$2,151,445.69
10/15/2015
11/20/2015
11/25/2015
03100
ADA
210 358
03/07/2016
BRIDGE REHABILITATION SH-43: OVER
MUDDY BOGGY CREEK AND MUDDY BOGGY
O'FLOW, 1.53 MILES EAST OF US-75 NEAR
COALGATE. PROJECT LENGTH = 0.311 MILE
30010(04) CO.RD.
STP-215D(021)CI
Wade, Tony
$543,761.81
Residency:Contract: 170070
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 87 % ( 87 %)
Time Passed: 158 % ( 158 %)
Adjusted:
07/10/2017
$543,761.81
02/16/2017
03/22/2017
03/25/2017
03100
ADA
90 90
07/03/2017
BRIDGE AND APPROACHES COUNTY ROAD
(OLD SH-3): OVER ROCK CREEK, 0.8 MILES
SOUTHEAST OF THE PONTOTOC COUNTY
LINE NEAR STONEWALL. PROJECT LENGTH =
0.311 MILE
24943(04) CO.RD.
CIRB-115C(074)RB
Wade, Tony
$3,929,467.03
Residency:Contract: 170298
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 100 %)
Time Passed: 138 % ( 125 %)
Adjusted:
02/05/2018
$3,854,509.82
09/21/2017
10/18/2017
10/19/2017
03100
ADA
180 200
02/05/2018
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (NS-369): FROM SH-3,
EXTEND SOUTH NEAR TUPELO. PROJECT
LENGTH = 2.964 MILES
Construction Status Report Page 69
27569(04) SH-43
STP-115C(103)PM
ZOA
$3,247,594.25
Residency:Contract: 180349
Contractor: TREAS CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 14 % ( 14 %)
Time Passed: 24 % ( 24 %)
Adjusted:
12/30/2019
$3,247,594.25
10/17/2019
11/12/2019
11/14/2019
03021
OLSSON ASSOCIATES
210 210
02/03/2020
BRIDGE AND APPROACHES SH-43: OVER MILL
CREEK, 4.1 MILES WEST OF THE US-69
JUNCTION NEAR COALGATE. PROJECT
LENGTH = 0.450 MILE
30665(04) COUNTY RO
STP-215D(031)CI
Wade, Tony
$1,017,103.91
Residency:Contract: 190386
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 59 % ( 59 %)
Time Passed: 51 % ( 51 %)
Adjusted:
01/09/2020
$1,017,103.91
11/14/2019
12/10/2019
12/17/2019
03100
ADA
120 120
01/20/2020
BRIDGE AND APPROACHES COUNTY ROAD
(OLD STATE HIGHWAY 3): OVER LEADER
CREEK, 1.7 MILES EAST OF THE SH-48
JUNCTION NEAR TUPELO. PROJECT LENGTH
= 0.188 MILE
34584(04) US-75
SSR-215B(032)SR
Wade, Tony
$4,194,734.93
Residency:Contract: 200058
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
04/20/2020
$4,194,734.93
02/20/2020
03/13/2020
03/16/2020
03100
ADA
90 90
07/06/2020
RESURFACE (A.C AND P.C) US-75: FROM THE
SH-3 JUNCTION, EXTEND NORTH NEAR
COALGATE. PROJECT LENGTH = 6.920 MILES
29731(04) US-75/SH-
NHPP-215N(028)PM
Wade, Tony
$745,765.50
Residency:Contract: 200090
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$745,765.50
02/20/2020
03/13/2020
03/18/2020
03100
ADA
120 120
09/08/2020
BRIDGE REHABILITATION US-75/SH-3: OVER
BRIAR CREEK, 2.9 MILES SOUTH OF THE
SH-43 JUNCTION NEAR LEHIGH. PROJECT
LENGTH = 0.043 MILE
ComancheCounty: Commissioner District: 7
Contracts Under Construction
Construction Status Report Page 70
28782(05) I-44
STP-216F(082)PM
Roberts, Colton
$591,046.42
Residency:Contract: 190196
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 19 % ( 19 %)
Time Passed: 36 % ( 32 %)
Adjusted:
02/15/2020
$580,755.45
06/20/2019
07/17/2019
07/24/2019
07100
DUNCAN
90 100
02/15/2020
JOINT SEAL/REPAIR I-44: OVER BISHOP ROAD
(EW-168), 1.2 MILES SOUTH OF THE SH-7
INTERCHANGE IN LAWTON. PROJECT
LENGTH = 0.000 MILE
33886(04) I-44
SBR-4400(056)SB
Knight, Reese
$1,010,948.50
Residency:Contract: 190344
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 50 % ( 49 %)
Time Passed: 41 % ( 41 %)
Adjusted:
03/09/2020
$994,388.50
11/14/2019
12/10/2019
12/19/2019
07300
ANADARKO
100 100
03/02/2020
BRIDGE REHABILITATION I-44: OVER FORT
SILL ROAD AND RAILROAD, 1.8 MILES NORTH
OF US-62 IN LAWTON. PROJECT LENGTH =
0.254 MILE
CottonCounty: Commissioner District: 7
Contracts Under Construction
29800(04) COUNTY RO
CIRB-217C(042)RB
Roberts, Colton
$5,337,711.15
Residency:Contract: 180191
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 95 % ( 94 %)
Time Passed: 93 % ( 87 %)
Adjusted:
05/13/2019
$5,264,109.43
01/17/2019
02/22/2019
03/01/2019
07100
DUNCAN
270 289
06/03/2019
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (NS-250): FROM THE US-70
JUNCTION, EXTEND NORTH NEAR RANDLETT.
PROJECT LENGTH = 4.992 MILES
28037(04) SH-5A
STP-217C(041)PM
Roberts, Colton
$4,109,021.66
Residency:Contract: 180351
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 94 % ( 92 %)
Time Passed: 85 % ( 85 %)
Adjusted:
08/19/2019
$3,994,021.66
05/16/2019
06/12/2019
06/18/2019
07100
DUNCAN
185 185
10/07/2019
BRIDGE AND APPROACHES SH-5A: OVER
WEST CACHE CREEK AND TWO
OVERFLOWS, 2.3 MILES, 2.4 MILES, AND 2.6
MILES EAST OF I-44 NEAR TEMPLE. PROJECT
LENGTH = 0.486 MILE
Construction Status Report Page 71
CraigCounty: Commissioner District: 8
Contracts Under Construction
31359(04) SH-25
SBR-218C(074)SB
GARV
$764,742.88
Residency:Contract: 190074
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 89 % ( 87 %)
Time Passed: 116 % ( 109 %)
Adjusted:
09/09/2019
$745,245.43
04/18/2019
05/14/2019
05/23/2019
08011
GARVER, LLC.
130 138
09/09/2019
BRIDGE REHABILITATION SH-25: OVER LITTLE
CABIN CREEK, 3.4 MILES WEST OF THE
OTTAWA COUNTY LINE NEAR BLUEJACKET.
PROJECT LENGTH = 0.158 MILE
32714(04) US-60
SSR-218B(075)SR
GARV
$684,122.10
Residency:Contract: 200059
Contractor: EMERY SAPP & SONS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$684,122.10
02/20/2020
03/13/2020
04/06/2020
08011
GARVER, LLC.
60 60
07/06/2020
RESURFACE (ASPHALT) US-60: FROM 3.3
MILES EAST OF THE US-69 JUNCTION,
EXTEND NORTHEAST THEN SOUTHEAST IN
VINITA. PROJECT LENGTH = 1.760 MILES
CreekCounty: Commissioner District: 8
Contracts Under Construction
27071(04) SH-51
ACSTP-219B(047)SS
Scott, Kalynn
$7,365,510.96
Residency:Contract: 160280
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 95 % ( 95 %)
Time Passed: 95 % ( 95 %)
Adjusted:
10/17/2016
$7,356,355.59
08/18/2016
09/16/2016
09/22/2016
08400
SAND SPRINGS
280 280
01/03/2017
BRIDGE AND APPROACHES SH-51: OVER
CIMARRON RIVER, 3.5 MILES EAST OF THE
SH-99 JUNCTION NEAR MANNFORD.
PROJECT LENGTH = 1.021 MILE.
Construction Status Report Page 72
29407(04) CO.RD.
STP-219D(056)CI
BCS
$1,227,000.00
Residency:Contract: 170223
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 100 % ( 100 %)
Time Passed: 152 % ( 140 %)
Adjusted:
04/09/2018
$1,227,000.00
11/16/2017
12/15/2017
12/18/2017
(TURNER TURNPIKE) NEAR DEPEW.
08018
BENCHMARK CONSTR. SERVS., LLC
120 130
04/09/2018
BRIDGE AND APPROACHES COUNTY ROAD
(NS-3650/S 465TH W AVE): OVER LITTLE DEEP
FORK CREEK, 0.1 MI SOUTH OF I-44 (TURNER
TURNPIKE) NEAR DEPEW. PROJECT LENGTH
= 0.589 MILE
27925(04) SH-48
STP-219B(054)SS
TETR
$9,375,961.88
Residency:Contract: 170254
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 95 %)
Time Passed: 107 % ( 104 %)
Adjusted:
01/15/2018
$8,683,795.40
11/16/2017
12/12/2017
12/13/2017
08002
TETRA TECH
420 432
01/16/2018
BRIDGE AND APPROACHES SH-48: OVER
CIMARRON RIVER, 2.6 MILES NORTH OF THE
SH-51 INTERSECTION NEAR MANNFORD.
PROJECT LENGTH = 0.709 MILE
33302(04) MULTIPLE
HSIPG-219F(057)TR
BCS
$1,261,977.01
Residency:Contract: 170316
Contractor: ACTION SAFETY SUPPLY CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 100 %)
Time Passed: 152 % ( 116 %)
Adjusted:
09/04/2018
$1,241,257.55
04/19/2018
05/22/2018
05/31/2018
I, III, AND VIII.
08018
BENCHMARK CONSTR. SERVS., LLC
90 118
09/04/2018
SAFETY IMPROVEMENT (HIGH FRICTION
SURFACE TREATMENT) US-HIGHWAYS/STATE
HIGHWAYS: AT MULTIPLE LOCATIONS IN
DIVISION I, II, III, AND VIII.
22752(04) CO.RD.
STP-119D(131)CI
BCS
$634,701.86
Residency:Contract: 170345
Contractor: H & H BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 75 % ( 104 %)
Time Passed: 93 % ( 93 %)
Adjusted:
04/02/2018
$879,299.67
11/16/2017
12/20/2017
01/26/2018
GHT.
08018
BENCHMARK CONSTR. SERVS., LLC
120 120
04/02/2018
BRIDGE AND APPROACHES COUNTY ROAD
(NS-369): OVER DOG CREEK, 4.2 MILES
NORTH OF THE SH-16 JUNCTION NEAR
DRUMRIGHT. PROJECT LENGTH = 0.359 MILE.
Construction Status Report Page 73
27083(04) SH-33
SSP-219B(063)PM
EST
$1,020,024.30
Residency:Contract: 180193
Contractor: CIMARRON CONSTRUCTION COMPANY, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 108 % ( 100 %)
Time Passed: 127 % ( 101 %)
Adjusted:
10/01/2018
$943,435.00
05/17/2018
06/13/2018
06/14/2018
08001
EST, INC.
120 151
10/01/2018
BRIDGE AND APPROACHES SH-33: OVER
TIGER CREEK, 0.8 MILES WEST OF SH-16 IN
DRUMRIGHT. PROJECT LENGTH = 0.0284 MILE
24132(04) SH-66
HSIP-119C(160)PM
EST
$3,448,792.29
Residency:Contract: 180281
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 63 % ( 62 %)
Time Passed: 227 % ( 227 %)
Adjusted:
02/04/2019
$3,357,000.00
09/20/2018
10/09/2018
10/11/2018
08001
EST, INC.
150 150
02/04/2019
GRADE, DRAIN, AND SURFACE SH-66: FROM
6.7 MILES SOUTHWEST OF THE SH-48
JUNCTION, EXTEND NORTHEAST NEAR
DEPEW. PROJECT LENGTH = 1.265 MILES
32710(04) SH-33
SSR-219B(067)SR
Scott, Kalynn
$2,205,000.00
Residency:Contract: 190038
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
09/03/2019
$2,205,000.00
01/17/2019
02/22/2019
03/01/2019
08400
SAND SPRINGS
45 45
09/03/2019
RESURFACE (ASPHALT) SH-33: FROM 0.28
MILES EAST OF THE SH-16/SH-99B JUNCTION,
EXTEND EAST NEAR DRUMRIGHT. PROJECT
LENGTH = 8.022 MILES
31090(04) SH-48
STP-219B(071)PM
Scott, Kalynn
$3,329,000.00
Residency:Contract: 190243
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
01/06/2020
$3,329,000.00
08/22/2019
09/12/2019
09/23/2019
08400
SAND SPRINGS
60 60
01/06/2020
PAVEMENT REHABILITATION (ASPHALT)
SH-48: FROM 2.0 MILES NORTH OF THE SH-33
JUNCTION, EXTEND NORTH NEAR
MANNFORD. PROJECT LENGTH = 6.318 MILES
CusterCounty: Commissioner District: 5
Contracts Under Construction
Construction Status Report Page 74
28772(04) SH-33
SSP-220B(064)SS
EST
$6,958,489.67
Residency:Contract: 190149
Contractor: TREAS CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 32 % ( 32 %)
Time Passed: 42 % ( 34 %)
Adjusted:
01/06/2020
$6,958,489.67
06/20/2019
07/17/2019
07/24/2019
05001
EST, INC.
200 244
02/16/2020
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-33: FROM 1.0 MILE WEST OF THE SH-47
JUNCTION, EXTEND EAST NEAR THOMAS.
PROJECT LENGTH = 0.615 MILE
30696(04) COUNTY RO
STP-220C(067)CI
CED7
$826,389.36
Residency:Contract: 190244
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 95 % ( 94 %)
Time Passed: 78 % ( 78 %)
Adjusted:
12/30/2019
$821,182.26
08/22/2019
09/19/2019
09/24/2019
05005
CIRCUIT ENGR. DISTR. # 7
120 120
01/06/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-099): OVER BARNITZ CREEK, 4.5 MILES
WEST OF THE US-183 JUNCTION NEAR
ARAPAHO. PROJECT LENGTH = 0.161 MILE
28997(04) I-40
NHPPI-4000(073)PM
Sawyer, Dax
$8,606,210.05
Residency:Contract: 190278
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 10 % ( 10 %)
Time Passed: 5 % ( 5 %)
Adjusted:
04/01/2020
$8,606,210.05
09/19/2019
10/23/2019
10/30/2019
05100
CLINTON
210 210
02/03/2020
RESURFACE(ASPHALT), BRIDGE
REHABILITATION, AND CABLE BARRIER I-40:
FROM 7.1 MILES WEST OF US-183, EXTEND
EAST NEAR CLINTON. PROJECT LENGTH =
5.352 MILES
24145(10) SH-54
STP-120C(133)PM
ATKINS
$6,518,011.89
Residency:Contract: 200009
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$6,518,011.89
01/16/2020
02/14/2020
02/25/2020
05010
ATKINS
365 365
06/01/2020
GRADE, DRAIN, SURFACE, AND EROSION
SH-54: FROM SH-33, EXTEND SOUTH NEAR
THOMAS. PROJECT LENGTH = 4.771 MILES
Construction Status Report Page 75
31793(04) SH-73
SBR-220C(066)SB
CED7
$1,010,954.05
Residency:Contract: 200101
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,010,954.05
03/19/2020
04/15/2020
04/21/2020
05005
CIRCUIT ENGR. DISTR. # 7
90 90
09/08/2020
BRIDGE REHABILITATION SH-73: OVER
LITTLE PANTHER CREEK, 5.7 MILES EAST OF
THE SH-34 JUNCTION NEAR FOSS LAKE.
PROJECT LENGTH = 0.170 MILE
27911(08) I-40 ON R
NHPPI-4000-(078)PM
Sawyer, Dax
$2,379,625.77
Residency:Contract: 200132
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,379,625.77
03/19/2020
04/15/2020
04/21/2020
05100
CLINTON
270 270
09/08/2020
GRADE, DRAIN, AND SURFACE I-40 ON
RAMP/FRONTAGE ROAD: FROM 2.2 MILES
EAST OF THE SH-54 JUNCTION, EXTEND
NORTHEAST IN WEATHERFORD. PROJECT
LENGTH = 0.759 MILE
DelawareCounty: Commissioner District: 8
Contracts Under Construction
29896(04) COUNTY RO
STP-221D(043)CI
ATKINS
$1,003,051.80
Residency:Contract: 180224
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 81 % ( 81 %)
Time Passed: 63 % ( 63 %)
Adjusted:
12/02/2019
$1,003,051.80
07/25/2019
08/20/2019
08/23/2019
08010
ATKINS
120 120
12/02/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-520): OVER CRAZY CREEK, 1.2 MILES
WEST OF THE ARKANSAS STATE LINE.
PROJECT LENGTH = 0.247 MILE
24147(04) SH-85
STP-121C(097)SS
Beats, Aaron
$6,138,660.47
Residency:Contract: 180283
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 86 % ( 81 %)
Time Passed: 96 % ( 78 %)
Adjusted:
09/03/2019
$5,716,000.00
10/18/2018
11/14/2018
11/19/2018
08300
CLAREMORE
180 220
09/03/2019
BRIDGE AND APPROACHES SH-85: OVER
DUCK CREEK, 3.2 MILES NORTHEAST OF THE
CRAIG COUNTY LINE NEAR KETCHUM.
PROJECT LENGTH = 0.376 MILE
Construction Status Report Page 76
31361(04) SH-20
SBR-221C(045)SB
Beats, Aaron
$668,492.76
Residency:Contract: 190150
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 25 % ( 25 %)
Time Passed: 49 % ( 49 %)
Adjusted:
12/02/2019
$668,492.76
07/25/2019
08/23/2019
08/27/2019
08300
CLAREMORE
120 120
12/02/2019
BRIDGE REHABILITATION SH-20: OVER
BRUSH CREEK, 1.4 MILES EAST OF THE SH-10
JUNCTION NEAR JAY. PROJECT LENGTH =
0.080 MILE
32725(04) SH-10
SSR-221C(044)SR
Beats, Aaron
$1,741,502.83
Residency:Contract: 200060
Contractor: EMERY SAPP & SONS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,741,502.83
02/20/2020
03/13/2020
03/18/2020
08300
CLAREMORE
60 60
07/06/2020
RESURFACE (ASPHALT) SH-10: FROM THE
SH-25 JUNCTION, EXTEND NORTH NEAR
GROVE. PROJECT LENGTH = 7.900 MILES
DeweyCounty: Commissioner District: 5
Contracts Under Construction
32304(04) COUNTY RO
STP-222C(031)CI
CED7
$708,189.25
Residency:Contract: 190349
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 62 % ( 62 %)
Time Passed: 74 % ( 74 %)
Adjusted:
02/03/2020
$708,189.25
11/14/2019
12/13/2019
12/17/2019
05005
CIRCUIT ENGR. DISTR. # 7
90 90
02/03/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-073): OVER TRIBUTARY OF CANADIAN
RIVER, 5.0 MILES WEST OF THE US-281
JUNCTION NEAR OAKWOOD. PROJECT
LENGTH = 0.132 MILE
32744(04) US-60/SH-
SSR-222F(034)SR
Sawyer, Dax
$2,358,864.15
Residency:Contract: 200011
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,358,864.15
01/16/2020
02/14/2020
02/25/2020
05100
CLINTON
Fixed Completion Date: 10/31/2020
RESURFACE (ASPHALT) US-60/SH-34: US-60,
FROM THE ELLIS COUNTY LINE, EXTEND
EAST. SH-34, FROM THE US-60 JUNCTION,
EXTEND NORTH NEAR VICI. PROJECT
LENGTH = 6.95 MILES
Construction Status Report Page 77
EllisCounty: Commissioner District: 6
Contracts Under Construction
24223(04) SH-15
NHPP-223N(011)
Dodgion, Richard
$7,832,570.37
Residency:Contract: 180045
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 101 % ( 97 %)
Time Passed: 115 % ( 94 %)
Adjusted:
08/13/2018
$7,466,886.07
01/18/2018
02/27/2018
06/07/2018
06100
BUFFALO
300 366
09/04/2018
WIDEN, RESURFACE, AND BRIDGE SH-15:
FROM 6.4 MILES EAST OF THE SH-46
JUNCTION, EXTEND NORTHEAST NEAR
FARGO. PROJECT LENGTH = 4.415 MILES
31125(04) COUNTY RO
STP-223C(019)CI
CED8
$842,047.83
Residency:Contract: 190245
Contractor: WYATT CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 57 % ( 57 %)
Time Passed: 45 % ( 45 %)
Adjusted:
02/24/2020
$842,047.83
08/22/2019
09/19/2019
09/24/2019
06009
CIRCUIT ENGR. DISTR. # 8
120 120
02/17/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-36): OVER DRY PRONG CREEK, 2.5 MILES
EAST OF THE TEXAS STATE LINE NEAR
CATESBY. PROJECT LENGTH = 0.189 MILE
GarfieldCounty: Commissioner District: 4
Contracts Under Construction
17020(05) CT.ST.
STP-224B(052)UR
Hoover, Jacob
$4,743,926.88
Residency:Contract: 170256
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 103 % ( 100 %)
Time Passed: 99 % ( 99 %)
Adjusted:
05/07/2018
$4,623,996.56
11/16/2017
12/11/2017
01/05/2018
UTH OF WEST CHESTNUT AVENUE, EXTEND NORTH IN THE CITY OF ENID.
04300
ENID
475 475
04/02/2018
GRADE, DRAIN, SURFACE, AND
INTERSECTION MODIFICATION CITY STREET
(NORTH CLEVELAND STREET): FROM 0.1
MILES SOUTH OF WEST CHESTNUT AVENUE,
EXTEND NORTH IN THE CITY OF ENID.
PROJECT LENGTH = 0.808 MILE
Construction Status Report Page 78
24637(04) US-60
ACNHPP-224N(055)PM
Hoover, Jacob
$10,896,510.93
Residency:Contract: 180132
Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 70 % ( 70 %)
Time Passed: 106 % ( 92 %)
Adjusted:
09/11/2018
$10,889,657.54
05/17/2018
06/19/2018
07/25/2018
NID.
04300
ENID
450 518
10/01/2018
BRIDGE AND APPROACHES US-60: OVER
BNSF RAILROAD, 1.8 MILES NORTH OF THE
US-412 INTERSECTION IN THE CITY OF ENID.
PROJECT LENGTH = 0.323 MILE
27965(04) US-64
NHPP-224N(054)SS
Hoover, Jacob
$1,760,428.52
Residency:Contract: 180352
Contractor: T. MCDONALD CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 76 % ( 76 %)
Time Passed: 162 % ( 155 %)
Adjusted:
04/10/2019
$1,754,263.75
11/15/2018
12/17/2018
12/28/2018
04300
ENID
140 146
04/01/2019
GRADE, DRAIN, AND SURFACE US-64: OVER
BLACK BEAR CREEK, 5.3 MILES WEST OF THE
SH-74 JUNCTION NEAR ENID. PROJECT
LENGTH = 0.073 MILE
27981(04) US-60
STP-224B(058)SS
Hoover, Jacob
$17,498,455.93
Residency:Contract: 190350
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$17,498,455.93
02/20/2020
03/13/2020
03/18/2020
04300
ENID
240 240
05/18/2020
GRADE, DRAIN, AND SURFACE US-60: FROM
SH-45. EXTEND NORTH NEAR ENID. PROJECT
LENGTH = 9.000 MILES
32771(04) US-60
SBR-224N(066)SB
Hoover, Jacob
$670,608.75
Residency:Contract: 190351
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
04/23/2020
$670,608.75
11/14/2019
12/09/2019
12/12/2019
04300
ENID
75 75
04/06/2020
BRIDGE REHABILITATION US-60: OVER CLEAR
CREEK, 1.6 MILES EAST OF THE SH-132
JUNCTION NEAR ENID. PROJECT LENGTH =
0.055 MILE
GarvinCounty: Commissioner District: 3
Contracts Under Construction
Construction Status Report Page 79
27566(04) US-77
STP-125A(190)PM
Wade, Tony
$7,039,995.14
Residency:Contract: 180263
Contractor: ALLEN CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 101 % ( 99 %)
Time Passed: 84 % ( 82 %)
Adjusted:
10/26/2018
$6,850,495.32
08/16/2018
09/25/2018
09/27/2018
03100
ADA
300 305
01/07/2019
BRIDGE AND APPROACHES US-77: OVER
RUSH CREEK, 0.6 MILES SOUTHEAST OF THE
SH-19 JUNCTION IN PAULS VALLEY. PROJECT
LENGTH = 0.421 MILE
27848(04) COUNTY RO
CIRB-225C(073)RB
CEC
$5,076,832.92
Residency:Contract: 180354
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 93 % ( 93 %)
Time Passed: 99 % ( 99 %)
Adjusted:
04/15/2019
$5,076,832.92
11/15/2018
12/12/2018
12/18/2018
03003
CEC CORP.
250 250
05/06/2019
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (INDIAN MERIDIAN ROAD/NS-323):
FROM THE SH-29 JUNCTION, EXTEND SOUTH
NEAR WYNNEWOOD. PROJECT LENGTH =
5.014 MILES
28938(04) SH-74
STP-225C(079)PM
Malave, Luis
$1,597,878.31
Residency:Contract: 190006
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 96 % ( 92 %)
Time Passed: 123 % ( 118 %)
Adjusted:
08/05/2019
$1,526,670.86
04/18/2019
05/21/2019
05/24/2019
03200
PURCELL
120 125
09/09/2019
BRIDGE AND APPROACHES SH-74: OVER
UNNAMED CREEK, 6.4 MILES NORTH OF THE
SH-29 JUNCTION NEAR ANTIOCH. PROJECT
LENGTH = 0.056 MILE
28184(04) I-35
SBR-125N(201)SB
Malave, Luis
$3,555,120.00
Residency:Contract: 190352
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 17 % ( 16 %)
Time Passed: 7 % ( 7 %)
Adjusted:
03/30/2020
$3,522,000.00
01/16/2020
02/18/2020
02/25/2020
03200
PURCELL
220 220
03/30/2020
BRIDGE REHABILITATION I-35: OVER SH-19,
6.6 MILES NORTH OF SH-29 IN PAULS VALLEY.
PROJECT LENGTH = 0.175 MILE
GradyCounty: Commissioner District: 7
Contracts Under Construction
Construction Status Report Page 80
31311(04) US-81
SBR-226N(062)SB
TETR
$3,762,206.04
Residency:Contract: 180047
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 105 % ( 99 %)
Time Passed: 129 % ( 100 %)
Adjusted:
07/16/2018
$3,540,418.11
01/18/2018
02/27/2018
03/01/2018
N CHICKASHA.
07002
TETRA TECH
240 310
09/04/2018
BRIDGE REHABILITATION US-81: OVER
WASHITA RIVER AND OVERFLOWS, 1.4 MI, 1.5
MI, AND 1.8 MI NORTH OF THE US-62
JUNCTION IN CHICKASHA.
20301(04) SH-37
STP-126C(063)
Knight, Reese
$11,770,834.83
Residency:Contract: 180355
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$11,770,834.83
04/18/2019
05/22/2019
05/28/2019
07300
ANADARKO
300 300
09/09/2019
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-37: FROM 0.7 MILES EAST OF THE US-81
JUNCTION, EXTEND EAST NEAR MINCO.
PROJECT LENGTH = 3.929 MILES
32937(04) US-62
HSIPG-226B(081)AD
Knight, Reese
$219,788.94
Residency:Contract: 190212
Contractor: SCHIRALLI CONSTRUCTION CORP.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$219,788.94
07/25/2019
08/20/2019
08/23/2019
07300
ANADARKO
90 90
12/02/2019
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
US-62: FROM THE CADDO COUNTY LINE,
EXTEND EAST IN VERDEN. PROJECT LENGTH
= 0.361 MILE
24428(19) PROPOSED
SSP-011N(106)RW
Knight, Reese
$104,168.00
Residency:Contract: 190246
Contractor: M & M WRECKING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 73 % ( 73 %)
Time Passed: 20 % ( 20 %)
Adjusted:
02/03/2020
$104,168.00
08/22/2019
09/19/2019
09/23/2019
07300
ANADARKO
180 180
10/14/2019
RIGHT-OF-WAY CLEARANCE PROPOSED
US-81 REALIGNMENT: FROM 1.0 MILE NORTH
OF THE US-277 JUNCTION, EXTEND NORTH IN
CHICKASHA. PROJECT LENGTH = 8.310 MILES
PREQUALIFICATION FOR THIS PROJECT HAS
BEEN WAIVED. BOTH BID EXPRESS AND
WRITTEN BIDS WILL BE ACCEPTED.
Construction Status Report Page 81
33478(04) US-81
HSIPG-226N(067)TR
Roberts, Colton
$1,570,196.24
Residency:Contract: 190285
Contractor: ACTION SAFETY SUPPLY CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 61 % ( 61 %)
Time Passed: 44 % ( 44 %)
Adjusted:
01/06/2020
$1,570,196.24
09/19/2019
10/25/2019
10/29/2019
07100
DUNCAN
120 120
01/06/2020
SAFETY IMPROVEMENT (CABLE BARRIER)
US-81: FROM THE STEPHENS COUNTY LINE,
EXTEND NORTH NEAR RUSH SPRINGS.
