April 30, 2020 April 01, 2020 to Period Covered in Report C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY COUNTY

Upload: others

Post on 22-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

April 30, 2020April 01, 2020 to

Period Covered in Report

C O N S T R U C T I O N R E P O R T

COMPILED BY

CONSTRUCTION ENGINEER

BY COUNTY

Page 2: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

Table of Contents

Report of Construction Engineer 3

Projects Completed - Final Estimate Not Processed 4

Projects Under Construction 51

Contracts Awarded - NTP Not Processed 154

ODOT Residency Directory 163

Construction Status Report Page 2

Page 3: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

Activity for Month of April 2020

Number of

Contracts Amount PaidContract Amount

Contracts Finaled 20 36,981,377.10 36,967,299.98

Contracts Completed 16 40,996,644.73 40,997,924.38

NTP Issued 25 0.00 53,149,908.51

Contracts Awarded 29 0.00 60,083,221.95

Contracts Let 43 0.00 83,397,796.43

Status of Construction Projects as of April 30, 2020

Number of

Contracts Amount PaidContract Amount

Contracts Completed, Final Estimate Not Paid 284 1,236,391,214.47 1,210,976,496.55

Contracts Under Construction 402 1,189,082,863.87 2,201,732,117.62

Contracts Awarded, NTP Not Processed 52 0.00 105,145,237.33

Active Contracts 738 2,425,474,078.34 3,517,853,851.50

Construction Status Report Page 3

Page 4: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

AdairCounty: Commissioner District: 1

Contracts Completed - Final Estimate Not Processed

28652(04) CO.RD.

CIRB-201D(022)RB

Orendorf, Barry

Residency:Contract: 160405

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:02/22/2018Completion Date:

Final Est Sub:Letting Date:

$619,500.64

11/17/2016

01200

SALLISAW

BRIDGE AND APPROACHES COUNTY ROAD

(NS-466): OVER SALLISAW CREEK, 3.8 MILES

SOUTH OF SH-100 NEAR STILLWELL. PROJECT

LENGTH = 0.208 MILE

26290(04) US-62

STP-101B(088)SS

Orendorf, Barry

Residency:Contract: 170250

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount:12/05/2019Completion Date:

Final Est Sub:Letting Date:

$2,031,387.91

09/21/2017

01200

SALLISAW

BRIDGE AND APPROACHES US-62: OVER

DENNISON HOLLOW CREEK, 4.0 MILES EAST OF

THE CHEROKEE COUNTY LINE NEAR CHRISTIE.

PROJECT LENGTH = 0.340 MILE

34218(04) SH-100

STP-201C(040)TR

Orendorf, Barry

Residency:Contract: 190311

Contractor: ADVANCED WORKZONE SERVICES, LLC

Engineer:

Contract Amount:03/05/2020Completion Date:

Final Est Sub:Letting Date:

$22,990.00

10/17/2019

01200

SALLISAW

SAFETY IMPROVEMENT (SCHOOL ZONE) SH-100:

FROM THE SH-59 JUNCTION, EXTEND EAST IN

STILWELL. PROJECT LENGTH = 1.666 MILES

AlfalfaCounty: Commissioner District: 6

Contracts Completed - Final Estimate Not Processed

28032(04) SH-58

ACSTP-202C(029)SS

Dodgion, Richard

Residency:Contract: 160069

Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.

Engineer:

Contract Amount:12/06/2018Completion Date:

Final Est Sub:Letting Date:

$2,697,204.35

02/18/2016

06100

BUFFALO

BRIDGE AND APPROACHES SH-58: OVER

MEDICINE LODGE RIVER OVERFLOW, 1.1 MILES

EAST OF THE SH-8 JUNCTION NEAR CHEROKEE.

PROJECT LENGTH = 0.225 MILE.

27943(04) SH-8

STP-202C(033)

Dodgion, Richard

Residency:Contract: 170112

Contractor: L & M CONTRACTORS, INC.

Engineer:

Contract Amount:01/16/2020Completion Date:

Final Est Sub:Letting Date:

$2,388,858.65

03/16/2017

06100

BUFFALO

BRIDGE AND APPROACHES SH-8: OVER

DRIFTWOOD CREEK, 0.9 MILES NORTH OF THE

SH-11 JUNCTION NEAR BURLINGTON. PROJECT

LENGTH = 0.251 MILE

AtokaCounty: Commissioner District: 2

Contracts Completed - Final Estimate Not Processed

Construction Status Report Page 4

Page 5: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29925(04) CO.RD.

CIRB-203C(033)RB

CED3

Residency:Contract: 170305

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount:10/18/2018Completion Date:

Final Est Sub:Letting Date:

$490,121.95

10/19/2017

02013

CIRCUIT ENGR. DISTR. # 3

BRIDGE AND APPROACHES COUNTY ROAD

(NS-4005): OVER DOYAL CREEK, 0.1 MILE NORTH

OF WESLEY ROAD NEAR STRINGTOWN.

PROJECT LENGTH = 0.171 MILE.

31169(04) CO.RD.

CIRB-203D(034)RB

CED3

Residency:Contract: 170366

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount:04/18/2019Completion Date:

Final Est Sub:Letting Date:

$1,280,688.63

11/16/2017

02013

CIRCUIT ENGR. DISTR. # 3

US-69/US-75 JUNCTION NEAR ATOKA.

BRIDGE AND APPROACHES COUNTY ROAD

(E-1844/DAIRY LN): OVER UNION PACIFIC

RAILROAD, 0.2 MILES SOUTHEAST OF THE

US-69/US-75 JUNCTION NEAR ATOKA. PROJECT

LENGTH = 0.159 MILE

29951(04) COUNTY RO

CIRB-203C(067)RB

CED3

Residency:Contract: 190001

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:02/13/2020Completion Date:

Final Est Sub:Letting Date:

$1,215,397.45

01/17/2019

02013

CIRCUIT ENGR. DISTR. # 3

GRADE, DRAIN, AND SURFACE COUNTY ROAD

(EW-186/BOGGY DEPOT ROAD): FROM 0.9 MILES

WEST OF THE US-69 JUNCTION, EXTEND EAST

NEAR TUSHKA. PROJECT LENGTH = 0.912 MILE

29923(04) COUNTY RO

STP-203D(069)CI

CED3

Residency:Contract: 190066

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount:11/30/2019Completion Date:

Final Est Sub:Letting Date:

$515,823.80

02/14/2019

02013

CIRCUIT ENGR. DISTR. # 3

BRIDGE AND APPROACHES COUNTY ROAD

(EW-167): OVER NOLLEYTUBBY CREEK, 4.4

MILES WEST OF THE PITTSBURG COUNTY LINE

NEAR WESLEY. PROJECT LENGTH = 0.191 MILE

BeckhamCounty: Commissioner District: 5

Contracts Completed - Final Estimate Not Processed

23243(04) SH-30

STPY-105C(124)SS/STPY-10*

Sawyer, Dax

Residency:Contract: 130149

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount:02/02/2017Completion Date:

Final Est Sub: 07/18/2019Letting Date:

$9,666,421.56

06/19/2014

05100

CLINTON

*5C(183)

GRADE, DRAIN, SURFACE, BRIDGE AND

APPROACHES SH-30: OVER THE NORTH FORK

OF THE RED RIVER, 5.0 MILES NORTH OF I-40.

PROJECT LENGTH = 1.310 MILES.

24354(04) I-40

ACNHPPI-4000(022)(028)SS

Sawyer, Dax

Residency:Contract: 160160

Contractor: CORNELL CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount:08/15/2017Completion Date:

Final Est Sub:Letting Date:

$11,066,589.87

05/19/2016

05100

CLINTON

RESURFACE (ASPHALT) AND BRIDGE REPAIR

I-40: FROM 0.3 MILE EAST OF SH-30, EXTEND

EAST NEAR SAYRE. PROJECT LENGTH = 9.395

MILES.

Construction Status Report Page 5

Page 6: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27023(04) I-40

SSP-4000(041)SS/SBR-4000*

Sawyer, Dax

Residency:Contract: 170061

Contractor: CORNELL CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount:10/19/2018Completion Date:

Final Est Sub: Letting Date:

$9,629,728.25

02/16/2017

05100

CLINTON

*(038)SB

RESURFACE (ASPHALT) AND BRIDGE

REHABILITATION I-40: FROM SH-34 SOUTH,

EXTEND EAST NEAR ELK CITY. PROJECT

LENGTH = 6.853 MILES.

24352(04) SH-152

SSP-105C(147)SS

Holley, Terri

Residency:Contract: 170115

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount:12/27/2018Completion Date:

Final Est Sub: Letting Date:

$4,227,399.73

03/16/2017

05200

ALTUS

GRADE, DRAIN, SURFACE, AND BRIDGE SH-152:

FROM SH-6, EXTEND EAST NEAR ELK CITY.

PROJECT LENGTH = 3.758 MILES.

31775(04) CO.RD.

SBR-4000(034)SB

Sawyer, Dax

Residency:Contract: 170217

Contractor: OBC, INC.

Engineer:

Contract Amount:03/01/2018Completion Date:

Final Est Sub: 08/08/2019Letting Date:

$1,849,841.75

07/20/2017

05100

CLINTON

BRIDGE REHABILITATION COUNTY ROAD

(CEMETERY ROAD): OVER I-40, 1.9 MILES

NORTHEAST OF I-40B NEAR SAYRE. PROJECT

LENGTH = 0.142 MILE.

30694(04) COUNTY RO

STP-205D(075)CI

CED7

Residency:Contract: 180258

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount:07/30/2019Completion Date:

Final Est Sub: 03/31/2020Letting Date:

$450,626.00

08/16/2018

05005

CIRCUIT ENGR. DISTR. # 7

BRIDGE AND APPROACHES COUNTY ROAD

(EW-123): OVER SAND CREEK, 0.9 MILES WEST

OF THE US-283 JUNCTION NEAR SAYRE.

PROJECT LENGTH = 0.180 MILE

27900(08) I-40B

NHPP-205N(083)RW

Sawyer, Dax

Residency:Contract: 180342

Contractor: M & M WRECKING, INC.

Engineer:

Contract Amount:07/11/2019Completion Date:

Final Est Sub: 11/06/2019Letting Date:

$47,000.01

11/15/2018

05100

CLINTON

RIGHT-OF-WAY CLEARANCE I-40B: OVER ELK

CREEK, 0.2 MILES EAST OF THE SH-6 JUNCTION

IN ELK CITY. PROJECT LENGTH = 0.17 MILE

PREQUALIFICATION FOR THIS PROJECT HAS

BEEN WAIVED. BOTH BID EXPRESS AND

WRITTEN BIDS WILL BE ACCE

31112(04) SH-34

STP-205F(082)3P

Holley, Terri

Residency:Contract: 190068

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount:11/16/2019Completion Date:

Final Est Sub: 02/04/2020Letting Date:

$2,516,314.44

06/20/2019

05200

ALTUS

RESURFACE (ASPHALT) SH-34: FROM THE

US-283 JUNCTION, EXTEND NORTH NEAR

WILLOW. PROJECT LENGTH = 10.43 MILES

BlaineCounty: Commissioner District: 5

Contracts Completed - Final Estimate Not Processed

Construction Status Report Page 6

Page 7: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27950(04) SH-51

STP-206C(053)PM

Sawyer, Dax

Residency:Contract: 180154

Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount:09/18/2019Completion Date:

Final Est Sub: Letting Date:

$3,381,458.44

05/17/2018

05100

CLINTON

8 JUNCTION IN CANTON.

BRIDGE AND APPROACHES SH-51: OVER NORTH

CANADIAN RIVER AND OVERFLOW, 0.4 MILES

AND 0.6 MILES EAST OF THE SH-58 JUNCTION IN

CANTON. PROJECT LENGTH = 0.378 MILE

27903(04) SH-8

ACSTP-206C(043)PM

Sawyer, Dax

Residency:Contract: 180217

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount:09/05/2019Completion Date:

Final Est Sub: Letting Date:

$3,598,708.87

04/19/2018

05100

CLINTON

AND 12.4 MI S OF THE SH-51 JCT NEAR OKEENE AND HITCHCOCK.

BRIDGE AND APPROACHES AND BRIDGE

REHABILITATION SH-8: OVER SPRING CREEK

AND UNNAMED CREEKS, 1.0 MI, 10.9 MI, AND 12.4

MI S OF THE SH-51 JCT NEAR OKEENE AND

HITCHCOCK. PROJECT LENGTH = 0.592 MILE

31711(04) SH-51A

STP-206B(055)3P

Sawyer, Dax

Residency:Contract: 190069

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount:02/17/2020Completion Date:

Final Est Sub: Letting Date:

$2,658,520.55

06/20/2019

05100

CLINTON

RESURFACE (ASPHALT) SH-51A: FROM THE

SH-51 SPUR JUNCTION, EXTEND NORTH NEAR

CANTON. PROJECT LENGTH = 7.57 MILES

BryanCounty: Commissioner District: 2

Contracts Completed - Final Estimate Not Processed

28101(04) US-69

NHG-013N(144)(145)TR

Bishop, Justin

Residency:Contract: 110371

Contractor: MIDSTATE TRAFFIC CONTROL, INC.

Engineer:

Contract Amount:11/16/2012Completion Date:

Final Est Sub: 10/07/2019Letting Date:

$2,001,222.50

08/18/2011

02300

MADILL

SAFETY IMPROVEMENT (CABLE BARRIER AND

GUARDRAIL) US-69: FROM THE

OKLAHOMA/TEXAS STATE LINE, EXTEND NORTH.

28193(04) US-70

NHPP-022N(218)3P

Bishop, Justin

Residency:Contract: 190070

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:11/05/2019Completion Date:

Final Est Sub: Letting Date:

$2,143,435.00

03/14/2019

02300

MADILL

RESURFACE (ASPHALT) US-70: FROM 5.4 MILES

WEST OF THE US-70 BYPASS, EXTEND EAST

NEAR DURANT. PROJECT LENGTH = 5.30 MILES

CaddoCounty: Commissioner District: 7

Contracts Completed - Final Estimate Not Processed

01817(09) SH-152

ACSTP-208C(041)SS

Knight, Reese

Residency:Contract: 160278

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:06/20/2019Completion Date:

Final Est Sub: 12/18/2019Letting Date:

$9,214,596.05

08/18/2016

07300

ANADARKO

GRADE, DRAIN, AND SURFACE SH-152: FROM 0.4

MILES WEST OF THE SH-146 JUNCTION, EXTEND

EAST NEAR BINGER. PROJECT LENGTH = 2.46

MILES

Construction Status Report Page 7

Page 8: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

24092(04) SH-58

STP-208C(052)SS

Knight, Reese

Residency:Contract: 170218

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:03/25/2020Completion Date:

Final Est Sub: Letting Date:

$5,338,036.82

11/16/2017

07300

ANADARKO

WIDEN AND RESURFACE SH-58: FROM SH-152,

EXTEND NORTH NEAR EAKLEY. PROJECT

LENGTH = 5.890 MILES

32828(04) US-281

STP-208B(067)3P

Knight, Reese

Residency:Contract: 190107

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:03/30/2020Completion Date:

Final Est Sub: 04/20/2020Letting Date:

$1,961,515.80

03/14/2019

07300

ANADARKO

RESURFACE (ASPHALT) US-281: FROM 0.01

MILES WEST OF THE SH-152 JUNCTION, EXTEND

WEST NEAR BINGER. PROJECT LENGTH = 4.10

MILES

33453(04) US-281

STP-208B(064)3P

Knight, Reese

Residency:Contract: 190194

Contractor: T & G CONSTRUCTION, INC.

Engineer:

Contract Amount:11/11/2019Completion Date:

Final Est Sub: 01/06/2020Letting Date:

$875,398.60

06/20/2019

07300

ANADARKO

RESURFACE (ASPHALT) US-281: FROM 6.6 MILES

SOUTH OF THE SH-152 JUNCTION, EXTEND

NORTH NEAR GRACEMONT. PROJECT LENGTH =

2.350 MILES

CanadianCounty: Commissioner District: 4

Contracts Completed - Final Estimate Not Processed

24424(07) I-40

IMY-040-4(436)/IMY-040-4*

Brooks, Jonathan

Residency:Contract: 130003

Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV

Engineer:

Contract Amount:06/10/2016Completion Date:

Final Est Sub: 10/14/2019Letting Date:

$48,167,910.63

01/17/2013

04200

YUKON

*(435)138/SBR-109N(182)SB

RECONSTRUCT - ADDED LANES, BRIDGE AND

APPROACHES I-40: FROM MILE MARKER 136,

EXTEND EAST TO MILE MARKER 140. SH-4

(MUSTANG ROAD): OVER I-40. PROJECT

LENGTH = 4.664 MILES.

27858(04) CO.RD.

CIRB-209D(063)RB

Brooks, Jonathan

Residency:Contract: 170368

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount:03/10/2019Completion Date:

Final Est Sub: Letting Date:

$4,378,548.90

11/16/2017

04200

YUKON

EXTEND SOUTH NEAR EL RENO.

GRADE, DRAIN, AND SURFACE COUNTY ROAD

(NS-274/CALUMET ROAD): FROM 0.2 MILES

SOUTH OF THE I-40 INTERSECTION, EXTEND

SOUTH NEAR EL RENO. PROJECT LENGTH =

4.336 MILES

33736(04) SH-3

NHPP-209N(066)3P

Brooks, Jonathan

Residency:Contract: 180321

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:09/27/2019Completion Date:

Final Est Sub: Letting Date:

$4,253,278.50

10/18/2018

04200

YUKON

RESURFACE (ASPHALT) SH-3: FROM THE SH-4

JUNCTION, EXTEND NORTHWEST NEAR

PIEDMONT. PROJECT LENGTH = 6.12 MILES

CarterCounty: Commissioner District: 7

Contracts Completed - Final Estimate Not Processed

Construction Status Report Page 8

Page 9: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

24104(04) SH-53

ACSTP-110C(189)(192)SS

Fuhrmann, Chris

Residency:Contract: 170009

Contractor: TREAS CONSTRUCTION, INC.

Engineer:

Contract Amount:04/24/2020Completion Date:

Final Est Sub: 04/24/2020Letting Date:

$7,798,865.79

08/17/2017

07200

ARDMORE

GRADE, DRAIN, BRIDGE, AND APPROACHES

SH-53: FROM 6.8 MILES EAST OF SH-76

JUNCTION, EXTEND EAST NEAR SPRINGER.

PROJECT LENGTH = 7.670 MILES

28782(04) MULTIPLE

STP-208F(068)PM

TETR

Residency:Contract: 190193

Contractor: PACIFIC PAINTING COMPANY, INC.

Engineer:

Contract Amount:03/05/2020Completion Date:

Final Est Sub:Letting Date:

$316,371.36

06/20/2019

07002

TETRA TECH

BRIDGE PAINTING I-35/I-35 FRONTAGE

ROAD/US-277/COUNTY ROAD (E2000): AT

MULTIPLE LOCATIONS IN DIVISION VII. PROJECT

LENGTH = 0.00

31308(04) SH-53

SBR-210C(069)SB

Fuhrmann, Chris

Residency:Contract: 190208

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Engineer:

Contract Amount:04/24/2020Completion Date:

Final Est Sub:Letting Date:

$458,934.10

07/25/2019

07200

ARDMORE

BRIDGE REHABILITATION SH-53: OVER BIG

BRANCH CREEK, 5.5 MILES EAST OF THE US-77

JUNCTION NEAR GENE AUTRY. PROJECT

LENGTH = 0.085 MILE

CherokeeCounty: Commissioner District: 1

Contracts Completed - Final Estimate Not Processed

24824(04) CO.RD.

CIRB-111C(119)RB

Hagerman, Jeremy

Residency:Contract: 130265

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:05/14/2016Completion Date:

Final Est Sub:Letting Date:

$3,559,547.93

08/22/2013

01100

MUSKOGEE

GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY

ROAD (NS-441): BEGIN 3.8 MILES SOUTH AND 2.3

MILES WEST OF SH-51/SH-80 JUNCTION, EXTEND

NORTH OVER RATTLESNAKE CREEK

TRIBUTARY. PROJECT LENGTH = 1.338 MILES.

23138(04) SH-51

ACSTP-111B(090)SS

Hagerman, Jeremy

Residency:Contract: 160279

Contractor: OBC, INC.

Engineer:

Contract Amount:05/13/2019Completion Date:

Final Est Sub:Letting Date:

$6,737,488.16

10/20/2016

01100

MUSKOGEE

BRIDGE AND APPROACHES SH-51: OVER

FOURTEEN MILE CREEK, 5.0 MILES EAST OF THE

WAGONER COUNTY LINE. PROJECT LENGTH =

0.870 MILE.

31680(04) US-62

HISPG-211B(018)TR

Orendorf, Barry

Residency:Contract: 160351

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:09/15/2017Completion Date:

Final Est Sub:Letting Date:

$434,626.34

10/20/2016

01200

SALLISAW

SAFETY IMPROVEMENT (CABLE BARRIER AND

GUARDRAIL) US-62: FROM 4.2 MILES EAST OF

THE SH-10 JUNCTION, EXTEND EAST NEAR

ELDON. PROJECT LENGTH = 1.470 MILES

ChoctawCounty: Commissioner District: 2

Contracts Completed - Final Estimate Not Processed

Construction Status Report Page 9

Page 10: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29965(04) CRYSTAL R

STP-212C(043)CI

CED3

Residency:Contract: 180322

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:08/26/2019Completion Date:

Final Est Sub: Letting Date:

$698,934.20

10/18/2018

02013

CIRCUIT ENGR. DISTR. # 3

RESURFACE (ASPHALT) COUNTY ROAD

(CRYSTAL ROAD/NS-401): FROM 2.5 MILES

NORTH OF THE US-70 JUNCTION, EXTEND

NORTH NEAR BOSWELL. PROJECT LENGTH =

2.500 MILES

31225(04) COUNTY RO

CIRB-212D(037)RB

CED3

Residency:Contract: 180348

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount:06/28/2019Completion Date:

Final Est Sub: Letting Date:

$157,414.16

11/15/2018

02013

CIRCUIT ENGR. DISTR. # 3

BRIDGE AND APPROACHES COUNTY ROAD

(NS-435): OVER UNNAMED CREEK, 0.7 MILES

SOUTH OF THE SH-109 JUNCTION NEAR

FROGVILLE. PROJECT LENGTH = 0.123 MILE

23144(15) MULTIPLE

STP-264C(064)PM

Nored, John

Residency:Contract: 190160

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount:12/10/2019Completion Date:

Final Est Sub: 04/20/2020Letting Date:

$51,718.00

04/18/2019

02100

ANTLERS

BRIDGE WATER PROOF SEAL

US-70/SH-2/SH-32/SH-48/SH-63/SH-109: AT

MULTIPLE LOCATIONS IN DIVISION II. PROJECT

LENGTH = 0.000 MILE

CimarronCounty: Commissioner District: 6

Contracts Completed - Final Estimate Not Processed

31688(04) US-56

BSAP-213N(015)FM

TETR

Residency:Contract: 170011

Contractor: UNIFIED SERVICES OF TEXAS, INC.