PROJECT LENGTH = 7.07 MILES
30462(04) COUNTY RO
CIRB-226C(085)RB
Knight, Reese
$998,356.64
Residency:Contract: 190314
Contractor: CENTRAL BRIDGE COMPANY, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 56 % ( 52 %)
Time Passed: 59 % ( 59 %)
Adjusted:
01/06/2020
$925,000.03
10/17/2019
11/19/2019
11/21/2019
07300
ANADARKO
150 150
02/03/2020
BRIDGE AND APPROACHES COUNTY ROAD
(NS-2760): OVER LAKE LOUIS BURTSCHI, 2.4
MILES NORTH OF THE US-277 JUNCTION
NEAR CEMENT. PROJECT LENGTH = 0.387
MILE
33478(05) US-81
HSIPG-226N(068)TR
Roberts, Colton
$1,486,092.33
Residency:Contract: 190390
Contractor: ACTION SAFETY SUPPLY CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,486,092.33
11/14/2019
12/17/2019
12/19/2019
07100
DUNCAN
120 120
03/02/2020
SAFETY IMPROVEMENT (CABLE BARRIER)
US-81: FROM THE SH-17 JUNCTION, EXTEND
NORTH IN RUSH SPRINGS. PROJECT LENGTH
= 7.28 MILES
GrantCounty: Commissioner District: 4
Contracts Under Construction
31372(04) US-60/US-
SSR-227B(026)SR
Hoover, Jacob
$2,095,902.08
Residency:Contract: 190044
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 103 % ( 97 %)
Time Passed: 106 % ( 106 %)
Adjusted:
08/08/2019
$1,985,450.70
01/17/2019
02/20/2019
04/17/2019
04300
ENID
120 120
06/03/2019
RESURFACE (ASPHALT) AND PAVEMENT
REHABILITATION (P.C.) US-60/US-81: US-60,
FROM US-81 JCT, EXTEND E IN POND CREEK.
US-81, FROM 0.54 MI S OF US-60 JCT, EXTEND
N IN POND CREEK. PROJECT LENGTH = 3.350
MILES
Construction Status Report Page 82
31844(04) COUNTY RO
STP-227C(023)CI
CED8
$2,217,086.68
Residency:Contract: 190169
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 86 % ( 87 %)
Time Passed: 98 % ( 98 %)
Adjusted:
08/05/2019
$2,263,454.84
04/18/2019
05/14/2019
07/01/2019
04009
CIRCUIT ENGR. DISTR. # 8
120 120
09/09/2019
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (NS-291): FROM THE SH-11 JUNCTION,
EXTEND NORTH NEAR MEDFORD. PROJECT
LENGTH = 3.043 MILES
30632(04) US-81
STP-227B(027)3P
Hoover, Jacob
$2,276,123.24
Residency:Contract: 190315
Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 8 % ( 8 %)
Time Passed: 14 % ( 14 %)
Adjusted:
03/09/2020
$2,276,123.24
10/17/2019
11/19/2019
11/21/2019
04300
ENID
150 150
03/02/2020
RESURFACE (ASPHALT) US-81: FROM 0.1
MILES SOUTH OF HARMON ROAD, EXTEND
NORTH IN MEDFORD. PROJECT LENGTH =
3.520 MILES
GreerCounty: Commissioner District: 5
Contracts Under Construction
32322(04) COUNTY RO
STP-228D(016)CI
CED7
$300,834.56
Residency:Contract: 190316
Contractor: KLAVER CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 65 % ( 65 %)
Time Passed: 34 % ( 34 %)
Adjusted:
03/02/2020
$300,834.56
10/17/2019
11/15/2019
01/30/2020
05005
CIRCUIT ENGR. DISTR. # 7
90 90
03/02/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-1415): OVER TITTLE CREEK, 1.5 MILES
WEST OF THE SH-6 JUNCTION NEAR
GRANITE. PROJECT LENGTH = 0.066 MILE
29509(04) US-283
STP-228B(017)PM
Holley, Terri
$7,797,408.00
Residency:Contract: 190354
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 22 % ( 22 %)
Time Passed: 9 % ( 9 %)
Adjusted:
03/02/2020
$7,797,408.00
11/14/2019
12/13/2019
12/17/2019
05200
ALTUS
370 370
03/02/2020
BRIDGE AND APPROACHES US-283: OVER
ELM FORK OF RED RIVER AND ELM FORK
OVERFLOW, 1.6 MILES AND 1.9 MILES NORTH
OF SH-9 WEST NEAR MANGUM. PROJECT
LENGTH = 0.625 MILE
Construction Status Report Page 83
34393(04) SH-6
SSR-228B(018)SR
Holley, Terri
$570,133.91
Residency:Contract: 200064
Contractor: DUSTROL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$570,133.91
02/20/2020
03/13/2020
04/23/2020
05200
ALTUS
Fixed Completion Date: 10/31/2020
RESURFACE (ASPHALT) SH-6: FROM 2.9
MILES NORTH OF THE US-283 JUNCTION,
EXTEND NORTH NEAR GRANITE. PROJECT
LENGTH = 3.150 MILES
HarmonCounty: Commissioner District: 5
Contracts Under Construction
27898(04) SH-30
STP-229C(011)PM
Holley, Terri
$4,064,494.13
Residency:Contract: 170225
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 53 % ( 53 %)
Time Passed: 78 % ( 78 %)
Adjusted:
10/07/2019
$4,064,494.13
05/16/2019
06/12/2019
06/18/2019
05200
ALTUS
210 210
10/07/2019
BRIDGE AND APPROACHES SH-30: OVER
ELM FORK OF RED RIVER, 1.2 MILES SOUTH
OF THE BECKHAM COUNTY LINE. PROJECT
LENGTH = 0.665 MILE
HaskellCounty: Commissioner District: 1
Contracts Under Construction
32838(04) SH-9
HSIPG-231B(040)AD
Orendorf, Barry
$431,875.50
Residency:Contract: 190247
Contractor: ROSSCON, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$431,875.50
02/20/2020
03/13/2020
03/18/2020
01200
SALLISAW
90 90
07/06/2020
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
SH-9: FROM 3RD STREET, EXTEND
NORTHEAST IN THE TOWN OF KEOTA.
PROJECT LENGTH = 0.414 MILE
Construction Status Report Page 84
28499(04) COUNTY RO
CIRB-231C(040)RB
CE2
$7,518,071.77
Residency:Contract: 200043
Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
04/13/2020
$7,518,071.77
01/16/2020
02/14/2020
03/13/2020
01017
CIRCUIT ENGR. DISTR. # 2
210 210
06/01/2020
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROADS (STAR RD/E1175/D1171):
FROM SH-9, EXTEND NORTH ON STAR ROAD
THEN EAST ON E1175 AND D1171 NEAR
KEOTA. PROJECT LENGTH = 6.685 MILES
HughesCounty: Commissioner District: 3
Contracts Under Construction
28575(04) CO.RD.
STP-232C(041)CI
Helton, Matthew
$3,269,971.31
Residency:Contract: 160090
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 91 % ( 90 %)
Time Passed: 255 % ( 141 %)
Adjusted:
09/06/2016
$3,220,801.19
02/18/2016
03/21/2016
03/24/2016
03300
WEWOKA
220 399
07/05/2016
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (EW-126): FROM 3.0 MILES
WEST OF US-75, EXTEND EAST NEAR
HOLDENVILLE. PROJECT LENGTH = 2.879
MILES.
JacksonCounty: Commissioner District: 5
Contracts Under Construction
29526(08) US-62/US-
ACSTP-NBIP(524)PM
EST
$566,293.10
Residency:Contract: 180115
Contractor: SOUTHEAST BRIDGE FL CORP
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 84 % ( 84 %)
Time Passed: 115 % ( 115 %)
Adjusted:
12/02/2018
$566,293.10
03/15/2018
04/18/2018
08/20/2018
05001
EST, INC.
150 150
09/04/2018
BRIDGE PAINTING US-62/US-183: AT
MULTIPLE LOCATIONS IN DIVISION V.
Construction Status Report Page 85
30698(04) COUNTY RO
STP-233D(037)CI
CED7
$895,542.95
Residency:Contract: 180286
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 96 % ( 96 %)
Time Passed: 98 % ( 98 %)
Adjusted:
03/18/2019
$895,542.95
11/15/2018
12/17/2018
12/20/2018
05005
CIRCUIT ENGR. DISTR. # 7
120 120
04/01/2019
BRIDGE AND APPROACHES COUNTY ROAD
(NS-198): OVER TURKEY CREEK, 1.8 MILES
SOUTH OF THE US-62 JUNCTION NEAR
ALTUS. PROJECT LENGTH = 0.199 MILE
27919(04) SH-5
STP-233C(038)PM
CEC
$2,427,837.39
Residency:Contract: 180356
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 43 % ( 42 %)
Time Passed: 25 % ( 25 %)
Adjusted:
03/02/2020
$2,405,161.72
05/16/2019
06/12/2019
06/18/2019
05003
CEC CORP.
150 150
03/02/2020
BRIDGE AND APPROACHES SH-5: OVER
SANDY CREEK, 2.5 MILES WEST OF THE SH-6
JUNCTION NEAR ELDORADO. PROJECT
LENGTH = 0.255 MILE
28778(04) SH-6
SSP-233C(039)PM
Holley, Terri
$1,107,964.11
Residency:Contract: 190080
Contractor: WYATT CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 105 % ( 97 %)
Time Passed: 86 % ( 86 %)
Adjusted:
10/14/2019
$1,029,093.37
02/14/2019
03/26/2019
06/07/2019
05200
ALTUS
120 120
10/14/2019
BRIDGE AND APPROACHES SH-6: OVER
UNNAMED CREEK, 2.6 MILES NORTHEAST OF
THE SH-34 JUNCTION NEAR OLUSTEE.
PROJECT LENGTH = 0.150 MILE
31149(04) COUNTY RO
STP-233D(041)CI
CED7
$707,827.55
Residency:Contract: 190355
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 22 % ( 22 %)
Time Passed: 8 % ( 8 %)
Adjusted:
04/06/2020
$707,827.55
11/14/2019
12/13/2019
12/17/2019
05005
CIRCUIT ENGR. DISTR. # 7
120 120
04/06/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-167): OVER BITTER CREEK, 3.1 MILES
WEST OF THE US-283 JUNCTION NEAR
ALTUS. PROJECT LENGTH = 0.189 MILE
Construction Status Report Page 86
32726(04) US-62/US-
SBR-020N(048)SB
Holley, Terri
$2,365,212.04
Residency:Contract: 200103
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,365,212.04
03/19/2020
04/22/2020
04/28/2020
05200
ALTUS
220 220
09/08/2020
BRIDGE REHABILITATION US-62/US-62 EB:
OVER BITTER CREEK AND TURKEY CREEK,
2.8 MILES AND 15.8 MILES WEST OF US-283
NEAR ALTUS AND DUKE. PROJECT LENGTH =
0.295 MILE
JeffersonCounty: Commissioner District: 7
Contracts Under Construction
29566(04) US-81
NHPPY-234N(041)/NHPPY-23*
ATKINS
$4,034,914.88
Residency:Contract: 170084
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 97 %)
Time Passed: 81 % ( 77 %)
Adjusted:
08/10/2017
$3,849,793.25
03/16/2017
04/14/2017
04/18/2017
*4N(043)SS
07010
ATKINS
280 295
09/05/2017
BRIDGE AND APPROACHES US-81: OVER
UNNAMED CREEK AND HACKBERRY CREEK,
1.7 MILES AND 4.1 MILES NORTH OF SH-32
NEAR RYAN. PROJECT LENGTH = 0.411 MILE
29914(04) COUNTY RO
CIRB-234C(045)RB
Roberts, Colton
$5,986,413.52
Residency:Contract: 190142
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 11 % ( 11 %)
Time Passed: 23 % ( 23 %)
Adjusted:
02/17/2020
$5,986,413.52
06/20/2019
07/17/2019
07/18/2019
07100
DUNCAN
180 180
02/15/2020
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (NOBLE WRAY II ROAD): FROM
4.6 MILES WEST OF THE US-81 JUNCTION,
EXTEND NORTH NEAR RYAN. PROJECT
LENGTH = 5.062 MILES
29368(04) COUNTY RO
STP-234D(046)CI
BCS
$734,799.20
Residency:Contract: 190234
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 97 % ( 97 %)
Time Passed: 81 % ( 81 %)
Adjusted:
11/04/2019
$734,799.20
07/25/2019
08/20/2019
08/23/2019
07018
BENCHMARK CONSTR. SERVS., LLC
100 100
12/02/2019
BRIDGE AND APPROACHES COUNTY ROAD
(NS-301): OVER TRIBUTARY TO MUD CREEK,
4.6 MILES SOUTH OF THE SH-53 JUNCTION
NEAR RINGLING. PROJECT LENGTH = 0.085
MILE
Construction Status Report Page 87
31955(04) US-81
SSR-011N(107)SR
Roberts, Colton
$1,284,844.69
Residency:Contract: 200066
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,284,844.69
02/20/2020
03/13/2020
03/18/2020
07100
DUNCAN
45 45
07/06/2020
RESURFACE (ASPHALT) US-81: FROM 5.0
MILES NORTH OF THE US-70 JUNCTION,
EXTEND NORTH NEAR WAURIKA. PROJECT
LENGTH = 4.450 MILES
JohnstonCounty: Commissioner District: 3
Contracts Under Construction
29603(04) SH-1
SBR-235C(017)SB
Wade, Tony
$2,660,882.47
Residency:Contract: 160287
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 107 % ( 100 %)
Time Passed: 181 % ( 106 %)
Adjusted:
10/18/2016
$2,483,537.37
08/18/2016
09/21/2016
09/26/2016
03100
ADA
210 360
03/06/2017
BRIDGE REHABILITATION SH-1: OVER
WASHITA RIVER AND OVERFLOW, 4.18 MILES
AND 4.44 MILES NORTH OF THE MARSHALL
COUNTY LINE. PROJECT LENGTH = 0.511
MILE.
29666(04) SH-7
STP-235C(037)PM
Wade, Tony
$1,743,285.55
Residency:Contract: 190081
Contractor: TREAS CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 61 % ( 61 %)
Time Passed: 78 % ( 78 %)
Adjusted:
08/12/2019
$1,743,285.55
05/16/2019
06/18/2019
06/20/2019
03100
ADA
210 210
10/07/2019
BRIDGE AND APPROACHES SH-7: OVER
PECAN CREEK, 0.7 MILES EAST OF THE SH-99
JUNCTION NEAR CONNERVILLE. PROJECT
LENGTH = 0.642 MILE
31841(04) SH-22/SH-
STP-235C(038)PM
Wade, Tony
$6,766,067.29
Residency:Contract: 200045
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$6,766,067.29
01/16/2020
02/21/2020
02/26/2020
03100
ADA
250 250
06/01/2020
GRADE, DRAIN, AND SURFACE SH-22/SH-99:
SH-22, FROM 0.4 MILES NW OF SH-9 EXTEND
SE. SH-99, FROM THE SH-22 JUNCTION,
EXTEND NE IN TISHOMINGO. PROJECT
LENGTH = 1.842 MILES
Construction Status Report Page 88
KayCounty: Commissioner District: 4
Contracts Under Construction
29491(05) SH-11
SBR-236N(052)SB
Zachary, Ted
$5,695,136.64
Residency:Contract: 180164
Contractor: GIBSON & ASSOCIATES, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 69 % ( 64 %)
Time Passed: 117 % ( 117 %)
Adjusted:
09/10/2018
$5,296,804.31
04/19/2018
05/15/2018
06/13/2018
-177 NEAR BLACKWELL.
04100
PERRY
325 325
09/04/2018
BRIDGE REHABILITATION SH-11: OVER
CHIKASKIA RIVER AND OVERFLOWS, 0.3 MI,
0.4 MI, 0.9 MI AND 1.1 MI EAST OF US-177
NEAR BLACKWELL. PROJECT LENGTH = 0.687
MILE
32993(04) PEDESTRIA
TAP-236F(031)TP
Zachary, Ted
$1,301,694.77
Residency:Contract: 190116
Contractor: SCHIRALLI CONSTRUCTION CORP.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 37 % ( 38 %)
Time Passed: 81 % ( 81 %)
Adjusted:
10/03/2019
$1,329,681.38
03/14/2019
04/16/2019
04/19/2019
04100
PERRY
90 90
10/01/2019
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) PEDESTRIAN TRAIL (LAKE
PONCA TRAIL): BETWEEN L A CANN DRIVE
AND CHECKSTAND ROAD IN THE CITY OF
PONCA CITY. PROJECT LENGTH = 1.070
MILES
33687(04) CITY STRE
STP-236B(062)UR
Mitchell, Matt
$1,465,586.78
Residency:Contract: 190198
Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,465,586.78
03/19/2020
04/15/2020
04/21/2020
04500
STILLWATER
150 150
08/03/2020
GRADE, SURFACE, WATER LINE, AND
EROSION CONTROL CITY STREET (WEST
HIGHLAND AVENUE): FROM 1.8 MILES WEST
OF THE US-77 JUNCTION, EXTEND EAST IN
PONCA CITY. PROJECT LENGTH = 0.288 MILE
25085(04) COUNTY RO
CIRB-136C(162)RB
CED8
$2,995,504.11
Residency:Contract: 190317
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 8 % ( 8 %)
Time Passed: 6 % ( 6 %)
Adjusted:
04/03/2020
$2,992,997.01
01/16/2020
02/14/2020
02/25/2020
04009
CIRCUIT ENGR. DISTR. # 8
210 210
06/01/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-9): OVER BITTER CREEK, 0.5 MILES EAST
OF THE US-177 JUNCTION NEAR BLACKWELL.
PROJECT LENGTH = 1.337 MILES
Construction Status Report Page 89
24380(04) US-77
STP-136B(145)SS
Zachary, Ted
$9,346,021.75
Residency:Contract: 190356
Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$9,346,021.75
01/16/2020
02/18/2020
02/27/2020
04100
PERRY
300 300
05/04/2020
WIDEN AND RESURFACE US-77: FROM 6.3
MILES NORTH OF THE SH-11W JUNCTION,
EXTEND NORTH NEAR NEWKIRK. PROJECT
LENGTH = 4.479 MILES
31923(04) I-35
SBR-3500(079)SB
Zachary, Ted
$1,629,615.48
Residency:Contract: 200012
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,629,615.48
01/16/2020
02/11/2020
02/24/2020
04100
PERRY
360 360
06/01/2020
BRIDGE REHABILITATION I-35: OVER SALT
FORK CREEK, 1.3 MILES SOUTH OF THE
US-60 INTERCHANGE NEAR TONKAWA.
PROJECT LENGTH = 0.221 MILE
32773(04) US-77
SSR-236N(065)SR
Zachary, Ted
$1,687,163.50
Residency:Contract: 200067
Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,687,163.50
02/20/2020
03/13/2020
03/18/2020
04100
PERRY
120 120
07/06/2020
RESURFACE (ASPHALT) US-77: FROM 1.2
MILES NORTH OF THE US-177 JUNCTION,
EXTEND NORTH IN PONCA CITY. PROJECT
LENGTH = 1.850 MILES
KingfisherCounty: Commissioner District: 4
Contracts Under Construction
27980(04) US-81
NHPP-237N(019)SS
Brooks, Jonathan
$8,940,178.46
Residency:Contract: 180009
Contractor: DUIT CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 95 % ( 92 %)
Time Passed: 165 % ( 132 %)
Adjusted:
06/25/2018
$8,595,946.52
02/15/2018
03/16/2018
04/25/2018
ITY OF KINGFISHER.
04200
YUKON
265 330
09/04/2018
GRADE, DRAIN, AND SURFACE US-81: FROM
1.3 MILES SOUTH OF THE SH-33
INTERSECTION, EXTEND SOUTHWEST NEAR
THE CITY OF KINGFISHER. PROJECT LENGTH
= 3.314 MILES
Construction Status Report Page 90
29842(04) US-81
NHPP-237N(041)SS
Hoover, Jacob
$3,604,685.76
Residency:Contract: 180048
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 103 % ( 100 %)
Time Passed: 88 % ( 88 %)
Adjusted:
05/08/2018
$3,481,003.40
01/18/2018
02/27/2018
03/02/2018
04300
ENID
365 365
09/04/2018
BRIDGE AND APPROACHES US-81: OVER
KINGFISHER CREEK, 0.7 MILES NORTH OF
THE SH-3 INTERSECTION IN KINGFISHER.
PROJECT LENGTH = 0.146 MILE
30445(04) US-81/SH-
STP-237B(049)PM
Mitchell, Matt
$1,249,805.98
Residency:Contract: 190177
Contractor: SCHIRALLI CONSTRUCTION CORP.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 38 % ( 28 %)
Adjusted:
03/01/2020
$1,249,805.98
05/16/2019
06/14/2019
06/17/2019
04500
STILLWATER
120 162
02/03/2020
PAVEMENT REHABILITATION (P. C.
CONCRETE) US-81/SH-33: US-81, FROM
SHERIDAN AVENUE EXTEND NORTH. SH-33,
FROM US-81, EXTEND EAST IN THE CITY OF
KINGFISHER. PROJECT LENGTH = 0.450 MILE
33017(04) CITY STRE
TAP-237E(048)TP
Brooks, Jonathan
$1,882,692.96
Residency:Contract: 190178
Contractor: SCHIRALLI CONSTRUCTION CORP.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,882,692.96
05/16/2019
06/14/2019
06/17/2019
04200
YUKON
180 180
01/06/2020
GRADE, SURFACE, TRAFFIC SIGNAL, AND
SIDEWALKS CITY STREET (OKLAHOMA
AVENUE): FROM THE US-81 JUNCTION,
EXTEND EAST IN THE TOWN OF OKARCHE.
PROJECT LENGTH = 0.233 MILE
KiowaCounty: Commissioner District: 5
Contracts Under Construction
27904(04) SH-19
STP-238C(045)SS
Holley, Terri
$2,126,115.44
Residency:Contract: 180010
Contractor: RRY SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 98 % ( 96 %)
Time Passed: 111 % ( 100 %)
Adjusted:
09/05/2018
$2,082,170.05
02/15/2018
03/23/2018
03/29/2018
05200
ALTUS
210 233
09/04/2018
BRIDGE AND APPROACHES SH-19: OVER
UNNAMED CREEKS, 0.2 MI AND 3.1 MI WEST
OF THE CADDO COUNTY LINE. PROJECT
LENGTH = 0.496 MILE
Construction Status Report Page 91
15027(04) SH-6
STP-038B(232)SS
Holley, Terri
$20,338,888.42
Residency:Contract: 180357
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 38 % ( 38 %)
Time Passed: 35 % ( 35 %)
Adjusted:
09/03/2019
$20,140,968.11
04/18/2019
05/16/2019
05/21/2019
05200
ALTUS
460 460
09/09/2019
GRADE, DRAIN, SURFACE, AND BRIDGE SH-6:
FROM 5.7 MILES SOUTH OF THE SH-55E
JUNCTION, EXTEND NORTH NEAR SENTINEL.
PROJECT LENGTH = 5.401 MILES
28780(04) US-62B
STP-238C(052)PM
Holley, Terri
$983,132.10
Residency:Contract: 190117
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 84 % ( 83 %)
Time Passed: 105 % ( 98 %)
Adjusted:
11/04/2019
$971,654.30
05/16/2019
06/12/2019
06/19/2019
05200
ALTUS
100 107
11/04/2019
BRIDGE AND APPROACHES US-62B: OVER
WEST FORK OF DEEP CREEK, 0.5 MILES
NORTHWEST OF THE US-62 JUNCTION NEAR
SNYDER. PROJECT LENGTH = 0.119 MILE
30075(04) COUNTY RO
STP-238C(056)CI
CED7
$623,051.75
Residency:Contract: 190361
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$623,051.75
11/14/2019
12/13/2019
12/17/2019
05005
CIRCUIT ENGR. DISTR. # 7
120 120
06/22/2020
BRIDGE AND APPROACHES COUNTY ROAD
(NS-236): OVER LONGHORN CREEK, 2.4 MILES
NORTH OF THE SH-19 JUNCTION NEAR
GOTEBO. PROJECT LENGTH = 0.133 MILE
32912(04) COUNTY RO
STP-238C(060)CI
CED7
$1,301,210.87
Residency:Contract: 200107
Contractor: T & G CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,301,210.87
03/19/2020
04/20/2020
04/28/2020
05005
CIRCUIT ENGR. DISTR. # 7
60 60
05/18/2020
RESURFACE (ASPHALT) COUNTY ROAD
(OZARK TRAIL ROAD): FROM THE US-183
JUNCTION, EXTEND EAST NEAR HOBART.
PROJECT LENGTH = 5.000 MILES
Le FloreCounty: Commissioner District: 2
Contracts Under Construction
Construction Status Report Page 92
31160(04) SH-63
SBR-240C(072)SB
Davis, Tim
$1,905,526.84
Residency:Contract: 190152
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 63 % ( 63 %)
Time Passed: 56 % ( 56 %)
Adjusted:
09/09/2019
$1,905,526.84
04/18/2019
05/16/2019
05/21/2019
02200
HEAVENER
165 165
09/09/2019
BRIDGE REHABILITATION SH-63: OVER
SYCAMORE CREEK, 11.9 MILES WEST OF THE
US-259 JUNCTION, NEAR LENOX. PROJECT
LENGTH: 0.00 MILE
33387(04) US-271
SSR-240N(077)SR
Davis, Tim
$932,015.50
Residency:Contract: 200013
Contractor: JOB CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$932,015.50
01/16/2020
02/14/2020
02/25/2020
02200
HEAVENER
30 30
05/04/2020
RESURFACE (ASPHALT) US-271: FROM 0.7
MILES SOUTHWEST OF THE SH-9A JUNCTION,
EXTEND EAST NEAR POCOLA. PROJECT
LENGTH = 3.945 MILES
34504(04) US-271
SAP-240C(078)ES
Davis, Tim
$116,245.00
Residency:Contract: 200014
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$116,245.00
01/16/2020
02/19/2020
02/25/2020
02200
HEAVENER
15 15
05/04/2020
BRIDGE REPAIR US-271: REPAIR VEHICLE
IMPACT DAMAGE OVER FOURCHE MALINE
CREEK, 2.8 MILES SOUTHWEST OF THE
US-270 JCT NEAR FANSHAWE. PROJECT
LENGTH = 0.00 MILE
LincolnCounty: Commissioner District: 3
Contracts Under Construction
27143(04) SH-18
STP-241C(058)PM
Mitchell, Matt
$3,280,371.54
Residency:Contract: 180091
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 100 %)
Time Passed: 148 % ( 105 %)
Adjusted:
05/25/2018
$3,216,964.08
02/15/2018
03/23/2018
03/29/2018
R CHANDLER.
04500
STILLWATER
210 294
09/04/2018
BRIDGE AND APPROACHES SH-18: OVER DRY
CREEK OVERFLOW AND DRY CREEK, 5.6
MILES AND 5.7 MILES NORTH OF I-44 NEAR
CHANDLER. PROJECT LENGTH = 0.661 MILE
Construction Status Report Page 93
29567(04) SH-66
SBR-241C(012)SB
Helton, Matthew
$524,613.07
Residency:Contract: 190153
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 98 % ( 94 %)
Time Passed: 101 % ( 85 %)
Adjusted:
10/07/2019
$500,674.67
05/16/2019
06/21/2019
06/21/2019
03300
WEWOKA
90 107
10/07/2019
BRIDGE REHABILITATION SH-66: OVER BELL
COW CREEK, 0.1 MILES WEST OF THE SH-18
JUNCTION IN CHANDLER. PROJECT LENGTH =
0.090 MILE
32371(04) COUNTY RO
STP-241D(067)CI
Helton, Matthew
$602,774.92
Residency:Contract: 190387
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 56 % ( 55 %)
Time Passed: 68 % ( 68 %)
Adjusted:
01/14/2020
$591,126.76
11/14/2019
12/11/2019
12/18/2019
03300
WEWOKA
90 90
04/06/2020
BRIDGE AND APPROACHES COUNTY ROAD
(NS-333): OVER DUGOUT CREEK, 1.0 MILE
NORTH OF THE SH-105 JUNCTION NEAR
CARNEY. PROJECT LENGTH = 0.302 MILE
29267(04) COUNTY RO
STP-241D(063)CI
David Hendricks
$840,777.04
Residency:Contract: 200069
Contractor: COWBOY CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$840,777.04
02/20/2020
03/20/2020
03/20/2020
03024
CIRCUIT ENGR. DISTR. #4
90 90
09/08/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-90): OVER DOSIE CREEK, 2.1 MILES EAST
OF THE SH-66 JUNCTION NEAR DAVENPORT.
PROJECT LENGTH = 0.391 MILE
29543(04) SH-99
STP-241B(064)PM
ZSRB
$2,188,771.00
Residency:Contract: 200070
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,188,771.00
02/20/2020
03/13/2020
03/18/2020
03022
SMITH ROBERTS BALDISCHWILER, LLC
180 180
09/08/2020
BRIDGE AND APPROACHES SH-99: OVER
SALT CREEK, 0.7 MILES NORTH OF I-44
(TURNER TURNPIKE) IN STROUD. PROJECT
LENGTH = 0.069 MILE
LoganCounty: Commissioner District: 4
Contracts Under Construction
Construction Status Report Page 94
28312(04) SH-74D
STP-242C(059)SS
Mitchell, Matt
$2,323,270.05
Residency:Contract: 170351
Contractor: RRY SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 96 % ( 96 %)
Time Passed: 140 % ( 99 %)
Adjusted:
02/05/2018
$2,323,270.05
11/16/2017
12/18/2017
12/27/2017
04500
STILLWATER
210 296
02/05/2018
BRIDGE AND APPROACHES SH-74D: OVER
ROCK CREEK, 1.7 MILES WEST OF SH-74
NEAR LOVELL. PROJECT LENGTH = 0.122
MILE.
32641(04) COUNTY RO
STP-242C(070)AG
ATKINS
$3,198,985.28
Residency:Contract: 180242
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 25 % ( 25 %)
Time Passed: 208 % ( 208 %)
Adjusted:
06/10/2019
$3,156,262.28
01/17/2019
02/20/2019
03/01/2019
04010
ATKINS
180 180
04/08/2019
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (COLTRANE ROAD): FROM SIMPSON
ROAD, EXTEND NORTH NEAR EDMOND.
PROJECT LENGTH = 1.991 MILES
27099(04) SH-51
STP-242C(057)SS
Mitchell, Matt
$4,453,837.32
Residency:Contract: 180358
Contractor: RRY SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 46 % ( 46 %)
Time Passed: 61 % ( 60 %)
Adjusted:
05/13/2019
$4,406,957.99
01/17/2019
02/26/2019
03/07/2019
04500
STILLWATER
340 344
06/03/2019
BRIDGE AND APPROACHES SH-51: OVER
MIDDLE BEAVER CREEK AND WEST BEAVER
CREEK, 2.2 MILES AND 3.3 MILES WEST OF
US-77 NEAR MULHALL. PROJECT LENGTH =
0.507 MILE
33803(04) US-77
SSR-242B(075)SR
Mitchell, Matt
$2,425,000.00
Residency:Contract: 200015
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,425,000.00
01/16/2020
02/11/2020
02/14/2020
04500
STILLWATER
210 210
03/09/2020
RESURFACE (ASPHALT) US-77/SH-33: US-77,
FROM 0.05 MI S OF INDUSTRIAL AVE EXT N.