Engineer:

Contract Amount:10/25/2018Completion Date:

Final Est Sub: 08/15/2019Letting Date:

$2,942,104.22

01/19/2017

06002

TETRA TECH

WEIGH STATION US-56: BOISE CITY WEIGH

STATION, 0.7 MILES WEST OF US-287.

24826(08) COUNTY RO

CIRB-213C(024)RB

Michael, Charles

Residency:Contract: 190034

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount:04/02/2020Completion Date:

Final Est Sub: Letting Date:

$2,999,125.73

01/17/2019

06200

GUYMON

GRADE, DRAIN, AND SURFACE COUNTY ROADS

(EW-35/NS-53): EW-35, FROM THE NS-53

JUNCTION EXTEND EAST. NS-53, FROM THE

TEXAS STATE LINE EXTEND NORTH. PROJECT

LENGTH = 3.371 MILES

26975(06) MULTIPLE

STP-230F(032)PM

Dodgion, Richard

Residency:Contract: 190213

Contractor: JLT CONTRACTING, LLC

Engineer:

Contract Amount:04/30/2020Completion Date:

Final Est Sub: Letting Date:

$186,826.15

07/25/2019

06100

BUFFALO

BRIDGE WATER PROOF SEAL

US-56/US-60/US-183/US-270/US-385/SH-3/SH-8/SH-

11/SH-34: AT MULTIPLE LOCATIONS IN DIVISION

VI. PROJECT LENGTH = 0.000 MILE

ClevelandCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

Construction Status Report Page 10

Page 11: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

09031(08) I-35

IM-NHIY-0035-2(289)109

Malave, Luis

Residency:Contract: 120328

Contractor: ALLEN CONTRACTING, INC./ MANHATTAN ROAD & BRIDGE (JV)

Engineer:

Contract Amount:08/02/2017Completion Date:

Final Est Sub: Letting Date:

$28,887,284.36

10/18/2012

03200

PURCELL

GRADE, DRAIN, SURFACE, AND BRIDGE I-35:

SINGLE POINT URBAN INTERCHANGE (SPUI) AT

MAIN STREET IN THE CITY OF NORMAN.

PROJECT LENGTH = 1.491 MILES.

20266(04) SH-09

SSP-114N(099)SS

JACOBS

Residency:Contract: 140089

Contractor: ALLEN CONTRACTING, INC.

Engineer:

Contract Amount:09/10/2015Completion Date:

Final Est Sub: 03/12/2020Letting Date:

$9,587,991.29

02/20/2014

03004

JACOBS ENGINEERING

GRADE, DRAIN, SURFACE, AND BRIDGE SH-9:

FROM JUST WEST OF 24TH AVE. S.E., EXTEND

EAST IN NORMAN. PROJECT LENGTH = 1.506

MILES.

09031(05) I-35

NHPPIY-0035-2(176)(304)

Malave, Luis

Residency:Contract: 140287

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount:05/23/2019Completion Date:

Final Est Sub: Letting Date:

$71,124,697.35

11/20/2014

03200

PURCELL

GRADE, DRAIN, SURFACE, AND BRIDGE I-35:

INTERCHANGE AT SH-9 AND LINDSEY STREET IN

NORMAN. PROJECT LENGTH = 1.036 MILES.

28810(04) CT.ST.

STP-114E(299)EH/STPG-114*

BCS

Residency:Contract: 170178

Contractor: RUDY CONSTRUCTION CO.

Engineer:

Contract Amount:11/15/2019Completion Date:

Final Est Sub: 02/28/2020Letting Date:

$3,052,446.98

05/18/2017

03018

BENCHMARK CONSTR. SERVS., LLC

*A(141)AG

ENHANCEMENT (STREETSCAPE) CITY STREET

(MAIN STREET): FROM JONES AVENUE, EXTEND

SOUTHWEST IN THE CITY OF NORMAN.

29289(04) CT.ST.

STP-214C(080)AG

ATKINS

Residency:Contract: 170313

Contractor: ALLEN CONTRACTING, INC.

Engineer:

Contract Amount:03/31/2019Completion Date:

Final Est Sub: Letting Date:

$2,794,653.90

10/19/2017

03010

ATKINS

GRADE, DRAIN, AND SURFACE CITY STREET

(12TH AVENUE SE): FROM 0.4 MILES SOUTH OF

SH-9, EXTEND NORTH IN THE CITY OF NORMAN.

PROJECT LENGTH = 0.530 MILE

24760(04) SH-9

ACSTP-114B(206)PM

Malave, Luis

Residency:Contract: 180126

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount:12/23/2019Completion Date:

Final Est Sub: Letting Date:

$5,328,788.81

03/15/2018

03200

PURCELL

BRIDGE AND APPROACHES SH-9: OVER LITTLE

RIVER, 12.5 MILES EAST OF US-77 IN NORMAN.

PROJECT LENGTH = 0.554 MILE

26836(04) CITY STRE

STP-114C(255)AG

EST

Residency:Contract: 180190

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount:03/26/2020Completion Date:

Final Est Sub: Letting Date:

$4,905,000.00

05/17/2018

03001

EST, INC.

INTERCHANGE IN THE CITY OF NORMAN.

GRADE, DRAIN, SURFACE, AND BRIDGE CITY

STREET (MAIN STREET): OVER BROOKHAVEN

CREEK, 1.0 MILE WEST OF THE I-35

INTERCHANGE IN THE CITY OF NORMAN.

PROJECT LENGTH = 0.195 MILE

Construction Status Report Page 11

Page 12: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33414(04) SH-37

SBR-214C(086)SB

Malave, Luis

Residency:Contract: 180261

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount:12/09/2019Completion Date:

Final Est Sub: Letting Date:

$1,885,495.63

08/16/2018

03200

PURCELL

BRIDGE REHABILITATION SH-37: OVER I-35, 3.7

MILES WEST OF THE SH-77H JUNCTION NEAR

MOORE. PROJECT LENGTH = 0.082 MILE

31254(04) COUNTY RO

STP-214D(088)CI

Malave, Luis

Residency:Contract: 190005

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount:02/10/2020Completion Date:

Final Est Sub: Letting Date:

$294,990.00

01/17/2019

03200

PURCELL

BRIDGE AND APPROACHES COUNTY ROAD

(EW-133/SLAUGHTERVILLE RD): OVER UNNAMED

CREEK, 0.3 MILES WEST OF THE US-77

JUNCTION IN SLAUGHTERVILLE. PROJECT

LENGTH = 0.033 MILE

34637(04) CITY STRE

E-SAP-214N(100)ES

Malave, Luis

Residency:Contract: 200007

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Engineer:

Contract Amount:04/17/2020Completion Date:

Final Est Sub: Letting Date:

$49,576.65

01/16/2020

03200

PURCELL

BRIDGE REPAIR CITY STREET (INDIAN HILLS

ROAD): REPAIR VEHICLE IMPACT DAMAGE

OVER I-35, 3.6 MILES WEST OF SH-77H IN

NORMAN. PROJECT LENGTH = 0.000 MILE

CoalCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

20317(04) US-75

NHPP-215N(014)SS

Wade, Tony

Residency:Contract: 150129

Contractor: BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC.

Engineer:

Contract Amount:05/15/2017Completion Date:

Final Est Sub: Letting Date:

$2,005,154.27

04/16/2015

03100

ADA

BRIDGE AND APPROACHES US-75: OVER COAL

CREEK, 2.2 MILES NORTH OF THE ATOKA

COUNTY LINE. PROJECT LENGTH = 0.208 MILE.

27998(04) US-75

STP-215B(015)SS

Wade, Tony

Residency:Contract: 150130

Contractor: BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC.

Engineer:

Contract Amount:12/10/2016Completion Date:

Final Est Sub: 04/16/2020Letting Date:

$2,529,033.82

04/16/2015

03100

ADA

BRIDGE AND APPROACHES US-75: OVER ROCK

CREEK, 7.09 MILES NORTH OF SH-3. PROJECT

LENGTH = 0.416 MILE.

24944(08) CO.RD.

CIRB-215C(024)RB

Wade, Tony

Residency:Contract: 170119

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:07/30/2019Completion Date:

Final Est Sub: Letting Date:

$1,746,298.20

04/20/2017

03100

ADA

GRADE, DRAIN, AND SURFACE COUNTY ROAD

(NS-382/POLK ROAD): FROM 4.2 MILES NORTH

OF SH-31, EXTEND NORTH NEAR COALGATE.

PROJECT LENGTH = 1.561 MILES

Construction Status Report Page 12

Page 13: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

22973(15) MULTIPLE

SSP-262C(040)SS

Wade, Tony

Residency:Contract: 170164

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount:07/24/2019Completion Date:

Final Est Sub: Letting Date:

$97,541.66

04/18/2019

03100

ADA

BRIDGE WATER PROOF SEAL

US-75/US-77/SH-19/SH-22/SH-59/SH-74/SH-76/SH-9

9: AT MULTIPLE LOCATIONS IN DIVISION III.

PROJECT LENGTH = 0.00 MILE

30011(04) CO.RD.

STP-215C(022)CI

Wade, Tony

Residency:Contract: 170253

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount:08/07/2019Completion Date:

Final Est Sub: Letting Date:

$516,623.15

08/17/2017

03100

ADA

BRIDGE AND APPROACHES COUNTY ROAD

(EW-1780): OVER WALNUT CREEK, 2.2 MILES

SOUTHWEST OF THE SH-48 INTERSECTION

NEAR BROMIDE. PROJECT LENGTH = 0.265 MILE

30013(04) COUNTY RO

STP-215D(030)CI

Wade, Tony

Residency:Contract: 180350

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount:09/12/2019Completion Date:

Final Est Sub: Letting Date:

$407,825.34

11/15/2018

03100

ADA

BRIDGE AND APPROACHES COUNTY ROAD

(EW-177): OVER UNNAMED CREEK, 2.74 MILES

WEST OF SH-75 NEAR LEHIGH. PROJECT

LENGTH = 0.247 MILE

33413(04) US-75

SSR-215N(029)SR

Wade, Tony

Residency:Contract: 190073

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:09/12/2019Completion Date:

Final Est Sub: Letting Date:

$720,294.34

02/14/2019

03100

ADA

RESURFACE (ASPHALT) US-75: FROM 0.8 MILES

NORTHWEST OF THE SH-31 JUNCTION, EXTEND

NORTHWEST NEAR COALGATE. PROJECT

LENGTH = 3.00 MILES

ComancheCounty: Commissioner District: 7

Contracts Completed - Final Estimate Not Processed

23410(04) SH-07

STP-116B(137)MS

CEC

Residency:Contract: 170248

Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)

Engineer:

Contract Amount:01/31/2020Completion Date:

Final Est Sub: Letting Date:

$8,319,903.28

08/17/2017

07003

CEC CORP.

GRADE, DRAIN, SURFACE, AND TRAFFIC SIGNAL

CITY STREET (SE 45TH STREET): FROM SH-7

(LEE BOULEVARD), EXTEND NORTH IN LAWTON.

PROJECT LENGTH = 1.292 MILES.

27050(04) I-44

NHPPI-216N(021)SS

CEC

Residency:Contract: 170342

Contractor: T & G CONSTRUCTION, INC.

Engineer:

Contract Amount:01/31/2020Completion Date:

Final Est Sub: Letting Date:

$6,680,994.79

11/16/2017

07003

CEC CORP.

INTERCHANGE I-44: AT THE US-62 INTERCHANGE

IN THE CITY OF LAWTON. PROJECT LENGTH =

0.961 MILE.

Construction Status Report Page 13

Page 14: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27968(04) US-277

STP-216C(072)SS

Roberts, Colton

Residency:Contract: 170371

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount:08/06/2019Completion Date:

Final Est Sub:Letting Date:

$2,834,368.61

11/16/2017

07100

DUNCAN

N.

BRIDGE AND APPROACHES US-277: OVER

SNAKE CREEK, 0.8 AND 0.9 MILE NORTH OF THE

COTTON COUNTY LINE NEAR LAWTON.

PROJECT LENGTH = 0.700 MILE.

29363(04) CO.RD.

CIRB-216D(075)RB

Roberts, Colton

Residency:Contract: 180043

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount:03/25/2019Completion Date:

Final Est Sub:Letting Date:

$499,590.70

01/18/2018

07100

DUNCAN

Y 115 NEAR INDIAHOMA.

BRIDGE AND APPROACHES COUNTY ROAD

(EW-168/BISHOP ROAD): OVER POST OAK

CREEK, 3.9 MILES WEST OF COUNTY HIGHWAY

115 NEAR INDIAHOMA. PROJECT LENGTH = 0.208

MILE

32795(04) COUNTY RO

SBR-4400(038)SB

Roberts, Colton

Residency:Contract: 190211

Contractor: BREWER CONSTRUCTION OKLAHOMA, LLC

Engineer:

Contract Amount:12/09/2019Completion Date:

Final Est Sub:Letting Date:

$342,957.40

07/25/2019

07100

DUNCAN

BRIDGE REHABILITATION COUNTY ROAD

(EW-171/PECAN ROAD): OVER I-44, 11.5 MILES

WEST OF SH-65 NEAR LAWTON. PROJECT

LENGTH = 0.000 MILE

CottonCounty: Commissioner District: 7

Contracts Completed - Final Estimate Not Processed

28036(04) US-277

ACSTP-217C(029)SS

Roberts, Colton

Residency:Contract: 160315

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:09/23/2019Completion Date:

Final Est Sub:Letting Date:

$7,787,208.07

09/15/2016

07100

DUNCAN

BRIDGE AND APPROACHES US-277: OVER DEEP

RED CREEK AND OVERFLOWS, 0.7 MI, 1.0 MI AND

1.2 MI SOUTH OF THE H.E. BAILEY TURNPIKE

NEAR RANDLETT. PROJECT LENGTH = 1.124

MILES.

32035(08) COUNTY RO

ERSTP-217C(021)ER

Roberts, Colton

Residency:Contract: 180192

Contractor: BREWER CONSTRUCTION OKLAHOMA, LLC

Engineer:

Contract Amount:11/22/2019Completion Date:

Final Est Sub:Letting Date:

$857,999.59

07/19/2018

07100

DUNCAN

GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY

ROAD (EW-198): OVER TRIBUTARY TO THE RED

RIVER, 1.9 MILES WEST OF THE SH-36 JUNCTION

NEAR DEVOL. PROJECT LENGTH = 0.206 MILE

CraigCounty: Commissioner District: 8

Contracts Completed - Final Estimate Not Processed

24115(04) US-59

STP-118B(080)SS

Beats, Aaron

Residency:Contract: 150160

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:02/06/2019Completion Date:

Final Est Sub:Letting Date:

$5,040,025.51

05/21/2015

08300

CLAREMORE

BRIDGE AND APPROACHES - DIVISION VIII US-59:

OVER UNION PACIFIC RAILROAD, 1.1 MILES

NORTH OF SH-10 NEAR WELCH. PROJECT

LENGTH = 0.871 MILE.

Construction Status Report Page 14

Page 15: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27089(04) SH-82

STP-218C(037)SS

Beats, Aaron

Residency:Contract: 150258

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:08/01/2019Completion Date:

Final Est Sub: Letting Date:

$3,723,826.73

01/21/2016

08300

CLAREMORE

BRIDGE AND APPROACHES SH-82: OVER

LOCUST CREEK, 6.5 MILES NORTH OF THE

MAYES COUNTY LINE NEAR VINITA. PROJECT

LENGTH = 0.711 MILE.

27069(04) SH-10

ACSTP-218C(054)SS

Beats, Aaron

Residency:Contract: 170283

Contractor: B & B BRIDGE COMPANY, LLC

Engineer:

Contract Amount:12/13/2019Completion Date:

Final Est Sub: Letting Date:

$4,689,111.77

09/21/2017

08300

CLAREMORE

BRIDGE AND APPROACHES SH-10: OVER BIG

CREEK AND THE EAST FORK OF BIG CREEK, 1.7

MILES AND 2.7 MILES EAST OF THE NOWATA

COUNTY LINE. PROJECT LENGTH = 0.549 MILE

29068(04) SH-10

STP-218C(059)SS

Beats, Aaron

Residency:Contract: 170344

Contractor: B & B BRIDGE COMPANY, LLC

Engineer:

Contract Amount:10/28/2019Completion Date:

Final Est Sub: Letting Date:

$2,077,439.04

11/16/2017

08300

CLAREMORE

BRIDGE AND APPROACHES SH-10: OVER BIG

CABIN CREEK, 3.6 MILES WEST OF THE US-59

INTERSECTION NEAR WELCH. PROJECT LENGTH

= 0.186 MILE

21904(04) SH-2

NHPP-218N(033)PM

Beats, Aaron

Residency:Contract: 180280

Contractor: CROSSLAND HEAVY CONTRACTORS INC.

Engineer:

Contract Amount:04/27/2020Completion Date:

Final Est Sub: Letting Date:

$10,552,000.00

09/20/2018

08300

CLAREMORE

GRADE, DRAIN, AND SURFACE SH-2: FROM THE

US-60 JUNCTION, EXTEND NORTH IN VINITA.

PROJECT LENGTH = 1.257 MILES

CreekCounty: Commissioner District: 8

Contracts Completed - Final Estimate Not Processed

27075(04) US-75A

ACSTP-219C(033)SS

Scott, Kalynn

Residency:Contract: 160245

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount:09/27/2019Completion Date:

Final Est Sub: Letting Date:

$8,084,675.09

09/15/2016

08400

SAND SPRINGS

BRIDGE AND APPROACHES US-75A: OVER BNSF

RAILROAD, 1.9 MILES NORTH OF THE

OKMULGEE COUNTY LINE NEAR MOUNDS.

PROJECT LENGTH = 0.667 MILE.

29408(04) CO.RD.

CIRB-219C(058)RB

GARV

Residency:Contract: 180006

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount:01/02/2020Completion Date:

Final Est Sub: 04/27/2020Letting Date:

$1,831,559.01

01/18/2018

08011

GARVER, LLC.

3.8 MI S OF SH-51 NEAR OILTON.

BRIDGE AND APPROACHES COUNTY ROAD

(NS-366/S. 449TH W. AVENUE): OVER

TRIBUTARIES TO BUCKEYE CREEK, 3.5 MI AND

3.8 MI S OF SH-51 NEAR OILTON. PROJECT

LENGTH = 0.572 MILE

Construction Status Report Page 15

Page 16: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

30599(04) SH-99

SBR-219N(060)SB

Scott, Kalynn

Residency:Contract: 180159

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount:03/01/2020Completion Date:

Final Est Sub: Letting Date:

$1,788,000.00

07/19/2018

08400

SAND SPRINGS

BRIDGE AND APPROACHES SH-99: OVER

LAGOON CREEK, 0.5 MILES NORTH OF THE

SH-51 JUNCTION NEAR OILTON. PROJECT

LENGTH = 0.253 MILE

CusterCounty: Commissioner District: 5

Contracts Completed - Final Estimate Not Processed

26490(04) I-40

NHPPIY-0040-3(082)SS/NHP*

Sawyer, Dax

Residency:Contract: 140092

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount:12/22/2015Completion Date:

Final Est Sub: Letting Date:

$16,738,134.68

02/20/2014

05100

CLINTON

*PIY-0040-3(085)

GRADE, DRAIN, SURFACE, AND BRIDGE

I-40/WASHINGTON AVENUE: ON I-40, FROM MILE

MARKER 76.6 TO 83.9; ON WASHINGTON

AVENUE, OVER I-40 IN WEATHERFORD.

PROJECT LENGTH = 7.714 MILES.

24427(05) I-40

NHPPI-0040-3(072)SS

Sawyer, Dax

Residency:Contract: 150051

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount:09/22/2017Completion Date:

Final Est Sub: Letting Date:

$10,440,306.71

02/19/2015

05100

CLINTON

RESURFACE AND BRIDGE REHABILITATION I-40:

FROM MILE MARKER 68.7 TO MILE MARKER 76.6.

PROJECT LENGTH = 7.899 MILES.

27911(06) CT.ST.

ACSTP-220B(040)SS

Sawyer, Dax

Residency:Contract: 160317

Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)

Engineer:

Contract Amount:10/31/2019Completion Date:

Final Est Sub: Letting Date:

$4,985,476.71

01/19/2017

05100

CLINTON

GRADE, DRAIN, SURFACE, AND TRAFFIC SIGNAL

CITY STREETS (MAIN STREET/WASHINGTON

AVENUE): FROM 1.0 MILE EAST OF SH-54,

EXTEND EAST IN WEATHERFORD. PROJECT

LENGTH = 0.391 MILE.

30055(04) COUNTY RO

STP-220D(050)CI

Sawyer, Dax

Residency:Contract: 180161

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount:12/19/2019Completion Date:

Final Est Sub: Letting Date:

$661,388.50

11/15/2018

05100

CLINTON

BRIDGE AND APPROACHES COUNTY ROAD

(EW-88): OVER LITTLE DEER CREEK, 0.8 MILES

WEST OF THE SH-33 JUNCTION NEAR THOMAS.

PROJECT LENGTH = 0.199 MILE

29523(04) I-40

SSP-4000(067)PM

Sawyer, Dax

Residency:Contract: 190039

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount:03/12/2020Completion Date:

Final Est Sub: Letting Date:

$1,533,773.30

01/17/2019

05100

CLINTON

BRIDGE AND APPROACHES I-40 NORTH

FRONTAGE ROAD: OVER LITTLE DEEP CREEK,

1.0 MILE WEST OF THE CADDO COUNTY LINE

NEAR WEATHERFORD. PROJECT LENGTH =

0.094 MILE

Construction Status Report Page 16

Page 17: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29526(09) MULTIPLE

SSP-220F(065)SS

TETR

Residency:Contract: 190197

Contractor: POSEIDON CONSTRUCTION, INC.

Engineer:

Contract Amount:01/28/2020Completion Date:

Final Est Sub: Letting Date:

$420,665.00

06/20/2019

05002

TETRA TECH

BRIDGE PAINTING I-40B (EB)/I-40 FRONTAGE

ROAD/US-183/SH-115/COUNTY ROAD (EW-120):

AT MULTIPLE LOCATIONS IN DIVISION V.

PROJECT LENGTH = 0.00

DeweyCounty: Commissioner District: 5

Contracts Completed - Final Estimate Not Processed

17671(34) US-270

NHPP-222N(027)

Sawyer, Dax

Residency:Contract: 170346

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount:09/18/2019Completion Date:

Final Est Sub: Letting Date:

$7,947,404.68

11/16/2017

05100

CLINTON

ING.

GRADE, DRAIN, AND SURFACE US-270: FROM 0.4

MILE SOUTHEAST OF THE SH-51 JUNCTION,

EXTEND NORTHEAST NEAR SEILING. PROJECT

LENGTH = 3.420 MILES.