SH-33, FROM 0.16 MI WEST OF 19TH ST EXT
EAST IN GUTHRIE. PROJECT LENGTH = 3.210
MILES
Construction Status Report Page 95
33810(04) SH-74
SSR-242C(083)SR
Mitchell, Matt
$1,344,425.00
Residency:Contract: 200071
Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,344,425.00
02/20/2020
03/13/2020
03/18/2020
04500
STILLWATER
120 120
07/06/2020
PAVEMENT REHABILITATION (ASPHALT)
SH-74: FROM 1.28 MILES NORTH OF THE
SH-74F JUNCTION, EXTEND NORTH NEAR
CEDAR VALLEY. PROJECT LENGTH = 3.780
MILES
LoveCounty: Commissioner District: 7
Contracts Under Construction
31603(04) I-35
HSIPIG-3500-(014)IT
ATKINS
$628,819.00
Residency:Contract: 170286
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 100 % ( 100 %)
Time Passed: 243 % ( 92 %)
Adjusted:
03/18/2019
$628,819.00
04/19/2018
05/18/2018
05/30/2018
07010
ATKINS
120 316
09/04/2018
SAFETY IMPROVEMENT (ITS) I-35: AT
MULTIPLE LOCATIONS IN DIVISION III, IV AND
VII.
31411(04) COUNTY RO
CIRB-243C(031)RB
Fuhrmann, Chris
$1,424,000.00
Residency:Contract: 190214
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,424,000.00
01/16/2020
02/18/2020
03/26/2020
07200
ARDMORE
150 150
06/01/2020
BRIDGE AND APPROACHES COUNTY ROAD
(MERLE WOLFE ROAD): OVER TRIBUTARY TO
BLUE LAKE, 3.0 MILES NORTH OF THE TEXAS
STATE LINE NEAR THACKERVILLE. PROJECT
LENGTH = 0.292 MILE
33878(04) SH
SSP-269F(068)PM
Fuhrmann, Chris
$330,920.00
Residency:Contract: 200124
Contractor: DIRECT TRAFFIC CONTROL INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$330,920.00
03/19/2020
04/20/2020
04/28/2020
07200
ARDMORE
30 30
08/03/2020
STRIPING AND PAVEMENT MARKING AT
MULTIPLE LOCATIONS IN DIVISION VII.
PROJECT LENGTH = 0.000
Construction Status Report Page 96
McClainCounty: Commissioner District: 3
Contracts Under Construction
27946(04) US-77
ACNHPP-244N(052)SS
Malave, Luis
$37,963,701.89
Residency:Contract: 170264
Contractor: WEBBER, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 105 % ( 99 %)
Time Passed: 79 % ( 77 %)
Adjusted:
10/30/2017
$35,939,300.00
08/17/2017
09/20/2017
09/29/2017
03200
PURCELL
800 826
10/30/2017
BRIDGE AND APPROACHES US-77: OVER
SOUTH CANADIAN RIVER AND OVER BNSF
RAILROAD, 0.3 MILES AND 0.8 MILES WEST
OF THE SH-39 JUNCTION IN PURCELL.
PROJECT LENGTH = 0.882 MILE
27220(04) I-35/CNTY
NHPPI-3500-(074)PM
Malave, Luis
$9,167,090.00
Residency:Contract: 190013
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 74 % ( 73 %)
Time Passed: 83 % ( 72 %)
Adjusted:
08/12/2019
$9,029,100.00
05/16/2019
06/14/2019
06/18/2019
03200
PURCELL
240 275
10/07/2019
GRADE, DRAIN, SURFACE, AND BRIDGE
I-35/CNTY RD(LADD RD): I-35, FROM 3.3 MI SE
OF SH-74, EXT N. CNTY RD (LADD RD), FROM
0.2 MI W OF I-35, EXT E IN GOLDSBY.
PROJECT LENGTH = 0.980 MILE
30111(04) COUNTY RO
STP-244D(066)CI
JACOBS
$1,504,587.17
Residency:Contract: 190179
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 78 % ( 78 %)
Time Passed: 63 % ( 63 %)
Adjusted:
11/18/2019
$1,505,087.17
05/16/2019
06/12/2019
06/17/2019
03004
JACOBS ENGINEERING
150 150
11/18/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-130): OVER NORTH FORK OF WALNUT
CREEK, 4.6 MILES EAST OF THE US-62
JUNCTION NEAR BLANCHARD. PROJECT
LENGTH = 0.296 MILE
23283(04) I-35
NHPPI-0035(297)SS
Malave, Luis
$4,858,804.60
Residency:Contract: 190216
Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 25 % ( 24 %)
Time Passed: 22 % ( 22 %)
Adjusted:
02/02/2020
$4,792,564.60
09/19/2019
10/23/2019
10/29/2019
03200
PURCELL
270 270
02/03/2020
GRADE, DRAIN, AND SURFACE I-35: FROM 0.5
MILES NORTHWEST OF SH-74, EXTEND
SOUTHEAST IN GOLDSBY. PROJECT LENGTH
= 1.065 MILES
Construction Status Report Page 97
34098(04) MULTIPLE
STP-244F(067)000
EST
$435,365.70
Residency:Contract: 190291
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$435,365.70
09/19/2019
10/25/2019
10/25/2019
03001
EST, INC.
90 90
04/06/2020
JOINT SEAL/REPAIR
US-75/US-377/SH-19/SH-24/SH-31/SH-39/SH-56/
SH-59/SH-74B/ SH-99/SH-102: AT MULTIPLE
LOCATIONS IN DIVISION III. PROJECT LENGTH
= 0.00 MILE
29734(04) I-35
NHPPI-3500-(077)PM
Malave, Luis
$16,636,130.93
Residency:Contract: 200046
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 18 % ( 18 %)
Time Passed: 45 % ( 19 %)
Adjusted:
03/02/2020
$16,636,130.93
01/16/2020
02/11/2020
02/12/2020
03200
PURCELL
Fixed Completion Date: 10/07/2020
GRADE, DRAIN, AND SURFACE I-35: FROM
SH-59, EXTEND NORTH NEAR WAYNE.
PROJECT LENGTH = 2.400 MILES
McCurtainCounty: Commissioner District: 2
Contracts Under Construction
24219(08) SH-3
NHPP-245N(053)PM
Nored, John
$5,087,104.72
Residency:Contract: 180244
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 96 % ( 94 %)
Time Passed: 77 % ( 77 %)
Adjusted:
12/03/2018
$4,970,196.52
07/19/2018
08/20/2018
08/21/2018
02100
ANTLERS
365 365
12/03/2018
BRIDGE REHABILITATION SH-3: OVER
YASHAU CREEK AND LUKFATA CREEK, 1.0
MILE AND 4.1 MILES NORTHWEST OF THE
US-259 JUNCTION NEAR BROKEN BOW.
PROJECT LENGTH = 0.10 MILE
30657(04) COUNTY RO
STP-245D(055)CI
CED3
$616,448.14
Residency:Contract: 190015
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 95 % ( 95 %)
Time Passed: 119 % ( 113 %)
Adjusted:
05/06/2019
$616,448.14
02/14/2019
03/15/2019
03/25/2019
02013
CIRCUIT ENGR. DISTR. # 3
90 95
07/01/2019
BRIDGE AND APPROACHES COUNTY ROAD
(NS-449): OVER WHITE OAK CREEK, 4.7
MILES NORTH OF THE US-70 JUNCTION NEAR
WRIGHT CITY. PROJECT LENGTH = 0.064
MILES
Construction Status Report Page 98
24404(07) US-259
SSP-245N(058)RW
Nored, John
$67,700.00
Residency:Contract: 190321
Contractor: RMR DEMOLITION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 53 % ( 53 %)
Time Passed: 6 % ( 6 %)
Adjusted:
12/16/2019
$67,700.00
10/17/2019
11/19/2019
11/21/2019
02100
ANTLERS
180 180
12/16/2019
RIGHT-OF-WAY CLEARANCE US-259: FROM
2.0 MILES NORTH OF THE TEXAS STATE LINE,
EXTEND NORTH NEAR IDABEL. PROJECT
LENGTH = 13.44 MILES PREQUALIFICATION
FOR THIS PROJECT HAS BEEN WAIVED.
BOTH BID EXPRESS AND WRITTEN BIDS WILL
BE ACCEPTED.
34382(04) US-259
SSR-245C(061)SR
Davis, Tim
$993,368.65
Residency:Contract: 200017
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 17 % ( 17 %)
Time Passed: 37 % ( 46 %)
Adjusted:
03/10/2020
$993,368.65
01/16/2020
02/14/2020
02/25/2020
02200
HEAVENER
Fixed Completion Date: 05/15/2020
INTERSECTION MODIFICATION US-259: AT
THE INTERSECTION OF SH-259A AND
LUKFATA TRAIL ROAD, 8.3 MI AND 11.4 MI N
OF THE SH-3 JCT NEAR BROKEN BOW.
PROJECT LENGTH = 0.570 MILE
McIntoshCounty: Commissioner District: 1
Contracts Under Construction
30256(04) CO.RD.
STP-246C(009)CI
Hagerman, Jeremy
$2,689,316.85
Residency:Contract: 140242
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 93 % ( 93 %)
Time Passed: 259 % ( 33 %)
Adjusted:
01/29/2015
$2,689,316.85
08/21/2014
09/22/2014
09/25/2014
01100
MUSKOGEE
Fixed Completion Date: 04/30/2015
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (MC-4626C/TEXANNA RD): BEGIN 4.0 MI
EAST AND 1.0 MI SOUTH OF THE
US-69/SH-150 JCT, EXTEND SOUTH AND
EAST. PROJECT LENGTH = 2.898 MILES.
29750(06) US-266
SSR-246C(024)(025)SR
Hagerman, Jeremy
$1,985,106.23
Residency:Contract: 170031
Contractor: GLOVER & ASSOCIATES, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 95 % ( 95 %)
Time Passed: 155 % ( 155 %)
Adjusted:
08/30/2017
$1,985,106.23
03/16/2017
04/21/2017
04/25/2017
01100
MUSKOGEE
60 60
08/07/2017
RESURFACE (ASPHALT) US-266: FROM THE
OKMULGEE COUNTY LINE, EXTEND EAST
NEAR LAKE EUFAULA. PROJECT LENGTH =
13.798 MILES
Construction Status Report Page 99
29755(04) US-69
NHPP-246N(027)
Hagerman, Jeremy
$27,240,998.58
Residency:Contract: 180055
Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 109 % ( 98 %)
Time Passed: 118 % ( 79 %)
Adjusted:
06/04/2018
$24,507,964.30
01/18/2018
02/27/2018
03/13/2018
01100
MUSKOGEE
365 550
06/04/2018
PAVEMENT REHABILITATION (ASPHALT)
US-69: FROM THE PITTSBURG COUNTY LINE,
EXTEND NORTH NEAR EUFAULA. PROJECT
LENGTH = 4.91 MILES
28502(04) COUNTY RO
CIRB-246C(039)RB
CE2
$4,099,771.00
Residency:Contract: 180201
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 30 % ( 30 %)
Time Passed: 106 % ( 106 %)
Adjusted:
09/09/2019
$4,099,771.00
04/18/2019
05/21/2019
05/24/2019
01017
CIRCUIT ENGR. DISTR. # 2
120 120
09/09/2019
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (TEXANNA ROAD): FROM THE US-266
JUNCTION, EXTEND SOUTH THEN WEST
NEAR CHECOTAH. PROJECT LENGTH = 5.113
MILES
27958(04) I-40
NHPPI-4000-(066)PM
TETR
$15,723,795.76
Residency:Contract: 190016
Contractor: OBC, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 18 % ( 18 %)
Time Passed: 26 % ( 26 %)
Adjusted:
11/04/2019
$15,723,795.76
06/20/2019
07/11/2019
10/09/2019
01002
TETRA TECH
500 500
11/04/2019
BRIDGE AND APPROACHES I-40: OVER
US-69B AND UNION PACIFIC RAILROAD, 0.8
MILES AND 0.9 MILES EAST OF THE US-69
INTERCHANGE IN CHECOTAH. PROJECT
LENGTH = 1.058 MILES
34093(04) MULTIPLE
NHPP-NBIP(530)3B
TETR
$383,630.00
Residency:Contract: 190292
Contractor: POSEIDON CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 86 % ( 86 %)
Time Passed: 64 % ( 64 %)
Adjusted:
02/03/2020
$383,630.00
09/19/2019
10/30/2019
01/17/2020
01002
TETRA TECH
90 90
02/03/2020
BRIDGE PAINTING COUNTY ROADS (E1080
ROAD/E1090 ROAD/ONAPA ROAD): OVER
US-69, 0.7 MI, 1.7 MI, AND 3.8 MI SOUTH OF
THE I-40 JUNCTION. PROJECT LENGTH = 0.00
MILE
Construction Status Report Page 100
28973(04) SH-52
STP-246C(042)PM
Hagerman, Jeremy
$4,100,175.39
Residency:Contract: 200018
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$4,100,175.39
01/16/2020
02/14/2020
02/25/2020
01100
MUSKOGEE
240 240
06/01/2020
BRIDGE AND APPROACHES SH-52: OVER MILL
CREEK AND CHISHOLM CREEK, 3.6 MILES
AND 1.7 MILES SOUTH OF THE SH-9
JUNCTION NEAR HANNA. PROJECT LENGTH =
0.233 MILE
MajorCounty: Commissioner District: 6
Contracts Under Construction
27009(04) US-60
ACNHPP-247N(018)SS
Dodgion, Richard
$8,846,494.22
Residency:Contract: 170267
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 113 % ( 100 %)
Time Passed: 88 % ( 88 %)
Adjusted:
11/06/2017
$7,816,100.52
08/17/2017
09/13/2017
09/15/2017
06100
BUFFALO
440 440
01/08/2018
BRIDGE AND APPROACHES US-60: OVER
CIMARRON RIVER, 1.5 MILES SOUTHWEST OF
THE SH-8 JUNCTION NEAR CLEO SPRINGS.
PROJECT LENGTH = 1.316 MILES.
29477(04) SH-58
SBR-247C(025)SB
BCS
$4,150,000.00
Residency:Contract: 190384
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 24 % ( 24 %)
Time Passed: 16 % ( 16 %)
Adjusted:
02/17/2020
$4,150,000.00
11/14/2019
12/13/2019
12/18/2019
06018
BENCHMARK CONSTR. SERVS., LLC
320 320
04/06/2020
BRIDGE REHABILITATION SH-58: OVER
CIMARRON RIVER, 0.4 MILES NORTH OF THE
SH-8 JUNCTION NEAR RINGWOOD. PROJECT
LENGTH = 0.361 MILE
33390(04) US-60
SBR-247N(022)SB
Dodgion, Richard
$2,797,243.15
Residency:Contract: 200136
Contractor: FRONTIER BRIDGE, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,797,243.15
03/19/2020
04/15/2020
04/21/2020
06100
BUFFALO
270 270
09/08/2020
BRIDGE REHABILITATION US-60: OVER INDIAN
CREEK, 0.1 MILES EAST OF THE SH-58
JUNCTION NEAR RINGWOOD. PROJECT
LENGTH = 0.090 MILE
Construction Status Report Page 101
MarshallCounty: Commissioner District: 2
Contracts Under Construction
29986(04) CO.RD.
CIRB-248C(034)RB
CED3
$2,802,594.26
Residency:Contract: 180052
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 101 % ( 92 %)
Time Passed: 244 % ( 220 %)
Adjusted:
04/23/2018
$2,563,204.62
02/15/2018
03/16/2018
03/21/2018
KINGSTON.
02013
CIRCUIT ENGR. DISTR. # 3
90 100
04/23/2018
GRADE,DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (ENOS ROAD): FROM 4.0
MILES SOUTH OF SH-32, EXTEND SOUTH
NEAR KINGSTON. PROJECT LENGTH = 3.039
MILES
28828(04) US-377/SH
STP-248C(036)PM
Bishop, Justin
$43,712,476.10
Residency:Contract: 180203
Contractor: JENSEN CONSTRUCTION COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 29 % ( 29 %)
Time Passed: 25 % ( 25 %)
Adjusted:
05/06/2019
$43,256,556.24
10/18/2018
11/20/2018
11/29/2018
02300
MADILL
780 780
05/06/2019
BRIDGE AND APPROACHES US-377/SH-99:
OVER LAKE TEXOMA (WILLIS BRIDGE), ON
THE TEXAS STATE LINE NEAR WILLIS.
PROJECT LENGTH = 1.669 MILES
29305(04) COUNTY RO
STP-248D(044)CI
CED3
$666,481.70
Residency:Contract: 190181
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 65 % ( 64 %)
Time Passed: 90 % ( 88 %)
Adjusted:
10/07/2019
$660,534.20
05/16/2019
06/12/2019
06/18/2019
02013
CIRCUIT ENGR. DISTR. # 3
120 123
10/07/2019
BRIDGE AND APPROACHES COUNTY ROAD
(TYLER ROAD): OVER TRIBUTARY OF LITTLE
HAUANI CREEK, 1.5 MILES NORTH OF THE
US-70 JUNCTION NEAR MCMILLAN. PROJECT
LENGTH = 0.209 MILE
33881(04) US-70
SSR-248N(047)SR
Bishop, Justin
$2,633,513.94
Residency:Contract: 190215
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 85 % ( 85 %)
Time Passed: 80 % ( 80 %)
Adjusted:
09/30/2019
$2,633,513.94
07/25/2019
08/20/2019
08/23/2019
02300
MADILL
180 180
09/30/2019
GRADE, DRAIN, AND SURFACE US-70: FROM
2.7 MILES EAST OF THE SH-32 JUNCTION,
EXTEND EAST NEAR KINGSTON. PROJECT
LENGTH = 0.536 MILE
Construction Status Report Page 102
29985(04) COUNTY RO
CIRB-248D(039)RB
CED3
$1,628,785.75
Residency:Contract: 190290
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 61 % ( 61 %)
Time Passed: 30 % ( 30 %)
Adjusted:
03/03/2020
$1,628,785.75
09/19/2019
10/23/2019
10/29/2019
02013
CIRCUIT ENGR. DISTR. # 3
90 90
03/03/2020
RESURFACE (ASPHALT) COUNTY ROAD
(POWELL ROAD): FROM 0.2 MILES SOUTH OF
THE SH-32 JUNCTION, EXTEND SOUTH, THEN
EAST NEAR LEBANON. PROJECT LENGTH =
4.979 MILES
28623(04) COUNTY RO
STP-248D(049)CI
CED3
$300,481.64
Residency:Contract: 200073
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$300,481.64
02/20/2020
03/13/2020
03/18/2020
02013
CIRCUIT ENGR. DISTR. # 3
120 120
09/08/2020
BRIDGE AND APPROACHES COUNTY ROAD
(JOE JOHNSON ROAD/PURSER ROAD): OVER
UNNAMED CREEK, 0.8 MILES WEST OF THE
SH-99C JUNCTION NEAR OAKLAND. PROJECT
LENGTH = 0.112 MILE
MayesCounty: Commissioner District: 8
Contracts Under Construction
27068(04) SH-82
STP-249C(047)PM
C&KI
$3,444,478.06
Residency:Contract: 180275
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 67 % ( 67 %)
Time Passed: 75 % ( 75 %)
Adjusted:
02/16/2019
$3,444,478.06
08/16/2018
09/25/2018
09/27/2018
08007
CRAIG & KEITHLINE, INC.
310 310
01/07/2019
BRIDGE AND APPROACHES SH-82: OVER
SALINE CREEK, 1.7 MILES SOUTH OF THE
SH-20 JUNCTION NEAR SALINA. PROJECT
LENGTH = 0.170 MILE
31161(04) COUNTY RO
STP-249C(053)CI
GARV
$3,560,000.00
Residency:Contract: 190364
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 28 % ( 28 %)
Time Passed: 47 % ( 47 %)
Adjusted:
02/03/2020
$3,560,000.00
11/14/2019
12/13/2019
12/18/2019
08011
GARVER, LLC.
120 120
02/03/2020
RESURFACE (P. C. CONCRETE) AND BRIDGE
AND APPROACHES COUNTY ROAD (NS-435):
FROM 0.5 MILES SOUTH OF THE SH-28
JUNCTION, EXTEND SOUTH NEAR ADAIR.
PROJECT LENGTH = 3.444 MILES
Construction Status Report Page 103
MurrayCounty: Commissioner District: 7
Contracts Under Construction
33320(04) SH-7
SSP-250N(018)PM
Fuhrmann, Chris
$3,516,249.58
Residency:Contract: 190051
Contractor: SEAL MASTERS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 70 % ( 70 %)
Time Passed: 91 % ( 91 %)
Adjusted:
06/03/2019
$3,517,749.58
01/17/2019
02/22/2019
03/07/2019
07200
ARDMORE
210 210
06/03/2019
GRADE, DRAIN, SURFACE, AND SIDEWALKS
SH-7: FROM 0.1 MILE EAST OF THE US-77
JUNCTION, EXTEND EAST IN DAVIS. PROJECT
LENGTH = 1.324 MILES
31309(04) SH-7 WB
SBR-3500(080)SB
Fuhrmann, Chris
$2,086,981.99
Residency:Contract: 190217
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 43 % ( 42 %)
Time Passed: 59 % ( 55 %)
Adjusted:
12/02/2019
$2,077,716.75
07/25/2019
08/20/2019
08/26/2019
07200
ARDMORE
150 159
12/02/2019
BRIDGE REHABILITATION SH-7 WB: OVER I-35,
2.8 MILES WEST OF THE US-77 JUNCTION
NEAR DAVIS. PROJECT LENGTH = 0.115 MILE
34144(04) I-35
HSIPG-243F(033)TR
Fuhrmann, Chris
$2,605,904.15
Residency:Contract: 190320
Contractor: ACTION SAFETY SUPPLY CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 8 % ( 8 %)
Time Passed: 12 % ( 12 %)
Adjusted:
02/03/2020
$2,605,904.15
10/17/2019
11/20/2019
11/25/2019
07200
ARDMORE
300 300
02/03/2020
TRAFFIC SIGNING I-35: FROM THE TEXAS
STATE LINE, EXTEND NORTH. PROJECT
LENGTH = 57.00 MILES
MuskogeeCounty: Commissioner District: 1
Contracts Under Construction
Construction Status Report Page 104
28962(04) SH-10
ACSTP-251C(081)SS
Hagerman, Jeremy
$7,788,707.82
Residency:Contract: 170269
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 103 % ( 99 %)
Time Passed: 96 % ( 96 %)
Adjusted:
02/19/2018
$7,488,677.57
09/21/2017
10/18/2017
10/19/2017
01100
MUSKOGEE
580 580
01/08/2018
BRIDGE AND APPROACHES SH-10: OVER
LITTLE GREEN LEAF CREEK, 6.7 MILES
NORTH OF THE MCINTOSH COUNTY LINE
NEAR BRAGGS. PROJECT LENGTH = 0.592
MILE
26287(04) US-62
ACSTP-151C(198)
Hagerman, Jeremy
$3,927,203.59
Residency:Contract: 170281
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 82 % ( 81 %)
Time Passed: 222 % ( 222 %)
Adjusted:
03/14/2018
$3,888,426.59
08/17/2017
09/18/2017
09/20/2017
01100
MUSKOGEE
210 210
01/08/2018
BRIDGE AND APPROACHES US-62: OVER
CANE CREEK AND CANE CREEK TRIBUTARY,
1.3 MILES AND 1.6 MILES SOUTH OF THE
US-64 INTERSECTION NEAR TAFT. PROJECT
LENGTH = 0.719 MILE
33094(04) SH-165
HSIPG-251N(074)TR
Hagerman, Jeremy
$1,446,978.38
Residency:Contract: 170288
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 33 % ( 33 %)
Time Passed: 177 % ( 177 %)
Adjusted:
04/23/2019
$1,446,978.38
02/15/2018
03/19/2018
03/26/2018
H IN MUSKOGEE.
01100
MUSKOGEE
180 180
07/09/2018
SAFETY IMPROVEMENT (RUMBLE STRIP AND
CABLE BARRIER) SH-165: FROM 0.8 MILES
NORTH OF THE US-62 INTERCHANGE,
EXTEND SOUTH IN MUSKOGEE.
29714(04) US-62
STP-251B(087)PM
Hagerman, Jeremy
$2,153,851.07
Residency:Contract: 180291
Contractor: T. MCDONALD CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 93 % ( 88 %)
Time Passed: 110 % ( 104 %)
Adjusted:
12/17/2018
$2,044,020.05
09/20/2018
10/16/2018
10/18/2018
01100
MUSKOGEE
90 95
11/26/2018
BRIDGE AND APPROACHES US-62: OVER
ABANDONED RAILROAD, 2.3 MILES EAST OF
THE SH-162 JUNCTION NEAR TAFT. PROJECT
LENGTH = 0.369 MILE
Construction Status Report Page 105
29383(04) COUNTY RO
CIRB-251C(095)RB
CE2
$1,234,254.65
Residency:Contract: 190119
Contractor: H & H BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 10 % ( 10 %)
Time Passed: 49 % ( 41 %)
Adjusted:
11/04/2019
$1,234,254.65
06/20/2019
07/11/2019
10/02/2019
01017
CIRCUIT ENGR. DISTR. # 2
200 237
11/04/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-082/DUNCAN ROAD): OVER CONCHARTY
CREEK, 4.4 MILES WEST OF THE US-64
JUNCTION NEAR HASKELL. PROJECT LENGTH
= 0.269 MILE
28807(04) CITY STRE
STP-151E(242)EH
Hagerman, Jeremy
$810,271.50
Residency:Contract: 190388
Contractor: ROSSCON, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 19 % ( 19 %)
Time Passed: 43 % ( 43 %)
Adjusted:
02/03/2020
$810,271.50
11/14/2019
12/12/2019
12/17/2019
01100
MUSKOGEE
120 120
02/03/2020
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) CITY STREETS (CHICAGO
ST/MACEDONIA ST): FROM 0.4 MI SOUTH OF
US-62, EXTEND NORTH THEN EAST THEN
NORTHEAST IN MUSKOGEE. PROJECT
LENGTH = 2.240 MILES
34447(04) SH-10
ERSTP-251C(100)ER
Hagerman, Jeremy
$773,678.00
Residency:Contract: 190391
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 101 % ( 98 %)
Time Passed: 82 % ( 82 %)
Adjusted:
01/02/2020
$749,739.00
10/17/2019
11/19/2019
12/03/2019
01100
MUSKOGEE
60 60
12/30/2019
SLOPE STABILIZATION SH-10: FROM 0.3
MILES EAST OF THE US-62 JUNCTION,
EXTEND EAST NEAR MUSKOGEE. PROJECT
LENGTH = 0.094 MILE
34448(04) US-62
ERSTP-251B(101)ER
Hagerman, Jeremy
$716,564.84
Residency:Contract: 200019
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 5 % ( 5 %)
Time Passed: 0 % ( 0 %)
Adjusted:
03/16/2020
$716,564.84
01/16/2020
02/14/2020
02/26/2020
01100
MUSKOGEE
60 60
03/16/2020
BRIDGE REPAIR US-62 WB: REPAIR SCOUR
DAMAGE OVER ROSS LAKE, 0.1 MILES EAST
OF THE SH-10 JUNCTION IN FORT GIBSON.
PROJECT LENGTH = 0.000 MILE
Construction Status Report Page 106
32787(04) SH-165
SSR-251N(099)SR
Hagerman, Jeremy
$867,105.04
Residency:Contract: 200074
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$867,105.04
02/20/2020
03/19/2020
03/20/2020
01100
MUSKOGEE
30 30
06/01/2020
RESURFACE (ASPHALT) SH-165: FROM US-64,
EXTEND EAST IN MUSKOGEE. PROJECT
LENGTH = 1.524 MILES
NobleCounty: Commissioner District: 4
Contracts Under Construction
32745(04) US-64
HSIPG-252N(037)AD
Zachary, Ted
$1,585,579.82
Residency:Contract: 180331
Contractor: SCHIRALLI CONSTRUCTION CORP.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 105 % ( 97 %)
Time Passed: 107 % ( 100 %)
Adjusted:
05/06/2019
$1,468,214.75
11/15/2018
12/12/2018
12/18/2018
04100
PERRY
150 160
05/01/2019
PEDESTRIAN IMPROVEMENTS AND
SIDEWALKS US-64 (FIR STREET)/CITY
STREETS (N 14TH STREET/N 15TH STREET
/UNNAMED STREET): AT MULTIPLE
LOCATIONS IN PERRY. PROJECT LENGTH =
2.145 MILES
25421(13) COUNTY RO
CIRB-252C(056)RB
Zachary, Ted
$3,848,116.74
Residency:Contract: 200020
Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$3,848,116.74
01/16/2020
02/14/2020
02/26/2020
04100
PERRY
180 180
06/01/2020
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (RED ROCK ROAD): FROM 0.8 MILES
NORTH OF US-412, EXTEND NORTH NEAR
RED ROCK. PROJECT LENGTH = 3.988 MILES
NowataCounty: Commissioner District: 8
Contracts Under Construction
Construction Status Report Page 107
27012(05) US-60
NHPP-253N(042)PM
Beats, Aaron
$8,299,131.56
Residency:Contract: 180246
Contractor: A. M. COHRON & SON, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 96 % ( 97 %)
Time Passed: 83 % ( 83 %)
Adjusted:
12/03/2018
$8,357,408.85
09/20/2018
10/11/2018
11/28/2018
08300
CLAREMORE
395 395
02/04/2019
BRIDGE AND APPROACHES US-60: OVER
VERDIGRIS RIVER AND KENTUCKY CREEK,
3.9 MILES AND 4.7 MILES EAST OF THE US-169
JUNCTION NEAR NOWATA. PROJECT LENGTH
= 1.086 MILES
28558(04) COUNTY RO
STP-253D(044)CI
CEC
$999,746.26
Residency:Contract: 190017
Contractor: H & H BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 89 % ( 89 %)
Time Passed: 84 % ( 84 %)
Adjusted:
10/07/2019
$999,746.26
05/16/2019
06/14/2019
09/12/2019
08003
CEC CORP.