06377(14) US-183

ACNHPP-122N(052)PM

Sawyer, Dax

Residency:Contract: 180131

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount:03/27/2020Completion Date:

Final Est Sub: Letting Date:

$4,077,383.41

03/15/2018

05100

CLINTON

ES

GRADE, DRAIN, SURFACE AND BRIDGE US-183:

FROM 7.3 MILES SOUTH OF THE US-60

JUNCTION, EXTEND PROJECT LENGTH = 1.181

MILES

GarvinCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

21786(04) SH-19

SSP-125B(112)SS

Wade, Tony

Residency:Contract: 130267

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount:12/12/2014Completion Date:

Final Est Sub: Letting Date:

$5,971,477.23

08/22/2013

03100

ADA

GRADE, DRAIN, SURFACE, AND BRIDGE SH-19:

OVER WASHITA RIVER, 1.72 MILES EAST OF

US-77, EXTEND EAST. PROJECT LENGTH = 0.681

MILE.

29615(04) I-35

SBR-225N(059)SB

Wade, Tony

Residency:Contract: 160134

Contractor: OBC, INC.

Engineer:

Contract Amount:07/25/2017Completion Date:

Final Est Sub: Letting Date:

$3,089,697.62

03/17/2016

03100

ADA

BRIDGE REHABILITATION I-35: OVER UNNAMED

CREEK, 0.4 MILE SOUTH OF SH-29 NEAR

WYNNEWOOD. PROJECT LENGTH = 0.258 MILE.

28929(04) SH-19

STP-225C(066)SS

Wade, Tony

Residency:Contract: 160412

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount:03/15/2018Completion Date:

Final Est Sub: Letting Date:

$1,315,000.00

11/17/2016

03100

ADA

BRIDGE AND APPROACHES SH-19: OVER BEEF

CREEK, 0.6 MILES EAST OF THE SH-74 JUNCTION

NEAR MAYSVILLE. PROJECT LENGTH = 0.057

MILE

Construction Status Report Page 17

Page 18: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29110(04) SH-17A

NHPPI-225N(001)SS

Wade, Tony

Residency:Contract: 170077

Contractor: M.J. HUGHES CONSTRUCTION, INC.

Engineer:

Contract Amount:12/31/2017Completion Date:

Final Est Sub: 04/22/2020Letting Date:

$2,161,373.46

02/16/2017

03100

ADA

BRIDGE REHABILITATION SH-17A: OVER I-35, 3.1

MILES WEST OF US-77 NEAR WYNNEWOOD.

PROJECT LENGTH = 0.159 MILE

29564(04) I-35

NHPPIY-225N-(045)

CEC

Residency:Contract: 170079

Contractor: OBC, INC.

Engineer:

Contract Amount:10/31/2018Completion Date:

Final Est Sub: Letting Date:

$2,276,522.83

02/16/2017

03003

CEC CORP.

BRIDGE REHABILITATION I-35: OVER RUSH

CREEK, 0.6 MILES SOUTH OF SH-19 IN PAULS

VALLEY. PROJECT LENGTH = 0.541 MILE

27999(04) US-77

STP-225C(072)PM

Malave, Luis

Residency:Contract: 180086

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount:09/25/2019Completion Date:

Final Est Sub: Letting Date:

$8,373,922.00

02/15/2018

03200

PURCELL

BRIDGE AND APPROACHES US-77: OVER

WASHITA RIVER, 1.5 MILES WEST OF THE SH-29

JUNCTION NEAR WYNNEWOOD. PROJECT

LENGTH = 0.944 MILE

29111(04) I-35

SSP-3500(071)PM

Malave, Luis

Residency:Contract: 180219

Contractor: A. M. COHRON & SON, INC.

Engineer:

Contract Amount:12/06/2019Completion Date:

Final Est Sub: Letting Date:

$2,278,614.41

08/16/2018

03200

PURCELL

I-35: OVER SHORT CREEK, 1.9 MILES NORTH OF

SH-145 NEAR PAOLI. PROJECT LENGTH = 0.082

MILE

24718(04) COUNTY RO

STP-125C(153)CI

Wade, Tony

Residency:Contract: 180353

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount:08/01/2019Completion Date:

Final Est Sub: Letting Date:

$522,972.50

11/15/2018

03100

ADA

BRIDGE AND APPROACHES COUNTY ROAD

(EW-161 ROAD): OVER LITTLE CANADIAN SANDY

CREEK, 0.8 MILES WEST OF THE PONTOTOC

COUNTY LINE. PROJECT LENGTH = 0.211 MILE

29608(04) I-35

SBR-3500(076)SB

Malave, Luis

Residency:Contract: 190076

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount:03/26/2020Completion Date:

Final Est Sub: Letting Date:

$609,925.77

02/14/2019

03200

PURCELL

BRIDGE REHABILITATION I-35: OVER COUNTY

ROAD (EW-161), 2.1 MILES NORTH OF SH-29

NEAR WYNNEWOOD. PROJECT LENGTH = 0.019

MILE

31840(04) I-35 (SB

NHPPI-3500-(051)SS

Malave, Luis

Residency:Contract: 190175

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:12/23/2019Completion Date:

Final Est Sub: 04/08/2020Letting Date:

$2,796,664.60

05/16/2019

03200

PURCELL

RESURFACE (ASPHALT) I-35 (SB LANES): FROM

THE SH-29 JUNCTION, EXTEND SOUTH NEAR

WYNNEWOOD. PROJECT LENGTH = 6.59 MILES

Construction Status Report Page 18

Page 19: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

22973(16) MULTIPLE

STP-262F(054)PM

Wade, Tony

Residency:Contract: 190184

Contractor: GARY A. CRAIN, INC.

Engineer:

Contract Amount:10/28/2019Completion Date:

Final Est Sub:Letting Date:

$128,807.92

05/16/2019

03100

ADA

BRIDGE WATER PROOF SEAL

I-35/SH-9/SH-74/SH-76/SH-99A/COUNTY ROAD

(E-1685): AT MULTIPLE LOCATIONS IN DIVISION

III. PROJECT LENGTH = 0.000 MILE

33330(04) SH-76

SSR-225C(083)SR

Malave, Luis

Residency:Contract: 190231

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:12/10/2019Completion Date:

Final Est Sub:Letting Date:

$2,691,970.86

06/20/2019

03200

PURCELL

RESURFACE (UTBWC AND ASPHALT) SH-76:

FROM THE SH-29 JUNCTION, EXTEND NORTH

NEAR LINDSAY AND FOSTER. PROJECT LENGTH

- 11.00 MILES

GradyCounty: Commissioner District: 7

Contracts Completed - Final Estimate Not Processed

33477(04) US-62

SBR-226B(074)SB

TETR

Residency:Contract: 180328

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount:10/31/2019Completion Date:

Final Est Sub:Letting Date:

$1,289,067.32

10/18/2018

07002

TETRA TECH

BRIDGE REHABILITATION US-62: OVER

STILLWATER CENTRAL RAILROAD. 2.3 MILES

WEST OF I-44 IN CHICKASHA. PROJECT LENGTH

= 0.00 MILE

33607(04) US-81

HSIPG-011N(102)TR

Roberts, Colton

Residency:Contract: 180329

Contractor: ACTION SAFETY SUPPLY CO., LLC

Engineer:

Contract Amount:12/12/2019Completion Date:

Final Est Sub:Letting Date:

$1,563,384.73

11/15/2018

07100

DUNCAN

SAFETY IMPROVEMENT (CABLE BARRIER) US-81:

FROM 5.0 MILES SOUTH OF THE US-277

JUNCTION, EXTEND NORTH NEAR NINNEKAH.

PROJECT LENGTH = 8.02 MILES

32833(04) SH-92

SSR-226C(075)SR

Knight, Reese

Residency:Contract: 190043

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount:10/31/2019Completion Date:

Final Est Sub: 04/27/2020Letting Date:

$1,224,600.00

01/17/2019

07300

ANADARKO

RESURFACE (ASPHALT) SH-92: FROM THE

US-62/US-277 JUNCTION, EXTEND NORTH NEAR

CHICKASHA. PROJECT LENGTH = 5.00 MILES

31952(04) US-62

STP-226B(076)3P

Knight, Reese

Residency:Contract: 190114

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount:02/03/2020Completion Date:

Final Est Sub: 02/11/2020Letting Date:

$2,018,070.00

03/14/2019

07300

ANADARKO

RESURFACE (ASPHALT) US-62: FROM 1.0 MILE

EAST OF THE CADDO COUNTY LINE, EXTEND

EAST NEAR CHICKASHA. PROJECT LENGTH =

6.49 MILES

Construction Status Report Page 19

Page 20: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

34071(04) US-277

MC-226C(082)

Knight, Reese

Residency:Contract: 190151

Contractor: CGC, LLC.

Engineer:

Contract Amount:11/15/2019Completion Date:

Final Est Sub: 04/21/2020Letting Date:

$595,000.00

04/18/2019

07300

ANADARKO

PAVEMENT REHABILITATION (P.C. CONCRETE)

US-277/SH-37: US-277, AT THE INTERSECTION OF

MAIN STREET IN CYRIL. SH-37, FROM US-81

EXTEND EAST IN MINCO. PROJECT LENGTH =

0.17 MILE

GrantCounty: Commissioner District: 4

Contracts Completed - Final Estimate Not Processed

24163(04) SH-11

STP-127B(107)(108)(109)*

Hoover, Jacob

Residency:Contract: 160413

Contractor: VENTURE CORPORATION DBA V. C. O. PAVING

Engineer:

Contract Amount:11/30/2018Completion Date:

Final Est Sub: 04/20/2020Letting Date:

$12,986,834.47

11/17/2016

04300

ENID

(110)SS

SHOULDER IMPROVEMENT, RESURFACE

(ASPHALT), AND BRIDGE SH-11: FROM 7.9 MILES

WEST OF US-81, EXTEND EAST NEAR MEDFORD.

PROJECT LENGTH = 7.660 MILES.

GreerCounty: Commissioner District: 5

Contracts Completed - Final Estimate Not Processed

15023(07) SH-6

ACSTP-128B(008)SS

Holley, Terri

Residency:Contract: 150370

Contractor: CASWELL CONTRACTING, INC/TOM HUDSON PAVING, INC. (JV)

Engineer:

Contract Amount:03/28/2018Completion Date:

Final Est Sub: 02/04/2020Letting Date:

$9,529,011.54

11/19/2015

05200

ALTUS

GRADE, DRAIN, AND SURFACE SH-6: FROM 1.0

MILE SOUTH OF SH-9 EXTEND NORTH IN

GRANITE. PROJECT LENGTH = 2.248 MILES.

32355(04) COUNTY RO

CIRB-248D(041)RB

CED3

Residency:Contract: 190118

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:02/06/2020Completion Date:

Final Est Sub: Letting Date:

$939,290.70

03/14/2019

02013

CIRCUIT ENGR. DISTR. # 3

RESURFACE (ASPHALT) COUNTY ROAD

(NS-359/BRIDGEVIEW ROAD): FROM THE SH-199

JUNCTION, EXTEND SOUTH NEAR LITTLE CITY.

PROJECT LENGTH = 4.000 MILES

HarmonCounty: Commissioner District: 5

Contracts Completed - Final Estimate Not Processed

28768(04) SH-30

SSP-229C(010)SS

Holley, Terri

Residency:Contract: 170260

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount:10/17/2019Completion Date:

Final Est Sub: 12/16/2019Letting Date:

$7,279,068.09

11/16/2017

05200

ALTUS

BRIDGE AND APPROACHES SH-30: OVER SALT

FORK OF RED RIVER, 3.9 MILES SOUTH OF SH-9

NEAR HOLLIS. PROJECT LENGTH = 0.931 MILE

Construction Status Report Page 20

Page 21: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

HarperCounty: Commissioner District: 6

Contracts Completed - Final Estimate Not Processed

30614(04) US-270

SBR-230N(024)SB

Dodgion, Richard

Residency:Contract: 170348

Contractor: B & B BRIDGE COMPANY, LLC

Engineer:

Contract Amount:06/13/2019Completion Date:

Final Est Sub: 04/29/2020Letting Date:

$405,947.50

02/15/2018

06100

BUFFALO

BRIDGE REHABILITATION US-270: OVER

UNNAMED CREEK, 2.3 MILES WEST OF THE

US-283 INTERSECTION NEAR LAVERNE.

PROJECT LENGTH = 0.096 MILE

HaskellCounty: Commissioner District: 1

Contracts Completed - Final Estimate Not Processed

28411(04) CO.RD.

CIRB-131C(114)RB

Orendorf, Barry

Residency:Contract: 130318

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:12/17/2015Completion Date:

Final Est Sub: 04/02/2020Letting Date:

$2,531,601.14

09/19/2013

01200

SALLISAW

GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY

ROAD (EW-127): FROM 2.8 MILES WEST OF SH-2,

EXTEND EAST. PROJECT LENGTH = 2.640 MILES.

30417(04) SH-31

STPY-231C(029)(030)3P

Orendorf, Barry

Residency:Contract: 170083

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:04/04/2018Completion Date:

Final Est Sub: 04/02/2020Letting Date:

$1,427,769.80

03/16/2017

01200

SALLISAW

RESURFACE (ASPHALT) SH-31: FROM SH-2

EXTEND EAST, NEAR KINTA. SH-82: FROM 1.3 MI

SOUTH OF THE SH-31 JCT, EXTEND NORTH.

PROJECT LENGTH = 7.157 MILES

31194(04) MULTIPLE

STP-231C(033)CI

CE2

Residency:Contract: 180225

Contractor: T. MCDONALD CONSTRUCTION, INC.

Engineer:

Contract Amount:12/13/2019Completion Date:

Final Est Sub: Letting Date:

$1,861,859.80

06/14/2018

01017

CIRCUIT ENGR. DISTR. # 2

RESURFACE (ASPHALT) AND BRIDGE AND

APPROACHES COUNTY ROAD (KEOTA LANDING

ROAD/NS-455/8TH STREET): FROM THE SH-9

JUNCTION, EXTEND NORTH IN KEOTA. PROJECT

LENGTH = 3.845 MILES

31284(04) COUNTY RO

ACSTP-231D(038)CI

CE2

Residency:Contract: 180264

Contractor: B & B BRIDGE COMPANY, LLC

Engineer:

Contract Amount:08/31/2019Completion Date:

Final Est Sub: Letting Date:

$445,548.05

11/15/2018

01017

CIRCUIT ENGR. DISTR. # 2

BRIDGE AND APPROACHES COUNTY ROAD

(NS-450): OVER UNNAMED CREEK, 0.6 MILES

SOUTH OF THE SH-9 JUNCTION NEAR KEOTA.

PROJECT LENGTH = 0.208 MILE

32053(04) SH-2/SH-3

STP-231B(037)3P

Hagerman, Jeremy

Residency:Contract: 190078

Contractor: ROSSCON, LLC

Engineer:

Contract Amount:12/11/2019Completion Date:

Final Est Sub: Letting Date:

$1,178,877.50

05/16/2019

01100

MUSKOGEE

RESURFACE (ASPHALT) SH-2/SH-31: FROM THE

PITTSBURG COUNTY LINE, EXTEND EAST NEAR

KINITA. PROJECT LENGTH = 5.723 MILES

Construction Status Report Page 21

Page 22: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

HughesCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

28939(04) SH-9

STP-232C(059)PM

JACOBS

Residency:Contract: 180195

Contractor: C-GAWF CONSTRUCTION, INC.

Engineer:

Contract Amount:11/30/2019Completion Date:

Final Est Sub: 04/15/2020Letting Date:

$2,498,299.76

05/17/2018

03004

JACOBS ENGINEERING

BRIDGE AND APPROACHES SH-9: OVER FISH

CREEK, 0.4 MILES EAST OF THE SH-84 JUNCTION

NEAR DUSTIN. PROJECT LENGTH = 0.492 MILE

JacksonCounty: Commissioner District: 5

Contracts Completed - Final Estimate Not Processed

24379(07) US-283

STP-133B(087)SS

Holley, Terri

Residency:Contract: 150136

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:01/19/2018Completion Date:

Final Est Sub: Letting Date:

$9,934,218.57

10/15/2015

05200

ALTUS

WIDEN, RESURFACE, AND BRIDGE US-283:

FROM 0.1 MILE SOUTH OF SH-5 EAST, EXTEND

NORTH NEAR ALTUS. PROJECT LENGTH = 6.099

MILES.

17014(06) CT.ST.

STP-033B(157)SG

Holley, Terri

Residency:Contract: 170174

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount:04/05/2019Completion Date:

Final Est Sub: 01/31/2020Letting Date:

$2,470,881.66

06/15/2017

05200

ALTUS

GRADE, DRAIN, AND SURFACE CITY STREET

(FALCON ROAD): FROM US-283, EXTEND EAST

IN ALTUS. PROJECT LENGTH = 0.921 MILE.

30407(04) US-62/SH-

NHPP-020N(044)3P

Holley, Terri

Residency:Contract: 180089

Contractor: CORNELL CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount:02/19/2019Completion Date:

Final Est Sub: Letting Date:

$2,583,106.15

02/15/2018

05200

ALTUS

S.

RESURFACE (ASPHALT) US-62/SH-6: FROM THE

SH-34 JUNCTION, EXTEND EAST ON US-62 THEN

SOUTH ON SH-6 NEAR ALTUS. PROJECT LENGTH

= 13.390 MILES

JeffersonCounty: Commissioner District: 7

Contracts Completed - Final Estimate Not Processed

27977(04) SH-79

STP-234B(014)SS

Roberts, Colton

Residency:Contract: 170123

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount:10/14/2019Completion Date:

Final Est Sub: Letting Date:

$11,164,064.48

03/16/2017

07100

DUNCAN

BRIDGE AND APPROACHES SH-79: OVER THE

RED RIVER, 0.5 MILE NORTH OF THE TEXAS

STATE LINE. PROJECT LENGTH = 1.189 MILES.

Construction Status Report Page 22

Page 23: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32835(04) US-70

SSR-234B(044)SR

Roberts, Colton

Residency:Contract: 190045

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:08/30/2019Completion Date:

Final Est Sub: 04/14/2020Letting Date:

$1,626,987.40

01/17/2019

07100

DUNCAN

RESURFACE (ASPHALT) US-70: FROM THE US-81

JUNCTION, EXTEND EAST NEAR WAURIKA.

PROJECT LENGTH = 7.99 MILES

31913(08) COUNTY RO

ERSTP-234C(033)CI

Roberts, Colton

Residency:Contract: 190141

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount:01/25/2020Completion Date:

Final Est Sub: Letting Date:

$433,988.30

03/14/2019

07100

DUNCAN

BRIDGE AND APPROACHES COUNTY ROAD

(EW-207): OVER TRIBUTARY TO RED RIVER, 3.3

MILES WEST OF THE US-81 JUNCTION NEAR

RYAN. PROJECT LENGTH = 0.082 MILE

JohnstonCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

27058(04) SH-22

STP-135C(135)SS

Wade, Tony

Residency:Contract: 150098

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount:05/23/2016Completion Date:

Final Est Sub: 12/11/2019Letting Date:

$2,489,951.32

03/19/2015

03100

ADA

BRIDGE AND APPROACHES SH-22: OVER

BUTCHER PEN CREEK, 4.3 MILES WEST OF

SH-78. PROJECT LENGTH = 0.321 MILE

23268(04) SH-99

ACSTP-135B(086)SS

Wade, Tony

Residency:Contract: 160250

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:12/10/2018Completion Date:

Final Est Sub: Letting Date:

$11,018,314.20

07/21/2016

03100

ADA

GRADE, DRAIN, SURFACE, AND BRIDGE SH-99:

FROM 5.64 MILES NORTH OF SH-22, EXTEND

NORTH NEAR TISHOMINGO. PROJECT LENGTH =

4.375 MILES.

28574(04) CO.RD.

STP-235C(020)CI

Wade, Tony

Residency:Contract: 160369

Contractor: OBC, INC.

Engineer:

Contract Amount:01/31/2019Completion Date:

Final Est Sub: Letting Date:

$4,352,723.36

10/20/2016

03100

ADA

BRIDGE AND APPROACHES COUNTY ROAD

(GREASY BEND ROAD): OVER THE WASHITA

RIVER, 1.4 MILES EAST OF THE CARTER COUNTY

LINE. PROJECT LENGTH = 0.478 MILE

17543(04) CO.RD.

CIRB-135C(020)RB

Wade, Tony

Residency:Contract: 170157

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:09/30/2019Completion Date:

Final Est Sub: Letting Date:

$2,557,873.81

04/20/2017

03100

ADA

GRADE, DRAIN, SURFACE, BRIDGE, AND

EROSION CONTROL. COUNTY ROAD (GREASY

BEND ROAD): OVER WASHITA RIVER, 5.0 MILES

EAST OF THE CARTER COUNTY LINE NEAR

MANNSVILLE. PROJECT LENGTH = 0.820 MILE

Construction Status Report Page 23

Page 24: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31380(04) SH-48A

STP-235C(035)PM

Wade, Tony

Residency:Contract: 180287

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount:12/31/2019Completion Date:

Final Est Sub:Letting Date:

$1,081,736.19

09/20/2018

03100

ADA

BRIDGE REHABILITATION SH-48A: OVER BIG

SANDY CREEK, 3.4 MILES WEST OF THE SH-48

JUNCTION NEAR MILBURN. PROJECT LENGTH =

0.1543 MILE

KingfisherCounty: Commissioner District: 4

Contracts Completed - Final Estimate Not Processed

21858(04) SH-51

ACSTP-137C(051)SS/ACSTP-*

Hoover, Jacob

Residency:Contract: 160200

Contractor: MUNOZ CONSTRUCTION, INC.

Engineer:

Contract Amount:08/05/2019Completion Date:

Final Est Sub:Letting Date:

$6,606,846.50

05/19/2016

04300

ENID

*242C(045)SS

BRIDGE AND APPROACHES SH-51: OVER

SKELETON CREEK AND BRIDGE CREEK, 6.0

MILES WEST AND 3.8 MILES EAST OF SH-74

NEAR HENNESSEY. PROJECT LENGTH = 0.912

MILE.

30461(04) CO.RD.

STP-237C(032)CI

CED8

Residency:Contract: 160223

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount:09/13/2019Completion Date:

Final Est Sub:Letting Date:

$858,178.58

06/16/2016

04009

CIRCUIT ENGR. DISTR. # 8

BRIDGE AND APPROACHES COUNTY ROAD

(NS-274): OVER KINGFISHER CREEK, 0.9 MILE

SOUTH OF SH-3 NEAR KINGFISHER. PROJECT

LENGTH = 0.189 MILE.

29490(04) SH-33

STP-237B(033)SS

Hoover, Jacob

Residency:Contract: 160418

Contractor: RDNJ, INC. DBA A-TECH PAVING

Engineer:

Contract Amount:06/04/2018Completion Date:

Final Est Sub: 02/18/2020Letting Date:

$1,000,076.68

11/17/2016

04300

ENID

BRIDGE AND APPROACHES SH-33: OVER

FOREMAN CREEK, 10.2 MILES EAST OF THE

US-81 JUNCTION NEAR KINGFISHER. PROJECT

LENGTH = 0.067 MILE.

33655(04) US-81

SSR-237N(047)SR

Brooks, Jonathan

Residency:Contract: 180241

Contractor: SHELL CONSTRUCTION COMPANY INC.

Engineer:

Contract Amount:12/13/2019Completion Date:

Final Est Sub:Letting Date:

$609,875.28

07/19/2018

04200

YUKON

GRADE, DRAIN, AND SURFACE US-81: FROM 3.1

MILES NORTH OF THE CANADIAN COUNTY LINE,

EXTEND NORTH NEAR OKARCHE. PROJECT

LENGTH = 0.300 MILE

KiowaCounty: Commissioner District: 5

Contracts Completed - Final Estimate Not Processed

28999(04) SH-44

ACSTP-238C(037)SS/STP-27*

ATKINS

Residency:Contract: 160320

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount:10/27/2019Completion Date:

Final Est Sub:Letting Date:

$3,321,240.72

09/15/2016

05010

ATKINS

*5C(035)SS

BRIDGE AND APPROACHES SH-44: OVER ELK

CREEK, ELK CREEK O'FLOW, AND DRY ELK

CREEK, 7.6 MI, 7.8 MI AND 11.4 MILES NORTH OF

SH-9 NEAR SENTINEL. PROJECT LENGTH = 0.410

MILE.

Construction Status Report Page 24

Page 25: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32947(04) SH-115

HSIPG-238C(041)AD

Holley, Terri

Residency:Contract: 180197

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount:09/06/2019Completion Date:

Final Est Sub: 11/08/2019Letting Date:

$836,299.75

05/17/2018

05200

ALTUS

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

SH-115: AT THE INTERSECTION OF SH-9, IN

MOUNTAIN VIEW. PROJECT LENGTH = 0.35 MILE

LatimerCounty: Commissioner District: 2

Contracts Completed - Final Estimate Not Processed

31231(04) CO.RD.

STP-239C(026)CI

CED3

Residency:Contract: 170026

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:01/08/2019Completion Date:

Final Est Sub: Letting Date:

$1,055,044.90

01/19/2017

02013

CIRCUIT ENGR. DISTR. # 3

GRADE, DRAIN, AND SURFACE COUNTY ROAD

(DRUMB ROAD): FROM THE PITTSBURG COUNTY

LINE, EXTEND NORTHEAST NEAR WILBURTON.

PROJECT LENGTH = 1.174 MILES.

20922(04) US-270

ACSTP-139B(049)SS

Plymate, Larry

Residency:Contract: 170280

Contractor: KOLB GRADING, LLC

Engineer:

Contract Amount:12/11/2019Completion Date:

Final Est Sub: Letting Date:

$5,477,511.60

08/17/2017

02400

MCALESTER

GRADE, DRAIN, AND SURFACE US-270: FROM 2.5

MILES EAST OF THE PITTSBURG COUNTY LINE,

EXTEND EAST NEAR GOWEN. PROJECT LENGTH

= 0.830 MILE

29946(04) CO.RD.

STP-239D(032)CI

CED3

Residency:Contract: 170319

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount:02/19/2019Completion Date:

Final Est Sub: Letting Date:

$414,307.66

10/19/2017

02013

CIRCUIT ENGR. DISTR. # 3

BRIDGE AND APPROACHES COUNTY ROAD

(EW-1470/SW LIMESTONE ROAD): OVER

LIMESTONE CREEK, 3.6 MILES SW OF THE

US-270 JUNCTION NEAR WILBURTON. PROJECT

LENGTH = 0.113 MILE.

27138(04) SH-1

STP-239C(029)

Davis, Tim

Residency:Contract: 180011

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount:01/31/2020Completion Date:

Final Est Sub: 03/26/2020Letting Date:

$6,249,000.91

01/18/2018

02200

HEAVENER

E SH-2 JUNCTION NEAR TALAHINA.

BRIDGE AND APPROACHES SH-1: OVER

BUFFALO CREEK AND OVERFLOWS, 2.6 MI, 2.7

MI, 2.9 MI, AND 3.2 MI EAST OF THE SH-2

JUNCTION NEAR TALAHINA. PROJECT LENGTH =

1.023 MILES

29976(04) CO.RD.

ACSTP-239D(034)CI

CED3

Residency:Contract: 180134

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount:02/19/2019Completion Date:

Final Est Sub: Letting Date:

$534,170.34

03/15/2018

02013

CIRCUIT ENGR. DISTR. # 3

UNTY LINE NEAR HARTSHORNE.

BRIDGE AND APPROACHES COUNTY ROAD

(EW-1490/LINWOOD LANE): OVER PIT CREEK, 1.4

MILES EAST OF THE PITTSBURG COUNTY LINE

NEAR HARTSHORNE. PROJECT LENGTH = 0.142

MILE

Le FloreCounty: Commissioner District: 2

Contracts Completed - Final Estimate Not Processed

Construction Status Report Page 25

Page 26: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27029(04) US-59

STP-240C(31)(29)SS/SBR-2*

Davis, Tim

Residency:Contract: 150205

Contractor: C-GAWF CONSTRUCTION, INC.

Engineer:

Contract Amount:05/22/2019Completion Date:

Final Est Sub: Letting Date:

$12,483,862.80

07/23/2015

02200

HEAVENER

*45C(4)SB/SBR-240N(22)SB/NHPP-240N(32)SS

BRIDGE AND APPROACHES & BRIDGE

REHABILITATION US-259/US-59/SH-63: AT

MULTIPLE BRIDGE LOCATIONS IN DIVISION II.

PROJECT LENGTH = 0.889 MILE.

32955(04) US-59

ACNHPP-240N(064)3P

Davis, Tim

Residency:Contract: 180288

Contractor: JOB CONSTRUCTION CO., INC.

Engineer:

Contract Amount:12/19/2019Completion Date:

Final Est Sub: 04/09/2020Letting Date:

$1,336,596.48

09/20/2018

02200

HEAVENER

RESURFACE (ASPHALT) AND PEDESTRIAN

IMPROVEMENTS (SIDEWALKS) US-59: FROM 2.0

MILES SOUTH OF THE SH-128 JUNCTION,

EXTEND NORTH IN HEAVENER. PROJECT

LENGTH = 2.369 MILES

24333(10) US-70/SH-

NHPP-207N(081)PM

Davis, Tim

Residency:Contract: 190191

Contractor: B & B CONSTRUCTION SERVICE J.T., INC.

Engineer:

Contract Amount:04/29/2020Completion Date:

Final Est Sub: Letting Date:

$634,308.07

06/20/2019

02200

HEAVENER

JOINT SEAL/REPAIR US-70/SH-112: OVER US-59,

RAILROAD, AND LAKE TEXOMA, AT MULTIPLE

LOCATIONS IN DIVISION II. PROJECT LENGTH =

0.00 MILE

LincolnCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

24228(10) SH-62

ACSTP-141C(232)(168)(171*

TETR

Residency:Contract: 160188

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount:07/24/2018Completion Date:

Final Est Sub: Letting Date:

$22,560,549.77

04/21/2016

03002

TETRA TECH

*(224)SS

GRADE, DRAIN, SURFACE, AND BRIDGE SH-102:

FROM 0.2 MI NORTH OF US-62, EXT NORTH NEAR

MIDWAY. US-62: FROM 3.65 MI WEST OF SH-102,

EXT EAST NEAR MIDWAY. PROJECT LENGTH =

6.370 MILES.

28925(04) US-62

STP-241C(052)SS

Helton, Matthew

Residency:Contract: 170263

Contractor: T. MCDONALD CONSTRUCTION, INC.

Engineer:

Contract Amount:12/20/2019Completion Date:

Final Est Sub: 04/20/2020Letting Date:

$1,514,040.01

01/18/2018

03300

WEWOKA

N.

GRADE, DRAIN, SURFACE, AND EROSION US-62:

FROM 1.0 MILE WEST OF US-177 INTERSECTION,

EXTEND EAST NEAR JACKTOWN. PROJECT

LENGTH = 0.426 MILE

28202(04) US-62

STP-241C(060)3P

Helton, Matthew

Residency:Contract: 190199

Contractor: EMERY SAPP & SONS, INC.

Engineer:

Contract Amount:01/08/2020Completion Date:

Final Est Sub: Letting Date:

$2,027,247.08

06/20/2019

03300

WEWOKA

RESURFACE (A.C. AND P.C.) US-62: FROM THE

SH-99 JUNCTION, EXTEND EAST IN PRAGUE.

PROJECT LENGTH = 3.60 MILES

LoganCounty: Commissioner District: 4

Contracts Completed - Final Estimate Not Processed

Construction Status Report Page 26

Page 27: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

21860(04) SH-33

ACSTP-242C(046)SS

Mitchell, Matt

Residency:Contract: 160290

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount:07/17/2019Completion Date:

Final Est Sub: Letting Date:

$17,235,548.53

09/15/2016

04500

STILLWATER

BRIDGE AND APPROACHES SH-33: OVER

COTTONWOOD CREEK AND BNSF RAILROAD, 0.2

MILE WEST OF SH-77 IN GUTHRIE. PROJECT

LENGTH = 0.794 MILE.

32379(04) CO.RD.

ACERSTP-242C(056)ER

CEC

Residency:Contract: 160439

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount:01/03/2020Completion Date:

Final Est Sub: Letting Date:

$1,025,064.43

11/17/2016

04003

CEC CORP.

BRIDGE AND APPROACHES COUNTY ROAD

(EW-84/SEWARD ROAD): OVER COTTONWOOD

CREEK, 4.3 MILES WEST OF US-77 NEAR

GUTHRIE. PROJECT LENGTH = 0.249 MILE.

27103(04) US-77

STP-242C(055)PM

Mitchell, Matt

Residency:Contract: 170125

Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount:04/17/2020Completion Date:

Final Est Sub: Letting Date:

$5,452,151.90

05/17/2018

04500

STILLWATER

BRIDGE AND APPROACHES US-77: OVER THE

CIMARRON RIVER, 2.7 MILES NORTH OF SH-33

NEAR GUTHRIE. PROJECT LENGTH = 0.610 MILE

32640(04) CO.RD.

CIRB-242B(054)RB

ATKINS

Residency:Contract: 170179

Contractor: SCHWARZ PAVING CO., INC.

Engineer:

Contract Amount:10/15/2019Completion Date:

Final Est Sub: Letting Date:

$3,779,648.60

05/18/2017

04010

ATKINS

GRADE, DRAIN, AND SURFACE COUNTY ROAD

(COLTRANE ROAD): FROM 1.0 MILE NORTH OF

THE OKLAHOMA COUNTY LINE EXTEND NORTH

NEAR EDMOND. PROJECT LENGTH = 2.083

MILES.

LoveCounty: Commissioner District: 7

Contracts Completed - Final Estimate Not Processed

26502(04) SH-32

ACSTP-143C(093)SS

Fuhrmann, Chris

Residency:Contract: 160098

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:05/20/2019Completion Date:

Final Est Sub: 04/30/2020Letting Date:

$11,463,969.39

07/21/2016

07200

ARDMORE

GRADE, DRAIN, SURFACE, AND BRIDGE SH-32:

OVER MUD CREEK AND MUD CREEK

OVERFLOWS, 0.6 MILE EAST OF SH-89 NEAR

COURTNEY. PROJECT LENGTH = 1.287 MILES.

25447(04) CO.RD.

CIRB-143C(091)RB

Fuhrmann, Chris

Residency:Contract: 170322

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:11/19/2019Completion Date:

Final Est Sub: Letting Date:

$6,583,798.11

10/19/2017

07200

ARDMORE

GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY

ROAD (OSWALT ROAD/EW-206): FROM SH-76,

EXTEND EAST NEAR ARDMORE. PROJECT

LENGTH = 6.025 MILES.

MajorCounty: Commissioner District: 6

Contracts Completed - Final Estimate Not Processed

Construction Status Report Page 27

Page 28: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29446(04) US-60

STP-247B(017)

ZOA

Residency:Contract: 170128

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount:08/28/2018Completion Date:

Final Est Sub: 03/16/2020Letting Date:

$5,360,055.79

03/16/2017

06021

OLSSON ASSOCIATES

BRIDGE AND APPROACHES US-60: OVER THE

NORTH CANADIAN RIVER, 2.2 MILES NORTH

OFUS-270 NEAR SEILING. PROJECT LENGTH =

0.851 MILE

MarshallCounty: Commissioner District: 2

Contracts Completed - Final Estimate Not Processed

29988(04) COUNTY RO

CIRB-248D(040)RB

CED3

Residency:Contract: 190010

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:07/12/2019Completion Date:

Final Est Sub: 03/20/2020Letting Date:

$793,297.48

01/17/2019

02013

CIRCUIT ENGR. DISTR. # 3

RESURFACE (ASPHALT) COUNTY ROAD (SHAY

ROAD): 2.8 MILES NORTH OF THE TEXAS STATE

LINE NEAR WILLIS. PROJECT LENGTH = 3.500

MILES

30418(04) SH-99

SSR-248C(046)SR

Bishop, Justin

Residency:Contract: 190011

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:03/02/2020Completion Date:

Final Est Sub: Letting Date:

$2,965,802.00

01/17/2019

02300

MADILL

RESURFACE (ASPHALT) SH-99: FROM 3.5 MILES

SOUTH OF THE SH-32 JUNCTION, EXTEND

NORTH NEAR KINGSTON. PROJECT LENGTH =

8.00 MILES

MayesCounty: Commissioner District: 8

Contracts Completed - Final Estimate Not Processed

31944(05) US-69/US-

SSP-249F(038)SS

TETR

Residency:Contract: 170159

Contractor: B & B CONSTRUCTION SERVICE J.T., INC.

Engineer:

Contract Amount:09/20/2019Completion Date:

Final Est Sub: 04/07/2020Letting Date:

$1,785,647.90

01/18/2018

08002

TETRA TECH

JOINT SEAL/REPAIR US-69/US-412: AT MULTIPLE

LOCATIONS IN DIVISION VIII.

McClainCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

01964(06) SH-76

ACSTP-144C(001)SS

JACOBS

Residency:Contract: 160142

Contractor: MUNOZ CONSTRUCTION, INC.

Engineer:

Contract Amount:05/31/2018Completion Date:

Final Est Sub: 04/06/2020Letting Date:

$6,557,900.51

03/17/2016

03004

JACOBS ENGINEERING

GRADE, DRAIN, SURFACE, AND BRIDGE SH-76:

FROM 0.1 MILE SOUTH OF SH-74B, EXTEND

NORTH NEAR BLANCHARD. PROJECT LENGTH =

2.162 MILES.

Construction Status Report Page 28

Page 29: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32742(04) SH-74B

SBR-244C(060)SB

GARV

Residency:Contract: 180169

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount:04/02/2020Completion Date:

Final Est Sub:Letting Date:

$843,437.51

04/19/2018

03011

GARVER, LLC.

BRIDGE REHABILITATION SH-74B: OVER

BUFFALO CREEK, 2.4 MILES EAST OF THE SH-76

JUNCTION NEAR BLANCHARD. PROJECT

LENGTH = 0.148 MILE

McCurtainCounty: Commissioner District: 2

Contracts Completed - Final Estimate Not Processed

25828(04) CO.RD.

ACSTP-145D(179)CI

CED3

Residency:Contract: 170172

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount:10/30/2018Completion Date:

Final Est Sub: 02/21/2020Letting Date:

$1,075,678.93

05/18/2017

02013

CIRCUIT ENGR. DISTR. # 3

BRIDGE AND APPROACHES COUNTY ROAD

(EW-174): OVER BIG EAGLE CREEK, 1.1 MILES

WEST OF US-259 NEAR SMITHVILLE. PROJECT

LENGTH = 0.217 MILE

25468(04) CO.RD.

CIRB-145C(172)RB

CED3

Residency:Contract: 170353

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount:01/03/2019Completion Date:

Final Est Sub:Letting Date:

$1,215,001.38

11/16/2017

02013

CIRCUIT ENGR. DISTR. # 3

BRIDGE AND APPROACHES COUNTY ROAD

(EW-208): OVER YANUBBEE CREEK, 1.6 MILES

EAST OF US-259 NEAR BROKEN BOW. PROJECT

LENGTH = 0.397 MILE

McIntoshCounty: Commissioner District: 1

Contracts Completed - Final Estimate Not Processed

30787(04) US-69

HSIPG-246N(011)TR

CEC

Residency:Contract: 140300

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:01/28/2017Completion Date:

Final Est Sub:Letting Date:

$3,780,404.96

11/20/2014

01003

CEC CORP.

SAFETY IMPROVEMENTS (CABLE BARRIER)

US-69: BEGIN AT THE MUSKOGEE COUNTY LINE,

EXTEND SOUTH. PROJECT LENGTH = 14.100

MILES.

25103(04) CO.RD.

CIRB-146C(101)RB

CE2

Residency:Contract: 160039

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:06/24/2017Completion Date:

Final Est Sub:Letting Date:

$2,212,168.11

01/21/2016

01017

CIRCUIT ENGR. DISTR. # 2

GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY

ROAD (EW-103/NS-423): FROM OLD US-69,

EXTEND EAST THEN NORTH NEAR CHECOTAH.

PROJECT LENGTH = 3.638 MILES.

26289(04) I-40

ACNHPPI-4000(029)SS

JACOBS

Residency:Contract: 160170

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:10/01/2018Completion Date:

Final Est Sub:Letting Date:

$13,056,622.86

04/21/2016

01004

JACOBS ENGINEERING

RESURFACE (ASPHALT) I-40: FROM THE

OKMULGEE COUNTY LINE, EXTEND EAST NEAR

CHECOTAH. PROJECT LENGTH = 7.971 MILES.

Construction Status Report Page 29

Page 30: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29374(04) CO.RD.

STP-246C(030)CI

CE2

Residency:Contract: 170374

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount:04/29/2020Completion Date:

Final Est Sub: Letting Date:

$1,108,167.04

11/16/2017

01017

CIRCUIT ENGR. DISTR. # 2

ND EAST.

GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY

ROAD (EW-115): FROM 4.8 MILES WEST OF THE

MUSKOGEE COUNTY LINE, EXTEND EAST.

PROJECT LENGTH = 0.408 MILE

29750(07) US-266

SSR-246C(033)SR

Hagerman, Jeremy

Residency:Contract: 180015

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount:11/15/2018Completion Date:

Final Est Sub: 04/30/2020Letting Date:

$653,068.64

01/18/2018

01100

MUSKOGEE

RESURFACE (ASPHALT) US-266: FROM THE

SH-72 JUNCTION, EXTEND WEST NEAR

CHECOTAH. PROJECT LENGTH = 3.02 MILES

29387(04) COUNTY RO

ACSTP-246D(035)CI

Hagerman, Jeremy

Residency:Contract: 180056

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount:10/03/2019Completion Date:

Final Est Sub: 02/24/2020Letting Date:

$395,086.64

04/19/2018

01100

MUSKOGEE

BRIDGE AND APPROACHES COUNTY ROAD

(EW-112): OVER MUD CREEK, 8.9 MILES EAST OF

US-69 NEAR TEXANNA. PROJECT LENGTH =

0.132 MILE

27113(04) US-69

NHPPI-NBIP(512)SS

EST

Residency:Contract: 190365

Contractor: EURO PAINT, LLC

Engineer:

Contract Amount:03/16/2020Completion Date:

Final Est Sub: Letting Date:

$541,002.00

11/14/2019

01001

EST, INC.

BRIDGE PAINTING US-69: OVER I-40, 1.2 MILES

SOUTH OF US-266 NEAR CHECOTAH. PROJECT

LENGTH = 0.000 MILE

MurrayCounty: Commissioner District: 7

Contracts Completed - Final Estimate Not Processed

30363(04) CO.RD.

NHPPI-3500(060)SS

Fuhrmann, Chris

Residency:Contract: 170355

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:04/30/2019Completion Date:

Final Est Sub: 04/30/2020Letting Date:

$3,686,657.50

11/16/2017

07200

ARDMORE

INE NEAR DAVIS.

BRIDGE AND APPROACHES COUNTY ROAD

(ROCK CRUSHER ROAD): OVER I-35, 1.8 MILES

SOUTHEAST OF THE GARVIN COUNTY LINE

NEAR DAVIS. PROJECT LENGTH = 0.363 MILE.

28440(04) COUNTY RO

STP-250D(019)CI

Fuhrmann, Chris

Residency:Contract: 180245

Contractor: WYATT CONTRACTING, INC.

Engineer:

Contract Amount:12/13/2019Completion Date:

Final Est Sub: 11/05/2019Letting Date:

$984,789.18

11/15/2018

07200

ARDMORE

BRIDGE AND APPROACHES COUNTY ROAD

(EW-1780): OVER BRANCH CREEK, 0.7 MILES

WEST OF THE US-177 JUNCTION NEAR

SULPHUR. PROJECT LENGTH = 0.151 MILE

Construction Status Report Page 30

Page 31: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33614(04) SH-7

NHPP-250N(020)3B

Fuhrmann, Chris

Residency:Contract: 180290

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Engineer:

Contract Amount:11/19/2019Completion Date:

Final Est Sub: 12/05/2019Letting Date:

$833,221.76

09/20/2018

07200

ARDMORE

JOINT SEAL/REPAIR SH-7 (EB): OVER WASHITA

RIVER, 0.8 MILES WEST OF THE US-77 JUNCTION

NEAR DAVIS. PROJECT LENGTH = 0.00 MILE

29397(04) COUNTY RO

CIRB-250C(021)RB

ZSRB

Residency:Contract: 190140

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount:04/15/2020Completion Date:

Final Est Sub: 04/20/2020Letting Date:

$1,078,664.70

03/14/2019

07022

SMITH ROBERTS BALDISCHWILER, LLC

BRIDGE AND APPROACHES COUNTY ROAD

(NS-328): OVER COLBERT CREEK, 0.6 MILES

SOUTH OF THE SH-7 JUNCTION NEAR DAVIS.

PROJECT LENGTH = 0.301 MILE

MuskogeeCounty: Commissioner District: 1

Contracts Completed - Final Estimate Not Processed

30583(04) US-64

SBR-251N(050)SB

Hagerman, Jeremy

Residency:Contract: 160044

Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES

Engineer:

Contract Amount:06/11/2018Completion Date:

Final Est Sub: Letting Date:

$1,818,806.71

01/21/2016

01100

MUSKOGEE

BRIDGE REHABILITATION US-64: OVER SH-165

IN MUSKOGEE.