120 120
10/07/2019
BRIDGE AND APPROACHES COUNTY ROAD
(NS-4140): OVER DOUBLE CREEK, 1.5 MILES
SOUTH OF US-169 NEAR NOWATA. PROJECT
LENGTH = 0.151 MILE
30494(04) COUNTY RO
STP-253D(045)CI
TETR
$817,920.00
Residency:Contract: 190018
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 15 % ( 15 %)
Time Passed: 47 % ( 22 %)
Adjusted:
11/04/2019
$817,920.00
05/16/2019
06/18/2019
06/20/2019
08002
TETRA TECH
120 255
11/04/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-27): OVER PANTHER CREEK, 1.8 MILES
WEST OF THE SH-28 JUNCTION NEAR
CHELSEA. PROJECT LENGTH = 0.117 MILE
31364(04) SH-10
SBR-253C(046)SB
CEC
$519,208.48
Residency:Contract: 190087
Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 100 % ( 100 %)
Time Passed: 81 % ( 81 %)
Adjusted:
09/09/2019
$519,208.48
04/18/2019
05/21/2019
05/24/2019
08003
CEC CORP.
120 120
09/09/2019
BRIDGE REHABILITATION SH-10: OVER
UNNAMED CREEK, 1.6 MILES EAST OF THE
US-169 JUNCTION NEAR LENAPAH. PROJECT
LENGTH = 0.108 MILE
Construction Status Report Page 108
25423(04) COUNTY RO
CIRB-153D(160)RB
TETR
$1,511,649.18
Residency:Contract: 190200
Contractor: H & H BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 52 % ( 52 %)
Time Passed: 81 % ( 81 %)
Adjusted:
11/04/2019
$1,511,649.18
06/20/2019
07/11/2019
10/02/2019
08002
TETRA TECH
150 150
11/04/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-15): OVER CALIFORNIA CREEK LOW
WATER CROSSING, 2.3 MILES WEST OF
US-169 NEAR DELAWARE. PROJECT LENGTH
= 0.985 MILE
OkfuskeeCounty: Commissioner District: 3
Contracts Under Construction
27963(04) US-62
STP-254C(040)SS
Helton, Matthew
$2,845,789.12
Residency:Contract: 180019
Contractor: TREAS CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 106 % ( 94 %)
Time Passed: 106 % ( 93 %)
Adjusted:
05/21/2018
$2,519,492.84
01/18/2018
02/27/2018
03/07/2018
03300
WEWOKA
210 240
09/04/2018
BRIDGE AND APPROACHES US-62: OVER
BOLEY CREEK, 4.3 MILES NORTHWEST OF
THE SH-48 INTERSECTION NEAR BOLEY.
PROJECT LENGTH = 0.320 MILE
21007(06) I-40
NHPPI-4000-(077)PM
Helton, Matthew
$19,003,873.60
Residency:Contract: 190182
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 12 % ( 12 %)
Time Passed: 23 % ( 22 %)
Adjusted:
12/02/2019
$18,920,365.00
06/20/2019
07/09/2019
07/18/2019
03300
WEWOKA
240 254
12/02/2019
RESURFACE (ASPHALT) AND CABLE BARRIER
I-40: FROM 0.5 MILES WEST OF SH-27,
EXTEND EAST NEAR OKEMAH. PROJECT
LENGTH = 5.793 MILES
OklahomaCounty: Commissioner District: 4
Contracts Under Construction
Construction Status Report Page 109
09033(16) I-235
ACNHPPI-2350-(004)(005)SS
Hubbard, Tom
$89,866,595.96
Residency:Contract: 160189
Contractor: ALLEN CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 110 % ( 99 %)
Time Passed: 73 % ( 62 %)
Adjusted:
01/02/2017
$80,999,877.96
04/21/2016
05/13/2016
05/18/2016
04400
EDMOND
850 1,008
01/02/2017
GRADE, DRAIN, SURFACE AND BRIDGE I-235:
FROM THE NW 36TH STREET INTERCHANGE,
EXTEND NORTH IN OKLAHOMA CITY.
PROJECT LENGTH = 1.718 MILES.
31008(04) I-35/I-40
SSP-3500(049)SS/SSP-4000*
Hubbard, Tom
$11,672,273.86
Residency:Contract: 160427
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 106 % ( 91 %)
Time Passed: 118 % ( 102 %)
Adjusted:
04/03/2017
$9,960,682.12
11/17/2016
12/16/2016
12/20/2016
(042)SS
04400
EDMOND
360 417
04/03/2017
PAVEMENT REHABILITATION I-35: FROM NE
122ND ST, EXTEND NORTH IN THE CITY OF
EDMOND. I-40: FROM MERIDIAN AVE,
EXTEND EAST IN OKLAHOMA CITY. PROJECT
LENGTH = 6.41 MILES.
20324(04) I-40
ACNHPPI-0040-5(382)/ACNH*
Harlin, Chris
$71,191,972.84
Residency:Contract: 170289
Contractor: DUIT CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 95 % ( 95 %)
Time Passed: 104 % ( 97 %)
Adjusted:
01/06/2018
$71,328,987.96
09/21/2017
10/11/2017
10/16/2017
04600
OKLAHOMA CITY
800 853
01/08/2018
GRADE, DRAIN, SURFACE, AND BRIDGE I-40:
FROM THE I-240 INTERSECTION, EXTEND
SOUTHEAST IN OKLAHOMA CITY. PROJECT
LENGTH = 5.182 MILES
32625(04) I-35
HSIPIG-3500(044)TR
Brooks, Jonathan
$5,154,792.48
Residency:Contract: 170328
Contractor: ACTION SAFETY SUPPLY CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 166 % ( 100 %)
Time Passed: 196 % ( 98 %)
Adjusted:
04/24/2018
$3,100,572.22
10/19/2017
11/20/2017
11/27/2017
04200
YUKON
180 360
02/05/2018
TRAFFIC SIGNING I-35: FROM ROBINSON
AVENUE, EXTEND NORTH IN NORMAN,
MOORE, OKLAHOMA CITY AND EDMOND.
Construction Status Report Page 110
17428(88) CT.ST.
OKC-XTWN(078)SS
Harlin, Chris
$28,634,578.66
Residency:Contract: 170356
Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 110 % ( 100 %)
Time Passed: 121 % ( 82 %)
Adjusted:
02/12/2018
$26,110,616.59
11/16/2017
12/18/2017
12/21/2017
UE, EXTEND SOUTHEAST IN OKLAHOMA CITY.
04600
OKLAHOMA CITY
445 651
01/29/2018
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREET (OKLAHOMA CITY BOULEVARD):
FROM 0.1 MILES WEST OF WESTERN
AVENUE, EXTEND SOUTHEAST IN OKLAHOMA
CITY. PROJECT LENGTH = 1.095 MILES
14964(08) SH-74
STP-155C(569)SS
Hubbard, Tom
$21,003,265.56
Residency:Contract: 170377
Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 87 % ( 87 %)
Time Passed: 103 % ( 98 %)
Adjusted:
02/05/2018
$20,998,215.56
11/16/2017
12/18/2017
12/20/2017
ITY.
04400
EDMOND
535 566
02/05/2018
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-74: FROM 0.2 MILE NORTH OF NW 164TH
STREET, EXTEND NORTH IN OKLAHOMA CITY.
PROJECT LENGTH = 4.237 MILES.
28855(04) I-44
NHPPI-4400-(034)SS
Harlin, Chris
$6,217,830.03
Residency:Contract: 180020
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 69 % ( 69 %)
Time Passed: 149 % ( 116 %)
Adjusted:
01/07/2019
$6,161,372.45
08/16/2018
09/25/2018
10/01/2018
04600
OKLAHOMA CITY
270 348
01/07/2019
GRADE, DRAIN, BRIDGE REHABILITATION,
AND BANK STABILIZATION I-44/I-44 RAMPS:
OVER DEEP FORK CREEK, 0.8 MILES WEST
OF THE I-235 INTERCHANGE IN OKLAHOMA
CITY. PROJECT LENGTH = 0.134 MILE
29495(04) I-44
NHPPI-4400-(027)PM
Mitchell, Matt
$4,653,530.09
Residency:Contract: 180100
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 112 % ( 98 %)
Time Passed: 173 % ( 110 %)
Adjusted:
07/09/2018
$4,070,015.02
02/15/2018
03/14/2018
03/20/2018
IN OKLAHOMA CITY.
04500
STILLWATER
160 251
07/09/2018
BRIDGE REHABILITATION I-44 (WEST TO
SOUTH RAMP): OVER SH-66 AND SH-3, 3.6
MILES NORTH OF THE I-40 INTERCHANGE IN
OKLAHOMA CITY. PROJECT LENGTH = 0.270
MILE
Construction Status Report Page 111
27897(04) I-35
NHPPI-3500-(066)FP
Hubbard, Tom
$31,707,345.94
Residency:Contract: 180139
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 90 % ( 83 %)
Time Passed: 91 % ( 67 %)
Adjusted:
09/17/2018
$29,200,520.28
03/15/2018
04/11/2018
04/13/2018
04400
EDMOND
570 775
09/17/2018
BRIDGE AND APPROACHES I-35: OVER DEEP
FORK CREEK, 0.2 MILES SOUTH OF THE I-44
INTERCHANGE IN OKLAHOMA CITY. PROJECT
LENGTH = 0.442 MILE
31504(04) SANTA FE
STP-255E(354)AG
CEC
$2,204,250.00
Residency:Contract: 180204
Contractor: JIM COOLEY CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 87 % ( 85 %)
Time Passed: 68 % ( 100 %)
Adjusted:
10/01/2018
$2,149,250.00
05/17/2018
06/19/2018
08/29/2018
04003
CEC CORP.
380 258
10/01/2018
PLATFORM IMPROVEMENTS SANTA FE
STATION: 0.6 MILES NORTH OF I-40, IN
OKLAHOMA CITY. PROJECT LENGTH = 0.00
MILES
30193(04) CITY STRE
STP-255E(475)AG
ZFAN
$6,213,380.00
Residency:Contract: 180292
Contractor: TRAFFIC SIGNALS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 93 % ( 93 %)
Time Passed: 113 % ( 102 %)
Adjusted:
02/04/2019
$6,200,000.00
09/20/2018
10/11/2018
03/11/2019
04023
FREESE & NICHOLS
375 412
02/04/2019
SAFETY IMPROVEMENT (ITS CORRIDOR) CITY
STREETS (BROADWAY AVE/DANFORTH
RD/SANTA FE AVE): AT MULTIPLE
LOCATIONS IN THE CITY OF EDMOND.
PROJECT LENGTH = 11.157 MILES
33616(04) I-44
STP-255F(473)3B
Brooks, Jonathan
$409,521.80
Residency:Contract: 180294
Contractor: RESTEK, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 96 % ( 96 %)
Time Passed: 104 % ( 104 %)
Adjusted:
09/03/2019
$409,521.80
01/17/2019
02/20/2019
03/07/2019
04200
YUKON
45 45
09/01/2019
JOINT SEAL/REPAIR I-44: OVER M.L. KING
BOULEVARD, 0.8 MILES WEST OF THE I-35
INTERCHANGE IN OKLAHOMA CITY. PROJECT
LENGTH = 0.00 MILE
Construction Status Report Page 112
09033(27) I-235
NHPPI-2350-(009)PM
Hubbard, Tom
$101,545,966.03
Residency:Contract: 180359
Contractor: ALLEN CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 52 % ( 52 %)
Time Passed: 42 % ( 42 %)
Adjusted:
03/25/2019
$101,080,883.05
11/15/2018
12/05/2018
12/11/2018
04400
EDMOND
900 900
04/01/2019
GRADE, DRAIN, SURFACE, AND BRIDGE I-235:
FROM THE NW 50TH INTERCHANGE, EXTEND
NORTH IN OKLAHOMA CITY. PROJECT
LENGTH = 0.957 MILE
31521(04) CITY STRE
STP-255B(455)AG
Hubbard, Tom
$2,280,120.55
Residency:Contract: 190019
Contractor: CROSSLAND HEAVY CONTRACTORS INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 89 % ( 85 %)
Time Passed: 183 % ( 62 %)
Adjusted:
07/22/2019
$2,171,000.00
01/17/2019
02/22/2019
03/07/2019
04400
EDMOND
Fixed Completion Date: 09/10/2019
PAVEMENT REHABILITATION (A.C. AND P.C.)
CITY STREET (NW 10TH STREET): FROM
NORTH MAY AVENUE EXTEND EAST IN THE
CITY OF OKLAHOMA CITY. PROJECT LENGTH
= 0.980 MILE
33739(04) CITY STRE
STPG-255F(482)AG
Harlin, Chris
$430,830.45
Residency:Contract: 190124
Contractor: TRAFFIC SIGNALS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 100 % ( 97 %)
Time Passed: 119 % ( 110 %)
Adjusted:
12/02/2019
$419,246.50
07/25/2019
08/14/2019
11/06/2019
04600
OKLAHOMA CITY
90 97
12/02/2019
TRAFFIC SIGNALS CITY STREETS (DOUGLAS
BLVD/ORCHARD BLVD/AIR DEPOT BLVD/
BOMBER RAIL TRAIL): AT MULTIPLE
LOCATIONS IN MIDWEST CITY. PROJECT
LENGTH: 0.000
31434(04) I-35 FRON
TAP-255D(327)AG
Zachary, Ted
$488,163.40
Residency:Contract: 190155
Contractor: CGC, LLC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 89 % ( 83 %)
Time Passed: 116 % ( 97 %)
Adjusted:
09/09/2019
$458,041.35
04/18/2019
05/21/2019
05/24/2019
04100
PERRY
120 143
09/09/2019
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) I-35 FRONTAGE ROAD (FOX
LAKE TRAIL LINKAGES): FROM 0.2 MILES
SOUTH OF 15TH STREET, EXTEND NORTH IN
EDMOND. PROJECT LENGTH = 0.370 MILE
Construction Status Report Page 113
31548(04) CITY STRE
STP-255B(461)AG
Harlin, Chris
$4,389,619.75
Residency:Contract: 190156
Contractor: SCHWARZ PAVING CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 16 % ( 16 %)
Time Passed: 89 % ( 61 %)
Adjusted:
11/04/2019
$4,389,619.75
06/20/2019
07/17/2019
07/25/2019
04600
OKLAHOMA CITY
180 266
11/04/2019
WIDEN, RESURFACE, AND SIDEWALKS CITY
STREET (SE 29TH STREET): FROM MIDWEST
BOULEVARD, EXTEND EAST IN MIDWEST
CITY. PROJECT LENGTH = 1.01 MILES
31546(04) CITY STRE
STP-255N(496)AG
Harlin, Chris
$2,567,607.67
Residency:Contract: 190183
Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 50 % ( 50 %)
Time Passed: 104 % ( 70 %)
Adjusted:
10/07/2019
$2,567,607.67
05/16/2019
06/12/2019
06/21/2019
04600
OKLAHOMA CITY
180 269
10/07/2019
RESURFACE (A.C. AND P.C.) CITY STREET
(DOUGLAS BOULEVARD): FROM SE 4TH
STREET, EXTEND NORTH IN THE CITY OF
MIDWEST CITY. PROJECT LENGTH = 1.240
MILES
24238(09) MULTIPLE
STP-252F(053)PM
Zachary, Ted
$108,524.30
Residency:Contract: 190220
Contractor: JLT CONTRACTING, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 89 % ( 89 %)
Time Passed: 85 % ( 85 %)
Adjusted:
09/16/2019
$108,524.30
07/25/2019
08/21/2019
08/23/2019
04100
PERRY
20 20
09/16/2019
BRIDGE WATER PROOF SEAL
SH-33/SH-51/CITY STREET (NW 23RD
STREET)/COUNTY ROAD (BENDER ROAD): AT
MULTIPLE LOCATIONS IN DIVISION IV.
PROJECT LENGTH = 0.000 MILE
24239(18) MULTIPLE
STP-252F(055)PM
EST
$865,860.00
Residency:Contract: 190222
Contractor: POSEIDON CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
04/23/2020
$865,860.00
09/19/2019
10/30/2019
01/16/2020
04001
EST, INC.
100 100
04/02/2020
BRIDGE PAINTING US-62/CITY STREETS ('A'
AVENUE/POLE YARD ROAD/POST ROAD): AT
MULTIPLE LOCATIONS IN DIVISION IV.
PROJECT LENGTH = 0.00 MILE
Construction Status Report Page 114
32929(04) COUNTY RO
STP-255C(487)CO
Hubbard, Tom
$577,710.00
Residency:Contract: 190224
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 35 % ( 35 %)
Time Passed: 47 % ( 47 %)
Adjusted:
02/17/2020
$577,710.00
09/19/2019
10/23/2019
10/29/2019
04400
EDMOND
90 90
02/15/2020
BRIDGE AND APPROACHES COUNTY ROAD
(WATERLOO RD): OVER TRIBUTARY TO
BLOODY RUSH CREEK, 0.5 MILES WEST OF
THE SH-74 JUNCTION NEAR EDMOND.
PROJECT LENGTH = 0.123 MILE
33777(04) I-40
NHPPI-4000-(082)3P
Harlin, Chris
$1,422,438.18
Residency:Contract: 190225
Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 100 % ( 100 %)
Time Passed: 19 % ( 10 %)
Adjusted:
03/29/2020
$1,419,438.18
09/19/2019
10/25/2019
10/31/2019
04600
OKLAHOMA CITY
Fixed Completion Date: 04/30/2020
RESURFACE (ASPHALT) I-40: FROM THE I-35
INTERCHANGE, EXTEND SOUTHEAST IN DEL
CITY. PROJECT LENGTH = 2.64 MILES
32591(04) COUNTY RO
STP-255D(499)CO
Hubbard, Tom
$508,497.03
Residency:Contract: 190250
Contractor: WYATT CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 48 % ( 48 %)
Time Passed: 18 % ( 18 %)
Adjusted:
03/23/2020
$508,497.03
08/22/2019
09/19/2019
09/26/2019
04400
EDMOND
120 120
01/06/2020
BRIDGE AND APPROACHES COUNTY ROAD
(BRITTON ROAD): OVER TRIBUTARY OF
NORTH CANADIAN RIVER, 11.3 MILES EAST
OF I-35 IN JONES. PROJECT LENGTH = 0.133
MILE
33860(04) I-35/I-44
HSIP-255E(486)PM
Brooks, Jonathan
$2,688,148.60
Residency:Contract: 190294
Contractor: ACTION SAFETY SUPPLY CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,688,148.60
10/17/2019
11/20/2019
11/25/2019
04200
YUKON
180 180
04/06/2020
TRAFFIC SIGNING I-35/I-44/I-240/US-60: AT
MULTIPLE LOCATIONS IN DIVISION IV.
PROJECT LENGTH = 0.00 MILE
Construction Status Report Page 115
34180(04) MULTIPLE
STP-255F(501)3B
Mitchell, Matt
$838,938.55
Residency:Contract: 190295
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 21 % ( 21 %)
Time Passed: 28 % ( 28 %)
Adjusted:
02/24/2020
$814,538.55
09/19/2019
10/25/2019
10/29/2019
04500
STILLWATER
150 150
02/03/2020
JOINT SEAL/REPAIR I-35/US-77 NB/CITY
STREETS (SOONER ROAD SB/WESTERN
AVENUE): AT MULTIPLE LOCATIONS IN
DIVISION IV. PROJECT LENGTH = 0.00 MILE
32777(04) SH-74
STP-242C(078)3P
Mitchell, Matt
$1,803,496.75
Residency:Contract: 190319
Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,803,496.75
10/17/2019
11/15/2019
11/20/2019
04500
STILLWATER
120 120
03/02/2020
RESURFACE (ASPHALT) SH-74: FROM 0.64
MILES SOUTH OF WATERLOO ROAD, EXTEND
NORTH NEAR EDMOND. PROJECT LENGTH =
6.920 MILES
32984(04) SH-66
TAP-255C(490)TP
Mitchell, Matt
$3,498,010.71
Residency:Contract: 190323
Contractor: CROSSLAND HEAVY CONTRACTORS INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 29 % ( 29 %)
Time Passed: 24 % ( 24 %)
Adjusted:
01/20/2020
$3,498,010.71
10/17/2019
11/18/2019
11/22/2019
04500
STILLWATER
270 270
03/02/2020
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) SH-66 MULTI-USE TRAIL:
FROM MIDWEST BOULEVARD, EXTEND EAST
IN THE CITY OF EDMOND. PROJECT LENGTH
= 2.427 MILES
33344(04) CITY STRE
STPG-255F(483)
Harlin, Chris
$618,806.50
Residency:Contract: 190325
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 27 % ( 27 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$618,806.50
10/17/2019
11/18/2019
11/22/2019
04600
OKLAHOMA CITY
90 90
05/04/2020
TRAFFIC SIGNALS CITY STREETS: AT
MULTIPLE LOCATIONS IN THE CITY OF
MIDWEST CITY. PROJECT LENGTH = 0.00
MILE
Construction Status Report Page 116
33346(04) CITY STRE
STPG-255F(480)AG
Harlin, Chris
$175,476.60
Residency:Contract: 190326
Contractor: ACTION SAFETY SUPPLY CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
04/06/2020
$175,476.60
10/17/2019
11/20/2019
11/25/2019
04600
OKLAHOMA CITY
90 90
04/06/2020
STRIPING AND PAVEMENT MARKING CITY
STREETS: AT MULTIPLE LOCATIONS IN
MIDWEST CITY. PROJECT LENGTH = 11.330
MILES
OkmulgeeCounty: Commissioner District: 1
Contracts Under Construction
31193(04) COUNTY RO
STP-256C(044)CI
CE2
$1,670,367.51
Residency:Contract: 180205
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 46 % ( 46 %)
Time Passed: 348 % ( 326 %)
Adjusted:
02/04/2019
$1,637,000.00
10/18/2018
11/14/2018
11/20/2018
01017
CIRCUIT ENGR. DISTR. # 2
75 80
02/04/2019
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (BIXBY ROAD): FROM 2.2 MILES SOUTH
OF THE TULSA COUNTY LINE EXTEND
SOUTHEAST NEAR WINCHESTER. PROJECT
LENGTH = 0.682 MILE
28967(04) US-75
NHPP-256N(034)PM
Hagerman, Jeremy
$4,095,487.61
Residency:Contract: 190020
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 79 % ( 79 %)
Time Passed: 92 % ( 82 %)
Adjusted:
06/03/2019
$4,085,462.55
01/17/2019
02/22/2019
03/07/2019
01100
MUSKOGEE
230 258
06/03/2019
INTERSECTION MODIFICATION AND CABLE
BARRIER US-75: AT MULTIPLE LOCATIONS
FROM 1.4 MILES NORTH OF THE SH-56
JUNCTION, BETWEEN OKMULGEE AND
BEGGS. PROJECT LENGTH = 4.861 MILES
29385(04) COUNTY RO
CIRB-256D(049)RB
ZPAA
$1,150,150.50
Residency:Contract: 190125
Contractor: RRY SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 41 % ( 41 %)
Time Passed: 63 % ( 63 %)
Adjusted:
10/04/2019
$1,150,150.50
06/20/2019
07/16/2019
07/17/2019
01020
POE AND ASSOCIATES
180 180
11/04/2019
BRIDGE AND APPROACHES COUNTY ROAD
(NS-3890/ROCKY HILL RD): OVER OKMULGEE
CREEK AND UNNAMED CREEK, 0.6 MI AND 0.7
MI S OF SH-56 NEAR OKMULGEE. PROJECT
LENGTH = 0.200 MILE
Construction Status Report Page 117
29673(04) US-75
NHPP-256N(045)PM
Hagerman, Jeremy
$3,836,789.37
Residency:Contract: 190226
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 49 % ( 48 %)
Time Passed: 31 % ( 30 %)
Adjusted:
10/07/2019
$3,829,814.97
07/25/2019
08/21/2019
08/26/2019
01100
MUSKOGEE
320 325
12/02/2019
BRIDGE AND APPROACHES US-75: OVER
COAL CREEK AND ABANDONED RAILROAD,
0.7 MILES AND 1.1 MILES NORTH OF THE I-40
INTERCHANGE IN HENRYETTA. PROJECT
LENGTH = 0.666 MILE
OsageCounty: Commissioner District: 8
Contracts Under Construction
24261(04) SH-99
SSP-157B(101)SS
Scott, Kalynn
$6,744,794.52
Residency:Contract: 170361
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 96 % ( 96 %)
Time Passed: 112 % ( 112 %)
Adjusted:
04/02/2018
$6,705,000.00
11/16/2017
12/15/2017
12/18/2017
A.
08400
SAND SPRINGS
450 451
04/02/2018
BRIDGE AND APPROACHES SH-99: OVER
BIRCH CREEK AND AN ABANDONED
RAILROAD, 1.4 MILES SOUTH OF SH-11 NEAR
WYNONA. PROJECT LENGTH = 1.874 MILES.
25528(04) COUNTY RO
STP-157C(167)CI
CEC
$2,268,477.06
Residency:Contract: 180107
Contractor: RRY SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 27 % ( 27 %)
Time Passed: 70 % ( 70 %)
Adjusted:
11/04/2019
$2,268,477.06
06/20/2019
07/16/2019
07/17/2019
08003
CEC CORP.
150 150
11/04/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-28): OVER LITTLE DRUM CREEK, 7.8
MILES EAST OF THE NOBLE COUNTY LINE.
PROJECT LENGTH = 0.955 MILE
31942(04) SH-123
STP-257C(071)3P
GARV
$1,623,000.00
Residency:Contract: 190129
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,623,000.00
03/14/2019
04/11/2019
04/19/2019
08011
GARVER, LLC.
75 75
08/05/2019
RESURFACE (ASPHALT) SH-123: FROM 5.2
MILES SOUTH OF THE US-60 (ADAMS
BOULEVARD) JUNCTION, EXTEND NORTH IN
BARTLESVILLE. PROJECT LENGTH = 5.25
MILES
Construction Status Report Page 118
24268(08) SH-20
STP-257C(076)RW
Scott, Kalynn
$157,600.00
Residency:Contract: 190296
Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 40 % ( 40 %)
Time Passed: 11 % ( 11 %)
Adjusted:
11/25/2019
$157,600.00
09/19/2019
10/25/2019
10/31/2019
08400
SAND SPRINGS
180 180
11/25/2019
RIGHT-OF-WAY CLEARANCE SH-20: FROM
THE SH-99 JUNCTION, EXTEND SOUTHEAST
NEAR HOMINY. PROJECT LENGTH = 5.016
MILES PREQUALIFICATION FOR THIS
PROJECT HAS BEEN WAIVED. BOTH BID
EXPRESS AND WRITTEN BIDS WILL BE
ACCEPTED.
27995(04) SH-99
STP-257B(035)PM
Scott, Kalynn
$16,002,441.99
Residency:Contract: 200044
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$16,002,441.99
01/16/2020
02/11/2020
02/14/2020
08400
SAND SPRINGS
450 450
06/01/2020
BRIDGE AND APPROACHES SH-99: OVER
CANEY RIVER AND POND CREEK, 2.2 MILES
AND 4.4 MILES SOUTH OF THE KANSAS
STATE LINE. PROJECT LENGTH = 1.056 MILES
32717(04) SH-11
STP-257B(072)3P
Scott, Kalynn
$803,266.40
Residency:Contract: 200118
Contractor: JLT CONTRACTING, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$803,266.40
03/19/2020
04/22/2020
04/28/2020
08400
SAND SPRINGS
60 60
08/03/2020
RESURFACE (CHIP SEAL) SH-11: FROM THE
SH-99 JUNCTION, EXTEND EAST NEAR
PERSHING. PROJECT LENGTH = 9.360 MILES
OttawaCounty: Commissioner District: 8
Contracts Under Construction
28871(04) SH-125
STP-258B(045)PM
TETR
$3,201,952.01
Residency:Contract: 180206
Contractor: CROSSLAND CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 103 % ( 99 %)
Time Passed: 198 % ( 172 %)
Adjusted:
10/29/2018
$3,098,013.12
05/17/2018
06/14/2018
06/15/2018
08002
TETRA TECH
180 208
10/01/2018
BRIDGE REHABILITATION SH-125: OVER
NEOSHO RIVER, 0.5 MILES SOUTH OF THE
US-69 JUNCTION IN MIAMI. PROJECT LENGTH
= 0.251 MILE
Construction Status Report Page 119
30710(04) COUNTY RO
CIRB-258D(049)RB
ATKINS
$1,004,791.78
Residency:Contract: 180207
Contractor: B & B BRIDGE COMPANY, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 87 % ( 86 %)
Time Passed: 81 % ( 71 %)
Adjusted:
11/15/2019
$988,083.78
06/20/2019
07/11/2019
07/23/2019
08010
ATKINS
120 137
11/15/2019
BRIDGE REHABILITATION COUNTY ROAD
(EW-30): OVER TAR CREEK, 0.8 MILES WEST
OF US-69 NEAR PICHER. PROJECT LENGTH =
0.160 MILE
30554(04) COUNTY RO
STP-258D(050)CI
GARV
$656,410.38
Residency:Contract: 180248
Contractor: B & B BRIDGE COMPANY, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 87 % ( 87 %)
Time Passed: 97 % ( 97 %)
Adjusted:
10/07/2019
$656,410.38
05/16/2019
06/12/2019
06/24/2019
08011
GARVER, LLC.
100 100
10/07/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-19): OVER TRIBUTARY TO HORSE
CREEK, 0.6 MILES WEST OF THE US-69
JUNCTION NEAR AFTON. PROJECT LENGTH =
0.166 MILE
24273(04) US-60
SSP-158B(119)PM
Beats, Aaron
$3,769,758.16
Residency:Contract: 180297
Contractor: RRY SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 80 % ( 80 %)
Time Passed: 87 % ( 87 %)
Adjusted:
12/31/2018
$3,769,758.16
10/18/2018
11/13/2018
11/19/2018
08300
CLAREMORE
255 255
12/31/2018
BRIDGE AND APPROACHES US-60: OVER
HORSE CREEK, 1.7 MILES SOUTHWEST OF
THE US-59 JUNCTION IN THE CITY OF AFTON.