28954(04) US-62

ACSTP-251B(029)SS

Hagerman, Jeremy

Residency:Contract: 160203

Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount:10/30/2017Completion Date:

Final Est Sub: 04/30/2020Letting Date:

$1,845,070.21

05/19/2016

01100

MUSKOGEE

BRIDGE REHABILITATION US-62: OVER CLOUD

CREEK, 1.5 MILES EAST OF THE SH-16 JUNCTION

NEAR MUSKOGEE. PROJECT LENGTH = 0.237

MILE.

27956(04) US-62

ACSTP-251B(058)SS

Hagerman, Jeremy

Residency:Contract: 160323

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:02/04/2019Completion Date:

Final Est Sub: Letting Date:

$5,221,126.20

09/15/2016

01100

MUSKOGEE

GRADE, DRAIN, SURFACE, AND INTERSECTION

MODIFICATION US-62/SH-10: FROM 2.2 MILES

EAST OF THE MUSKOGEE TURNPIKE (SH-165),

EXTEND EAST IN FORT GIBSON. PROJECT

LENGTH = 4.408 MILES.

31163(04) CO.RD.

STP-251D(080)CI

CE2

Residency:Contract: 170270

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:04/11/2019Completion Date:

Final Est Sub: Letting Date:

$303,462.43

08/17/2017

01017

CIRCUIT ENGR. DISTR. # 2

BRIDGE AND APPROACHES COUNTY ROAD

(NS-432): OVER UNNAMED CREEK, 3.6 MILES

NORTH OF I-40 NEAR WARNER. PROJECT

LENGTH = 0.189 MILE

Construction Status Report Page 31

Page 32: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31383(04) SH-2

STP-251C(084)3P

Hagerman, Jeremy

Residency:Contract: 180096

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount:05/09/2019Completion Date:

Final Est Sub: 04/23/2020Letting Date:

$2,515,300.46

02/15/2018

01100

MUSKOGEE

RESURFACE (ASPHALT) US-64/SH-2: FROM THE

I-40 INTERCHANGE, EXTEND NORTH NEAR

WARNER. PROJECT LENGTH = 6.374 MILES

32837(04) US-64

ACSTPY-251E(075)AD

Hagerman, Jeremy

Residency:Contract: 180136

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount:01/29/2019Completion Date:

Final Est Sub: 04/23/2020Letting Date:

$279,296.33

03/15/2018

01100

MUSKOGEE

TH = 0.494 MILE

RESURFACE (ASPHALT) AND PEDESTRIAN

IMPROVEMENTS US-64: FROM THE SH-104

JUNCTION, EXTEND SOUTH IN HASKELL.

PROJECT LENGTH = 0.494 MILE

NobleCounty: Commissioner District: 4

Contracts Completed - Final Estimate Not Processed

31189(04) CO.RD.

ACSTP-252C(043)CI

CED8

Residency:Contract: 180137

Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.

Engineer:

Contract Amount:08/27/2019Completion Date:

Final Est Sub: Letting Date:

$1,590,475.40

03/15/2018

04009

CIRCUIT ENGR. DISTR. # 8

GRADE, DRAIN, AND SURFACE COUNTY ROAD

(EW-58/CR 310): FROM THE SH-86 JUNCTION,

EXTEND EAST NEAR PERRY. PROJECT LENGTH

= 2.01 MILES

29867(04) COUNTY RO

CIRB-252D(019)RB

CED8

Residency:Contract: 180227

Contractor: B & B BRIDGE COMPANY, LLC

Engineer:

Contract Amount:02/11/2020Completion Date:

Final Est Sub: Letting Date:

$429,155.24

11/15/2018

04009

CIRCUIT ENGR. DISTR. # 8

BRIDGE AND APPROACHES COUNTY ROAD

(NS-330): OVER MULE CREEK, 1.3 MILES NORTH

OF THE US-64 JUNCTION NEAR SUMNER.

PROJECT LENGTH = 0.170 MILE

OkfuskeeCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

28919(04) SH-48

STP-254C(035)

Helton, Matthew

Residency:Contract: 170132

Contractor: TREAS CONSTRUCTION, INC.

Engineer:

Contract Amount:11/04/2019Completion Date:

Final Est Sub: Letting Date:

$3,416,591.36

06/15/2017

03300

WEWOKA

BRIDGE AND APPROACHES SH-48: OVER

WALNUT CREEK AND LITTLE WALNUT CREEK,

6.0 MILES AND 6.5 MILES NORTH OF US-62 NEAR

CASTLE. PROJECT LENGTH = 0.610 MILE.

32966(04) SH-62

ACHSIPG-254C(039)AD

Helton, Matthew

Residency:Contract: 180138

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount:12/26/2019Completion Date:

Final Est Sub: Letting Date:

$954,264.68

03/15/2018

03300

WEWOKA

9TH ST THEN N ON MAIN ST IN PADEN.

PEDESTRIAN IMPROVEMENTS (SIDEWALK) SH-62

(9TH STREET)/MAIN STREET: FROM 3.1 MI E OF

THE LINCOLN C/L, EXTEND E ON SH-62/9TH ST

THEN N ON MAIN ST IN PADEN.

Construction Status Report Page 32

Page 33: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33324(04) I-40/US-7

SAP-254N(042)

Wade, Tony

Residency:Contract: 180163

Contractor: RESTEK, INC.

Engineer:

Contract Amount:12/12/2018Completion Date:

Final Est Sub: 03/12/2020Letting Date:

$95,857.40

04/19/2018

03100

ADA

IAN RIVER.

BRIDGE REPAIR I-40/US-75: I-40, REPAIR

VEHICLE IMPACT DAMAGE OVER SH-27. US-75,

REPAIR VEHICLE IMPACT DAMAGE OVER

CANADIAN RIVER.

OklahomaCounty: Commissioner District: 4

Contracts Completed - Final Estimate Not Processed

17428(60) CT.ST.

OKC-XTWN(048)(006)SS

Harlin, Chris

Residency:Contract: 150026

Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)

Engineer:

Contract Amount:02/02/2017Completion Date:

Final Est Sub: Letting Date:

$40,611,253.81

01/22/2015

04600

OKLAHOMA CITY

GRADE, DRAIN, SURFACE, AND BRIDGE CITY

STREET (OKC BOULEVARD): E.K. GAYLORD

BLVD. FROM RENO AVE., EXTEND SOUTH. OKC

BOULEVARD AND 3RD ST. FROM B.N.S.F.

RAILROAD, EXTEND EAST TO NORTHBOUND I-35.

PROJECT LENGTH = 1.184

25909(48) I-35

HSIPG-255F(180)IT

Brooks, Jonathan

Residency:Contract: 150340

Contractor: MIDSTATE TRAFFIC CONTROL, INC.

Engineer:

Contract Amount:07/31/2018Completion Date:

Final Est Sub: 02/28/2020Letting Date:

$3,771,714.50

05/19/2016

04200

YUKON

SAFETY IMPROVEMENT (DYNAMIC MESSAGE

SIGN AND CCTV PROJECT)

I-35/I-40/I-44/US-69/US-271: AT MULTIPLE

LOCATIONS ON THE OKLAHOMA STATE LINE.

09032(20) I-240

ACNHPPI-2400-(004)SS

Harlin, Chris

Residency:Contract: 160046

Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)

Engineer:

Contract Amount:09/11/2017Completion Date:

Final Est Sub: 06/28/2019Letting Date:

$11,958,193.19

01/21/2016

04600

OKLAHOMA CITY

GRADE, DRAIN, AND SURFACE I-240: FROM

SANTA FE AVENUE, EXTEND EAST IN

OKLAHOMA CITY. PROJECT LENGTH = 0.484

MILE.

30277(04) CT.ST.

STP-255C(343)AG

Hubbard, Tom

Residency:Contract: 160147

Contractor: ALLEN CONTRACTING, INC.

Engineer:

Contract Amount:10/23/2017Completion Date:

Final Est Sub: Letting Date:

$11,798,388.72

04/21/2016

04400

EDMOND

GRADE, DRAIN, SURFACE, AND TRAFFIC SIGNAL

CITY STREET (COVELL ROAD): AT THE

INTERSECTION OF SOONER ROAD IN THE CITY

OF EDMOND. PROJECT LENGTH = 1.032 MILES.

24364(04) CT.ST.

STP-155B(614)AG

Harlin, Chris

Residency:Contract: 160379

Contractor: SCHWARZ PAVING CO., INC.

Engineer:

Contract Amount:05/31/2018Completion Date:

Final Est Sub: 02/25/2020Letting Date:

$8,844,680.81

10/20/2016

04600

OKLAHOMA CITY

GRADE, DRAIN, SURFACE, AND BRIDGE CITY

STREETS (SE 15TH STREET): FROM 0.2 MILE

WEST OF WESTMINISTER ROAD, EXTEND EAST

IN MIDWEST CITY AND CHOCTAW. PROJECT

LENGTH = 1.405 MILES.

Construction Status Report Page 33

Page 34: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

30635(04) SH-152

SBR-255N(416)SB

Harlin, Chris

Residency:Contract: 160385

Contractor: RESTEK, INC.

Engineer:

Contract Amount:09/15/2017Completion Date:

Final Est Sub: 08/01/2019Letting Date:

$966,416.19

10/20/2016

04600

OKLAHOMA CITY

BRIDGE REHABILITATION SH-152: OVER

PORTLAND AVENUE, 0.6 MI NW, 0.6 MI W, AND

1.1 MI NW OF THE I-44 INTERCHANGE IN

OKLAHOMA CITY.

31476(04) CT.ST.

STP-255B(337)AG

Harlin, Chris

Residency:Contract: 160388

Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV

Engineer:

Contract Amount:01/09/2018Completion Date:

Final Est Sub: 04/14/2020Letting Date:

$2,344,841.28

10/20/2016

04600

OKLAHOMA CITY

RESURFACE (ASPHALT) AND PEDESTRIAN

IMPROVEMENTS CITY STREET (SE 15TH

STREET): FROM MIDWEST BOULEVARD, EXTEND

WEST IN MIDWEST CITY. PROJECT LENGTH =

1.560 MILES.

09032(17) I-240/I-3

NHPPI-0240-1(358)004SS

Harlin, Chris

Residency:Contract: 160425

Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV

Engineer:

Contract Amount:06/30/2018Completion Date:

Final Est Sub: 04/16/2020Letting Date:

$10,629,506.29

11/17/2016

04600

OKLAHOMA CITY

GRADE, DRAIN, AND SURFACE I-240/I-35: FROM

SHIELDS BOULEVARD, EXTEND EAST ON I-240

THEN SOUTH ON I-35 IN OKLAHOMA CITY.

PROJECT LENGTH = 0.962 MILE.

24357(04) SH-66

STPY-155C(611)

Hubbard, Tom

Residency:Contract: 170035

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount:08/10/2018Completion Date:

Final Est Sub:Letting Date:

$4,046,765.06

02/16/2017

04400

EDMOND

WIDEN, RESURFACE, AND BRIDGE SH-66: FROM

THE LINCOLN COUNTY LINE, EXTEND WEST IN

LUTHER. PROJECT LENGTH = 2.286 MILES

31526(04) CT.ST.

STP-255D(419)AG

Hubbard, Tom

Residency:Contract: 170038

Contractor: M.J. HUGHES CONSTRUCTION, INC.

Engineer:

Contract Amount:11/03/2017Completion Date:

Final Est Sub: 01/15/2020Letting Date:

$914,777.72

02/16/2017

04400

EDMOND

BRIDGE REHABILITATION CITY STREET (RENO

AVENUE): OVER CHERRY CREEK, 0.3 MILE EAST

OF SUNNYLANE ROAD IN THE CITY OF DEL CITY.

PROJECT LENGTH = 0.056 MILE.

32261(05) US-62

ACERSTP-255N(358)ER

Hubbard, Tom

Residency:Contract: 170134

Contractor: CP3 ENTERPRISES, INC.

Engineer:

Contract Amount:08/16/2019Completion Date:

Final Est Sub:Letting Date:

$612,210.14

01/17/2019

04400

EDMOND

BANK PROTECTION US-62: OVER THE NORTH

CANADIAN RIVER, 0.4 MILES NORTHEAST OF

THE SH-270 JUNCTION NEAR HARRAH. PROJECT

LENGTH = 0.00 MILE

28767(04) CT.ST.

CIRB-155C(917)CO

Brooks, Jonathan

Residency:Contract: 170176

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount:11/07/2018Completion Date:

Final Est Sub: 09/19/2019Letting Date:

$7,800,000.00

04/20/2017

04200

YUKON

GRADE, DRAIN, SURFACE, AND BRIDGE CITY

STREET (NORTH MACARTHUR BOULEVARD):

FROM 3.0 MILES NORTH OF THE KILPATRICK

TURNPIKE, EXTEND NORTH IN EDMOND.

PROJECT LENGTH = 1.875 MILES.

Construction Status Report Page 34

Page 35: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31436(04) CT.ST.

TAP-255D(329)AG

Harlin, Chris

Residency:Contract: 170181

Contractor: PARATHON CONSTRUCTION, LLC

Engineer:

Contract Amount:08/09/2018Completion Date:

Final Est Sub: 04/16/2020Letting Date:

$644,640.18

05/18/2017

04600

OKLAHOMA CITY

PEDESTRIAN IMPROVEMENTS (TRAIL

CONSTRUCTION) CITY STREET (SE 29TH STREET

TRAIL): FROM SOONER ROAD, EXTEND EAST IN

MIDWEST CITY. PROJECT LENGTH = 1.050 MILES

PREQUALIFICATION FOR THIS PROJECT HAS

BEEN WAIVED. BOTH BID EX

31435(04) CT.ST.

TAP-255D(328)AG

Harlin, Chris

Residency:Contract: 170327

Contractor: CROSSLAND HEAVY CONTRACTORS INC.

Engineer:

Contract Amount:05/12/2018Completion Date:

Final Est Sub: Letting Date:

$525,980.00

10/19/2017

04600

OKLAHOMA CITY

ENHANCEMENT (TRAIL CONSTRUCTION)

RAILROAD CORRIDOR WITH TRAIL: FROM

S.E.15TH STREET, EXTEND NORTHWEST IN THE

CITY OF MIDWEST CITY. PROJECT LENGTH =

1.030 MILES PREQUALIFICATION FOR THIS

PROJECT HAS BEEN WAIVED. BOTH BID

30326(04) CT.ST.

STP-255B(360)AG

Brooks, Jonathan

Residency:Contract: 170358

Contractor: SCHWARZ PAVING CO., INC.

Engineer:

Contract Amount:09/20/2019Completion Date:

Final Est Sub: Letting Date:

$4,419,663.32

11/16/2017

04200

YUKON

MOND.

GRADE, DRAIN, AND SURFACE CITY STREET

(WESTERN AVENUE): FROM NW 178TH STREET,

EXTEND NORTH IN THE CITY OF EDMOND.

PROJECT LENGTH = 0.966 MILE

30444(06) I-40

NHPPI-3500-(062)SS

Harlin, Chris

Residency:Contract: 170359

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount:08/01/2018Completion Date:

Final Est Sub: 04/16/2020Letting Date:

$5,018,449.68

11/16/2017

04600

OKLAHOMA CITY

GRADE, DRAIN, AND SURFACE I-40: AT THE

I-35/I-235 INTERCHANGE IN OKLAHOMA CITY.

PROJECT LENGTH = 1.461 MILES

27905(04) I-235

NHPPI-2350-(007)PM

Hubbard, Tom

Residency:Contract: 180099

Contractor: RUDY CONSTRUCTION CO.

Engineer:

Contract Amount:03/20/2019Completion Date:

Final Est Sub: Letting Date:

$686,705.14

02/15/2018

04400

EDMOND

GRADE, DRAIN, AND SURFACE I-235:

NORTHBOUND OFF-RAMP TO NE 23RD STREET

IN THE CITY OF OKLAHOMA CITY. PROJECT

LENGTH = 0.141 MILE

30230(04) CITY STRE

STP-255A(450)AG

EST

Residency:Contract: 180101

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount:05/07/2019Completion Date:

Final Est Sub: Letting Date:

$2,868,868.00

04/19/2018

04001

EST, INC.

ND EAST IN OKLAHOMA CITY.

RESURFACE (ASPHALT) CITY STREET (WEST

MEMORIAL ROAD): FROM THE SH-74 (N

PORTLAND AVENUE) INTERSECTION, EXTEND

EAST IN OKLAHOMA CITY. PROJECT LENGTH =

2.075 MILES

31432(04) CT.ST.

TAP-255D(325)AG

Harlin, Chris

Residency:Contract: 180102

Contractor: SAC SERVICES, INC.

Engineer:

Contract Amount:08/30/2018Completion Date:

Final Est Sub: 04/07/2020Letting Date:

$73,629.50

02/15/2018

04600

OKLAHOMA CITY

PEDESTRIAN IMPROVEMENTS (BUS STOPS) CITY

STREETS: AT MULTIPLE LOCATIONS IN

OKLAHOMA CITY.

Construction Status Report Page 35

Page 36: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31568(04) CITY STRE

STPG-255A(459)AG

Harlin, Chris

Residency:Contract: 180105

Contractor: MIDSTATE TRAFFIC CONTROL, INC.

Engineer:

Contract Amount:02/11/2019Completion Date:

Final Est Sub: 04/22/2020Letting Date:

$81,345.75

04/19/2018

04600

OKLAHOMA CITY

TRAFFIC SIGNALS CITY STREET (MERIDIAN

AVENUE): BETWEEN NW 52ND STREET AND NW

53RD STREET, IN OKLAHOMA CITY.

30793(04) SH-66

HSIP-255N(257)TR

Brooks, Jonathan

Residency:Contract: 180266

Contractor: TRAFFIC SIGNALS, INC.

Engineer:

Contract Amount:06/24/2019Completion Date:

Final Est Sub: 03/10/2020Letting Date:

$72,936.79

08/16/2018

04200

YUKON

SAFETY IMPROVEMENT (SCHOOL SIGNS) SH-66

(NW 39TH STREET): AT THE INTERSECTION OF

GROVE AVENUE, IN THE CITY OF WARR ACRES.

PROJECT LENGTH = 0.00 MILE

31527(04) CITY STRE

STP-255D(442)AG

Brooks, Jonathan

Residency:Contract: 180267

Contractor: PBX CORPORATION

Engineer:

Contract Amount:07/23/2019Completion Date:

Final Est Sub: Letting Date:

$1,022,129.26

08/16/2018

04200

YUKON

BRIDGE REHABILITATION CITY STREET (NE 4TH

STREET): OVER CHERRY CREEK, 1.6 MILES

EAST OF I-35 IN DEL CITY. PROJECT LENGTH =

0.058 MILE

32592(04) COUNTY RO

STP-255C(464)CB

Harlin, Chris

Residency:Contract: 180269

Contractor: KLAVER CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount:08/01/2019Completion Date:

Final Est Sub: 04/23/2020Letting Date:

$396,325.79

08/16/2018

04600

OKLAHOMA CITY

BRIDGE AND APPROACHES COUNTY ROAD

(NS-328/NORTH HARRAH ROAD): OVER

UNNAMED CREEK, 0.8 MILES SOUTH OF I-44

(TURNER TURNPIKE) NEAR LUTHER. PROJECT

LENGTH = 0.081 MILE

31102(04) CITY STRE

STP-255C(430)AG

Harlin, Chris

Residency:Contract: 180293

Contractor: CROSSLAND HEAVY CONTRACTORS INC.

Engineer:

Contract Amount:02/05/2020Completion Date:

Final Est Sub: Letting Date:

$3,954,000.00

11/15/2018

04600

OKLAHOMA CITY

GRADE, DRAIN, SURFACE, AND SIDEWALKS CITY

STREET (BRITTON ROAD): FROM 0.4 MILES

EAST OF SH-74, EXTEND EAST IN THE CITY OF

THE VILLAGE. PROJECT LENGTH = 1.004 MILES

33616(05) SH-152/NE

STP-NBIP(526)3B

EST

Residency:Contract: 180295

Contractor: POSEIDON CONSTRUCTION, INC.

Engineer:

Contract Amount:11/04/2019Completion Date:

Final Est Sub: Letting Date:

$534,869.00

09/20/2018

04001

EST, INC.

BRIDGE PAINTING SH-152: OVER RAILROAD,

CITY STREET (NEWCASTLE ROAD), AND

UNNAMED CREEK, 1.4 MILES W OF THE I-44

INTERCHANGE IN OKC. PROJECT LENGTH = 0.00

MILE

32091(04) SH-3

NHPP-017N(252)3P

Brooks, Jonathan

Residency:Contract: 180333

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount:04/23/2020Completion Date:

Final Est Sub: Letting Date:

$6,076,769.00

04/18/2019

04200

YUKON

RESURFACE (ASPHALT) SH-3: FROM SH-74

EXTEND NORTHWEST, IN OKLAHOMA CITY.

PROJECT LENGTH = 6.860 MILES

Construction Status Report Page 36

Page 37: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33773(04) SH-74

ACSTP-255C(491)PM

Hubbard, Tom

Residency:Contract: 190159

Contractor: TRAFFIC SIGNALS, INC.

Engineer:

Contract Amount:10/25/2019Completion Date:

Final Est Sub: Letting Date:

$193,114.19

06/20/2019

04400

EDMOND

TRAFFIC SIGNAL, SIGNING, AND PAVEMENT

MARKING SH-74: AT THE INTERSECTION OF

WATERLOO ROAD, NEAR EDMOND. PROJECT

LENGTH = 0.47 MILE

28817(04) MID-AMERI

STP-155E(919)EH

Harlin, Chris

Residency:Contract: 190170

Contractor: REDLANDS CONTRACTING, LLC

Engineer:

Contract Amount:02/12/2020Completion Date:

Final Est Sub: Letting Date:

$674,201.15

04/18/2019

04600

OKLAHOMA CITY

PEDESTRIAN IMPROVEMENTS (TRAIL

CONSTRUCTION) MID-AMERICA TRAIL: FROM

THE INTERSECTION OF N. MIDWEST BLVD AND

NE 10TH ST, EXTEND NORTHWEST IN MIDWEST

CITY. PROJECT LENGTH = 0.653 MILE

OkmulgeeCounty: Commissioner District: 1

Contracts Completed - Final Estimate Not Processed

27970(04) I-40

NHPPI-4000-(005)SS/HSIPI*

Hagerman, Jeremy

Residency:Contract: 150175

Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV

Engineer:

Contract Amount:02/01/2017Completion Date:

Final Est Sub: 02/07/2020Letting Date:

$15,602,123.20

05/21/2015

01100

MUSKOGEE

*G-0040-6(380)238TR

PAVEMENT REHABILITATION - DIVISION I

I-40/US-75B: ON I-40, FROM MILE MARKER 237.41

EXTEND EAST, AND ON US-75B, FROM I-40

EXTEND NORTHEAST IN HENRYETTA. PROJECT

LENGTH = 7.020 MILES.