PROJECT LENGTH = 0.139 MILE
30709(04) COUNTY RO
CIRB-258D(051)RB
ATKINS
$625,224.80
Residency:Contract: 190056
Contractor: RRY SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 93 % ( 93 %)
Time Passed: 100 % ( 100 %)
Adjusted:
11/04/2019
$625,224.80
06/20/2019
07/16/2019
07/17/2019
08010
ATKINS
100 100
11/04/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-128): OVER MODOC CREEK, 1.8 MILES
WEST OF THE MISSOURI STATE LINE.
PROJECT LENGTH = 0.058 MILE
Construction Status Report Page 120
32712(04) US-60
SSR-258B(055)SR
Beats, Aaron
$1,050,000.00
Residency:Contract: 200023
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,050,000.00
01/16/2020
02/11/2020
02/24/2020
08300
CLAREMORE
90 90
06/01/2020
RESURFACE (P.C. CONCRETE) US-60: FROM
THE SH-125 JUNCTION, EXTEND NORTHEAST
IN FAIRLAND. PROJECT LENGTH = 0.580 MILE
33376(04) US-59
SSR-258N(057)SR
Beats, Aaron
$2,040,000.00
Residency:Contract: 200026
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,040,000.00
01/16/2020
02/11/2020
02/24/2020
08300
CLAREMORE
110 110
06/01/2020
RESURFACE (ASPHALT) US-59: FROM 0.5
MILES NORTH OF I-44, EXTEND NORTH NEAR
AFTON. PROJECT LENGTH = 8.810 MILES
PawneeCounty: Commissioner District: 8
Contracts Under Construction
24323(04) US-64
STP-159C(077)SS
Scott, Kalynn
$9,540,525.30
Residency:Contract: 170205
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 97 % ( 95 %)
Time Passed: 156 % ( 129 %)
Adjusted:
10/09/2017
$9,368,000.00
06/15/2017
06/18/2017
07/19/2017
08400
SAND SPRINGS
400 483
10/02/2017
GRADE, DRAIN, SURFACE, AND BRIDGE
US-64: FROM 3.1 MILES WEST OF THE SH-99
JUNCTION, EXTEND WEST NEAR PAWNEE.
PROJECT LENGTH = 2.982 MILES.
30321(04) US-412
NHPP-256N(037)
CEC
$1,052,893.53
Residency:Contract: 180064
Contractor: BREWER CONSTRUCTION OKLAHOMA, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 87 % ( 97 %)
Time Passed: 98 % ( 98 %)
Adjusted:
10/01/2018
$1,179,474.38
02/15/2018
03/14/2018
03/19/2018
08003
CEC CORP.
60 60
10/01/2018
GRADE AND DRAIN US-412: FROM THE US-64
INTERCHANGE, EXTEND EAST NEAR
WESTPORT. PROJECT LENGTH = 7.58 MILES
Construction Status Report Page 121
24323(07) US-64
STP-259C(050)PM
Scott, Kalynn
$14,224,346.71
Residency:Contract: 180298
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 88 % ( 86 %)
Time Passed: 58 % ( 58 %)
Adjusted:
02/04/2019
$13,885,202.71
09/20/2018
10/11/2018
10/12/2018
08400
SAND SPRINGS
435 435
02/04/2019
GRADE, DRAIN, SURFACE, AND BRIDGE
US-64: FROM 3.4 MILES WEST OF THE SH-99
JUNCTION, EXTEND EAST NEAR THE CITY OF
CLEVELAND. PROJECT LENGTH = 3.381 MILES
31180(04) COUNTY RO
STP-259D(051)CI
JACOBS
$1,162,147.24
Residency:Contract: 190022
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 96 % ( 96 %)
Time Passed: 104 % ( 99 %)
Adjusted:
09/17/2019
$1,162,147.30
05/16/2019
06/18/2019
06/20/2019
08004
JACOBS ENGINEERING
120 126
10/07/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EW-500): OVER PEPPER CREEK, 3.9 MILES
WEST OF SH-18 NEAR PAWNEE. PROJECT
LENGTH = 0.284 MILE
27934(04) US-64
STP-259B(034)SS
Scott, Kalynn
$10,827,000.00
Residency:Contract: 190130
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 23 % ( 23 %)
Time Passed: 45 % ( 45 %)
Adjusted:
10/07/2019
$10,827,000.00
05/16/2019
06/12/2019
06/17/2019
08400
SAND SPRINGS
325 325
10/07/2019
BRIDGE AND APPROACHES US-64: OVER
CEDAR CREEK AND PEDESTRIAN TRAIL, 0.1
MILES SOUTH OF THE SH-99 JUNCTION IN
THE CITY OF CLEVELAND. PROJECT LENGTH
= 0.364 MILE
32716(04) SH-18
STP-259B(052)3P
Scott, Kalynn
$628,523.50
Residency:Contract: 200119
Contractor: JLT CONTRACTING, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$628,523.50
03/19/2020
04/22/2020
04/28/2020
08400
SAND SPRINGS
60 60
05/18/2020
RESURFACE (CHIP SEAL) SH-18: FROM 0.4
MILES NORTH OF THE US-64 JUNCTION,
EXTEND NORTH NEAR PAWNEE. PROJECT
LENGTH = 7.590 MILES
PayneCounty: Commissioner District: 4
Contracts Under Construction
Construction Status Report Page 122
28582(04) COUNTY RO
CIRB-260D(032)RB
Mitchell, Matt
$785,953.74
Residency:Contract: 180208
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 100 %)
Time Passed: 104 % ( 93 %)
Adjusted:
11/19/2018
$769,370.00
09/20/2018
10/11/2018
10/12/2018
04500
STILLWATER
120 134
11/19/2018
BRIDGE AND APPROACHES COUNTY ROAD
(EW-63): OVER SALT CREEK, 2.6 MILES EAST
OF THE SH-18 JUNCTION NEAR YALE.
PROJECT LENGTH = 0.203 MILE
34596(04) I-35
E-SAP-3500(088)ES
Mitchell, Matt
$672,194.27
Residency:Contract: 190392
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
04/27/2020
$643,850.00
11/14/2019
12/13/2019
12/19/2019
04500
STILLWATER
90 90
04/06/2020
BRIDGE REPAIR I-35: REPAIR VEHICLE
IMPACT DAMAGE OVER SH-51, 11.2 MILES
SOUTH OF US-77 NEAR STILLWATER.
PROJECT LENGTH = 0.00 MILE
32597(04) COUNTY RO
STP-260C(041)CI
Mitchell, Matt
$907,376.34
Residency:Contract: 200027
Contractor: ATLAS PAVING COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$907,376.34
03/19/2020
04/20/2020
04/28/2020
04500
STILLWATER
90 90
06/01/2020
RESURFACE (ASPHALT) COUNTY ROAD
(FAIRGROUNDS / NS-337): FROM THE SH-51
JUNCTION, EXTEND SOUTH NEAR
STILLWATER. PROJECT LENGTH = 4.930
MILES
PittsburgCounty: Commissioner District: 2
Contracts Under Construction
28912(04) SH-31
STP-261C(071)PM
Plymate, Larry
$9,286,475.15
Residency:Contract: 180299
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 61 % ( 61 %)
Time Passed: 43 % ( 43 %)
Adjusted:
02/04/2019
$9,224,320.92
09/20/2018
10/16/2018
10/18/2018
02400
MCALESTER
475 475
02/04/2019
BRIDGE REHABILITATION SH-31: OVER
GAINES CREEK AND ASH CREEK, 7.2 MILES
AND 10.7 MILES NORTHEAST OF THE US-270
JUNCTION NEAR KREBS. PROJECT LENGTH =
0.410 MILE
Construction Status Report Page 123
29996(04) COUNTY RO
STP-261D(083)CI
CED3
$752,310.64
Residency:Contract: 190090
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 79 % ( 79 %)
Time Passed: 166 % ( 116 %)
Adjusted:
08/19/2019
$752,310.64
02/14/2019
03/12/2019
03/19/2019
02013
CIRCUIT ENGR. DISTR. # 3
90 129
07/01/2019
BRIDGE AND APPROACHES COUNTY ROAD
(CABINISS ROAD): OVER BIG WILDHORSE
CREEK, 0.6 MILES NORTH OF THE US-270
JUNCTION NEAR CABINISS. PROJECT
LENGTH = 0.189 MILE
32359(04) COUNTY RO
CIRB-261C(089)RB
CED3
$1,297,565.00
Residency:Contract: 190254
Contractor: ROSSCON, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 99 % ( 99 %)
Time Passed: 233 % ( 233 %)
Adjusted:
10/14/2019
$1,297,565.00
08/22/2019
09/12/2019
09/23/2019
02013
CIRCUIT ENGR. DISTR. # 3
30 30
10/14/2019
RESURFACE (ASPHALT) COUNTY ROAD
(ASHLAND ROAD): FROM THE SH-31
JUNCTION, EXTEND EAST IN ASHLAND.
PROJECT LENGTH = 4.000 MILES
33393(04) US-69
NHPP-013N(168)3P
Plymate, Larry
$1,176,515.00
Residency:Contract: 190268
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,176,515.00
02/20/2020
03/13/2020
03/18/2020
02400
MCALESTER
75 75
07/06/2020
RESURFACE (ASPHALT) US-69: FROM 3.0
MILES NORTH OF THE ATOKA COUNTY LINE,
EXTEND NORTH NEAR KIOWA. PROJECT
LENGTH = 1.79 MILES
29738(04) SH-31 EB
SBR-261B(090)SB
Plymate, Larry
$2,124,741.60
Residency:Contract: 190369
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 18 % ( 18 %)
Time Passed: 60 % ( 60 %)
Adjusted:
02/03/2020
$2,124,741.60
11/14/2019
12/12/2019
12/18/2019
02400
MCALESTER
90 90
02/03/2020
BRIDGE REHABILITATION SH-31 EB: OVER
US-270, 0.7 MILES EAST OF THE US-69
INTERCHANGE IN MCALESTER. PROJECT
LENGTH = 0.159 MILE
Construction Status Report Page 124
34329(04) US-69
SSP-013N(176)PM
Plymate, Larry
$6,365,930.45
Residency:Contract: 190370
Contractor: DUIT CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 4 % ( 4 %)
Time Passed: 11 % ( 11 %)
Adjusted:
03/23/2020
$6,365,930.45
01/16/2020
02/11/2020
02/14/2020
02400
MCALESTER
180 180
06/01/2020
PAVEMENT REHABILITATION US-69: FROM 0.5
MILES NORTH OF THE US-270 INTERCHANGE,
EXTENDED NORTH IN MCALESTER. PROJECT
LENGTH = 3.679 MILES
PontotocCounty: Commissioner District: 3
Contracts Under Construction
31252(04) EW-165
CIRB-262C(048)RB
Wade, Tony
$5,472,842.44
Residency:Contract: 190101
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 57 % ( 57 %)
Time Passed: 106 % ( 98 %)
Adjusted:
04/22/2019
$5,534,406.04
02/14/2019
03/14/2019
03/19/2019
03100
ADA
220 239
04/22/2019
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-165/OLD FITTSTOWN HIGHWAY):
FROM THE US-377 JUNCTION, EXTEND WEST
NEAR FITTSTOWN. PROJECT LENGTH = 5.979
MILES
23286(10) SH-99
STP-162B(207)SS
Wade, Tony
$6,126,960.99
Residency:Contract: 190132
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
10/07/2019
$6,126,960.99
05/16/2019
06/12/2019
06/17/2019
03100
ADA
300 300
10/07/2019
WIDEN AND RESURFACE (ASPHALT) SH-99:
FROM 2.6 MILES SOUTH OF THE SH-3
JUNCTION, EXTEND NORTH NEAR ADA.
PROJECT LENGTH = 2.452 MILES
28571(08) COUNTY RO
STP-262C(043)CI
Wade, Tony
$1,114,835.75
Residency:Contract: 190255
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 37 % ( 37 %)
Time Passed: 23 % ( 23 %)
Adjusted:
03/25/2020
$1,114,835.75
02/20/2020
03/11/2020
03/12/2020
03100
ADA
150 150
09/08/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-151): OVER LITTLE SANDY CREEK, 2.4
MILES EAST OF THE US-377 JUNCTION NEAR
ADA. PROJECT LENGTH = 0.171 MILE
Construction Status Report Page 125
33057(04) OLD STATE
CIRB-262C(059)RB
Wade, Tony
$3,074,256.90
Residency:Contract: 200120
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$3,074,256.90
03/19/2020
04/15/2020
04/21/2020
03100
ADA
150 150
09/08/2020
WIDEN, RESURFACE, AND BRIDGE OLD
STATE HIGHWAY 99: FROM 2.0 MILES NORTH
OF THE SH-1 JUNCTION, EXTEND NORTH
NEAR ADA. PROJECT LENGTH = 5.800 MILES
PottawatomieCounty: Commissioner District: 3
Contracts Under Construction
28922(04) SH-3E
STP-263C(066)PM
TETR
$2,651,369.08
Residency:Contract: 190023
Contractor: CP3 ENTERPRISES, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 24 % ( 23 %)
Time Passed: 89 % ( 89 %)
Adjusted:
11/05/2019
$2,580,009.08
05/16/2019
06/18/2019
06/21/2019
03002
TETRA TECH
150 150
10/07/2019
BRIDGE AND APPROACHES SH-3E: OVER
ROCK CREEK, 2.1 MILES WEST OF THE SH-9A
JUNCTION NEAR SHAWNEE. PROJECT
LENGTH = 0.204 MILE
34097(04) MULTIPLE
STP-NBIP(531)3B
EST
$242,005.00
Residency:Contract: 190276
Contractor: POSEIDON CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$242,005.00
09/19/2019
10/30/2019
01/17/2020
03001
EST, INC.
45 45
02/03/2020
BRIDGE PAINTING US-270
SB/US-377/SH-99/CITY STREET (ROBINSON
STREET): AT MULTIPLE LOCATIONS IN
DIVISION III. PROJECT LENGTH = 0.00 MILE
33838(04) SH-39
SSR-263B(067)SR
Wade, Tony
$1,577,900.00
Residency:Contract: 200078
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,577,900.00
02/20/2020
03/13/2020
03/18/2020
03100
ADA
45 45
07/06/2020
RESURFACE (ASPHALT) SH-39: FROM THE
CLEVELAND COUNTY LINE, EXTEND EAST
NEAR EASON. PROJECT LENGTH = 6.640
MILES
Construction Status Report Page 126
33336(04) I-40
NHPPI-4000(096)3P
Helton, Matthew
$5,924,420.29
Residency:Contract: 200121
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$5,924,420.29
03/19/2020
04/15/2020
04/21/2020
03300
WEWOKA
70 70
07/06/2020
RESURFACE (ASPHALT AND UTBWC) I-40:
FROM THE SH-18 JUNCTION, EXTEND EAST
NEAR SHAWNEE. PROJECT LENGTH = 14.050
MILES
PushmatahaCounty: Commissioner District: 2
Contracts Under Construction
28835(04) US-271
STP-264B(062)PM
Nored, John
$2,175,792.02
Residency:Contract: 190264
Contractor: HUB CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
02/24/2020
$2,175,792.02
10/17/2019
11/12/2019
11/18/2019
02100
ANTLERS
240 240
02/03/2020
BRIDGE AND APPROACHES US-271: OVER
UNNAMED CREEKS, 10.3 MILES AND 51.1
MILES NORTHEAST OF THE SH-3 JUNCTION
NEAR FINLEY AND ALBION. PROJECT LENGTH
= 0.169 MILE
30433(04) US-271
SBR-264B(065)SB
Nored, John
$1,719,086.74
Residency:Contract: 190373
Contractor: L & N BRIDGE, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 16 % ( 16 %)
Time Passed: 7 % ( 7 %)
Adjusted:
02/24/2020
$1,719,086.74
11/14/2019
12/13/2019
12/18/2019
02100
ANTLERS
290 290
02/03/2020
BRIDGE REHABILITATION US-271: OVER
SNOW CREEK AND UNNAMED CREEK, 10.0
MILES AND 10.4 MILES SOUTHWEST OF THE
SH-144 JUNCTION NEAR SNOW. PROJECT
LENGTH = 0.00 MILE
Roger MillsCounty: Commissioner District: 5
Contracts Under Construction
Construction Status Report Page 127
25477(04) CO.RD.
CIRB-165C(099)RB
CED7
$7,006,386.22
Residency:Contract: 170095
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 110 % ( 98 %)
Time Passed: 108 % ( 100 %)
Adjusted:
09/05/2017
$6,283,092.30
02/16/2017
03/21/2017
03/25/2017
05005
CIRCUIT ENGR. DISTR. # 7
270 292
09/05/2017
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (NS-197/EW-97/NS-200/EW-96):
FROM SH-34, EXTEND WEST AND SOUTH TO
THE EW-98/NS-197 JCT NEAR HAMMON.
PROJECT LENGTH = 7.79 MILES.
25478(04) CO.RD.
CIRB-165C(100)RB
CED7
$6,133,922.80
Residency:Contract: 180113
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 108 % ( 100 %)
Time Passed: 120 % ( 100 %)
Adjusted:
04/17/2018
$5,668,110.30
02/15/2018
03/19/2018
03/26/2018
D E THEN S ON NS-192, THEN E ON EW-98.
05005
CIRCUIT ENGR. DISTR. # 7
235 280
09/04/2018
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROADS (EW-97/NS-192/EW-98): ON
EW-97 FROM 4.7 MI E OF US-283, EXTEND E
THEN S ON NS-192, THEN E ON EW-98.
PROJECT LENGTH = 6.975 MILES
27899(04) US-283
STP-265B(017)SS
ATKINS
$2,307,772.40
Residency:Contract: 190269
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 49 % ( 49 %)
Time Passed: 60 % ( 60 %)
Adjusted:
01/13/2020
$2,307,772.40
07/25/2019
08/20/2019
08/26/2019
05010
ATKINS
150 150
12/21/2019
BRIDGE AND APPROACHES US-283: OVER
DEAD WARRIOR CREEK, 3.0 MILES NORTH OF
THE SH-33 JUNCTION NEAR CHEYENNE.
PROJECT LENGTH = 0.179 MILE
32739(04) SH-30/SH-
SSR-265C(021)SR
Sawyer, Dax
$6,203,209.26
Residency:Contract: 200029
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$6,203,209.26
01/16/2020
02/19/2020
02/25/2020
05100
CLINTON
Fixed Completion Date: 10/31/2020
RESURFACE (ASPHALT) SH-30/SH-33: SH-30
FROM THE SH-47 JUNCTION EXTEND NORTH
NEAR REYDON. SH-33, FROM THE TEXAS
STATE LINE EXTEND EAST. PROJECT LENGTH
= 29.790 MILES
RogersCounty: Commissioner District: 8
Contracts Under Construction
Construction Status Report Page 128
22144(04) CT.ST.
STP-166B(164)IG
GARV
$2,831,426.52
Residency:Contract: 160259
Contractor: PARAGON CONTRACTORS, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 117 % ( 97 %)
Time Passed: 150 % ( 150 %)
Adjusted:
12/06/2016
$2,343,181.49
08/18/2016
09/16/2016
09/22/2016
08011
GARVER, LLC.
270 270
01/03/2017
GRADE, DRAIN, AND SURFACE CITY STREET
(PINE STREET): FROM NORTH 193RD
AVENUE, EXTEND EAST IN CATOOSA.
PROJECT LENGTH = 0.631 MILE.
23170(10) US-412/SH
SSP-266N(056)SS
C&KI
$8,626,854.28
Residency:Contract: 180030
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 113 % ( 100 %)
Time Passed: 128 % ( 106 %)
Adjusted:
04/30/2018
$7,647,000.00
01/18/2018
02/27/2018
03/07/2018
S-412 EXT N. S4200, FR US-412 EXT S.
08007
CRAIG & KEITHLINE, INC.
345 415
09/04/2018
GRADE, DRAIN, AND SURFACE
US-412/SH-88/S4200 RD: US-412, FR 0.2 MI W
OF SH-88 EXT E. SH-88, FR 0.1 MI S OF US-412
EXT N. S4200, FR US-412 EXT S. PROJECT
LENGTH = 4.629 MILES
20315(04) I-44
NHPPI-0044-2(422)238
Beats, Aaron
$20,244,807.92
Residency:Contract: 190133
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 59 % ( 59 %)
Time Passed: 53 % ( 53 %)
Adjusted:
08/05/2019
$20,248,311.85
03/14/2019
04/11/2019
04/19/2019
08300
CLAREMORE
360 360
08/05/2019
INTERCHANGE I-44: AT THE INTERSECTION
OF 165TH EAST AVENUE, 1.8 MILES WEST OF
THE SH-167 JUNCTION IN THE CITY OF
TULSA. PROJECT LENGTH = 1.072 MILES
29601(04) US-412
NHPP-019N(135)PM
Beats, Aaron
$6,469,627.45
Residency:Contract: 190161
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 33 % ( 33 %)
Time Passed: 52 % ( 52 %)
Adjusted:
09/09/2019
$6,465,000.00
04/18/2019
05/14/2019
05/23/2019
08300
CLAREMORE
310 310
09/09/2019
BRIDGE AND APPROACHES US-412: OVER
THE VERDIGRIS RIVER O'FLOW, 5.9 MILES
EAST OF THE I-44 INTERCHANGE NEAR FAIR
OAKS. PROJECT LENGTH = 0.837 MILE
Construction Status Report Page 129
27031(08) SH-20
STP-266B(069)RW
Beats, Aaron
$183,500.00
Residency:Contract: 190202
Contractor: MJM CONSTRUCTION & APPLICATION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 43 % ( 43 %)
Time Passed: 18 % ( 18 %)
Adjusted:
08/12/2019
$183,500.00
06/20/2019
07/25/2019
07/25/2019
08300
CLAREMORE
180 180
08/12/2019
RIGHT-OF-WAY CLEARANCE SH-20: FROM 4.1
MILES EAST OF THE US-169 JUNCTION,
EXTEND EAST NEAR CLAREMORE. PROJECT
LENGTH = 4.290 MILES PREQUALIFICATION
FOR THIS PROJECT HAS BEEN WAIVED.
BOTH BID EXPRESS AND WRITTEN BIDS WILL
BE ACCEPTED.
31402(04) COUNTY RO
STP-266D(073)CI
C&KI
$2,311,461.41
Residency:Contract: 190297
Contractor: B & B BRIDGE COMPANY, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
04/06/2020
$2,311,461.41
11/14/2019
12/10/2019
03/13/2020
08007
CRAIG & KEITHLINE, INC.
120 120
04/06/2020
BRIDGE AND APPROACHES COUNTY ROADS
(NS-4210/EW-0405): NS-4210, OVER DOG
CREEK 1.1 MI E OF SH-66. EW-0405, FROM
NS-4210 EXTEND E NEAR FOYIL. PROJECT
LENGTH = 0.281 MILE
33016(04) SUMMERLIN
TAP-266E(071)TP
C&KI
$385,825.90
Residency:Contract: 190327
Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 8 % ( 8 %)
Time Passed: 3 % ( 3 %)
Adjusted:
02/17/2020
$385,825.90
10/17/2019
11/19/2019
11/22/2019
08007
CRAIG & KEITHLINE, INC.
90 90
03/02/2020
PEDESTRIAN IMPROVEMENTS (BICYCLE AND
PEDESTRIAN TRAIL) SUMMERLIN TRAIL:
FROM INOLA ELEMENTARY SCHOOL, EXTEND
NORTH IN THE TOWN OF INOLA. PROJECT
LENGTH = 0.499 MILE
33314(04) CITY STRE
STP-266B(072)IG
EST
$809,001.10
Residency:Contract: 190328
Contractor: ELLSWORTH CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 30 % ( 30 %)
Time Passed: 60 % ( 50 %)
Adjusted:
03/23/2020
$809,001.10
10/17/2019
11/25/2019
11/26/2019
08001
EST, INC.
45 54
03/02/2020
RESURFACE (ASPHALT) CITY STREET (PINE
STREET): FROM THE SH-167 JUNCTION,
EXTEND WEST IN CATOOSA. PROJECT
LENGTH = 2.982 MILES
Construction Status Report Page 130
32733(04) SH-88
SBR-266C(077)SB
Beats, Aaron
$553,618.45
Residency:Contract: 200031
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$553,618.45
01/16/2020
02/19/2020
02/26/2020
08300
CLAREMORE
180 180
06/01/2020
BRIDGE REHABILITATION SH-88: OVER
PANTHER CREEK, 2.2 MILES SOUTHEAST OF
I-44 NEAR CLAREMORE. PROJECT LENGTH =
0.029 MILE
SeminoleCounty: Commissioner District: 3
Contracts Under Construction
30039(08) CO.RD.
CIRB-267C(053)RB
Helton, Matthew
$2,512,694.19
Residency:Contract: 170097
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 92 % ( 92 %)
Time Passed: 266 % ( 266 %)
Adjusted:
10/09/2017
$2,508,689.16
02/16/2017
03/21/2017
03/25/2017
03300
WEWOKA
150 150
09/05/2017
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (NS-360/MARKET ROAD): FROM 1.1
MILES NORTH OF SH-9, EXTEND NORTH NEAR
SEMINOLE. PROJECT LENGTH = 2.963 MILES
32798(04) US-77
HSIPG-267F(057)TR/HSIPG-*
Wade, Tony
$143,206.00
Residency:Contract: 170100
Contractor: ACTION SAFETY SUPPLY CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 83 % ( 83 %)
Time Passed: 80 % ( 80 %)
Adjusted:
05/01/2017
$143,206.00
02/16/2017
03/21/2017
03/24/2017
*235C(032)TR
03100
ADA
30 30
07/03/2017
SAFETY IMPROVEMENT (RUMBLE STRIP AND
PAVEMENT MARKING)
US-77/US-270/SH-9/SH-78: AT MULTIPLE
LOCATIONS IN DIVISION III.
23289(10) SH-99
NHPP-267N(062)PM
Wade, Tony
$10,032,738.66
Residency:Contract: 170236
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 99 %)
Time Passed: 141 % ( 99 %)
Adjusted:
09/04/2018
$9,733,613.40
06/14/2018
07/12/2018
07/13/2018
03100
ADA
250 355
09/04/2018
BRIDGE AND APPROACHES SH-99: OVER
SANDY CREEK AND SALT CREEK, 6.0 MILES
AND 7.9 MILES NORTH OF THE SH-56
INTERSECTION NEAR SEMINOLE. PROJECT
LENGTH = 1.754 MILES
Construction Status Report Page 131
28943(04) SH-9
STP-267C(051)PM
TETR
$4,218,914.85
Residency:Contract: 170275
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 23 % ( 23 %)
Time Passed: 112 % ( 69 %)
Adjusted:
11/05/2018
$4,203,929.85
02/15/2018
03/19/2018
03/22/2018
INTERSECTION NEAR SEMINOLE.
03002
TETRA TECH
360 589
11/05/2018
BRIDGE AND APPROACHES SH-9: OVER
UNNAMED CREEKS, 4.4 MILES, 6.0 MILES AND
6.3 MILES EAST OF THE US-270/SH-3E
INTERSECTION NEAR SEMINOLE. PROJECT
LENGTH = 0.468 MILE
29109(04) US-270
NHPP-267N(004)SS
Helton, Matthew
$2,176,534.67
Residency:Contract: 180032
Contractor: T. MCDONALD CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 104 % ( 100 %)
Time Passed: 100 % ( 100 %)
Adjusted:
06/04/2018
$2,082,389.19
01/18/2018
02/27/2018
03/08/2018
03300
WEWOKA
240 240
06/04/2018
BRIDGE AND APPROACHES US-270: OVER
MAGNOLIA CREEK, 0.7 MILES EAST OF THE
SH-99 INTERSECTION IN SEMINOLE. PROJECT
LENGTH = 0.141 MILE
29460(04) SH-99A
STP-267C(071)SS
CEC
$4,587,468.99
Residency:Contract: 180233
Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 100 % ( 98 %)
Time Passed: 103 % ( 100 %)
Adjusted:
11/05/2018
$4,508,696.39
05/17/2018
06/13/2018
06/18/2018
ON, NEAR CROMWELL AND LITTLE.
03003
CEC CORP.