21740(04) US-75

NHPP-256N(024)SS

Hagerman, Jeremy

Residency:Contract: 150265

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount:11/15/2018Completion Date:

Final Est Sub: Letting Date:

$29,671,928.47

08/20/2015

01100

MUSKOGEE

GRADE, DRAIN, SURFACE, AND BRIDGE US-75:

FROM 7.0 MILES NORTH OF I-40, EXTEND NORTH

NEAR OKMULGEE. PROJECT LENGTH = 2.538

MILES.

24369(04) US-75A

ACSTP-156C(136)SS

CEC

Residency:Contract: 160255

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:09/27/2019Completion Date:

Final Est Sub: Letting Date:

$16,214,688.52

07/21/2016

01003

CEC CORP.

GRADE, DRAIN, SURFACE, AND BRIDGE US-75A:

FROM 1.1 MILES NORTH OF THE SH-16

JUNCTION, EXTEND NORTH IN BEGGS.

PROJECT LENGTH = 7.511 MILES.

30126(04) CT.ST.

STP-256C(029)UR

Hagerman, Jeremy

Residency:Contract: 170040

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount:04/29/2019Completion Date:

Final Est Sub: Letting Date:

$1,310,188.90

04/20/2017

01100

MUSKOGEE

BRIDGE AND APPROACHES CITY STREET

(MUSKOGEE AVENUE): OVER OKMULGEE

CREEK, 0.1 MILE AND 0.3 MILE NORTH OF SH-56

IN THE CITY OF OKMULGEE. PROJECT LENGTH

= 0.238 MILE.

Construction Status Report Page 37

Page 38: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

10465(04) SH-56

STP-256C(047)PM

ZPAA

Residency:Contract: 170360

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount:12/05/2019Completion Date:

Final Est Sub: Letting Date:

$2,990,615.00

06/14/2018

01020

POE AND ASSOCIATES

BRIDGE AND APPROACHES SH-56: OVER BRIER

CREEK AND TRIBUTARY, 0.4 MILES AND 0.6

MILES EAST OF THE OKFUSKEE COUNTY LINE.

PROJECT LENGTH = 0.606 MILE

32991(04) CT.ST.

TAP-256D(043)TP

Hagerman, Jeremy

Residency:Contract: 180140

Contractor: CROSSLAND HEAVY CONTRACTORS INC.

Engineer:

Contract Amount:03/22/2019Completion Date:

Final Est Sub: Letting Date:

$772,000.00

03/15/2018

01100

MUSKOGEE

E.

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

CITY STREET (OKMULGEE AVENUE): FROM 6TH

STREET, EXTEND NORTH IN THE CITY OF

OKMULGEE.

32054(04) SH-56 LOO

STP-256B(048)3P

Hagerman, Jeremy

Residency:Contract: 190088

Contractor: ROSSCON, LLC

Engineer:

Contract Amount:12/19/2019Completion Date:

Final Est Sub: Letting Date:

$1,131,689.75

05/16/2019

01100

MUSKOGEE

RESURFACE (ASPHALT) SH-56 LOOP: FROM THE

US-75 JUNCTION, EXTEND SOUTHEAST IN

OKMULGEE. PROJECT LENGTH = 3.59 MILES

34045(04) US-75 (SB

MC-256N(053)

Hagerman, Jeremy

Residency:Contract: 190126

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount:08/20/2019Completion Date:

Final Est Sub: 04/28/2020Letting Date:

$1,250,044.00

03/14/2019

01100

MUSKOGEE

RESURFACE (ASPHALT) US-75 (SB LANES):

FROM THE SH-16 JUNCTION, EXTEND NORTH

NEAR WINCHESTER. PROJECT LENGTH = 8.00

MILES

34046(04) I-40/US-7

MC-256N(054)

Hagerman, Jeremy

Residency:Contract: 190127

Contractor: KEYSTONE SERVICES, INC.

Engineer:

Contract Amount:10/14/2019Completion Date:

Final Est Sub: 03/16/2020Letting Date:

$360,333.90

03/14/2019

01100

MUSKOGEE

JOINT SEAL/REPAIR I-40/US-75: AT MULTIPLE

LOCATIONS IN DIVISION I. PROJECT LENGTH =

2.405 MILES

30651(04) MULTIPLE

STP-251F(098)PM

Hagerman, Jeremy

Residency:Contract: 190218

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount:12/19/2019Completion Date:

Final Est Sub: 03/17/2020Letting Date:

$112,473.53

07/25/2019

01100

MUSKOGEE

BRIDGE WATER PROOF SEAL I-40/US-62/US-64B

SB/US-75/SH-10/SH-51: AT MULTIPLE LOCATIONS

IN DIVISION I. PROJECT LENGTH = 0.000 MILE

31376(04) US-75B

SSR-256N(042)SR

Hagerman, Jeremy

Residency:Contract: 190235

Contractor: PARAGON CONTRACTORS, LLC

Engineer:

Contract Amount:12/15/2019Completion Date:

Final Est Sub: 03/09/2020Letting Date:

$407,704.00

07/25/2019

01100

MUSKOGEE

RESURFACE (ASPHALT) US-75B: FROM 0.7

MILES WEST OF US-62, EXTEND WEST IN

HENRYETTA. PROJECT LENGTH = 0.460 MILE

Construction Status Report Page 38

Page 39: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

OsageCounty: Commissioner District: 8

Contracts Completed - Final Estimate Not Processed

24287(04) US-60

NHPPY-257N(020)SS

Scott, Kalynn

Residency:Contract: 130395

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount:01/30/2017Completion Date:

Final Est Sub:Letting Date:

$36,982,702.17

11/21/2013

08400

SAND SPRINGS

GRADE, DRAIN, SURFACE, AND BRIDGE US-60:

FROM 2.0 MILES EAST OF SH-99, EXTEND EAST.

PROJECT LENGTH = 5.821 MILES.

24266(08) SH-11

SSP-257B(059)RW

Scott, Kalynn

Residency:Contract: 170271

Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC

Engineer:

Contract Amount:03/13/2020Completion Date:

Final Est Sub:Letting Date:

$67,025.00

09/21/2017

08400

SAND SPRINGS

RIGHT-OF-WAY CLEARANCE SH-11: FROM THE

WASHINGTON COUNTY LINE, EXTEND

NORTHWEST NEAR

SKIATOOK.PREQUALIFICATION FOR THIS

PROJECT HAS BEEN WAIVED. BOTH BID

EXPRESS AND WRITTEN BIDS WILL BE

ACCEPTABLE.

30704(04) CO.RD.

CIRB-257D(064)RB

GARV

Residency:Contract: 180023

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount:07/01/2019Completion Date:

Final Est Sub:Letting Date:

$910,474.85

01/18/2018

08011

GARVER, LLC.

BRIDGE AND APPROACHES COUNTY ROAD

(EW-33): OVER DOG THRESHER CREEK, 3.2

MILES WEST OF SH-11 NEAR BARNSDALL.

PROJECT LENGTH = 0.302 MILE

31940(04) SH-20

STP-257C(070)3P

Scott, Kalynn

Residency:Contract: 190128

Contractor: ROSSCON, LLC

Engineer:

Contract Amount:10/31/2019Completion Date:

Final Est Sub:Letting Date:

$1,706,222.68

06/20/2019

08400

SAND SPRINGS

RESURFACE (ASPHALT) SH-20: FROM THE SH-18

JUNCTION, EXTEND SOUTHEAST NEAR

RALSTON. PROJECT LENGTH = 7.890 MILES

PayneCounty: Commissioner District: 4

Contracts Completed - Final Estimate Not Processed

26369(04) SH-51

SSP-160B(190)SS

Mitchell, Matt

Residency:Contract: 160231

Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV

Engineer:

Contract Amount:09/30/2017Completion Date:

Final Est Sub:Letting Date:

$7,354,181.48

06/16/2016

04500

STILLWATER

BRIDGE AND APPROACHES SH-51 (6TH AVENUE):

OVER BOOMER CREEK, 0.02 MILE WEST OF THE

US-177 (PERKINS ROAD) INTERSECTION IN

STILLWATER. PROJECT LENGTH = 0.353 MILE.

32952(04) US-177

HSIPG-260N(060)AD

Mitchell, Matt

Residency:Contract: 180335

Contractor: MORTON CONSTRUCTION, INC.

Engineer:

Contract Amount:08/15/2019Completion Date:

Final Est Sub:Letting Date:

$498,481.03

10/18/2018

04500

STILLWATER

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

US-177: FROM 1.1 MILES SOUTH OF THE SH-51

JUNCTION, EXTEND NORTH IN STILLWATER.

PROJECT LENGTH = 1.231 MILES.

Construction Status Report Page 39

Page 40: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33011(04) CITY STRE

TAP-260D(033)TP

Mitchell, Matt

Residency:Contract: 190131

Contractor: T. MCDONALD CONSTRUCTION, INC.

Engineer:

Contract Amount:04/14/2020Completion Date:

Final Est Sub: Letting Date:

$1,440,019.50

03/14/2019

04500

STILLWATER

PEDESTRIAN IMPROVEMENTS (SIDEWALKS,

BRIDGE, AND CHANNEL) CITY STREET (DUCK

STREET): FROM MCELROY ROAD, EXTEND

SOUTH IN STILLWATER. PROJECT LENGTH =

0.000 MILE

PittsburgCounty: Commissioner District: 2

Contracts Completed - Final Estimate Not Processed

28991(04) US-69

ACNHPP-261N(072)SS

Plymate, Larry

Residency:Contract: 170273

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount:08/27/2019Completion Date:

Final Est Sub: 04/22/2020Letting Date:

$5,212,465.15

08/17/2017

02400

MCALESTER

BRIDGE AND APPROACHES US-69(SB): OVER

US-69B, 2.9 MI NE OF THE INDIAN NATION TNPK.

US-69(NB): UNDER US-69, 2.9 MI NE OF INDIAN

NATION TNPK. PROJECT LENGTH = 0.646 MILE

32356(04) COUNTY RO

CIRB-261C(075)RB

CED3

Residency:Contract: 180209

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:08/16/2019Completion Date:

Final Est Sub: Letting Date:

$2,139,498.28

01/17/2019

02013

CIRCUIT ENGR. DISTR. # 3

RESURFACE (ASPHALT) COUNTY ROAD

(ASHLAND ROAD): FROM 0.3 MILES WEST OF

US-69, EXTEND WEST NEAR KIOWA. PROJECT

LENGTH = 7.130 MILES

PontotocCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

30674(04) CO.RD.

ACSTP-262C(042)CI

Wade, Tony

Residency:Contract: 170274

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:05/02/2019Completion Date:

Final Est Sub: Letting Date:

$4,171,637.46

08/17/2017

03100

ADA

GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY

ROAD (EW-157): FROM SH-1, EXTEND WEST

NEAR ADA. PROJECT LENGTH = 4.289 MILES

31831(04) SH-1

SSR-262B(047)SR

Wade, Tony

Residency:Contract: 180028

Contractor: SCHIRALLI CONSTRUCTION CORP.

Engineer:

Contract Amount:04/30/2019Completion Date:

Final Est Sub: Letting Date:

$564,025.63

01/18/2018

03100

ADA

RESURFACE (A.C. AND P.C.) SH-1: FROM THE

SH-99 JUNCTION, EXTEND EAST IN ADA.

PROJECT LENGTH = 3.640 MILES

33753(04) SH-48

SSR-262B(051)SR

Wade, Tony

Residency:Contract: 180300

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:07/15/2019Completion Date:

Final Est Sub: Letting Date:

$786,640.00

09/20/2018

03100

ADA

RESURFACE (ASPHALT) SH-48: FROM THE COAL

COUNTY LINE, EXTEND NORTH NEAR

STONEWALL. PROJECT LENGTH = 5.000 MILES

Construction Status Report Page 40

Page 41: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32768(04) SH-1

STP-262C(052)3P

Wade, Tony

Residency:Contract: 190092

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:11/14/2019Completion Date:

Final Est Sub: Letting Date:

$3,146,973.08

06/20/2019

03100

ADA

RESURFACE (ASPHALT) SH-1: FROM 0.2 MILES

NORTH OF THE CHICKASAW TURNPIKE, EXTEND

NORTHEAST NEAR ROFF. PROJECT LENGTH =

8.00 MILES

33756(04) SH-48

STP-262C(055)3P

Wade, Tony

Residency:Contract: 190201

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount:11/05/2019Completion Date:

Final Est Sub: Letting Date:

$684,496.90

06/20/2019

03100

ADA

RESURFACE (ASPHALT) SH-48: FROM 5.2 MILES

NORTH OF THE COAL COUNTY LINE, EXTEND

NORTH NEAR JAYDEE. PROJECT LENGTH = 4.00

MILES

PottawatomieCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

32976(04) PEDESTRIA

TAP-263D(049)TP

Wade, Tony

Residency:Contract: 180144

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount:02/15/2019Completion Date:

Final Est Sub: 12/11/2019Letting Date:

$175,128.00

03/15/2018

03100

ADA

ELM STREET IN THE TOWN OF ASHER.

PEDESTRIAN IMPROVEMENTS (TRAIL

CONSTRUCTION) PEDESTRIAL TRAIL: AT ASHER

PUBLIC SCHOOL, BETWEEN MAIN STREET AND

ELM STREET IN THE TOWN OF ASHER. PROJECT

LENGTH = 0.25 MILE

29569(04) US-270

SSP-263B(062)PM

Helton, Matthew

Residency:Contract: 180301

Contractor: PBX CORPORATION

Engineer:

Contract Amount:04/28/2020Completion Date:

Final Est Sub: Letting Date:

$1,860,996.72

09/20/2018

03300

WEWOKA

BRIDGE REHABILITATION US-270: OVER

US-270B, 1.5 MILES NORTH OF THE SH-3E/SH-18

INTERCHANGE IN SHAWNEE. PROJECT LENGTH

= 0.042 MILE

32990(04) MULTIPLE

TAP-263D(065)TP

Helton, Matthew

Residency:Contract: 190057

Contractor: RUDY CONSTRUCTION CO.

Engineer:

Contract Amount:10/25/2019Completion Date:

Final Est Sub: 04/20/2020Letting Date:

$149,843.40

01/17/2019

03300

WEWOKA

PEDESTRIAN IMPROVEMENTS (SIDEWALKS) AT

MULTIPLE LOCATIONS IN THE CITY OF MCLOUD.

PROJECT LENGTH = 0.222 MILE.

34670(04) I-40 EB

MC-4000(103)

Helton, Matthew

Residency:Contract: 200135

Contractor: CGC, LLC.

Engineer:

Contract Amount:04/24/2020Completion Date:

Final Est Sub: Letting Date:

$68,973.00

02/20/2020

03300

WEWOKA

RESURFACE (ASPHALT) I-40 EB: FROM 2.0 MILES

EAST OF THE US-177 INTERCHANGE, EXTEND

EAST NEAR SHAWNEE. PROJECT LENGTH =

0.019 MILE

PushmatahaCounty: Commissioner District: 2

Contracts Completed - Final Estimate Not Processed

Construction Status Report Page 41

Page 42: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29918(04) CO.RD.

CIRB-264D(041)RB

CED3

Residency:Contract: 170209

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount:04/11/2018Completion Date:

Final Est Sub: Letting Date:

$1,204,150.92

06/15/2017

02013

CIRCUIT ENGR. DISTR. # 3

BRIDGE AND APPROACHES COUNTY ROAD

(NS-4393): OVER BLACK FORK CREEK, 0.8 MILES

SOUTH OF SH-144 NEAR NASHOBA. PROJECT

LENGTH = 0.236 MILE

RogersCounty: Commissioner District: 8

Contracts Completed - Final Estimate Not Processed

33220(04) US-169

STP-272F(228)3B

TETR

Residency:Contract: 180075

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount:09/23/2019Completion Date:

Final Est Sub: Letting Date:

$1,580,103.68

01/18/2018

08002

TETRA TECH

JOINT SEAL/REPAIR US-169: AT MULTIPLE

LOCATIONS IN DIVISION VIII.

31480(34) CITY STRE

SRS-266E(035)ST

C&KI

Residency:Contract: 180303

Contractor: GRADE LINE CONSTRUCTION, LLC

Engineer:

Contract Amount:04/29/2020Completion Date:

Final Est Sub: Letting Date:

$389,108.52

06/20/2019

08007

CRAIG & KEITHLINE, INC.

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

CITY STREETS ('A' ST NW/E COMMERCIAL ST/S

4215 RD): FROM INOLA ELEMENTARY SCHOOL

TO INOLA MIDDLE SCHOOL IN INOLA. PROJECT

LENGTH = 1.170 MILES

31941(04) SH-28

STP-266C(067)3P

Beats, Aaron

Residency:Contract: 190134

Contractor: ROSSCON, LLC

Engineer:

Contract Amount:02/27/2020Completion Date:

Final Est Sub: Letting Date:

$892,389.50

05/16/2019

08300

CLAREMORE

RESURFACE (ASPHALT) SH-28: FROM THE SH-66

JUNCTION, EXTEND SOUTH NEAR CHELSEA.

PROJECT LENGTH = 4.11 MILES

SeminoleCounty: Commissioner District: 3

Contracts Completed - Final Estimate Not Processed

28911(04) SH-56

STP-267C(045)SS

Wade, Tony

Residency:Contract: 180033

Contractor: TREAS CONSTRUCTION, INC.

Engineer:

Contract Amount:10/31/2019Completion Date:

Final Est Sub: Letting Date:

$2,976,295.58

02/15/2018

03100

ADA

NAWA.

GRADE, DRAIN, SURFACE, AND BRIDGE SH-56:

OVER JUMPER CREEK, 1.3 MILES EAST OF THE

SH-99 INTERSECTION NEAR KONAWA. PROJECT

LENGTH = 0.568 MILE

33006(04) PEDESTRIA

TAP-263D(050)TP

Wade, Tony

Residency:Contract: 180145

Contractor: BISHOP CONSTRUCTION, LLC

Engineer:

Contract Amount:04/30/2019Completion Date:

Final Est Sub: Letting Date:

$280,698.00

03/15/2018

03100

ADA

TAYLOR AVE IN MAUD.

PEDESTRIAN IMPROVEMENTS (TRAIL AND

SIDEWALK) PEDESTRIAN TRAIL: AT MAUD

PUBLIC SCHOOL, BETWEEN HARRIS AVE AND

TAYLOR AVE IN MAUD. PROJECT LENGTH = 0.410

MILE

Construction Status Report Page 42

Page 43: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33329(04) US-270

STP-267A(074)3P

Helton, Matthew

Residency:Contract: 180305

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:12/10/2019Completion Date:

Final Est Sub: 04/03/2020Letting Date:

$978,972.57

09/20/2018

03300

WEWOKA

RESURFACE (ASPHALT) US-270: FROM SH-9,

EXTEND SOUTHEAST IN SEMINOLE. PROJECT

LENGTH = 2.39 MILES

34039(04) US-270

MC-267C(079)

Helton, Matthew

Residency:Contract: 190135

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount:01/13/2020Completion Date:

Final Est Sub: 04/23/2020Letting Date:

$402,530.00

06/20/2019

03300

WEWOKA

RESURFACE (ASPHALT) US-270: FROM THE

US-377 JUNCTION, EXTEND EAST IN SEMINOLE.

PROJECT LENGTH = 0.206 MILE

SequoyahCounty: Commissioner District: 1

Contracts Completed - Final Estimate Not Processed

25434(04) CO.RD.

CIRB-168C(190)RB

Orendorf, Barry

Residency:Contract: 150402

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:11/14/2018Completion Date:

Final Est Sub: Letting Date:

$2,499,565.09

11/19/2015

01200

SALLISAW

GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY

ROAD (NS-462): OVER BRUSHY CREEK, 6.5

MILES NORTH OF SH-64 NEAR SALLISAW.

PROJECT LENGTH = 0.464 MILE

28515(04) CO.RD.

CIRB-268C(037)RB

Orendorf, Barry

Residency:Contract: 160207

Contractor: TREAS CONSTRUCTION, INC.

Engineer:

Contract Amount:12/20/2019Completion Date:

Final Est Sub: 03/09/2020Letting Date:

$2,947,508.69

05/19/2016

01200

SALLISAW

GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY

ROAD (EW-112): FROM 0.1 MILES SOUTH OF

US-64, EXTEND SOUTHEAST THEN EAST NEAR

MULDROW. PROJECT LENGTH = 3.995 MILES

32223(04) CO.RD.

ERSTP-268C(025)ER

TETR

Residency:Contract: 160398

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount:12/09/2017Completion Date:

Final Est Sub: Letting Date:

$748,033.36

10/20/2016

01002

TETRA TECH

GRADE, DRAIN, AND SURFACE COUNTY ROAD

(INDIAN ROAD): FROM 1.1 MILES NORTHEAST OF

THE SH-10A JUNCTION, EXTEND EAST NEAR

TENKILLER STATE PARK. PROJECT LENGTH =

0.227 MILE.

StephensCounty: Commissioner District: 7

Contracts Completed - Final Estimate Not Processed

20316(23) US-81

NHPP-269N(020)SS

Roberts, Colton

Residency:Contract: 150310

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:03/07/2018Completion Date:

Final Est Sub: Letting Date:

$15,567,066.97

09/17/2015

07100

DUNCAN

GRADE, DRAIN, SURFACE, AND BRIDGE US-81:

FROM 0.2 MILE SOUTH OF SEMINOLE ROAD,

EXTEND NORTHWEST TO SH-7 (DUNCAN

BYPASS) IN DUNCAN. PROJECT LENGTH = 1.608

MILES.

Construction Status Report Page 43

Page 44: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

20316(04) US-81

ACNHPP-011N(100)SS

Roberts, Colton

Residency:Contract: 160261

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount:03/03/2020Completion Date:

Final Est Sub:Letting Date:

$14,336,306.11

07/21/2016

07100

DUNCAN

GRADE, DRAIN, SURFACE, AND BRIDGE US-81:

FROM CHEROKEE ROAD, EXTEND NORTH NEAR

DUNCAN. PROJECT LENGTH = 1.123 MILES.

32402(04) SH-7

SBR-269N(038)SB

Roberts, Colton

Residency:Contract: 160262

Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES

Engineer:

Contract Amount:03/31/2018Completion Date:

Final Est Sub:Letting Date:

$2,431,662.08

07/21/2016

07100

DUNCAN

BRIDGE REHABILITATION SH-7: OVER 7TH

STREET AND UNION PACIFIC RAILROAD, 0.7 MILE

EAST OF THE US-81 JUNCTION IN DUNCAN.

TexasCounty: Commissioner District: 6

Contracts Completed - Final Estimate Not Processed

33657(04) US-54/SH-

STP-270F(035)3B

Michael, Charles

Residency:Contract: 180306

Contractor: RESTEK, INC.

Engineer:

Contract Amount:10/01/2019Completion Date:

Final Est Sub: 04/10/2020Letting Date:

$338,543.30

11/15/2018

06200

GUYMON

JOINT SEAL/REPAIR US-54/SH-3/SH-95/SH-136: AT

MULTIPLE LOCATIONS IN DIVISION VI. PROJECT

LENGTH = 0.00 MILE

TulsaCounty: Commissioner District: 8

Contracts Completed - Final Estimate Not Processed

26300(06) I-244

NHPPIY-0244-2(501)(504)(*

Arnold, Bruce

Residency:Contract: 140304

Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV

Engineer:

Contract Amount:11/15/2017Completion Date:

Final Est Sub:Letting Date:

$36,170,934.33

10/16/2014

08100

TULSA

*507)

PAVEMENT AND BRIDGE REHABILITATION I-244:

BEGIN 1.5 MILES EAST OF US-75, EXTEND EAST.

PROJECT LENGTH = 2.939 MILES.

28883(04) US-64

NHPP-272N(094)SS

Scott, Kalynn

Residency:Contract: 150272

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount:07/10/2019Completion Date:

Final Est Sub:Letting Date:

$5,894,292.84

08/20/2015

08400

SAND SPRINGS

BRIDGE REHABILITATION US-64: OVER 161ST W.

AVE AND 193RD W. AVE, 4.6 MI SOUTHEAST OF

THE OSAGE COUNTY LINE IN SAND SPRINGS.

PROJECT LENGTH = 2.201 MILES.

21899(04) I-44

ACNHPPI-4400-(438)SS

Arnold, Bruce

Residency:Contract: 160333

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount:12/19/2018Completion Date:

Final Est Sub:Letting Date:

$29,559,681.69

09/15/2016

08100

TULSA

GRADE, DRAIN, SURFACE, AND BRIDGE I-44:

FROM 1.0 MILE EAST OF THE I-244

INTERCHANGE, EXTEND WEST IN THE CITY OF

TULSA. PROJECT LENGTH = 1.155 MILES.

Construction Status Report Page 44

Page 45: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28872(04) IS-44

ACNHPPI-4400-(016)(014)(*

Arnold, Bruce

Residency:Contract: 170053

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount:07/21/2018Completion Date:

Final Est Sub: Letting Date:

$5,833,000.00

01/19/2017

08100

TULSA

*015)SS

BRIDGE REHABILITATION I-44/GILCREASE

EXPWY RAMP: OVER I-244, CITY ST, CNTY RD,

TSU RR AND BNSF RR, AT MULTIPLE LOCATIONS

IN TULSA. PROJECT LENGTH = 0.170 MILE.

25211(04) CT.ST.

STP-172B(399(398)(456)IG

ATKINS

Residency:Contract: 170103

Contractor: NABHOLZ CONSTRUCTION CORPORATION

Engineer:

Contract Amount:06/24/2019Completion Date:

Final Est Sub: Letting Date:

$10,544,739.61

02/16/2017

08010

ATKINS

GRADE, DRAIN, SURFACE, AND TRAFFIC

SIGNALS CITY STREET (W MAIN STREET/W. 96TH

STREET): FROM US-75, EXTEND EAST IN THE

CITY OF JENKS. PROJECT LENGTH = 2.218

MILES.

27937(04) US-64

STP-272C(202)

CEC

Residency:Contract: 170141

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount:11/06/2019Completion Date:

Final Est Sub: Letting Date:

$3,901,904.47

03/16/2017

08003

CEC CORP.

BRIDGE AND APPROACHES US-64: OVER SNAKE

CREEK, 4.8 MILES SOUTH AND EAST OF THE

SH-67 JUNCTION IN BIXBY. PROJECT LENGTH =

0.823 MILE.

28865(04) CT.ST.

ACNHPPI-4440-(002)(003)S*

Arnold, Bruce

Residency:Contract: 170142

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount:11/15/2019Completion Date:

Final Est Sub: Letting Date:

$9,256,000.00

03/16/2017

08100

TULSA

*S/NHPPI-4440-(004)SS/ACNHPP-272N(149)SS

BRIDGE REHABILITATION CITY STREETS: OVER

I-444 AND US-75, AT MULTIPLE LOCATIONS IN

THE CITY OF TULSA. PROJECT LENGTH = 0.240

MILE.

31672(04) US-169

NHPP-272A(126)3B/SSP-272*

Arnold, Bruce

Residency:Contract: 170144

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount:09/29/2018Completion Date:

Final Est Sub: Letting Date:

$5,915,032.62

03/16/2017

08100

TULSA

*N(203)SS/STP-272A(174)3B

RESURFACE (ASPHALT) AND JOINT SEAL

REPAIR US-169: AT MULTIPLE LOCATIONS IN

DIVISION VIII. PROJECT LENGTH = 6.789 MILES

28876(04) US-75

NHPPI-4400-(013)SS/NHPP-*

Arnold, Bruce

Residency:Contract: 170241

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount:05/31/2019Completion Date:

Final Est Sub: Letting Date:

$2,923,000.00

09/21/2017

08100

TULSA

BRIDGE REHABILITATION US-75: OVER I-44, 2.0

MI EAST OF I-244 AND OVER SW BOULEVARD

AND TSU RAILROAD IN TULSA. PROJECT

LENGTH = 0.465 MILE

27015(04) US-64

NHPP-272N(204)SS

CEC

Residency:Contract: 170243

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount:10/02/2019Completion Date:

Final Est Sub: Letting Date:

$7,484,532.13

07/20/2017

08003

CEC CORP.

BRIDGE AND APPROACHES US-64: OVER

SH-151, 0.3 MILE SOUTHEAST OF THE OSAGE

COUNTY LINE NEAR SAND SPRINGS. PROJECT

LENGTH = 1.021 MILES.

Construction Status Report Page 45

Page 46: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28884(04) US-64

ACNHPP-272N(200)SS

Scott, Kalynn

Residency:Contract: 170295

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount:10/22/2019Completion Date:

Final Est Sub: Letting Date:

$3,067,000.00

10/19/2017

08400

SAND SPRINGS

BRIDGE REHABILITATION US-64: OVER 97TH W.

AVENUE (ADAMS ROAD), 0.8 MILES EAST OF THE

SH-97 JUNCTION IN SAND SPRINGS. PROJECT

LENGTH = 0.082 MILE

23708(06) CT.ST.

SEC1934-272C(223)TI

GARV

Residency:Contract: 170341

Contractor: TRAFFIC & LIGHTING SYSTEMS, LLC

Engineer:

Contract Amount:11/12/2019Completion Date:

Final Est Sub: 04/27/2020Letting Date:

$1,974,263.25

10/19/2017

08011

GARVER, LLC.

TRAFFIC SIGNALS CITY STREETS: AT MULTIPLE

LOCATIONS IN THE CITY OF TULSA.

28878(04) US-64/SH-

NHPP-272N(231)SS

Arnold, Bruce

Residency:Contract: 170383

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount:11/13/2018Completion Date:

Final Est Sub: Letting Date:

$1,589,652.87

11/16/2017

08100

TULSA

BRIDGE REHABILITATION US-64/SH-51: OVER

SHERIDAN ROAD, 0.5 MILES NORTH OF I-44 IN

THE CITY OF TULSA. PROJECT LENGTH = 0.202

MILE

30598(04) SH-20

SBR-272A(162)SB

Arnold, Bruce

Residency:Contract: 180072

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount:12/23/2019Completion Date:

Final Est Sub: Letting Date:

$1,528,721.91

01/18/2018

08100

TULSA

BRIDGE REHABILITATION SH-20: OVER BIRD

CREEK. 0.4 MILES EAST OF THE SH-11

INTERSECTION NEAR SKIATOOK. PROJECT

LENGTH = 0.229 MILE

31944(06) US-64

SSP-272F(240)PM

C&KI

Residency:Contract: 180119

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount:11/05/2019Completion Date:

Final Est Sub: 03/17/2020Letting Date:

$1,229,758.68

02/15/2018

08007

CRAIG & KEITHLINE, INC.

ION IN BIXBY.

JOINT SEAL/REPAIR US-64: OVER ARKANSAS

RIVER AND ARKANSAS RIVER O'FLOW, 0.8 MILES

AND 1.0 MILE NORTH OF THE SH-67 JUNCTION IN

BIXBY.

28859(04) CT.ST.

ACNHPPI-2440-(017)FP

Arnold, Bruce

Residency:Contract: 180148

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount:08/30/2019Completion Date:

Final Est Sub: Letting Date:

$5,224,452.68

03/15/2018

08100

TULSA

BRIDGE AND APPROACHES CITY STREET (129TH

E AVENUE): OVER I-244, 0.5 MILES NORTH OF

I-44 IN TULSA. PROJECT LENGTH = 0.282 MILE

33035(04) CITY STRE

TAP-272E(233)IG

ZPAA

Residency:Contract: 180212

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount:09/03/2019Completion Date:

Final Est Sub: 01/31/2020Letting Date:

$550,590.00

06/14/2018

08020

POE AND ASSOCIATES

SAFETY IMPROVEMENT (BIKEWAY STRIPING

AND SIGNAGE) CITY STREETS: AT MULTIPLE

LOCATIONS IN THE CITY OF BROKEN ARROW.

PROJECT LENGTH = 0.000 MILE

Construction Status Report Page 46

Page 47: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33577(04) MULTIPLE

STP-272F(252)3B

ATKINS

Residency:Contract: 180310

Contractor: B & B CONSTRUCTION SERVICE J.T., INC.

Engineer:

Contract Amount:08/06/2019Completion Date:

Final Est Sub: Letting Date:

$1,023,938.89

11/15/2018

08010

ATKINS

JOINT SEAL/REPAIR I-44/US-75/US-75A/SH-117:

AT MULTIPLE LOCATIONS IN DIVISION VIII.

PROJECT LENGTH = 0.00 MILE

31938(05) I-44

SSP-4400(033)PM

GARV

Residency:Contract: 180338

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount:02/07/2020Completion Date:

Final Est Sub: Letting Date:

$3,547,000.00

10/18/2018

08011

GARVER, LLC.

RESURFACE (ASPHALT) AND JOINT/SEAL

REPAIR I-44: FROM 0.4 MILES EAST OF THE I-244

INTERCHANGE, EXTEND EAST IN TULSA.

PROJECT LENGTH = 1.953 MILES

32702(04) US-169 RA

HSIP-272N(255)PM

Arnold, Bruce

Residency:Contract: 180363

Contractor: TRAFFIC & LIGHTING SYSTEMS, LLC

Engineer:

Contract Amount:12/12/2019Completion Date:

Final Est Sub: Letting Date:

$575,322.10

11/15/2018

08100

TULSA

INTERSECTION MODIFICATION AND TRAFFIC

SIGNAL US-169 RAMPS: AT THE INTERSECTION

OF EAST 46TH STREET NORTH (SH-266), IN THE

CITY OF TULSA. PROJECT LENGTH = 0.570 MILE

34229(05) US-169

E-SAP-4400(060)ES

GARV

Residency:Contract: 190337

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount:02/07/2020Completion Date:

Final Est Sub: Letting Date:

$587,000.00

09/19/2019

08011

GARVER, LLC.

BRIDGE REPAIR US-169: REPAIR VEHICLE

IMPACT DAMAGE OVER I-44, 2.7 MILES EAST OF

THE SH-51 JUNCTION IN TULSA. PROJECT

LENGTH = 0.000 MILE

34389(04) US-64

MC-272N(288)

Arnold, Bruce

Residency:Contract: 190385

Contractor: PBX CORPORATION

Engineer:

Contract Amount:03/18/2020Completion Date:

Final Est Sub: Letting Date:

$83,953.64

11/14/2019

08100

TULSA

BRIDGE REPAIR I-44/US-64: I-44, OVER ELWOOD

AVE AND ARKANSAS RIV 0.7 MI E OF US-75.

US-64, OVER ARKANSAS RIV 4.5 MI S OF CREEK

TPK. PROJECT LENGTH = 0.00 MILE

WagonerCounty: Commissioner District: 1

Contracts Completed - Final Estimate Not Processed

28905(04) CT.ST.

STPY-173C(177)MS

GARV

Residency:Contract: 160067

Contractor: PARAGON CONTRACTORS, LLC

Engineer:

Contract Amount:07/26/2019Completion Date:

Final Est Sub: 03/17/2020Letting Date:

$2,811,811.00

01/21/2016

01011

GARVER, LLC.

GRADE, DRAIN, AND SURFACE CITY STREETS:

ON 257TH E AVE, FROM SH-51 EXTEND NORTH

THEN EAST ON 101ST STREET IN COWETA.

PROJECT LENGTH = 0.817 MILE.

Construction Status Report Page 47

Page 48: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

25489(04) CO.RD.

CIRB-173C(146)RB

GARV

Residency:Contract: 160268

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount:03/24/2020Completion Date:

Final Est Sub:Letting Date:

$2,887,499.15

07/21/2016

01011

GARVER, LLC.

GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY

ROAD (INDIAN ROAD/161ST STREET SOUTH):

FROM 2.0 MILES WEST OF SH-72, EXTEND EAST

NEAR COWETA. PROJECT LENGTH = 1.542

MILES.

28504(04) COUNTY RO

ACSTP-273C(048)CI

ZPAA

Residency:Contract: 180273

Contractor: B & B BRIDGE COMPANY, LLC

Engineer:

Contract Amount:03/06/2020Completion Date:

Final Est Sub:Letting Date:

$1,474,531.25

11/15/2018

01020

POE AND ASSOCIATES

BRIDGE AND APPROACHES COUNTY ROAD

(NS-4170): OVER FIFE CREEK, 1.6 MILES NORTH

OF THE SH-51 JUNCTION NEAR COWETA.

PROJECT LENGTH = 0.245 MILE

33041(04) SH-51

TAP-273A(049)IG

Hagerman, Jeremy

Residency:Contract: 190063

Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC

Engineer:

Contract Amount:11/06/2019Completion Date:

Final Est Sub:Letting Date:

$383,318.00

03/14/2019

01100

MUSKOGEE

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

SH-51: FROM 0.4 MILES SOUTHEAST OF THE

SH-72 JUNCTION, EXTEND EAST IN COWETA.

PROJECT LENGTH = 0.98 MILE

WashingtonCounty: Commissioner District: 8

Contracts Completed - Final Estimate Not Processed

29825(04) US-60

SBR-274N(014)SB

Arnold, Bruce

Residency:Contract: 170277

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount:07/05/2019Completion Date:

Final Est Sub:Letting Date:

$2,617,000.00

02/15/2018

08100

TULSA

BRIDGE REHABILITATION US-60: OVER CANEY

RIVER, 2.1 MILES EAST OF THE OSAGE COUNTY

LINE IN BARTLESVILLE. PROJECT LENGTH =

0.158 MILE

32692(04) US-75

NHPP-274N(022)PM

C&KI

Residency:Contract: 180230

Contractor: KEYSTONE SERVICES, INC.

Engineer:

Contract Amount:09/05/2019Completion Date:

Final Est Sub:Letting Date:

$678,421.47

06/14/2018

08007

CRAIG & KEITHLINE, INC.

INTERSECTION MODIFICATION US-75: FROM 11.8

MILES NORTH OF THE TULSA COUNTY LINE,

EXTEND NORTH NEAR BARTLESVILLE. PROJECT

LENGTH = 0.286 MILE

WashitaCounty: Commissioner District: 5

Contracts Completed - Final Estimate Not Processed

31783(04) CO.RD.

SBR-4000(036)SB

Sawyer, Dax

Residency:Contract: 160438

Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount:12/07/2017Completion Date:

Final Est Sub: 04/28/2020Letting Date:

$1,458,401.62

11/17/2016

05100

CLINTON

BRIDGE REHABILITATION COUNTY ROAD

(CANUTE ROAD): OVER I-40, 5.0 MILES EAST OF

THE BECKHAM COUNTY LINE IN CANUTE.

PROJECT LENGTH = 0.127 MILE.

Construction Status Report Page 48

Page 49: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

26480(04) SH-152

STPY-175C(109)

ATKINS

Residency:Contract: 170056

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount:08/19/2019Completion Date:

Final Est Sub: 02/04/2020Letting Date:

$1,770,139.98

01/19/2017

05010

ATKINS

BRIDGE AND APPROACHES SH-152: OVER TRAIL

CREEK, 4.2 MILES EAST OF THE BECKHAM

COUNTY LINE. PROJECT LENGTH = 0.342 MILE

30406(04) SH-152

STP-275C(042)3P

Sawyer, Dax

Residency:Contract: 180121

Contractor: CORNELL CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount:06/21/2019Completion Date:

Final Est Sub:Letting Date:

$1,460,278.66

02/15/2018

05100

CLINTON

RESURFACE (ASPHALT) SH-152: FROM 5.23

MILES EAST OF SH-44, EXTEND EAST NEAR

CORDELL. PROJECT LENGTH = 5.19 MILES

27001(04) SH-152

STP-275C(043)PM

EST

Residency:Contract: 180231

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount:03/31/2020Completion Date:

Final Est Sub:Letting Date:

$2,270,084.19

06/14/2018

05001

EST, INC.

BRIDGE AND APPROACHES SH-152: OVER EAST

ELK CREEK, 0.1 MILES EAST OF THE SH-44

JUNCTION NEAR DILL CITY. PROJECT LENGTH =

0.280 MILE

27902(04) SH-55

STP-275C(044)PM

Holley, Terri

Residency:Contract: 180232

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount:10/09/2019Completion Date:

Final Est Sub: 03/26/2020Letting Date:

$2,450,354.55

06/14/2018

05200

ALTUS

BRIDGE AND APPROACHES SH-55: OVER LITTLE

ELK CREEK, 0.9 MILES WEST OF US-183 NEAR

ROCKY. PROJECT LENGTH = 0.437 MILE

33014(04) MAIN STRE

TAP-275E(047)TP

Sawyer, Dax

Residency:Contract: 180365

Contractor: SCHIRALLI CONSTRUCTION CORP.

Engineer:

Contract Amount:08/23/2019Completion Date:

Final Est Sub:Letting Date:

$277,554.70

11/15/2018

05100

CLINTON

PEDESTRIAN IMPROVEMENTS AND SIDEWALKS

CITY STREET (MAIN STREET): FROM 8TH

STREET, EXTEND NORTH IN THE TOWN OF

BESSIE. PROJECT LENGTH = 0.0871 MILE.

WoodsCounty: Commissioner District: 6

Contracts Completed - Final Estimate Not Processed

30492(04) CO.RD.

STP-276C(025)CI

CED8

Residency:Contract: 170109

Contractor: VENTURE CORPORATION DBA V. C. O. PAVING

Engineer:

Contract Amount:12/03/2018Completion Date:

Final Est Sub:Letting Date:

$2,444,095.65

02/16/2017

06009

CIRCUIT ENGR. DISTR. # 8

GRADE, DRAIN, AND SURFACE COUNTY ROAD

(NS-237): FROM 5 MILES NORTH OF US-64,

EXTEND NORTH NEAR ALVA. PROJECT LENGTH

= 2.964 MILES

Construction Status Report Page 49

Page 50: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28458(04) CO.RD.

CIRB-276C(027)RB

CED8

Residency:Contract: 170188

Contractor: VENTURE CORPORATION DBA V. C. O. PAVING

Engineer:

Contract Amount:09/07/2018Completion Date:

Final Est Sub: 03/25/2020Letting Date:

$2,263,384.32

05/18/2017

06009

CIRCUIT ENGR. DISTR. # 8

BRIDGE AND APPROACHES COUNTY ROAD

(NS-2300): OVER UNNAMED CREEK, 2.8 MILES

NORTH OF US-64 NEAR ALVA. PROJECT LENGTH

= 1.022 MILES

WoodwardCounty: Commissioner District: 6

Contracts Completed - Final Estimate Not Processed

28825(04) SH-34

ACSTP-277B(034)SS

Dodgion, Richard

Residency:Contract: 160343

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount:12/06/2019Completion Date:

Final Est Sub:Letting Date:

$5,717,619.96

09/15/2016

06100

BUFFALO

BRIDGE AND APPROACHES SH-34: OVER SOUTH

AND NORTH PERSIMMON CREEK, 4.9 MILES AND

7.6 MILES NORTH OF THE DEWEY COUNTY LINE.

PROJECT LENGTH = 0.601 MILE.

29475(04) SH50

SBR-277C(036)SB

Dodgion, Richard

Residency:Contract: 170364

Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.

Engineer:

Contract Amount:02/20/2020Completion Date:

Final Est Sub:Letting Date:

$945,011.35

02/15/2018

06100

BUFFALO

BRIDGE REHABILITATION SH-50: OVER BULL

CREEK, 2.8 MILES SOUTH OF THE US-412

JUNCTION NEAR MOORELAND. PROJECT

LENGTH = 0.127 MILE

29449(08) SH-34

STP-277B(045)PM

Dodgion, Richard

Residency:Contract: 180216

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount:02/10/2020Completion Date:

Final Est Sub: 04/29/2020Letting Date:

$704,522.00

05/17/2018

06100

BUFFALO

WOODWARD.

BRIDGE AND APPROACHES SH-34: OVER NORTH

CANADIAN RIVER OVERFLOW, 0.3 MILES SOUTH

OF THE SH-34C JUNCTION NEAR WOODWARD.

PROJECT LENGTH = 0.094 MILE

Construction Status Report Page 50

Page 51: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

AdairCounty: Commissioner District: 1

Contracts Under Construction

27949(04) SH-51/SH-

SSP-201C(035)PM

Orendorf, Barry

$4,787,528.40

Residency:Contract: 180222

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 94 % ( 94 %)

Time Passed: 97 % ( 97 %)

Adjusted:

09/24/2018

$4,787,528.40

06/14/2018

07/20/2018

07/24/2018

01200

SALLISAW

400 400

11/05/2018

BRIDGE AND APPROACHES AND BRIDGE

REHABILITATION SH-51: OVER MULBERRY

HOLLOW, 4.3 MILES NORTHWEST OF US-59.

SH-100: OVER RUSSELL BRANCH CREEK, 4.5

MILES EAST OF US-59. PROJECT LENGTH =

0.235 MILE

16928(17) US-59

NHPP-101A(052)

Orendorf, Barry

$25,988,804.50

Residency:Contract: 180341

Contractor: EMERY SAPP & SONS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 73 % ( 73 %)

Time Passed: 83 % ( 83 %)

Adjusted:

03/05/2019

$25,980,193.74

11/15/2018

12/17/2018

02/06/2019

01200

SALLISAW

320 320

03/10/2019

GRADE, DRAIN, SURFACE, AND BRIDGE

US-59: FROM 6.4 MILES NORTH OF THE US-62

JUNCTION, EXTEND NORTH NEAR WATTS.

PROJECT LENGTH = 3.344 MILES

AlfalfaCounty: Commissioner District: 6

Contracts Under Construction

24124(07) US-64

ACSTP-102C(156)SS

Dodgion, Richard

$5,693,232.44

Residency:Contract: 180036

Contractor: VENTURE CORPORATION DBA V. C. O. PAVING

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 97 % ( 97 %)

Time Passed: 101 % ( 101 %)

Adjusted:

07/30/2018

$5,666,413.34

03/15/2018

04/09/2018

05/02/2018

ROKEE.

06100

BUFFALO

210 210

09/04/2018

GRADE, DRAIN, SURFACE, AND EROSION

US-64: FROM 0.8 MILES WEST OF THE SH-8

INTERSECTION, EXTEND WEST NEAR

CHEROKEE. PROJECT LENGTH = 3.422 MILES

Construction Status Report Page 51

Page 52: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

24064(04) US-64

STP-102B(106)SS

Dodgion, Richard

$9,002,389.95

Residency:Contract: 190270

Contractor: VENTURE CORPORATION DBA V. C. O. PAVING

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 19 % ( 18 %)

Time Passed: 54 % ( 49 %)

Adjusted:

09/27/2019

$8,539,135.79

07/25/2019

08/14/2019

09/06/2019

06100

BUFFALO

270 295

12/02/2019

GRADE, DRAIN, SURFACE, EROSION

CONTROL, AND BRIDGE US-64: FROM 1.0 MILE

WEST OF THE SH-11 JUNCTION, EXTEND

EAST NEAR CHEROKEE. PROJECT LENGTH =

4.531 MILES

31769(04) COUNTY RO

STP-202C(037)CI

CED8

$2,703,544.46

Residency:Contract: 190272

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,703,544.46

09/19/2019

10/30/2019

11/04/2019

06009

CIRCUIT ENGR. DISTR. # 8

120 120

02/03/2020

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (EW-33): FROM THE SH-45 JUNCTION,

EXTEND EAST IN GOLTRY. PROJECT LENGTH

= 2.798 MILES

17668(10) SH-8/SH-4

STP-102B(025)SS

Dodgion, Richard

$9,764,596.36

Residency:Contract: 200001

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$9,764,596.36

01/16/2020

02/14/2020

02/25/2020

06100

BUFFALO

260 260

06/01/2020

GRADE, DRAIN, SURFACE, AND BRIDGE

SH-8/SH-45: SH-8, FROM 0.2 MILES NORTH OF

SH-45 EXTEND SOUTH NEAR CARMEN. SH-45,

FROM SH-8 EXTEND WEST IN CARMEN.

PROJECT LENGTH = 2.247 MILES

AtokaCounty: Commissioner District: 2

Contracts Under Construction

31192(04) COUNTY RO

CIRB-203C(068)RB

CED3

$1,624,247.05

Residency:Contract: 190002

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 38 % ( 38 %)

Time Passed: 39 % ( 39 %)

Adjusted:

03/05/2020

$1,624,247.05

01/17/2019

02/20/2019

02/28/2019

02013

CIRCUIT ENGR. DISTR. # 3

90 90

06/03/2019

RESURFACE (ASPHALT) COUNTY ROAD

(BOGGY DEPOT ROAD): FROM 8.0 MILES

WEST OF THE US-69 JUNCTION, EXTEND

EAST NEAR TUSHKA. PROJECT LENGTH =

7.138 MILES

Construction Status Report Page 52

Page 53: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31171(04) COUNTY RO

STP-203D(060)CI

CED3

$599,984.00

Residency:Contract: 190189

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 89 % ( 89 %)

Time Passed: 101 % ( 101 %)

Adjusted:

10/23/2019

$599,984.00

06/20/2019

07/11/2019

07/18/2019

02013

CIRCUIT ENGR. DISTR. # 3

90 90

11/04/2019

BRIDGE AND APPROACHES COUNTY ROAD

(SOUTH PECAN ROAD/NS-396.5): OVER

UNNAMED CREEK, 0.4 MILES SOUTH OF SH-3

NEAR LANE. PROJECT LENGTH = 0.109 MILES

30411(04) US-69

NHPP-013N(174)PM

Plymate, Larry

$19,290,546.42

Residency:Contract: 190275

Contractor: DUIT CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 5 % ( 5 %)

Time Passed: 10 % ( 10 %)

Adjusted:

03/02/2020

$19,290,546.42

10/17/2019

11/18/2019

11/21/2019

02400

MCALESTER

365 365

03/02/2020

GRADE, DRAIN, AND SURFACE US-69: FROM

0.4 MILES NORTH OF THE SH-22 JUNCTION,

EXTEND NORTH NEAR CADDO. PROJECT

LENGTH = 6.609 MILES

28947(04) US-69

NHPP-013N(170)PM

Plymate, Larry

$2,468,681.53

Residency:Contract: 200047

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,468,681.53

02/20/2020

03/13/2020

03/18/2020

02400

MCALESTER

165 165

09/08/2020

BRIDGE AND APPROACHES US-69

NORTHBOUND: OVER BUCK CREEK, 3.1

MILES SOUTH OF THE SH-131 JUNCTION

NEAR KIOWA. PROJECT LENGTH = 0.181 MILE

34254(04) US-69 NB

NHPP-013N(181)3P

Nored, John

$1,196,715.50

Residency:Contract: 200095

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,196,715.50

03/19/2020

04/15/2020

04/21/2020

02100

ANTLERS

30 30

06/01/2020

RESURFACE (ASPHALT) US-69 NB: FROM 5.3

MILES NORTH OF THE BRYAN COUNTY LINE,

EXTEND NORTH NEAR CANEY. PROJECT

LENGTH = 6.70 MILES

BeaverCounty: Commissioner District: 6

Contracts Under Construction

Construction Status Report Page 53

Page 54: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28344(04) COUNTY RO

STP-204C(027)CI

Michael, Charles

$716,428.76

Residency:Contract: 190003

Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 95 % ( 94 %)

Time Passed: 97 % ( 97 %)

Adjusted:

06/10/2019

$706,908.68

03/14/2019

04/15/2019

05/08/2019

06200

GUYMON

120 120

09/09/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-19): OVER CAMP CREEK, 7.6 MILES EAST

OF THE SH-23 JUNCTION NEAR BEAVER CITY.

PROJECT LENGTH = 0.330 MILE

33399(04) US-83

SSR-204B(029)SR

Michael, Charles

$2,514,617.50

Residency:Contract: 200048

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,514,617.50

02/20/2020

03/13/2020

03/18/2020

06200

GUYMON

Fixed Completion Date: 10/31/2020

RESURFACE (ASPHALT) US-83: FROM THE

TEXAS STATE LINE, EXTEND NORTH NEAR

BRYANS CORNER. PROJECT LENGTH = 7.000

MILES

33400(04) US-64

SSR-204B(030)SR

Michael, Charles

$1,428,352.50

Residency:Contract: 200049

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,428,352.50

02/20/2020

03/13/2020

03/18/2020

06200

GUYMON

Fixed Completion Date: 10/31/2020

RESURFACE (ASPHALT) US-64: FROM 7.99

MILES EAST OF THE US-270 JUNCTION,

EXTEND EAST NEAR KNOWLES. PROJECT

LENGTH = 8.300 MILES

BeckhamCounty: Commissioner District: 5

Contracts Under Construction

24839(04) CO.RD.

CIRB-105C(157)RB

CED7

$7,160,722.23

Residency:Contract: 170004

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 104 % ( 99 %)

Time Passed: 106 % ( 100 %)

Adjusted:

06/07/2017

$6,804,603.73

02/16/2017

03/21/2017

03/25/2017

05005

CIRCUIT ENGR. DISTR. # 7

270 287

07/03/2017

GRADE, DRAIN, SURFACE AND BRIDGE

COUNTY ROAD (RED HILLS ROAD/EW-117):

FROM SH-30, EXTEND EAST NEAR MAYFIELD.

PROJECT LENGTH = 6.830 MILES.

Construction Status Report Page 54

Page 55: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28775(04) SH-6

STP-205B(077)PM

Sawyer, Dax

$2,930,527.88

Residency:Contract: 180343

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 98 % ( 98 %)

Time Passed: 116 % ( 116 %)

Adjusted:

10/14/2019

$2,930,527.88

06/20/2019

07/11/2019

07/17/2019

05100

CLINTON

120 120

11/04/2019

BRIDGE AND APPROACHES SH-6: OVER

SADLER CREEK, 1.4 MILES AND 1.5 MILES

NORTH OF THE SH-55 JUNCTION NEAR ELK

CITY. PROJECT LENGTH = 0.254 MILE

30998(04) SH-6

ACNHPPI-4000(061)PM

Sawyer, Dax

$28,767,645.83

Residency:Contract: 190100

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 55 % ( 54 %)

Time Passed: 33 % ( 33 %)

Adjusted:

05/28/2019

$28,621,809.91

02/14/2019

03/14/2019

03/19/2019

05100

CLINTON

800 807

09/09/2019

GRADE, DRAIN, SURFACE, BRIDGE, AND

APPROACHES I-40B/SH-6: I-40B, FROM 1.1 MI

N OF I-40, EXT N. NEAR SAYRE. SH-6, OVER

I-40, 1.6 MILES SOUTH OF I-40B IN ELK CITY.

PROJECT LENGTH = 1.141 MILES

29004(04) I-40B

STP-205N(078)PM

Holley, Terri

$1,871,740.73

Residency:Contract: 190265

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 32 % ( 32 %)

Time Passed: 36 % ( 36 %)

Adjusted:

11/13/2019

$1,871,740.73

07/25/2019

08/20/2019

08/23/2019

05200

ALTUS

150 150

12/02/2019

BRIDGE AND APPROACHES I-40B: OVER EAST

FORK OF ELK CREEK, 1.1 MILES WEST OF

THE I-40 INTERCHANGE IN ELK CITY.

PROJECT LENGTH = 0.106 MILE

29005(04) I-40B

STP-205C(079)PM

Sawyer, Dax

$2,571,585.08

Residency:Contract: 190380

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 46 % ( 46 %)

Time Passed: 50 % ( 50 %)

Adjusted:

01/13/2020

$2,571,585.08

10/17/2019

11/08/2019

11/14/2019

05100

CLINTON

150 150

03/02/2020

I-40B: OVER LITTLE TURKEY CREEK, 0.2

MILES WEST OF THE SH-30 JUNCTION NEAR

ERICK. PROJECT LENGTH = 0.241 MILE

Construction Status Report Page 55

Page 56: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27900(04) I-40B

NHPP-205N(086)PM

Sawyer, Dax

$4,729,142.31

Residency:Contract: 200050

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$4,729,142.31

02/20/2020

03/13/2020

03/18/2020

05100

CLINTON

270 270

09/08/2020

BRIDGE AND APPROACHES I-40B: OVER ELK

CREEK, 0.2 MILES EAST OF THE SH-6

JUNCTION IN ELK CITY. PROJECT LENGTH =

0.201 MILE

BlaineCounty: Commissioner District: 5

Contracts Under Construction

30057(04) COUNTY RO

CIRB-206C(047)RB

CED7

$3,851,195.50

Residency:Contract: 180277

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 87 % ( 87 %)

Time Passed: 88 % ( 88 %)

Adjusted:

10/07/2019

$3,851,195.50

05/16/2019

06/12/2019

06/17/2019

05005

CIRCUIT ENGR. DISTR. # 7

150 150

10/07/2019

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (EW-72): FROM 2.3 MILES EAST OF THE

SH-8 JUNCTION, EXTEND EAST NEAR

HITCHCOCK. PROJECT LENGTH = 4.019 MILES

32902(04) COUNTY RO

STP-206D(050)CI

CED7

$463,549.45

Residency:Contract: 180278

Contractor: WYATT CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 101 % ( 99 %)

Time Passed: 108 % ( 94 %)

Adjusted:

02/04/2019

$451,549.45

09/20/2018

10/16/2018

10/18/2018

05005

CIRCUIT ENGR. DISTR. # 7

60 69

02/04/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-65): OVER SPRING CREEK, 5.2 MILES

EAST OF THE SH-51 JUNCTION NEAR

OKEENE. PROJECT LENGTH = 0.127 MILE

31789(04) SH-51A

SBR-206B(060)SB

Sawyer, Dax

$1,139,531.17

Residency:Contract: 190144

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 120 % ( 93 %)

Time Passed: 102 % ( 68 %)

Adjusted:

09/10/2019

$880,990.57

04/18/2019

05/21/2019

05/24/2019

05100

CLINTON

90 135

09/09/2019

BRIDGE REHABILITATION SH-51A: OVER U.S.

GYPSUM ROAD, 2.4 MILES NORTH OF THE

SH-51 JUNCTION NEAR CANTON. PROJECT

LENGTH = 0.196 MILE

Construction Status Report Page 56

Page 57: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27913(10) SH-3

NHPP-017N(254)PM

Sawyer, Dax

$9,866,475.86

Residency:Contract: 190238

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 7 % ( 7 %)

Time Passed: 6 % ( 6 %)

Adjusted:

03/23/2020

$9,866,475.86

08/22/2019

09/19/2019

09/23/2019

05100

CLINTON

310 310

01/06/2020

GRADE, DRAIN, AND SURFACE SH-3: FROM

1.0 MILE EAST OF THE US-270 JUNCTION,

EXTEND EAST IN WATONGA. PROJECT

LENGTH = 4.109 MILES

27918(04) SH-8

STP-206C(044)SS

CEC

$2,390,112.46

Residency:Contract: 190340

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 55 % ( 55 %)

Time Passed: 38 % ( 38 %)

Adjusted:

02/17/2020

$2,390,112.46

11/14/2019

12/09/2019

12/12/2019

05003

CEC CORP.

130 130

03/02/2020

BRIDGE AND APPROACHES SH-8: OVER SALT

CREEK, 7.3 MILES SOUTH OF THE SH-51

JUNCTION NEAR HITCHCOCK. PROJECT

LENGTH = 0.226 MILE

30040(04) COUNTY RO

CIRB-206D(048)RB

CED7

$664,569.50

Residency:Contract: 200003

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 12 % ( 12 %)

Time Passed: 23 % ( 23 %)

Adjusted:

03/30/2020

$664,569.50

01/16/2020

02/18/2020

02/25/2020

05005

CIRCUIT ENGR. DISTR. # 7

75 75

06/01/2020

BRIDGE AND APPROACHES COUNTY ROAD

(NS-257): OVER TRIBUTARY OF SPRING

CREEK, 2.6 MILES SOUTH OF THE SH-51

JUNCTION NEAR OKEENE. PROJECT LENGTH

= 0.132 MILE

30044(04) COUNTY RO

CIRB-206D(049)RB

CED7

$524,788.65

Residency:Contract: 200004

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$524,788.65

01/16/2020

02/18/2020

02/25/2020

05005

CIRCUIT ENGR. DISTR. # 7

75 75

06/01/2020

BRIDGE AND APPROACHES COUNTY ROAD

(NS-251): OVER WEAVER CREEK, 1.9 MILES

SOUTH OF THE US-270 JUNCTION NEAR

WATONGA. PROJECT LENGTH = 0.123 MILE

BryanCounty: Commissioner District: 2

Contracts Under Construction

Construction Status Report Page 57

Page 58: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28003(07) SH-78

STP-207C(065)PM

Bishop, Justin

$15,449,865.59

Residency:Contract: 180235

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 62 % ( 62 %)

Time Passed: 50 % ( 50 %)

Adjusted:

07/08/2019

$15,439,206.76

04/18/2019

05/16/2019

05/21/2019

02300

MADILL

480 482

09/09/2019

BRIDGE AND APPROACHES SH-78: OVER THE

RED RIVER, ON THE TEXAS STATE LINE NEAR

YARNABY. PROJECT LENGTH = 1.126 MILES

29901(04) COUNTY RO

STP-207D(084)CI

CED3

$847,783.37

Residency:Contract: 180345

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 96 % ( 96 %)

Time Passed: 103 % ( 103 %)

Adjusted:

02/16/2019

$847,783.37

11/15/2018

12/17/2018

12/27/2018

02013

CIRCUIT ENGR. DISTR. # 3

120 120

01/21/2019

BRIDGE AND APPROACHES COUNTY ROAD

(NS-3705): OVER ISLAND BAYOU CREEK, 2.3

MILES NORTH OF THE SH-91 JUNCTION NEAR

CALERA. PROJECT LENGTH = 0.133 MILE

31855(04) US-69

NHPP-207N(085)FP

Bishop, Justin

$152,700,219.12

Residency:Contract: 190145

Contractor: DUIT CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 12 % ( 12 %)

Time Passed: 0 % ( 0 %)

Adjusted:

10/14/2019

$152,700,219.12

07/25/2019

08/21/2019

09/30/2019

02300

MADILL

1,250 1,250

02/01/2020

GRADE, DRAIN, SURFACE, AND BRIDGE

US-69: FROM 4.5 MILES SOUTHWEST OF THE

US-70 INTERCHANGE, EXTEND NORTHEAST

NEAR CALERA. PROJECT LENGTH = 4.086

MILES

24333(16) US-70

SSP-NBIP(527)PM

TETR

$364,978.00

Residency:Contract: 190192

Contractor: OMEGA COATINGS & CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 106 % ( 99 %)

Time Passed: 45 % ( 45 %)

Adjusted:

11/19/2019

$340,000.00

06/20/2019

07/17/2019

10/01/2019

02002

TETRA TECH

150 150

11/04/2019

BRIDGE PAINTING US-70: OVER LAKE

TEXOMA, 5.5 MILES EAST OF THE SH-32

JUNCTION NEAR KINGSTON. PROJECT

LENGTH = 0.00 MILE

Construction Status Report Page 58

Page 59: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

34267(04) US-69

NHPP-207N(098)3P

Nored, John

$2,656,348.50

Residency:Contract: 200096

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,656,348.50

03/19/2020

04/15/2020

04/21/2020

02100

ANTLERS

45 45

06/01/2020

RESURFACE (ASPHALT) US-69: FROM 2.2

MILES NORTH OF THE US-70 JUNCTION,

EXTEND NORTH IN DURANT. PROJECT

LENGTH = 4.300 MILES

CaddoCounty: Commissioner District: 7

Contracts Under Construction

27039(04) SH-58

ACSTP-208C(048)(053)SS/S*

Knight, Reese

$13,737,798.13

Residency:Contract: 170252

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 99 %)

Time Passed: 122 % ( 108 %)

Adjusted:

12/06/2017

$13,390,014.14

09/21/2017

10/11/2017

10/16/2017

07300

ANADARKO

410 464

02/05/2018

GRADE, DRAIN, SURFACE, AND BRIDGE

SH-58: FROM 0.2 MILE NORTH OF SH-9,

EXTEND NORTH IN CARNEGIE. PROJECT

LENGTH = 2.283 MILES.

32931(04) SH-152

SBR-208C(057)SB

Knight, Reese

$3,408,534.35

Residency:Contract: 180318

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 100 %)

Time Passed: 186 % ( 119 %)

Adjusted:

02/20/2019

$3,322,665.90

10/18/2018

11/14/2018

11/19/2018

07300

ANADARKO

180 282

03/04/2019

BRIDGE REHABILITATION SH-152: OVER LAKE

CREEK OVERFLOW AND WILLOW CREEK, 2.2

MILES AND 7.3 MILES EAST OF THE SH-58

JUNCTION NEAR BINGER. PROJECT LENGTH

= 0.00 MILE

24134(09) MULTIPLE

STP-220F(063)PM

Sawyer, Dax

$68,592.00

Residency:Contract: 190143

Contractor: GARY A. CRAIN, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 89 % ( 89 %)

Time Passed: 73 % ( 73 %)

Adjusted:

07/31/2019

$68,592.00

04/18/2019

05/21/2019

05/24/2019

05100

CLINTON

30 30

09/09/2019

BRIDGE WATER PROOF SEAL

US-183/SH-58/SH-152/CANUTE

ROAD/CEMETERY ROAD: AT MULTIPLE

LOCATIONS IN DIVISION V. PROJECT LENGTH

= 0.00 MILE

Construction Status Report Page 59

Page 60: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32948(04) CITY STRE

HSIPG-208C(066)AD

Sawyer, Dax

$584,880.10

Residency:Contract: 190146

Contractor: REDLANDS CONTRACTING, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 92 % ( 92 %)

Time Passed: 83 % ( 83 %)

Adjusted:

09/09/2019

$584,880.10

04/18/2019

05/14/2019

05/23/2019

05100

CLINTON

180 180

09/09/2019

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

CITY STREETS (SH-58 (ARAPAHO AVE/MAIN

ST): SH-58, FROM 0.6 MI N OF I-40 EXT N.

MAIN ST, AT THE INT OF SH-58 IN HYDRO.

PROJECT LENGTH = 0.405 MILE

30175(04) US-281

STP-208B(075)PM

Knight, Reese

$1,925,913.72

Residency:Contract: 190341

Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 9 % ( 9 %)

Time Passed: 6 % ( 6 %)

Adjusted:

04/06/2020

$1,925,913.72

11/14/2019

12/13/2019

12/17/2019

07300

ANADARKO

180 180

04/06/2020

GRADE, DRAIN, AND SURFACE US-281: FROM

0.3 MILES SOUTH OF I-40, EXTEND SOUTH IN

HINTON. PROJECT LENGTH = 0.322 MILE

33453(06) US-281

NHPP-208N(073)3P

Knight, Reese

$1,257,109.52

Residency:Contract: 200098

Contractor: T & G CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,257,109.52

03/19/2020

04/20/2020

04/28/2020

07300

ANADARKO

45 45

08/03/2020

RESURFACE (ASPHALT) US-281: FROM THE

SH-152 JUNCTION, EXTEND SOUTH NEAR

BINGER. PROJECT LENGTH = 4.160 MILES

CanadianCounty: Commissioner District: 4

Contracts Under Construction

29257(04) I-40

NHPPIY-0040-4(441)

Brooks, Jonathan

$17,609,403.50

Residency:Contract: 150180

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 93 % ( 89 %)

Time Passed: 84 % ( 79 %)

Adjusted:

11/02/2015

$16,901,090.73

05/21/2015

06/10/2015

06/15/2015

04200

YUKON

365 385

11/02/2015

GRADE, DRAIN, SURFACE, AND BRIDGE -

DIVISION IV I-40: AT RADIO ROAD IN EL

RENO, 2.0 MILES EAST OF US-81. PROJECT

LENGTH = 0.444 MILE.

Construction Status Report Page 60

Page 61: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31441(04) CITY STRE

TAP-255A(334)AG

Brooks, Jonathan

$894,011.18

Residency:Contract: 180259

Contractor: CROSSLAND HEAVY CONTRACTORS INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 114 % ( 100 %)

Time Passed: 110 % ( 94 %)

Adjusted:

01/21/2019

$780,799.37

09/20/2018

10/16/2018

10/29/2018

04200

YUKON

120 141

02/04/2019

PEDESTRIAN IMPROVEMENTS (TRAIL

CONSTRUCTION) CITY STREETS: MAIN

ST(SH-66)/FRONTAGE RD/ CORNWELL

DR/POPLAR AVE/LAKESHORE DR: AT

MULTIPLE LOCATIONS IN YUKON. PROJECT

LENGTH = 1.946 MILES

31031(04) SH-3

SBR-209N(060)SB

Brooks, Jonathan

$2,680,357.48

Residency:Contract: 180346

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 98 %)

Time Passed: 153 % ( 114 %)

Adjusted:

04/15/2019