240 246
11/05/2018
BRIDGE AND APPROACHES SH-99A: OVER
SAND CREEK AND TURKEY CREEK, 2.0 MI
AND 13.1 MI WEST OF THE SH-56 JUNCTION,
NEAR CROMWELL AND LITTLE. PROJECT
LENGTH = 0.700 MILE
21006(16) US-270
STP-267B(075)RW
Helton, Matthew
$273,995.75
Residency:Contract: 180271
Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$273,995.75
08/16/2018
09/27/2018
10/02/2018
03300
WEWOKA
180 180
10/22/2018
RIGHT-OF-WAY CLEARANCE US-270: FROM
THE SH-270A JUNCTION, EXTEND
SOUTHEAST NEAR SEMINOLE. PROJECT
LENGTH = 8.04 MILES
Construction Status Report Page 132
21006(07) US-270
STP-167B(122)PM
Helton, Matthew
$11,874,202.91
Residency:Contract: 180304
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 36 % ( 36 %)
Time Passed: 11 % ( 11 %)
Adjusted:
12/03/2019
$11,794,403.73
10/17/2019
11/13/2019
11/19/2019
03300
WEWOKA
595 606
02/03/2020
BRIDGE AND APPROACHES US-270: OVER
WEWOKA CREEK AND RAILROAD, 3.5 MILES
AND 3.7 MILES NORTHWEST OF THE US-59
JUNCTION NEAR WEWOKA. PROJECT
LENGTH = 0.586 MILE
28923(04) US-270
STP-267B(076)PM
Helton, Matthew
$1,732,543.42
Residency:Contract: 180313
Contractor: B & B BRIDGE COMPANY, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 86 % ( 85 %)
Time Passed: 109 % ( 108 %)
Adjusted:
02/15/2019
$1,708,926.24
09/20/2018
11/15/2018
11/30/2018
03300
WEWOKA
210 212
02/04/2019
BRIDGE AND APPROACHES US-270: OVER
UNNAMED CREEK, 1.6 MILES WEST OF THE
SH-3E JUNCTION NEAR SEMINOLE. PROJECT
LENGTH = 0.164 MILE
30580(04) SH-56
SBR-267C(077)SB
Helton, Matthew
$3,835,981.22
Residency:Contract: 180361
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 111 % ( 100 %)
Time Passed: 75 % ( 75 %)
Adjusted:
01/28/2019
$3,447,514.16
11/15/2018
12/17/2018
12/31/2018
03300
WEWOKA
240 240
04/01/2019
BRIDGE REHABILITATION SH-56: OVER SAND
CREEK AND WEWOKA CREEK, 0.6 MILES AND
0.7 MILES NORTH OF THE US-270B JUNCTION
IN WEWOKA. PROJECT LENGTH = 0.322 MILE
21845(04) SH-9
STPY-167C(102)
Helton, Matthew
$3,506,191.80
Residency:Contract: 190024
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 34 % ( 34 %)
Time Passed: 48 % ( 43 %)
Adjusted:
11/11/2019
$3,467,035.00
05/16/2019
06/12/2019
06/17/2019
03300
WEWOKA
210 231
11/11/2019
GRADE, DRAIN, AND SURFACE SH-9: FROM
6.8 MILES EAST OF THE US-377 JUNCTION,
EXTEND EAST NEAR SEMINOLE. PROJECT
LENGTH = 1.022 MILES
Construction Status Report Page 133
30048(04) COUNTY RO
STP-267D(081)CI
Helton, Matthew
$641,974.90
Residency:Contract: 200032
Contractor: RRY SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$641,974.90
03/19/2020
04/15/2020
04/21/2020
03300
WEWOKA
120 120
08/03/2020
BRIDGE AND APPROACHES COUNTY ROAD
(NS-3650 ROAD) : OVER UNNAMED CREEK, 0.1
MILES SOUTH OF THE US-59 JUNCTION NEAR
WEWOKA. PROJECT LENGTH = 0.111 MILE
33321(04) SH-39
SSR-267C(082)SR
Wade, Tony
$1,249,097.40
Residency:Contract: 200033
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,249,097.40
01/16/2020
02/14/2020
02/26/2020
03100
ADA
45 45
06/01/2020
RESURFACE (ASPHALT) SH-39: FROM THE
POTTAWATOMIE COUNTY LINE, EXTEND
EAST NEAR KONOWA. PROJECT LENGTH =
6.190 MILES
SequoyahCounty: Commissioner District: 1
Contracts Under Construction
10618(07) I-40/US-6
NHPPI-4000-(248)FP
Orendorf, Barry
$42,517,321.61
Residency:Contract: 180251
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 58 % ( 58 %)
Time Passed: 43 % ( 43 %)
Adjusted:
01/07/2019
$42,434,900.32
07/19/2018
08/21/2018
11/26/2018
01200
SALLISAW
700 700
01/07/2019
GRADE, DRAIN, SURFACE, BRIDGE, AND
APPROACHES I-40/US-64: I-40, FROM 1.1 MI
EAST OF US-59, EXTEND EAST. US-64, AT THE
I-40 INTERCHANGE, NEAR SALLISAW.
PROJECT LENGTH = 2.867 MILES
28501(04) COUNTY RO
CIRB-268D(058)RB
CE2
$2,096,174.67
Residency:Contract: 190059
Contractor: T. MCDONALD CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 33 % ( 33 %)
Time Passed: 81 % ( 67 %)
Adjusted:
04/15/2019
$2,096,174.67
01/17/2019
02/27/2019
03/11/2019
01017
CIRCUIT ENGR. DISTR. # 2
250 303
04/15/2019
GRADE, DRAIN, BRIDGE, AND SURFACE
COUNTY ROAD (EW-1090): OVER SALLISAW
CREEK, 2.6 MILES WEST OF THE US-59
JUNCTION NEAR SALLISAW. PROJECT
LENGTH = 0.370 MILE
Construction Status Report Page 134
33730(04) MULTIPLE
HSIPG-251F(091)TR
Hagerman, Jeremy
$825,000.00
Residency:Contract: 190086
Contractor: DIRECT TRAFFIC CONTROL INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 72 % ( 72 %)
Time Passed: 165 % ( 120 %)
Adjusted:
07/30/2019
$825,000.00
05/16/2019
06/11/2019
06/17/2019
01100
MUSKOGEE
Fixed Completion Date: 10/31/2019
STRIPING AND PAVEMENT MARKING
I-40/US-59/US-62/US-75/SH-51: AT MULTIPLE
LOCATIONS IN DIVISION I. PROJECT LENGTH
= 0.000 MILE
28988(04) I-40
NHPPI-4000-(076)PM
TETR
$36,536,881.25
Residency:Contract: 190186
Contractor: DUIT CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 14 % ( 14 %)
Time Passed: 42 % ( 42 %)
Adjusted:
10/07/2019
$36,536,881.25
05/16/2019
06/12/2019
06/19/2019
01002
TETRA TECH
400 400
10/07/2019
PAVEMENT AND BRIDGE
REHABILITATION,AND BRIDGE AND
APPROACHES I-40: FROM 1.0 MILE EAST OF
SH-10, EXTEND EAST NEAR VIAN. PROJECT
LENGTH = 6.497 MILES
32055(04) US-64
SSR-268C(054)SR
Orendorf, Barry
$2,471,375.93
Residency:Contract: 190236
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 90 % ( 89 %)
Time Passed: 103 % ( 107 %)
Adjusted:
09/09/2019
$2,456,937.63
07/25/2019
08/22/2019
08/27/2019
01200
SALLISAW
Fixed Completion Date: 11/30/2019
RESURFACE (ASPHALT) US-64: FROM 0.9
MILES EAST OF SH-64B, EXTEND EAST NEAR
ROLAND. PROJECT LENGTH = 5.143 MILES
32396(04) MULTIPLE
STP-268C(056)CI
CE2
$8,848,045.86
Residency:Contract: 190257
Contractor: JOB CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 6 % ( 6 %)
Time Passed: 9 % ( 9 %)
Adjusted:
03/16/2020
$8,848,045.86
08/22/2019
09/12/2019
09/23/2019
01017
CIRCUIT ENGR. DISTR. # 2
515 515
01/06/2020
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (DWIGHT MISSION/SEQUOYAH
LANDING ROAD): FROM I-40, EXTEND NORTH
NEAR SALLISAW. PROJECT LENGTH = 5.555
MILES
Construction Status Report Page 135
33439(04) US-64
SBR-268C(068)SB
Orendorf, Barry
$1,084,765.90
Residency:Contract: 200123
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,084,765.90
03/19/2020
04/22/2020
04/28/2020
01200
SALLISAW
90 90
09/08/2020
BRIDGE REHABILITATION US-64: OVER VIAN
CREEK, 1.0 MILE WEST OF THE SH-82
JUNCTION NEAR VIAN. PROJECT LENGTH =
0.083 MILE
StephensCounty: Commissioner District: 7
Contracts Under Construction
27847(04) CO.RD.
CIRB-269C(002)RB
Roberts, Colton
$5,271,083.89
Residency:Contract: 170381
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 109 % ( 99 %)
Time Passed: 122 % ( 101 %)
Adjusted:
04/02/2018
$4,783,900.66
11/16/2017
12/18/2017
12/21/2017
ILES
07100
DUNCAN
200 242
04/02/2018
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (EW-187): FROM US-81,
EXTEND WEST NEAR COMANCHE. PROJECT
LENGTH = 4.982 MILES
24412(04) SH-29
STP-169B(134)PM
Roberts, Colton
$12,809,408.35
Residency:Contract: 180211
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 64 % ( 62 %)
Time Passed: 87 % ( 87 %)
Adjusted:
09/04/2018
$12,462,832.15
05/17/2018
06/15/2018
06/18/2018
07100
DUNCAN
420 422
09/04/2018
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-29: FROM 2.4 MILES EAST OF THE US-81
JUNCTION, EXTEND EAST NEAR MARLOW.
PROJECT LENGTH = 4.418 MILES
27966(04) SH-53
STP-269C(049)SS
Roberts, Colton
$1,745,199.06
Residency:Contract: 180362
Contractor: C3 CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 81 % ( 74 %)
Time Passed: 118 % ( 101 %)
Adjusted:
01/06/2020
$1,610,199.06
05/16/2019
06/18/2019
06/21/2019
07100
DUNCAN
60 70
01/16/2020
BRIDGE AND APPROACHES SH-53: OVER
SOUTH FORK OF DEER CREEK, 4.3 MILES
EAST OF THE US-81 JUNCTION NEAR
COMANCHE. PROJECT LENGTH = 0.160 MILE
Construction Status Report Page 136
24412(09) SH-29
STP-269C(054)PM
Roberts, Colton
$12,244,587.15
Residency:Contract: 190165
Contractor: OVERLAND CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 15 % ( 15 %)
Time Passed: 35 % ( 35 %)
Adjusted:
09/09/2019
$12,247,790.70
04/18/2019
05/14/2019
05/23/2019
07100
DUNCAN
450 450
09/09/2019
GRADE, DRAIN, AND SURFACE SH-29: FROM
6.8 MILES EAST OF THE US-81 JUNCTION,
EXTEND EAST NEAR MARLOW. PROJECT
LENGTH = 4.632 MILES
28781(04) MULTIPLE
STP-269F(053)PM
Roberts, Colton
$177,886.03
Residency:Contract: 190166
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 92 % ( 92 %)
Time Passed: 68 % ( 68 %)
Adjusted:
08/06/2019
$177,886.03
04/18/2019
05/15/2019
05/23/2019
07100
DUNCAN
60 60
09/09/2019
BRIDGE WATER PROOF SEAL
US-81/US-277/DUNCAN
BYPASS/SH-32/SH-53/SH-79/ROCK CRUSHER
ROAD: AT MULTIPLE LOCATIONS IN DIVISION
VII. PROJECT LENGTH = 0.000 MILE
29932(04) COUNTY RO
STP-269D(055)CI
Roberts, Colton
$1,102,330.18
Residency:Contract: 190167
Contractor: RRY SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 77 % ( 77 %)
Time Passed: 133 % ( 131 %)
Adjusted:
08/30/2019
$1,096,463.15
04/18/2019
05/20/2019
05/23/2019
07100
DUNCAN
120 122
09/09/2019
BRIDGE AND APPROACHES COUNTY ROAD
(EAST CHESTNUT AVENUE/EW-173): OVER
EAST COW CREEK, 2.8 MILES EAST OF SH-7
NEAR DUNCAN. PROJECT LENGTH = 0.208
MILE
32939(04) US-81 (BR
HSIPG-269N(050)AD
Roberts, Colton
$320,729.46
Residency:Contract: 190298
Contractor: TOM HUDSON PAVING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 69 % ( 69 %)
Time Passed: 56 % ( 56 %)
Adjusted:
02/02/2020
$320,729.46
09/19/2019
10/23/2019
10/29/2019
07100
DUNCAN
45 45
02/02/2020
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
US-81 (BROADWAY STREET): FROM
CHICKASAW AVENUE, EXTEND NORTH IN
MARLOW. PROJECT LENGTH = 0.372 MILE
Construction Status Report Page 137
34129(04) US-81/SH-
STP-269F(060)3B
Roberts, Colton
$642,011.00
Residency:Contract: 190299
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 51 % ( 51 %)
Time Passed: 61 % ( 61 %)
Adjusted:
02/17/2020
$642,011.00
09/19/2019
10/23/2019
10/30/2019
07100
DUNCAN
90 90
02/03/2020
JOINT SEAL/REPAIR US-81/SH-7 EB: US-81,
OVER CLARIDY CREEK 5.9 MI N OF
SH-53.SH-7 EB, OVER US-81 0.8 MI S OF SH-7A
IN DUNCAN. PROJECT LENGTH = 0.00 MILE
27967(04) SH-53
STP-269C(057)PM
Roberts, Colton
$4,768,286.95
Residency:Contract: 190375
Contractor: TREAS CONSTRUCTION, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$4,699,292.79
11/14/2019
12/13/2019
12/18/2019
07100
DUNCAN
185 185
03/16/2020
BRIDGE AND APPROACHES SH-53: OVER
MUD CREEK AND OVERFLOWS, 11.1 MILES
AND 11.0 MILES EAST OF THE US-81
JUNCTION NEAR COMANCHE. PROJECT
LENGTH = 0.572 MILE
TexasCounty: Commissioner District: 6
Contracts Under Construction
20839(08) US-54
NHPP-270N(017)FP
Michael, Charles
$9,413,377.47
Residency:Contract: 170101
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 104 % ( 94 %)
Time Passed: 118 % ( 92 %)
Adjusted:
04/02/2018
$8,539,125.29
11/16/2017
12/12/2017
01/16/2018
NE.
06200
GUYMON
360 461
04/02/2018
GRADE, DRAIN, AND SURFACE US-54: FROM
8.5 MILES NORTHEAST OF THE US-64
JUNCTION, EXTEND NORTHEAST NEAR
TYRONE. PROJECT LENGTH = 2.041 MILES.
20947(04) US-54
NHPP-008N(059)FP
Michael, Charles
$11,898,921.62
Residency:Contract: 190097
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 74 % ( 74 %)
Time Passed: 74 % ( 74 %)
Adjusted:
07/01/2019
$11,898,921.62
02/14/2019
03/12/2019
06/07/2019
06200
GUYMON
300 300
07/01/2019
GRADE, DRAIN, AND SURFACE US-54: FROM
4.8 MILES NORTHEAST OF THE US-64
JUNCTION. PROJECT LENGTH = 7.294 MILES
Construction Status Report Page 138
14971(44) SH-54
NHPP-008N(103)RW
Michael, Charles
$63,500.00
Residency:Contract: 200080
Contractor: D T SPECIALIZED SERVICES, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$63,500.00
02/20/2020
03/19/2020
03/20/2020
06200
GUYMON
180 180
04/13/2020
RIGHT-OF-WAY CLEARANCE SH-54: FROM
10.5 MILES NORTHEAST OF THE US-64
JUNCTION, EXTEND NORTHEAST NEAR
TYRONE. PROJECT LENGTH = 3.670 MILES
PREQUALIFICATIONS FOR THIS PROJECT
HAS BEEN WAIVED. BOTH BID EXPRESS AD
WRITTEN BIDS WILL BE ACCEPTED.
28465(11) COUNTY RO
CIRB-270C(038)RB
Michael, Charles
$5,906,691.33
Residency:Contract: 200083
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$5,906,691.33
02/20/2020
03/13/2020
03/18/2020
06200
GUYMON
210 210
06/01/2020
GRADE, DRAIN, AND SURFACE COUNTY
ROADS (EW-10/NS-100): EW-10, FROM SH-136
EXTEND EAST NEAR STRAIGHT. NS-100,
FROM US-54 EXTEND NORTH NEAR HOOKER.
PROJECT LENGTH = 5.833 MILES
24241(04) SH-136
STP-170C(123)SS
Michael, Charles
$17,864,751.39
Residency:Contract: 200183
Contractor: J & R SAND COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$17,864,751.39
02/20/2020
03/13/2020
03/18/2020
06200
GUYMON
580 580
07/06/2020
GRADE, DRAIN, WIDEN, AND RESURFACE
SH-136: FROM THE TEXAS STATE LINE,
EXTEND NORTH, AND FROM 6.2 MILES SOUTH
OF THE US-412 JCT, EXTEND NORTH
PROJECT LENTH = 8.189 MILES
TillmanCounty: Commissioner District: 5
Contracts Under Construction
31137(04) COUNTY RO
STP-271D(059)CI
CED7
$1,225,591.35
Residency:Contract: 180184
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 115 % ( 91 %)
Time Passed: 103 % ( 100 %)
Adjusted:
12/03/2018
$974,723.30
07/19/2018
08/20/2018
08/21/2018
05005
CIRCUIT ENGR. DISTR. # 7
120 124
12/03/2018
BRIDGE AND APPROACHES COUNTY ROAD
(NS-215): OVER OTTER CREEK, 3.6 MILES
NORTH OF THE SH-5 JUNCTION NEAR
TIPTON. PROJECT LENGTH = 0.161 MILE
Construction Status Report Page 139
33435(04) US-183
SSR-271B(062)SR
Holley, Terri
$4,404,728.07
Residency:Contract: 190062
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 99 %)
Time Passed: 164 % ( 120 %)
Adjusted:
11/05/2019
$4,260,389.07
05/16/2019
06/12/2019
06/17/2019
05200
ALTUS
Fixed Completion Date: 10/31/2019
RESURFACE (ASPHALT) US-183: FROM 1.02
MILES NORTH OF THE SH-5 JUNCTION,
EXTEND NORTH NEAR FREDERICK. PROJECT
LENGTH = 7.05 MILES
31154(04) COUNTY RO
STP-271D(065)CI
CED7
$368,793.53
Residency:Contract: 190258
Contractor: WYATT CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 65 % ( 65 %)
Time Passed: 57 % ( 57 %)
Adjusted:
01/06/2020
$368,793.53
08/22/2019
09/19/2019
09/26/2019
05005
CIRCUIT ENGR. DISTR. # 7
60 60
01/06/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-190): OVER BOTTLE CREEK, 0.2 MILES
EAST OF THE US-183 JUNCTION NEAR
DAVIDSON. PROJECT LENGTH = 0.121 MILE
29514(04) US-70
STP-271C(067)PM
Holley, Terri
$3,199,743.58
Residency:Contract: 200035
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 6 % ( 6 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$3,199,743.58
01/16/2020
02/18/2020
02/26/2020
05200
ALTUS
310 310
06/01/2020
BRIDGE AND APPROACHES US-70: OVER
BOTTLE CREEK AND SUTTLE CREEK, 1.1
MILES AND 3.3 MILES EAST OF THE US-183
JUNCTION NEAR DAVIDSON. PROJECT
LENGTH = 0.378 MILE
29516(04) SH-5
STP-271C(066)PM
Holley, Terri
$7,189,781.75
Residency:Contract: 200125
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$7,189,781.75
03/19/2020
04/20/2020
04/28/2020
05200
ALTUS
300 300
09/08/2020
BRIDGE AND APPROACHES SH-5: OVER
NORTH FORK OF RED RIVER AND
OVERFLOW, 4.3 MILES WEST OF THE SH-5C
JUNCTION NEAR TIPTON. PROJECT LENGTH =
0.937 MILE
TulsaCounty: Commissioner District: 8
Contracts Under Construction
Construction Status Report Page 140
31943(05) MULTIPLE
SSP-272F(220)SS
CEC
$166,017.84
Residency:Contract: 170168
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 100 % ( 100 %)
Time Passed: 78 % ( 78 %)
Adjusted:
06/04/2018
$166,017.84
01/18/2018
02/27/2018
03/08/2018
08003
CEC CORP.
45 45
06/04/2018
BRIDGE WATER PROOF SEAL
I-244/US-59/US-60/US-69/SH-75A/SH-99: AT
MULTIPLE LOCATIONS IN DIVISION VIII.
32626(04) INTERSTAT
HSIPG-272F(180)TR
Arnold, Bruce
$383,768.51
Residency:Contract: 180071
Contractor: ACTION SAFETY SUPPLY CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 53 % ( 53 %)
Time Passed: 71 % ( 71 %)
Adjusted:
01/06/2020
$383,768.51
09/19/2019
10/25/2019
10/30/2019
08100
TULSA
90 90
02/03/2020
TRAFFIC SIGNING INTERSTATES/US
HWYS/STATE HWYS/CITY STREETS: AT
MULTIPLE LOCATIONS IN THE CITY OF TULSA.
PROJECT LENGTH = 0.00 MILE
31943(06) MULTIPLE
SSP-272F(239)PM
CEC
$349,659.80
Residency:Contract: 180118
Contractor: JLT CONTRACTING, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 81 % ( 78 %)
Time Passed: 312 % ( 173 %)
Adjusted:
09/04/2018
$336,439.80
02/15/2018
03/23/2018
03/29/2018
08003
CEC CORP.
60 108
07/09/2018
BRIDGE WATER PROOF SEAL
INTERSTATES/US-HIGHWAYS/STATE
HIGHWAYS/CITY STREETS: AT MULTIPLE
LOCATIONS IN DIVISION VIII.
28900(04) I-444
NHPPI-4440-(007)PM
Arnold, Bruce
$25,104,810.21
Residency:Contract: 180229
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 102 % ( 98 %)
Time Passed: 104 % ( 104 %)
Adjusted:
01/02/2019
$24,104,826.47
06/14/2018
07/16/2018
07/19/2018
08100
TULSA
360 360
01/02/2019
RESURFACE (P.C. CONCRETE) AND BRIDGE
REHABILITATION I-444: OVER HOUSTON
AVENUE, SOUTHWEST BLVD RAMP, 6TH
STREET, 11TH STREET, AT MULTIPLE
LOCATIONS IN THE CITY OF TULSA. PROJECT
LENGTH = 1.630 MILES
Construction Status Report Page 141
29076(04) SH-11
NHPP-272N(245)PM
EST
$8,463,531.63
Residency:Contract: 180253
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 81 % ( 81 %)
Time Passed: 114 % ( 114 %)
Adjusted:
01/07/2019
$8,467,000.00
07/19/2018
08/16/2018
10/03/2018
08001
EST, INC.
380 380
01/07/2019
BRIDGE REHABILITATION SH-11:OVER BNSF
RAILROAD, PINE STREET, AND RAMP OVER
I-244, AT MULTIPLE LOCATIONS IN THE CITY
OF TULSA. PROJECT LENGTH = 0.749 MILE
11477(04) SH-51
SSP-272N(206)PM
C&KI
$12,835,737.20
Residency:Contract: 180307
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 80 % ( 80 %)
Time Passed: 60 % ( 60 %)
Adjusted:
05/01/2019
$12,797,000.00
09/20/2018
10/09/2018
10/11/2018
08007
CRAIG & KEITHLINE, INC.
525 525
05/01/2019
BRIDGE REHABILITATION SH-51/BROKEN
ARROW EXPRESSWAY: OVER LEWIS AVE,
RAILROAD, AND 15TH ST, 1.0 MI, 1.1 MI, AND
1.3 MI E OF US-75 IN TULSA. PROJECT
LENGTH = 0.575 MILE
31368(04) US-75/CHE
SBR-272N(257)SB
TETR
$1,241,307.68
Residency:Contract: 190098
Contractor: PBX CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 85 % ( 85 %)
Time Passed: 143 % ( 143 %)
Adjusted:
11/04/2019
$1,241,307.68
02/14/2019
03/26/2019
03/27/2019
08002
TETRA TECH
75 75
11/04/2019
BRIDGE REHABILITATION US-75/CHEROKEE
EXPRESSWAY: UNDER PINE STREET AND
OVER LEWIS AVENUE, 1.3 MILES AND 2.6
MILES NORTH OF I-244 IN TULSA. PROJECT
LENGTH = 0.083 MILE
32541(04) CITY STRE
STP-272C(259)IG
ATKINS
$1,540,713.06
Residency:Contract: 190099
Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 98 % ( 91 %)
Time Passed: 109 % ( 109 %)
Adjusted:
08/05/2019
$1,439,272.30
04/18/2019
05/21/2019
05/24/2019
08010
ATKINS
180 180
08/05/2019
INTERSECTION MODIFICATION CITY STREET
(EAST 131ST STREET): AT THE
INTERSECTION OF SOUTH MINGO ROAD, IN
THE CITY OF BIXBY. PROJECT LENGTH =
0.370 MILE
Construction Status Report Page 142
32203(04) CITY STRE
STP-272C(261)CI
GARV
$2,135,503.45
Residency:Contract: 190137
Contractor: RRY SERVICES, LLC / GRADE LINE CONSTRUCTION, LLC JV
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
04/20/2020
$2,135,503.45
06/20/2019
07/17/2019
07/23/2019
08011
GARVER, LLC.
150 150
04/20/2020
GRADE, DRAIN, AND SURFACE CITY STREET
(EAST 86TH STREET NORTH): AT THE
INTERSECTION OF NORTH SHERIDAN ROAD,
1.2 MILES EAST OF US-75 NEAR OWASSO.
PROJECT LENGTH = 0.619 MILE
30596(04) CITY STRE
NHPPI-2440-(016)PM
Arnold, Bruce
$4,194,469.57
Residency:Contract: 190228
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 80 % ( 79 %)
Time Passed: 62 % ( 62 %)
Adjusted:
12/02/2019
$4,119,889.57
07/25/2019
08/14/2019
08/29/2019
08100
TULSA
180 180
12/02/2019
BRIDGE REHABILITATION CITY STREETS
(SHERIDAN RD/GARNETT RD): OVER I-244, 2.4
MILES WEST AND 0.5 MILES EAST OF THE
US-169 INTERCHANGE IN TULSA. PROJECT
LENGTH = 0.00 MILE
30318(09) MULTIPLE
SSP-272F(268)SS
EST
$1,547,517.34
Residency:Contract: 190259
Contractor: JK INDUSTRIES, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 64 % ( 61 %)
Time Passed: 67 % ( 62 %)
Adjusted:
10/28/2019
$1,489,640.20
08/22/2019
09/12/2019
10/04/2019
08001
EST, INC.
150 163
10/28/2019
BRIDGE PAINTING I-44/US-75 NB/CITY
STREETS (YALE AVE/PITTSBURG
AVE/HARVARD AVE/MEMORIAL RD): AT
MULTIPLE LOCATIONS IN DIVISION VIII.
PROJECT LENGTH = 0.00 MILE
31943(07) MULTIPLE
SSP-272F(267)SS
TETR
$136,504.89
Residency:Contract: 190260
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 100 % ( 100 %)
Time Passed: 70 % ( 70 %)
Adjusted:
01/06/2020
$136,504.89
08/22/2019
09/12/2019
09/20/2019
08002
TETRA TECH
70 70
01/06/2020
BRIDGE WATER PROOF SEAL
US-64/US-75/US-412EB/SH-10/SH-11/SH-51/HA
RVARD AVE/PITTSBURG AVE/YALE AVE: AT
MULTIPLE LOCATIONS IN DIVISION VIII.
PROJECT LENGTH = 0.00 MILES
Construction Status Report Page 143
30742(04) CITY STRE
STP-272B(258)IG
TETR
$8,897,000.00
Residency:Contract: 190262
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 10 % ( 10 %)
Time Passed: 12 % ( 12 %)
Adjusted:
01/06/2020
$8,897,000.00
08/22/2019
09/12/2019
09/19/2019
08002
TETRA TECH
425 425
01/06/2020
GRADE, DRAIN, AND SURFACE CITY STREET
(NORTH GARNETT ROAD): FROM EAST 96TH
STREET NORTH, EXTEND NORTH IN THE CITY
OF OWASSO. PROJECT LENGTH = 0.870 MILE
27291(04) CITY STRE
STP-172B(484)IG
JACOBS
$8,095,431.84
Residency:Contract: 190271
Contractor: PARAGON CONTRACTORS, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 34 % ( 32 %)
Time Passed: 11 % ( 11 %)
Adjusted:
01/13/2020
$7,755,557.00
08/22/2019
09/19/2019
11/18/2019
08004
JACOBS ENGINEERING
500 500
01/06/2020
GRADE, DRAIN, AND SURFACE CITY STREET
(MAIN STREET): FROM SH-97 (WILSON
AVENUE), EXTEND EAST THEN NORTH IN THE
CITY OF SAND SPRINGS. PROJECT LENGTH =
1.230 MILES
34157(04) I-44/CITY
STP-272F(276)3B
CEC
$1,048,323.04
Residency:Contract: 190301
Contractor: PBX CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 57 % ( 57 %)
Time Passed: 54 % ( 54 %)
Adjusted:
02/16/2020
$1,048,323.04
09/19/2019
10/25/2019
12/19/2019
08003
CEC CORP.
90 90
02/03/2020
JOINT SEAL/REPAIR I-44/CITY STREET
(ADMIRAL PLACE): AT MULTIPLE LOCATIONS
IN DIVISION VIII. PROJECT LENGTH = 0.00
MILE
29693(04) I-44
NHPPI-4400(058)PM
Arnold, Bruce
$10,889,659.61
Residency:Contract: 190331
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 23 % ( 23 %)
Time Passed: 18 % ( 18 %)
Adjusted:
01/27/2020
$10,884,214.61
10/17/2019
11/15/2019
11/20/2019
08100
TULSA
380 380
03/02/2020
BRIDGE AND APPROACHES I-44: OVER 33RD
WEST AVENUE, 0.5 MILES EAST OF THE I-244
INTERCHANGE IN TULSA. PROJECT LENGTH =
0.312 MILE
Construction Status Report Page 144
31619(04) CITY STRE
TAP-272D(279)IG
C&KI
$64,374.15
Residency:Contract: 190332
Contractor: ADVANCED WORKZONE SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 81 % ( 81 %)
Time Passed: 55 % ( 55 %)
Adjusted:
03/02/2020
$64,374.15
10/17/2019
11/18/2019
11/22/2019
08007
CRAIG & KEITHLINE, INC.
20 20
03/02/2020
PEDESTRIAN IMPROVEMENTS (BIKE LANE
SIGNING AND STRIPING) CITY STREETS (4TH
STREET/4TH PLACE): FROM HARVARD
AVENUE, EXTEND EAST IN TULSA. PROJECT
LENGTH = 1.02 MILES
31620(04) CITY STRE
TAP-272D(280)IG
C&KI
$500,000.00
Residency:Contract: 190333
Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 53 % ( 53 %)
Time Passed: 55 % ( 55 %)
Adjusted:
03/02/2020
$500,000.00
10/17/2019
11/19/2019
11/22/2019
08007
CRAIG & KEITHLINE, INC.
60 60
03/02/2020
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
CITY STREETS (E. 36TH PL/E. 37TH ST/S.
QUINCY AVE/ S. ROCKFORD AVE): AT
MULTIPLE LOCATIONS IN TULSA. PROJECT
LENGTH = 1.580 MILES
31621(04) CITY STRE
TAP-272N(281)IG
C&KI
$1,536,866.70
Residency:Contract: 190334
Contractor: GRADE LINE CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 27 % ( 27 %)
Time Passed: 29 % ( 29 %)
Adjusted:
03/02/2020
$1,536,866.70
10/17/2019
11/15/2019
11/20/2019
08007
CRAIG & KEITHLINE, INC.
120 120
03/02/2020
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
CITY STREET (S. MEMORIAL DRIVE): FROM
CREEK TURNPIKE, EXTEND NORTH IN TULSA.
PROJECT LENGTH = 4.670 MILES
31885(04) SH-11
STP-272B(266)PM
Arnold, Bruce
$1,753,055.53
Residency:Contract: 190335
Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 2 % ( 2 %)
Time Passed: 0 % ( 0 %)
Adjusted:
12/16/2019
$1,753,055.53
10/17/2019
11/19/2019
11/22/2019
08100
TULSA
120 120
12/16/2019
BRIDGE AND APPROACHES SH-11: OVER
DIRTY BUTTER CREEK, 1.2 MILES WEST OF
THE US-75 JUNCTION IN TULSA. PROJECT
LENGTH = 0.075 MILE
Construction Status Report Page 145
29326(04) CITY STRE
STP-272B(277)IG
ATKINS
$8,451,811.83
Residency:Contract: 190389
Contractor: CROSSLAND HEAVY CONTRACTORS INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 14 % ( 14 %)
Time Passed: 15 % ( 15 %)
Adjusted:
02/03/2020
$8,445,000.00
11/14/2019
12/13/2019
12/19/2019
08010
ATKINS
400 400
02/03/2020
GRADE, DRAIN,SURFACE, AND BRIDGE CITY
STREET (EAST 76TH STREET NORTH): FROM
0.1 MILES EAST OF THE US-169
INTERSECTION, EXTENDED EAST IN
OWASSO. PROJECT LENGTH 0.844 MILE
30604(04) US-64/CIT
SBR-272N(292)SB
Scott, Kalynn
$1,856,453.77
Residency:Contract: 200036
Contractor: PBX CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 9 % ( 9 %)
Time Passed: 15 % ( 15 %)
Adjusted:
03/23/2020
$1,856,453.77
01/16/2020
02/19/2020
02/26/2020
08400
SAND SPRINGS
150 150
06/01/2020
BRIDGE REHABILITATION US-64/CITY STREET
(209TH W AVE): US-64, OVER UNNAMED CR
1.5 MI E OF SH-151. 209TH W AVE, OVER
US-64 1.2 MI N OF SH-51. PROJECT LENGTH =
0.092 MILE
33019(04) CITY STRE
TAP-272E(294)CO
JACOBS
$1,847,662.84
Residency:Contract: 200086
Contractor: ELLSWORTH CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$1,847,662.84
02/20/2020
03/19/2020
03/20/2020
08004
JACOBS ENGINEERING
120 120
06/01/2020
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) CITY STREET (WEKIWA
ROAD): FROM THE NORTH 161ST STREET
JUNCTION, EXTEND SOUTHEAST NEAR SAND
SPRINGS. PROJECT LENGTH = 2.122 MILES
33039(04) TRAILS
TAP-272E(282)IG
JACOBS
$261,105.80
Residency:Contract: 200087
Contractor: ELLSWORTH CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$261,105.80
02/20/2020
03/19/2020
03/20/2020
08004
JACOBS ENGINEERING
90 90
07/06/2020
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) TRAILS (CHURCHILL PARK
AND SOUTH CREEK SUBDIVISIONS):
BETWEEN ELM STREET AND ELWOOD
AVENUE IN THE CITY OF JENKS. PROJECT
LENGTH = 1.885 MILES
Construction Status Report Page 146
24346(04) SH-20
STP-172B(360)SS
Arnold, Bruce
$15,450,000.00
Residency:Contract: 200092
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$15,450,000.00
01/16/2020
02/11/2020
02/24/2020
08100
TULSA
350 350
06/01/2020
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-20: FROM 0.1 MILES EAST OF THE US-75
JUNCTION, EXTEND EAST NEAR SKIATOOK.
PROJECT LENGTH = 3.780 MILES
WagonerCounty: Commissioner District: 1
Contracts Under Construction
24366(04) SH-16
ACSTP-273C(025)SS
Hagerman, Jeremy
$14,612,666.55
Residency:Contract: 160306
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 91 % ( 89 %)
Time Passed: 201 % ( 115 %)
Adjusted:
07/24/2017
$14,277,000.00
01/19/2017
02/21/2017
02/24/2017
01100
MUSKOGEE
320 560
07/24/2017
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-16: FROM 0.1 MILE NORTH OF THE SH-51
JUNCTION, EXTEND SOUTH NEAR WAGONER.
PROJECT LENGTH = 6.050 MILES.
32395(04) COUNTY RO
STP-273C(051)CI
CE2
$1,340,613.00
Residency:Contract: 190139
Contractor: PARAGON CONTRACTORS, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 75 % ( 73 %)
Time Passed: 98 % ( 78 %)
Adjusted:
10/07/2019
$1,290,092.00
05/16/2019
06/14/2019
06/18/2019
01017
CIRCUIT ENGR. DISTR. # 2
120 152
10/07/2019
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EAST 121ST STREET SOUTH): FROM
SOUTH 23RD STREET, EXTEND EAST NEAR
COWETA. PROJECT LENGTH = 1.012 MILES
32789(04) US-69 NB
SSR-013N(171)SR
Hagerman, Jeremy
$1,402,005.00
Residency:Contract: 200038
Contractor: APAC-CENTRAL, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
04/27/2020
$1,402,005.00
01/16/2020
02/11/2020
02/14/2020
01100
MUSKOGEE
60 60
06/01/2020
RESURFACE (ASPHALT) US-69 NB: FROM 0.7
MILES NORTH OF THE SH-51 JUNCTION,
EXTEND NORTH NEAR WAGONER. PROJECT
LENGTH = 5.405 MILES
Construction Status Report Page 147
32791(04) SH-51
NHPP-273N(053)3P
Hagerman, Jeremy
$2,170,629.85
Residency:Contract: 200130
Contractor: ROSSCON, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$2,170,629.85
03/19/2020
04/15/2020
04/21/2020
01100
MUSKOGEE
Fixed Completion Date: 08/01/2020
RESURFACE (ASPHALT) SH-51: FROM 4.2
MILES SOUTHEAST OF THE CREEK
TURNPIKE, EXTEND SOUTHEAST NEAR
COWETA. PROJECT LENGTH = 4.490 MILES
WashingtonCounty: Commissioner District: 8
Contracts Under Construction
25490(04) CO.RD.
CIRB-174D(062)RB
EST
$4,604,950.00
Residency:Contract: 180151
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 97 % ( 96 %)
Time Passed: 216 % ( 216 %)
Adjusted:
09/04/2018
$4,589,000.00
03/15/2018
04/13/2018
04/17/2018
THEN SOUTH ON NS-398 NEAR DEWEY.
08001
EST, INC.
180 180
09/04/2018
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROADS (EW-14/NS-398): FROM THE
US-75 JUNCTION, EXTEND EAST ON EW-14
THEN SOUTH ON NS-398 NEAR DEWEY.
PROJECT LENGTH = 3.214 MILES
24242(04) US-60
NHPP-018N(053)
EST
$15,867,000.00
Residency:Contract: 190027
Contractor: BECCO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 15 % ( 15 %)
Time Passed: 33 % ( 33 %)
Adjusted:
11/04/2019
$15,867,000.00
05/16/2019
06/12/2019
06/17/2019
08001
EST, INC.
360 360
11/04/2019
GRADE, DRAIN, SURFACE, AND BRIDGE
US-60: FROM 2.3 MILES EAST OF THE US-75
JCT, EXTEND EAST NEAR BARTLESVILLE.
PROJECT LENGTH = 4.894 MILES
31369(04) US-75
SBR-274N(021)SB
ATKINS
$4,365,872.05
Residency:Contract: 190104
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 60 % ( 60 %)
Time Passed: 54 % ( 53 %)
Adjusted:
08/27/2019
$4,364,927.05
02/14/2019
03/15/2019
03/25/2019
08010
ATKINS
300 304
09/09/2019
BRIDGE REHABILITATION US-75: OVER
COTTON CREEK, 2.3 MILES NORTH OF THE
SH-10 JUNCTION NEAR COPAN. PROJECT
LENGTH = 0.208 MILE
Construction Status Report Page 148
31944(07) US-75
SSP-272F(269)SS
EST
$509,146.79
Residency:Contract: 190261
Contractor: PBX CORPORATION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 82 % ( 82 %)
Time Passed: 100 % ( 100 %)
Adjusted:
12/09/2019
$509,146.79
08/22/2019
09/19/2019
09/26/2019
08001
EST, INC.
90 90
12/09/2019
JOINT SEAL/REPAIR US-75: OVER CANEY
RIVER O'FLOW, NORTH AND SOUTH FORK
DOUBLE CREEK, AND SK &O RAILROAD IN
DIVISIONS VIII. PROJECT LENGTH - 0.00 MILE
30618(04) COUNTY RO
CIRB-274D(024)RB
BCS
$822,394.71
Residency:Contract: 190309
Contractor: BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 68 % ( 68 %)
Time Passed: 71 % ( 71 %)
Adjusted:
02/13/2020
$822,394.71
11/14/2019
12/17/2019
12/19/2019
08018
BENCHMARK CONSTR. SERVS., LLC
90 90
01/27/2020
BRIDGE AND APPROACHES COUNTY ROAD
(NS-400): OVER BEVAN CREEK, 4.0 MILES
NORTH OF THE TULSA COUNTY LINE NEAR
VERA. PROJECT LENGTH = 0.163 MILE
WashitaCounty: Commissioner District: 5
Contracts Under Construction
27935(04) I-40
ACNHPPI-4000-(057)PM
Sawyer, Dax
$9,190,302.38
Residency:Contract: 180152
Contractor: CASWELL CONTRACTING, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 101 % ( 94 %)
Time Passed: 155 % ( 124 %)
Adjusted:
09/04/2018
$8,502,098.06
05/17/2018
06/15/2018
06/20/2018
MILES
05100
CLINTON
240 300
09/04/2018
RESURFACE (ASPHALT)AND CABLE BARRIER
I-40: FROM 0.4 MILES WEST OF SH-44,
EXTEND WEST NEAR FOSS. PROJECT
LENGTH = 7.841 MILES
31101(04) SH-54
SBR-275C(046)SB
Sawyer, Dax
$1,299,500.06
Residency:Contract: 180364
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 97 % ( 97 %)
Time Passed: 113 % ( 113 %)
Adjusted:
09/03/2019
$1,299,500.06
04/18/2019
05/21/2019
05/23/2019
05100
CLINTON
120 120
09/09/2019
BRIDGE REHABILITATION SH-54: OVER
CALVARY CREEK, 1.0 MILE SOUTH OF THE
SH-152 JUNCTION NEAR CLOUD CHIEF.
PROJECT LENGTH = 0.206 MILE
Construction Status Report Page 149
29278(04) SH-44
SBR-275C(048)SB
Holley, Terri
$1,082,884.80
Residency:Contract: 190229
Contractor: K & R BUILDERS, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 90 % ( 84 %)
Time Passed: 54 % ( 54 %)
Adjusted:
02/17/2020
$1,013,537.00
07/25/2019
08/14/2019
08/16/2019
05200
ALTUS
90 90
02/17/2020
BRIDGE REHABILITATION SH-44: OVER LITTLE
ELK CREEK, 0.5 MILES NORTH OF THE SH-152
JUNCTION NEAR DILL CITY. PROJECT
LENGTH = 0.049 MILE
34099(04) US-183 SB
STP-275F(050)3B
Sawyer, Dax
$739,397.60
Residency:Contract: 190302
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 43 % ( 43 %)
Time Passed: 42 % ( 42 %)
Adjusted:
02/06/2020
$739,397.60
09/19/2019
10/25/2019
10/29/2019
05100
CLINTON
120 120
02/04/2020
JOINT SEAL/REPAIR US-183 SB/SH-152: AT
MULTIPLE LOCATIONS IN DIVISION V.
PROJECT LENGTH = 0.00 MILE
32323(04) COUNTY RO
STP-275D(049)CI
CED7
$631,296.40
Residency:Contract: 190378
Contractor: SEWELL BROS., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 8 % ( 8 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$631,296.40
11/14/2019
12/13/2019
12/19/2019
05005
CIRCUIT ENGR. DISTR. # 7
120 120
06/01/2020
BRIDGE AND APPROACHES COUNTY ROAD
(EW-110): OVER GYP CREEK, 6.7 MILES WEST
OF THE SH-54 JUNCTION NEAR CORN.
PROJECT LENGTH = 0.152 MILE
WoodsCounty: Commissioner District: 6
Contracts Under Construction
25493(04) CO.RD.
CIRB-176C(151)RB
CED8
$3,631,483.61
Residency:Contract: 170245
Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 99 % ( 100 %)
Time Passed: 91 % ( 91 %)
Adjusted:
10/20/2017
$3,634,540.76
07/20/2017
08/21/2017
09/22/2017
E.
06009
CIRCUIT ENGR. DISTR. # 8
210 210
12/04/2017
BRIDGE AND APPROACHES COUNTY ROAD
(N2380 ROAD): OVER SALT FORK RIVER, 2.6
MILES SOUTH OF THE KANSAS STATE LINE.
PROJECT LENGTH = 0.850 MILE
Construction Status Report Page 150
27923(04) US-64
STP-276B(032)PM
Dodgion, Richard
$4,595,214.64
Residency:Contract: 180215
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 108 % ( 99 %)
Time Passed: 127 % ( 84 %)
Adjusted:
09/10/2018
$4,191,320.10
05/17/2018
06/12/2018
07/18/2018
06100
BUFFALO
210 319
10/01/2018
BRIDGE AND APPROACHES US-64: OVER
BNSF RAILROAD, 2.1 MILES WEST OF THE
US-281 JUNCTION NEAR ALVA. PROJECT
LENGTH = 0.687 MILE
27922(04) US-64
STP-276B(029)PM
Dodgion, Richard
$2,431,234.70
Residency:Contract: 180256
Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 101 % ( 99 %)
Time Passed: 136 % ( 103 %)
Adjusted:
11/09/2018
$2,393,762.35
07/19/2018
08/15/2018
08/31/2018
06100
BUFFALO
160 210
12/03/2018
BRIDGE AND APPROACHES US-64: OVER
ANDERSON CREEK, 2.1 MILES EAST OF THE
SH-50 JUNCTION NEAR FREEDOM. PROJECT
LENGTH = 0.198 MILE
34138(04) US-281/US
STP-276F(036)3B
Dodgion, Richard
$151,953.24
Residency:Contract: 190306
Contractor: RESTEK, INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 53 % ( 53 %)
Time Passed: 57 % ( 57 %)
Adjusted:
01/31/2020
$151,953.24
09/19/2019
10/23/2019
10/30/2019
06100
BUFFALO
90 90
02/03/2020
JOINT SEAL/REPAIR US-281/US-412: AT
MULTIPLE LOCATIONS IN DIVISION VI.
PROJECT LENGTH - 0.00 MILE
29782(04) COUNTY RO
CIRB-276D(044)RB
CED8
$610,698.86
Residency:Contract: 200039
Contractor: RRY SERVICES, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$610,698.86
01/16/2020
03/19/2020
03/20/2020
06009
CIRCUIT ENGR. DISTR. # 8
120 120
06/01/2020
BRIDGE AND APPROACHES COUNTY ROAD
(NS-246): OVER SAND CREEK, 2.7 MILES
NORTH OF SH-45 NEAR DACOMA. PROJECT
LENGTH = 0.175 MILE
WoodwardCounty: Commissioner District: 6
Contracts Under Construction
Construction Status Report Page 151
17457(16) US-183
NHPP-277N(010)SS/NHPP-17*
Dodgion, Richard
$19,784,232.10
Residency:Contract: 150274
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 96 % ( 96 %)
Time Passed: 133 % ( 133 %)
Adjusted:
12/07/2015
$19,773,696.37
08/20/2015
09/22/2015
11/06/2015
*N(060)SS
06100
BUFFALO
525 527
12/07/2015
GRADE, DRAIN, SURFACE, AND BRIDGE
US-183: FROM 5.0 MILES SOUTHEAST OF THE
SH-50 JUNCTION, EXTEND SOUTHEAST NEAR
MUTUAL. PROJECT LENGTH = 5.643 MILES.
29799(04) CT.ST.
ACSTP-277C(043)UR
Dodgion, Richard
$8,564,897.16
Residency:Contract: 180122
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 74 % ( 74 %)
Time Passed: 133 % ( 93 %)
Adjusted:
08/06/2018
$8,553,070.73
03/15/2018
04/11/2018
04/17/2018
WARD.
06100
BUFFALO
365 523
08/06/2018
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREET (34TH STREET): FROM THE US-412
JUNCTION, EXTEND SOUTH IN WOODWARD.
PROJECT LENGTH = 2.074 MILES
17457(20) US-183/US
NHPP-017N(063)
Dodgion, Richard
$12,326,684.39
Residency:Contract: 180366
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 41 % ( 41 %)
Time Passed: 80 % ( 71 %)
Adjusted:
04/01/2019
$12,326,684.39
11/15/2018
12/17/2018
12/20/2018
06100
BUFFALO
380 427
04/01/2019
GRADE, DRAIN, SURFACE, AND BRIDGE
US-183/US-270: FROM 9.8 MILES NORTHWEST
OF THE US-60 JUNCTION, EXTEND
SOUTHEAST NEAR SEILING. PROJECT
LENGTH = 3.694 MILES
27407(04) COUNTY RO
CIRB-177C(113)RB
CED8
$6,464,095.36
Residency:Contract: 190064
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 56 % ( 55 %)
Time Passed: 111 % ( 88 %)
Adjusted:
06/03/2019
$6,342,476.10
01/17/2019
02/20/2019
02/28/2019
06009
CIRCUIT ENGR. DISTR. # 8
210 266
06/03/2019
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (QUINLAN ROAD): FROM 4.3
MILES NORTHEAST OF THE US-412
JUNCTION, EXTEND NORTHEAST NEAR
QUINLAN. PROJECT LENGTH = 6.225 MILES
Construction Status Report Page 152
26974(06) US-64/US-
STP-230F(031)PM
Dodgion, Richard
$381,383.20
Residency:Contract: 190205
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 48 % ( 48 %)
Time Passed: 77 % ( 77 %)
Adjusted:
10/11/2019
$381,383.20
07/25/2019
08/20/2019
08/23/2019
06100
BUFFALO
90 90
12/02/2019
JOINT SEAL/REPAIR US-64/US-183: AT
MULTIPLE LOCATIONS IN DIVISION VI.
PROJECT LENGTH = 0.000 MILES
17457(54) US-183/US
NHPP-017N(206)PM
Dodgion, Richard
$21,069,785.08
Residency:Contract: 190379
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 2 % ( 2 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$21,069,785.08
11/14/2019
12/17/2019
12/19/2019
06100
BUFFALO
485 485
04/01/2020
GRADE, DRAIN, SURFACE, AND BRIDGE
US-183/US-270: FROM 1.6 MILES NORTHWEST
OF THE US-60 JUNCTION, EXTEND
NORTHWEST NEAR SEILING. PROJECT
LENGTH = 4.360 MILES
31767(04) US-412
NHPP-019N(140)3P
Dodgion, Richard
$4,837,667.00
Residency:Contract: 200131
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Contract Amount: ( )
Adjusted:
Contract Time: ( )
Letting Date:
Contract Date:
W/O Issued
W/O Effective:
Work Started:
Amount Paid: 0 % ( 0 %)
Time Passed: 0 % ( 0 %)
Adjusted:
$4,837,667.00
03/19/2020
04/22/2020
04/28/2020
06100
BUFFALO
Fixed Completion Date: 10/31/2020
RESURFACE (ASPHALT) US-412: FROM 1.08
MILES EAST OF US-183S JUNCTION, EXTEND
EAST NEAR WOODWARD. PROJECT LENGTH
= 7.623 MILES
Construction Status Report Page 153
AdairCounty: Commissioner District: 1
Contracts Awarded - NTP Not Processed
32792(04) SBR-268B(067)SBMULTIPLE200170Contract:
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Contract Amount:
Letting Date:
$305,254.46
04/16/2020
Residency: 01100
MUSKOGEE
BRIDGE
REHABILITATIONI-40/US-59/US-62/US-64/SH-9/SH-16/
SH-51 EB/SH-82/SH-101: ATMULTIPLE LOCATIONS IN
DIVISION I.PROJECT LENGTH = 0.000 MILES
BeaverCounty: Commissioner District: 6
Contracts Awarded - NTP Not Processed
30500(04) STP-204C(031)CICOUNTY RO200138Contract:
Contractor: K & R BUILDERS, INC.
Contract Amount:
Letting Date:
$1,360,625.24
04/16/2020
Residency: 06200
GUYMON
BRIDGE AND APPROACHESCOUNTY ROAD (EW-34):
OVER KIOWA CREEK, 15.5 MILES EAST OFTHE
SH-23 JUNCTION NEAR LOGAN.PROJECT LENGTH =
0.464 MILE
BlaineCounty: Commissioner District: 5
Contracts Awarded - NTP Not Processed
29512(04) STP-206C(061)PMSH-58200216Contract:
Contractor: K & R BUILDERS, INC.
Contract Amount:
Letting Date:
$2,279,999.17
04/16/2020
Residency: 05100
CLINTON
BRIDGE AND APPROACHESSH-58: OVER
MINNEHAHA CREEK, 0.1 MILES SOUTH OF THE
SH-51JUNCTION IN CANTON.PROJECT LENGTH =
0.156 MILE
BryanCounty: Commissioner District: 2
Contracts Awarded - NTP Not Processed
23145(10) SSP-264F(071)PMUS-70200140Contract:
Contractor: MONOKO, LLC
Contract Amount:
Letting Date:
$1,171,890.00
04/16/2020
Residency: 02002
TETRA TECH
BRIDGE PAINTINGUS-70: OVER LAKE TEXOMA, 5.5
MILES EAST OF THE SH-32JUNCTION NEAR
KINGSTON.PROJECT LENGTH = 0.000 MILES
CaddoCounty: Commissioner District: 7
Contracts Awarded - NTP Not Processed
33883(04) STP-208B(072)3PUS-62200142Contract:
Contractor: T & G CONSTRUCTION, INC.
Contract Amount:
Letting Date:
$735,101.05
04/16/2020
Residency: 07300
ANADARKO
RESURFACE (ASPHALT)US-62: FROM 6.3 MILES
EAST OF THE SH-9 JUNCTION, EXTENDEAST THEN
NORTH IN ANADARKO.PROJECT LENGTH = 1.620
MILES
Construction Status Report Page 154
CherokeeCounty: Commissioner District: 1
Contracts Awarded - NTP Not Processed
32790(04) STP-211B(038)3PUS-62/SH-200144Contract:
Contractor: APAC-CENTRAL, INC.
Contract Amount:
Letting Date:
$1,128,103.20
04/16/2020
Residency: 01100
MUSKOGEE
RESURFACE (ASPHALT)US-62/SH-10 (EB ONLY):
FROM 0.42 MILES EAST OF THE
MUSKOGEECOUNTY LINE, EXTEND EAST NEAR
FORT GIBSON.PROJECT LENGTH = 3.280 MILES
ClevelandCounty: Commissioner District: 3
Contracts Awarded - NTP Not Processed
33270(04) TAP-214D(101)AGSH-9200145Contract:
Contractor: SAC SERVICES, INC.
Contract Amount:
Letting Date:
$737,860.25
04/16/2020
Residency: 03021
OLSSON ASSOCIATES
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)SH-9:
FROM 36TH AVENUE, EXTEND EAST IN THE CITY OF
NORMAN.PROJECT LENGTH = 0.980 MILE
34760(04) MC-3500(090)MDI-35 (NB200186Contract:
Contractor: HASKELL LEMON CONSTRUCTION CO.
Contract Amount:
Letting Date:
$247,891.75
04/16/2020
Residency: 03200
PURCELL
RESURFACE (ASPHALT AND UTBWC)I-35 (NB LANES
ONLY): FROM 0.5 MILES SOUTH OF THE
US-77JUNCTION, EXTEND NORTH IN
NORMAN.PROJECT LENGTH = 0.530 MILE
CreekCounty: Commissioner District: 8
Contracts Awarded - NTP Not Processed
32731(04) SBR-219N(075)SBUS-75A200008Contract:
Contractor: LOGOS CONSTRUCTION CO., LLC
Contract Amount:
Letting Date:
$785,645.21
04/16/2020
Residency: 08400
SAND SPRINGS
BRIDGE REHABILITATIONUS-75A: OVER POLECAT
CREEK, 2.0 MILES SOUTHEAST OF THESH-117
INTERSECTION NEAR SAPULPA.PROJECT LENGTH
= 0.236 MILE
31360(04) SBR-219B(070)SBSH-33200146Contract:
Contractor: CONCRETE SERVICES CORPORATION
Contract Amount:
Letting Date:
$1,060,069.62
04/16/2020
Residency: 08400
SAND SPRINGS
BRIDGE REHABILITATIONSH-33: OVER BROWNS
CREEK, 3.8 MILES EAST OF THE SH-48JUNCTION
NEAR LAKE HEYBURN.PROJECT LENGTH = 0.322
MILE
32715(04) STP-219C(069)3PSH-16200147Contract:
Contractor: ROSSCON, LLC
Contract Amount:
Letting Date:
$1,674,760.70
04/16/2020
Residency: 08400
SAND SPRINGS
RESURFACE (ASPHALT)SH-16: FROM 7.16 MILES
SOUTHEAST OF THE SH-33 JUNCTION,EXTEND
EAST NEAR SHAMROCK.PROJECT LENGTH = 8.000
MILES
DelawareCounty: Commissioner District: 8
Contracts Awarded - NTP Not Processed
Construction Status Report Page 155
28856(04) STP-221C(046)PMSH 85A200148Contract:
Contractor: C-GAWF CONSTRUCTION, INC.
Contract Amount:
Letting Date:
$14,482,070.35
04/16/2020
Residency: 08300
CLAREMORE
BRIDGE AND APPROACHESSH-85A: OVER HORSE
CREEK, 2.1 MILES SOUTHWEST OF THE
SH-125JUNCTION IN BERNICE.PROJECT LENGTH =
0.562 MILE
33915(04) CIRB-221D(049)RBCOUNTY RO200149Contract:
Contractor: K & R BUILDERS, INC.
Contract Amount:
Letting Date:
$1,173,154.30
04/16/2020
Residency: 08010
ATKINS
BRIDGE AND APPROACHESCOUNTY ROADS
(EW-450/D4643): OVER BEATY CREEK, 3.5
MILESSOUTH OF THE SH-20 JUNCTION NEAR
SYCAMORE.PROJECT LENGTH = 0.165 MILE
EllisCounty: Commissioner District: 6
Contracts Awarded - NTP Not Processed
24160(04) NHPP-223N(021)SSSH-15200062Contract:
Contractor: J & R SAND COMPANY, INC.
Contract Amount:
Letting Date:
$8,778,549.03
02/20/2020
Residency: 06100
BUFFALO
GRADE, DRAIN, SURFACE AND BRIDGESH-15: FROM
2.5 MILES EAST OF THE SH-64 JUNCTION,
EXTENDNORTHEAST NEAR GAGE.PROJECT
LENGTH = 4.219 MILES
GarfieldCounty: Commissioner District: 4
Contracts Awarded - NTP Not Processed
30641(04) SBR-019N(134)SBUS-64/US-200151Contract:
Contractor: BRIDGECO CONTRACTORS, INC.
Contract Amount:
Letting Date:
$892,764.17
04/16/2020
Residency: 04300
ENID
BRIDGE REHABILITATIONUS-64/US-412: OVER
SKELETON CREEK, 4.3 MILES EAST OF THEUS-81
JUNCTION IN ENID.PROJECT LENGTH 0.071 MILE
GradyCounty: Commissioner District: 7
Contracts Awarded - NTP Not Processed
30078(04) STP-208F(078)PMMULTIPLE200141Contract:
Contractor: GARY A. CRAIN, INC.
Contract Amount:
Letting Date:
$151,132.16
04/16/2020
Residency: 07300
ANADARKO
BRIDGE WATER PROOF SEALUS-62
EB/US-81/SH-9/SH-19/SH-58: AT MULTIPLE
LOCATIONS INDIVISION VII.PROJECT LENGTH =
0.000 MILE
GrantCounty: Commissioner District: 4
Contracts Awarded - NTP Not Processed
28416(04) STP-227D(025)CICOUNTY RO200102Contract:
Contractor: H & H BRIDGE COMPANY
Contract Amount:
Letting Date:
$744,732.20
03/19/2020
Residency: 04009
CIRCUIT ENGR. DISTR.
# 8
BRIDGE AND APPROACHESCOUNTY ROAD
(EW-026): OVER WILD HORSE CREEK, 5.3 MILES
EASTOF THE US-81 JUNCTION NEAR POND
CREEK.PROJECT LENGTH = 0.298 MILE
Construction Status Report Page 156
HarmonCounty: Commissioner District: 5
Contracts Awarded - NTP Not Processed
24134(10) STP-206F(064)PMMULTIPLE200139Contract:
Contractor: GARY A. CRAIN, INC.
Contract Amount:
Letting Date:
$90,090.10
04/16/2020
Residency: 05200
ALTUS
BRIDGE WATER PROOF
SEALSH-8/SH-19/SH-30/SH-51/SH-55: AT MULTIPLE
LOCATIONS INDIVISION V.PROJECT LENGTH = 0.000
MILE
HaskellCounty: Commissioner District: 1
Contracts Awarded - NTP Not Processed
24967(04) CIRB-131C(087)RBCOUNTY RO200133Contract:
Contractor: C3 CONSTRUCTION, INC.
Contract Amount:
Letting Date:
$2,684,648.91
03/19/2020
Residency: 01017
CIRCUIT ENGR. DISTR.
# 2
WIDEN, RESURFACE, AND BRIDGECOUNTY ROAD
(NS-447/TAMAHA ROAD): FROM SH-9, EXTEND
NORTHNEAR STIGLER.PROJECT LENGTH = 3.977
MILES
31195(04) STP-231B(042)PMSH-2200152Contract:
Contractor: C-GAWF CONSTRUCTION, INC.
Contract Amount:
Letting Date:
$1,250,001.46
04/16/2020
Residency: 01200
SALLISAW
GRADE, DRAIN, AND SURFACESH-2: FROM 2.3
MILES NORTH OF THE LATIMER COUNTY
LINE,EXTEND NORTH NEAR WILBURTON.PROJECT
LENGTH = 0.159 MILE
HughesCounty: Commissioner District: 3
Contracts Awarded - NTP Not Processed
29545(04) STP-232B(062)PMUS-75200065Contract:
Contractor: TREAS CONSTRUCTION, INC.
Contract Amount:
Letting Date:
$1,832,059.37
04/16/2020
Residency: 03100
ADA
BRIDGE AND APPROACHESUS-75: OVER SALT
CREEK, 5.7 MILES SOUTH OF THE US-270JUNCTION
NEAR CALVIN.PROJECT LENGTH = 0.159 MILE
JeffersonCounty: Commissioner District: 7
Contracts Awarded - NTP Not Processed
29359(04) STP-234D(050)CIEW-207200153Contract:
Contractor: K & R BUILDERS, INC.
Contract Amount:
Letting Date:
$939,292.76
04/16/2020
Residency: 07100
DUNCAN
BRIDGES AND APPROACHESCOUNTY ROAD
(EW-207): OVER BAKER CR AND TRIBUTARY TO
BAKERCR, 4.0 MILES AND 3.0 MILES WEST OF THE
SH-32 NEAR GRADY.PROJECT LENGTH = 0.381 MILE
KayCounty: Commissioner District: 4
Contracts Awarded - NTP Not Processed
Construction Status Report Page 157
33000(04) TAP-236N(063)TPCITY STRE200154Contract:
Contractor: DOWNEY CONTRACTING, LLC
Contract Amount:
Letting Date:
$758,115.30
04/16/2020
Residency: 04100
PERRY
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)CITY
STREET (MAIN STREET): FROM 0.1 MILES SOUTH
OF US-60B(E NORTH AVENUE), EXTEND NORTH IN
THE CITY OF TONKAWA.PROJECT LENGTH = 0.987
MILE
KiowaCounty: Commissioner District: 5
Contracts Awarded - NTP Not Processed
31712(04) STP-238C(055)3PSH-44A200106Contract:
Contractor: CASWELL CONTRACTING, INC.
Contract Amount:
Letting Date:
$495,629.69
03/19/2020
Residency: 05200
ALTUS
RESURFACE (ASPHALT)SH-44A: FROM THE SH-44
JUNCTION, EXTEND NORTH NEAR
LUGERT.PROJECT LENGTH = 1.360 MILES
LatimerCounty: Commissioner District: 2
Contracts Awarded - NTP Not Processed
23144(12) SSP-264F(072)PMMULTIPLE200168Contract:
Contractor: GARY A. CRAIN, INC.
Contract Amount:
Letting Date:
$82,194.68
04/16/2020
Residency: 02200
HEAVENER
BRIDGE WATER PROOF SEALUS-69
SB/US-259/SH-1/SH-113/CROWDER ROAD: AT
MULTIPLELOCATIONS IN DIVISION II.PROJECT
LENGTH = 0.000 MILES
LincolnCounty: Commissioner District: 3
Contracts Awarded - NTP Not Processed
22529(04) STP-141D(150)CICOUNTY RO200155Contract:
Contractor: BRIDGECO CONTRACTORS, INC.
Contract Amount:
Letting Date:
$505,437.59
04/16/2020
Residency: 03024
CIRCUIT ENGR. DISTR.
#4
BRIDGE AND APPROACHESCOUNTY ROAD (EW-77):
OVER SAND CREEK, 0.2 MILES EAST OF THESH-99
JUNCTION NEAR SHAMROCK.PROJECT LENGTH =
0.180 MILE
MajorCounty: Commissioner District: 6
Contracts Awarded - NTP Not Processed
31771(04) STP-247C(026)CICOUNTY RO200109Contract:
Contractor: WILDCAT CONSTRUCTION CO., INC. &
SUBSIDIARIES
Contract Amount:
Letting Date:
$647,868.96
03/19/2020
Residency: 06009
CIRCUIT ENGR. DISTR.
# 8
BRIDGE REHABILITATIONCOUNTY ROAD (D0553):
OVER CIMARRON RIVER, 3.5 MILES WEST OFTHE
SH-8 JUNCTION NEAR AMES.PROJECT LENGTH =
0.288 MILE
27005(10) SSP-019N(136)PMUS-412200217Contract:
Contractor: TOM HUDSON PAVING, INC.
Contract Amount:
Letting Date:
$109,649.37
04/16/2020
Residency: 06100
BUFFALO
GRADE AND DRAINUS-412: FROM 1.7 MILES EAST
OF THE WOODWARD COUNTY LINE,EXTEND
EAST.PROJECT LENGTH = 0.060 MILE
Construction Status Report Page 158
MarshallCounty: Commissioner District: 2
Contracts Awarded - NTP Not Processed
31278(04) NHPP-248N(050)PMUS-70200157Contract:
Contractor: OVERLAND CORPORATION
Contract Amount:
Letting Date:
$8,382,350.95
04/16/2020
Residency: 02300
MADILL
WIDEN AND RESURFACEUS-70: FROM 1.9 MILES
EAST OF THE CARTER COUNTY LINE, EXTENDEAST
NEAR MADILL.PROJECT LENGTH = 5.227 MILES
McIntoshCounty: Commissioner District: 1
Contracts Awarded - NTP Not Processed
28503(04) CIRB-246C(043)RBCOUNTY RO200110Contract:
Contractor: ROBINSON CONSTRUCTION, LLC
Contract Amount:
Letting Date:
$3,157,980.13
03/19/2020
Residency: 01017
CIRCUIT ENGR. DISTR.
# 2
GRADE, DRAIN, AND SURFACECOUNTY ROAD
(DAM ROAD): FROM 0.4 MILES NORTH OF THE
SH-71JUNCTION, EXTEND NORTH NEAR
TEXANNA.PROJECT LENGTH = 3.418 MILES
MuskogeeCounty: Commissioner District: 1
Contracts Awarded - NTP Not Processed
32723(04) SBR-251C(096)SBSH-72200159Contract:
Contractor: PARADIGM CONSTRUCTION & ENGINEERING,
INC
Contract Amount:
Letting Date:
$1,780,880.63
04/16/2020
Residency: 01100
MUSKOGEE
BRIDGE REHABILITATIONSH-72: OVER COAL
CREEK, 1.3 MILES NORTH OF THE US-64JUNCTION
NEAR HASKELL.PROJECT LENGTH = 0.160 MILE
NobleCounty: Commissioner District: 4
Contracts Awarded - NTP Not Processed
30633(04) STP-252C(062)3PSH-15200162Contract:
Contractor: EVANS & ASSOCIATES CONSTRUCTION CO.,
INC.
Contract Amount:
Letting Date:
$1,553,774.00
04/16/2020
Residency: 04100
PERRY
RESURFACE (ASPHALT)SH-15: FROM THE
GARFIELD COUNTY LINE, EXTEND EAST
NEARBILLINGS.PROJECT LENGTH = 6.500 MILES
OkfuskeeCounty: Commissioner District: 3
Contracts Awarded - NTP Not Processed
23957(04) STP-154D(099)CIEW-107200113Contract:
Contractor: H & H BRIDGE COMPANY
Contract Amount:
Letting Date:
$788,391.38
03/19/2020
Residency: 03004
JACOBS ENGINEERING
BRIDGE AND APPROACHESCOUNTY ROAD (EW-107)
: OVER ROCK CREEK, 5.5 MILES EAST OFUS-377
NEAR PADEN.PROJECT LENGTH = 0.189 MILE
Construction Status Report Page 159
OklahomaCounty: Commissioner District: 4
Contracts Awarded - NTP Not Processed
31438(04) TAP-255N(331)AGI-240 FRO200075Contract:
Contractor: SAC SERVICES, INC.
Contract Amount:
Letting Date:
$627,738.55
04/16/2020
Residency: 04600
OKLAHOMA CITY
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)I-240
FRONTAGE ROAD: AT THE INTERSECTION OF MAY
AVENUE,PENNSYLVANIA AVENUE, AND SANTA FE
AVENUE IN OKLAHOMA CITY.PROJECT LENGTH =
0.334 MILE
27586(04) SBR-155A(874)SBSH-66200165Contract:
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Contract Amount:
Letting Date:
$3,525,432.35
04/16/2020
Residency: 04600
OKLAHOMA CITY
BRIDGE REHABILITATIONSH-66: OVER SH-74, 4.0
MILES WEST OF THE I-235 INTERCHANGEIN
OKLAHOMA CITY.PROJECT LENGTH = 0.139 MILE
27107(04) SBR-255N(517)SBSH-77H200185Contract:
Contractor: FRONTIER BRIDGE, INC.
Contract Amount:
Letting Date:
$3,664,145.19
04/16/2020
Residency: 04600
OKLAHOMA CITY
BRIDGE REHABILITATIONSH-77H (SOONER ROAD):
OVER I-240, 4.0 MILES EAST OF THE
I-35INTERCHANGE IN OKLAHOMA CITY.PROJECT
LENGTH = 0.131 MILE
OsageCounty: Commissioner District: 8
Contracts Awarded - NTP Not Processed
31074(04) SBR-257B(079)SBSH-11200166Contract:
Contractor: LOGOS CONSTRUCTION CO., LLC
Contract Amount:
Letting Date:
$805,293.60
04/16/2020
Residency: 08002
TETRA TECH
BRIDGE REHABILITATIONSH-11: OVER BIRD CREEK,
0.2 MILES SOUTH OF THE US-60JUNCTION IN
PAWHUSKA.PROJECT LENGTH = 0.104 MILE
32732(04) SBR-257N(080)SBUS-60200167Contract:
Contractor: LOGOS CONSTRUCTION CO., LLC
Contract Amount:
Letting Date:
$1,230,198.84
04/16/2020
Residency: 04100
PERRY
BRIDGE REHABILITATIONUS-60: OVER COUNTY
ROAD AND ARKANSAS RIVER, 0.1 MILES AND0.3
MILES EAST OF THE US-177 JUNCTION IN PONCA
CITY.PROJECT LENGTH = 0.430 MILE
PushmatahaCounty: Commissioner District: 2
Contracts Awarded - NTP Not Processed
28631(04) CIRB-264D(068)RBCOUNTY RO200028Contract:
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Contract Amount:
Letting Date:
$5,376,195.20
04/16/2020
Residency: 02200
HEAVENER
GRADE, DRAIN, AND SURFACECOUNTY ROAD
(NOLIA LOOP ROAD): FROM THE SH-144
JUNCTION,EXTEND SOUTHEAST THEN NORTHEAST
NEAR NASHOBA.PROJECT LENGTH = 3.938 MILES
RogersCounty: Commissioner District: 8
Contracts Awarded - NTP Not Processed
Construction Status Report Page 160
26242(10) SSP-266N(083)RWSH-20200122Contract:
Contractor: ROBIN HAUSNER HOUSE MOVERS &
DEMOLITION, LLC
Contract Amount:
Letting Date:
$58,338.00
04/16/2020
Residency: 08300
CLAREMORE
RIGHT-OF-WAY CLEARANCESH-20 REALIGNMENT:
FROM 0.7 MILES EAST OF THE SH-66JUNCTION,
EXTEND NORTHWEST IN CLAREMORE.PROJECT
LENGTH = 1.723 MILES
32718(04) NHPP-030N(078)3PUS-169200169Contract:
Contractor: BECCO CONTRACTORS, INC.
Contract Amount:
Letting Date:
$1,793,000.00
04/16/2020
Residency: 08300
CLAREMORE
RESURFACE (ASPHALT)US-169: FROM 7.36 MILES
NORTHEAST OF THE TULSA COUNTY LINE,EXTEND
NORTH NEAR OOLOGAH.PROJECT LENGTH = 5.010
MILES
SeminoleCounty: Commissioner District: 3
Contracts Awarded - NTP Not Processed
32376(04) CIRB-267C(080)RBOLD STATE200079Contract:
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Contract Amount:
Letting Date:
$3,921,365.94
04/16/2020
Residency: 03024
CIRCUIT ENGR. DISTR.
#4
PAVEMENT REHABILITATION (ASPHALT)OLD STATE
HIGHWAY 99: FROM THE SH-39 JUNCTION,
EXTENDNORTHEAST IN KONAWA.PROJECT
LENGTH = 6.784 MILES
SequoyahCounty: Commissioner District: 1
Contracts Awarded - NTP Not Processed
32761(04) SBR-268C(060)SBUS-64190163Contract:
Contractor: BRIDGECO CONTRACTORS, INC.
Contract Amount:
Letting Date:
$1,300,344.65
04/16/2020
Residency: 01200
SALLISAW
BRIDGE REHABILITATIONUS-64: OVER LITTLE SKIN
BAYOU, 1.3 MILES WEST OF THE US-64BJUNCTION
IN MULDROW.PROJECT LENGTH = 0.000 MILE
34713(04) MC-268C(070)I-40200184Contract:
Contractor: SCODELLER CONSTRUCTION, INC.
Contract Amount:
Letting Date:
$685,220.00
04/16/2020
Residency: 01200
SALLISAW
CONCRETE PAVEMENT JOINT SEALI-40: FROM THE
US-64 JUNCTION, EXTEND NORTHEAST NEAR
ROLAND.PROJECT LENGTH = 6.000 MILES
TillmanCounty: Commissioner District: 5
Contracts Awarded - NTP Not Processed
31710(04) STP-271C(061)3PUS-70180337Contract:
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Contract Amount:
Letting Date:
$4,625,438.49
04/16/2020
Residency: 05200
ALTUS
RESURFACE (ASPHALT)US-70: FROM THE US-183
JUNCTION, EXTEND EAST NEAR DAVIDSONAND
GRANDFIELD.PROJECT LENGTH = 18.190 MILES
TulsaCounty: Commissioner District: 8
Contracts Awarded - NTP Not Processed
Construction Status Report Page 161
30703(04) STP-272B(278)CICITY STRE200085Contract:
Contractor: CROSSLAND HEAVY CONTRACTORS INC.
Contract Amount:
Letting Date:
$2,887,000.00
03/19/2020
Residency: 08011
GARVER, LLC.
GRADE, DRAIN, SURFACE, AND TRAFFIC
SIGNALSCITY STREETS (EAST 116TH STREET
NORTH): AT THE INTERSECTIONOF NORTH 129TH
EAST AVENUE IN OWASSO.PROJECT LENGTH =
0.426 MILE
33450(04) SBR-2440(025)SBI-244200173Contract:
Contractor: CONCRETE SERVICES CORPORATION
Contract Amount:
Letting Date:
$160,478.84
04/16/2020
Residency: 08100
TULSA
BRIDGE REHABILITATIONI-244 WB RAMP TO E. 1ST
STREET: OVER US-75, 1.4 MILES EASTOF THE
US-64/US-412/SH-51 INTERCHANGE IN THE CITY OF
TULSA.PROJECT LENGTH = 0.000 MILE
WagonerCounty: Commissioner District: 1
Contracts Awarded - NTP Not Processed
20916(04) STP-173C(087)PMSH-72200175Contract:
Contractor: APAC-CENTRAL, INC.
Contract Amount:
Letting Date:
$6,945,000.00
04/16/2020
Residency: 01100
MUSKOGEE
GRADE, DRAIN, AND SURFACESH-72: FROM 4.4
MILES NORTH OF THE US-64 JUNCTION,
EXTENDNORTH NEAR HASKELL.PROJECT LENGTH
= 2.301 MILES
32724(04) SBR-273C(052)SBSH-72200176Contract:
Contractor: BECCO CONTRACTORS, INC.
Contract Amount:
Letting Date:
$2,187,000.00
04/16/2020
Residency: 01100
MUSKOGEE
BRIDGE REHABILITATIONSH-72: OVER THE
ARKANSAS RIVER, 2.6 MILES SOUTH OF THE
SH-51JUNCTION NEAR COWETA.PROJECT LENGTH
= 0.322 MILE
WashingtonCounty: Commissioner District: 8
Contracts Awarded - NTP Not Processed
31085(04) SBR-274N(028)SBUS-75200178Contract:
Contractor: BUILT RIGHT CONSTRUCTION, LLC
Contract Amount:
Letting Date:
$695,255.70
04/16/2020
Residency: 08001
EST, INC.
BRIDGE REHABILITATIONUS-75: OVER CANEY
RIVER, 6.0 MILES SOUTH OF THE US-60JUNCTION
NEAR BARTLESVILLE.PROJECT LENGTH = 0.181
MILE
WoodsCounty: Commissioner District: 6
Contracts Awarded - NTP Not Processed
32755(04) SSR-276C(040)SRSH-8/SH-1200040Contract:
Contractor: VENTURE CORPORATION DBA V. C. O.
PAVING
Contract Amount:
Letting Date:
$1,562,640.60
01/16/2020
Residency: 06100
BUFFALO
RESURFACE (ASPHALT)SH-8/SH-11: SH-8, FROM
THE NS-257 JUNCTION EXTEND WEST.SH-11, FROM
THE US-281 JUNCTION EXTEND EAST NEAR
CAPRON.PROJECT LENGTH = 8.980 MILES
33410(04) STP-276B(039)ADUS-281200181Contract:
Contractor: DOWNEY CONTRACTING, LLC
Contract Amount:
Letting Date:
$327,183.24
04/16/2020
Residency: 06100
BUFFALO
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)US-281
(SANTA FE ST/FLYNN ST): FROM THE MAIN ST JCT,
EXTENDEAST ON SANTA FE ST THEN NORTH ON
FLYNN ST IN WAYNOKA.PROJECT LENGTH = 0.190
MILE
Construction Status Report Page 162
Resident Directory
EST
3201 S. BERRY ROADNORMAN, OK
(405)307-8378
73072
(405)329-1914 super@servting.com
0X001 - EST, INC.Residency:
Engineer: Ph: Fx:
TETR
525 CENTRAL PARK DRIVE, SUITE
403
OKLAHOMA CITY, OK
(405)606-8600
73105
(405)608-8601 tetris@ea.com
0X002 - TETRA TECHResidency:
Engineer: Ph: Fx:
CEC
4555 W. MEMORIAL RD.OKLAHOMA CITY, OK
(405)753-4200
73142
(405)384-4589
0X003 - CEC CORP.Residency:
Engineer: Ph: Fx:
JACOBS
10001 N. BROADWAY EXTENSIONOKLAHOMA CITY, OK
(405) 810-8254
73114
(405) 810-2980
0X004 - JACOBS ENGINEERINGResidency:
Engineer: Ph: Fx:
CED7
PO BOX 337 - 1779 MARSHALL RD.CLINTON, OK
(580)323-8685
736010X005 - CIRCUIT ENGR. DISTR. # 7Residency:
Engineer: Ph: Fx:
O&OE
PO BOX 5997NORMAN, OK
405-364-0281
730700X006 - OLLAR & OLLAR ENGINEERINGResidency:
Engineer: Ph: Fx:
C&KI
6940 S. UTICA AVE.TULSA, OK
(918)743-6611
74136
(918)743-6680
0X007 - CRAIG & KEITHLINE, INC.Residency:
Engineer: Ph: Fx:
BEC
521 S SECOND STREETMCALESTER, OK
(918)420-5500
745010X008 - BRAWLEY ENGINEERING CORP.Residency:
Engineer: Ph: Fx:
CED8
909 WEST LAKES DRIVEALVA, OK
(580)430-5078
737170X009 - CIRCUIT ENGR. DISTR. # 8Residency:
Engineer: Ph: Fx:
ATKINS
350 DAVID L. BOREN BOULEVARD,
SUITE 1510
NORMAN, OK
(405)321-2480
730720X010 - ATKINSResidency:
Engineer: Ph: Fx:
GARV
6450 S. LEWISTULSA, OK
(918)250-5922
741360X011 - GARVER, LLC.Residency:
Engineer: Ph: Fx:
DEWB
1350 SOUTH BOULDER, STE 600TULSA, OK
(918)587-7283
741190X012 - DEWBERRYResidency:
Engineer: Ph: Fx:
CED3
203 PEPSI COLA AVEHUGO, OK
(580)326-9191
747430X013 - CIRCUIT ENGR. DISTR. # 3Residency:
Engineer: Ph: Fx:
BENH
9400 NORTH BROADWAY, SUITE
300
OKLAHOMA CITY, OK
(405)478-5353
731140X014 - BENHAM (AKA - LEIDOS)Residency:
Engineer: Ph: Fx:
FCM
9636 N MAY ST STE 200OKLAHOMA CITY
(405)753-4142
731200X015 - FOSTER CM GROUPResidency:
Engineer: Ph: Fx:
MKEC
9500 WESTGATE RD, STE 100OKLAHOMA CITY
(405)603-7608
731620X016 - MKEC (AKA - KONERU)Residency:
Engineer: Ph: Fx:
CE2
PO BOX 2366MUSKOGEE
(918) 682-2125
744020X017 - CIRCUIT ENGR. DISTR. # 2Residency:
Engineer: Ph: Fx:
Construction Status Report Page 163
BCS
3430 MAC DONNELL DR.NORMAN
580-665-5178
730690X018 - BENCHMARK CONSTR. SERVS., LLCResidency:
Engineer: Ph: Fx:
BKL
1623 E. 6TH STREETTULSA, OK
918-835-9588
741200X019 - BKL, INCORPORATEDResidency:
Engineer: Ph: Fx:
ZPAA
4606 S GARNETT RD, STE 600TULSA, OK
9186658800
741460X020 - POE AND ASSOCIATESResidency:
Engineer: Ph: Fx:
ZOA
201 NW 63RD STREET, SUITE 130OKLAHOMA CITY, OK
4052426601
731160X021 - OLSSON ASSOCIATESResidency:
Engineer: Ph: Fx:
ZSRB
100 NE 5TH STOKLAHOMA CITY, OK
4058407094
731040X022 - SMITH ROBERTS BALDISCHWILER, LLCResidency:
Engineer: Ph: Fx:
ZFAN
6303 N PORTLAND AVE SUITE 100OKLAHOMA CITY, OK
4056077060
731120X023 - FREESE & NICHOLSResidency:
Engineer: Ph: Fx:
David Hendricks
40002 Benson Park RdShawnee 748010X024 - CIRCUIT ENGR. DISTR. #4Residency:
Engineer: Ph: Fx:
Hagerman, Jeremy
2800 S. 32ND - US-69 3 MI. S OF
US-62
MUSKOGEE, OK
(918) 682-9471
74401
(918) 682-2597 jhagerman@odot.org
01100 - MUSKOGEEResidency:
Engineer: Ph: Fx:
Orendorf, Barry
P.O. BOX 449 - 113 MCGEE DRIVESALLISAW, OK
(918) 775-2751
74955
(918) 776-0285 borendorf@odot.org
01200 - SALLISAWResidency:
Engineer: Ph: Fx:
Vacant
2800 S. 32ND - US-69 3 MI. S
US-62
MUSKOGEE, OK
(918) 682-9471
74401
(918) 682-2597
01700 - DIV. 1 BRIDGEResidency:
Engineer: Ph: Fx:
Nored, John
P. O. BOX DRAWER 628 - US-271 2
MI. S. TOWN
ANTLERS, OK
(580) 298-3081
74523
(580) 298-6152 jnored@odot.org
02100 - ANTLERSResidency:
Engineer: Ph: Fx:
Davis, Tim
P.O. BOX 835 - N. HIGHWAY 59HEAVENER, OK
(918) 653-7896
74937
(918) 653-4532 tdavis@odot.org
02200 - HEAVENERResidency:
Engineer: Ph: Fx:
Bishop, Justin
P. O. BOX 297 - HWY. BLDG. S.
MADILL
MADILL, OK
(580) 795-3675
73446
(580) 795-7461 jbishop@odot.org
02300 - MADILLResidency:
Engineer: Ph: Fx:
Plymate, Larry
P.O. BOX 3269 - US-270 E.
MCALESTER
MCALESTER, OK
(918) 423-5443
74502
(918) 429-0807 lplymate@odot.org
02400 - MCALESTERResidency:
Engineer: Ph: Fx:
Nabors, Monte
P.O. BOX DRAWER 628 - US-271 2
MI. S TOWN
ANTLERS, OK
(580) 298-3371
74523
(580) 298-6152 mnabors@odot.org
02700 - DIV. 2 BRIDGEResidency:
Engineer: Ph: Fx:
Wade, Tony
P.O. BOX 157 - 3 MI. NW ADA ON
SH-3W
ADA, OK
(580) 332-2094
74820
(580) 332-2566 twade@odot.org
03100 - ADAResidency:
Engineer: Ph: Fx:
Malave, Luis
P.O. BOX 468 - SH-74 2 MI. SW OF
PURCELL
PURCELL, OK
(405) 527-5569
73080
(405) 527-6576 lmalave@odot.org
03200 - PURCELLResidency:
Engineer: Ph: Fx:
Helton, Matthew
P.O. BOX 918 - 1.5 MI. N. WEWOKA
ON SH-56
WEWOKA, OK
(405) 257-3325
74884
(405) 257-5003 mhelton@odot.org
03300 - WEWOKAResidency:
Engineer: Ph: Fx:
Construction Status Report Page 164
Vacant
P.O. BOX 549 - 3 MI. N.W. OF ADA
ON SH-3W
ADA, OK
(580) 332-1526
74820
(580) 332-0261
03700 - DIV. 3 BRIDGEResidency:
Engineer: Ph: Fx:
Zachary, Ted
P.O. BOX 548 - US-77 1/4 M. E. OF
I-35
PERRY, OK
(580) 336-7374
73077
(580) 336-7373 tzachary@odot.org
04100 - PERRYResidency:
Engineer: Ph: Fx:
Brooks, Jonathan
15100 NW 36th St.Yukon, OK
(405) 350-2331
73099
(405) 350-2199 jbrooks@odot.org
04200 - YUKONResidency:
Engineer: Ph: Fx:
Hoover, Jacob
410 KREMLINENID, OK
(580) 234-3223
73701
(580) 237-3328 jhoover@odot.org
04300 - ENIDResidency:
Engineer: Ph: Fx:
Hubbard, Tom
4105 E. MEMORIAL RD.EDMOND, OK
(405) 475-2860
73013
(405) 478-1126 thubbard@odot.org
04400 - EDMONDResidency:
Engineer: Ph: Fx:
Mitchell, Matt
3613 N. HUSBANDSTILLWATER, OK
(405) 372-5644
74075
(405) 377-8321 mmitchell@odot.org
04500 - STILLWATERResidency:
Engineer: Ph: Fx:
Harlin, Chris
701 S.E. 82nd St.OKLAHOMA CITY, OK
(405) 522-5575
73149
charlin@odot.org
04600 - OKLAHOMA CITYResidency:
Engineer: Ph: Fx:
Vacant
P.O. BOX 471 - US-77 1/4 MI. E
I-35
PERRY, OK
(580) 336-7340
73077
(580) 336-7350
04700 - DIV. 4 BRIDGEResidency:
Engineer: Ph: Fx:
Sawyer, Dax
P.O. BOX 818 - US-183 1 MI S. OF
I-40
CLINTON, OK
(580) 323-0702
73601
(580) 323-3551 dsawyer@odot.org
05100 - CLINTONResidency:
Engineer: Ph: Fx:
Holley, Terri
608 S. JACKSON STALTUS, OK
(580) 482-3191
73521
(580) 482-0792 tholley@odot.org
05200 - ALTUSResidency:
Engineer: Ph: Fx:
Clanton, Mike
P.O. BOX 1449 - US-183 1 MI. S.
I-40
CLINTON, OK
(580) 323-1431
73601
(580) 323-1430 mclanton@odot.org
05700 - DIV. 5 BRIDGEResidency:
Engineer: Ph: Fx:
Dodgion, Richard
P. O. BOX 190 - US-64 1 MI. W
US-183
BUFFALO, OK
(580) 735-2537
73834
(580) 735-2024 rdodgion@odot.org
06100 - BUFFALOResidency:
Engineer: Ph: Fx:
Michael, Charles
P.O. BOX 348 - 504 S. CRUMLEYGUYMON, OK
(580) 338-3545
73942
(580) 338-5685 cmichael@odot.org
06200 - GUYMONResidency:
Engineer: Ph: Fx:
Roesner, Wayne
P.O. BOX 190 - US-64 1 MI. W
US-183
BUFFALO, OK
(580) 735-2561
73834
(580) 735-2248 wroesner@odot.org
06700 - DIV. 6 BRIDGEResidency:
Engineer: Ph: Fx:
Roberts, Colton
P.O. BOX 1107 - 2205 S. US-81
BYPASS
DUNCAN, OK
(580) 255-7609
73534
(580) 252-6178 croberts@odot.org
07100 - DUNCANResidency:
Engineer: Ph: Fx:
Fuhrmann, Chris
P. O. BOX 1826 - 525 INTERSTATE
DR.
ARDMORE, OK
(580) 223-1351
73402
(580) 226-8146 cfuhrmann@odot.org
07200 - ARDMOREResidency:
Engineer: Ph: Fx:
Knight, Reese
P.O. BOX 220 - 211 W MAIN ST.ANADARKO, OK
(405) 247-2462
73005
(405) 247-2057 rknight@odot.org
07300 - ANADARKOResidency:
Engineer: Ph: Fx:
Lawson, Bryce
P.O. BOX 460 - 2205 S. US-81
BYPASS
DUNCAN, OK
(580) 255-7586
73533
(580) 255-5064 blawson@odot.org
07700 - DIV. 7 BRIDGEResidency:
Engineer: Ph: Fx:
Construction Status Report Page 165
Arnold, Bruce
4002 N. MINGO VAL. EXPWY.TULSA, OK
(918) 836-7116
74116
(918) 832-0383 barnold@odot.org
08100 - TULSAResidency:
Engineer: Ph: Fx:
Beats, Aaron
25825-B S. HWY. 66 - 729 S.
MORETZ
CLAREMORE, OK
(918) 266-1160
74018
(918) 343-1203 abeats@odot.org
08300 - CLAREMOREResidency:
Engineer: Ph: Fx:
Scott, Kalynn
110 E. 41ST (PRATTVILLE)SAND SPRINGS, OK
(918) 245-9531
74063
(918) 245-0953 kscott@odot.org
08400 - SAND SPRINGSResidency:
Engineer: Ph: Fx:
Casillas, Matt
P.O. BOX 660 - 4002 N. MINGO
VAL. EXPWY.
TULSA, OK
(918) 838-9933
74101
(918) 832-9074 mcasillas@odot.org
08700 - DIV. 8 BRIDGEResidency:
Engineer: Ph: Fx: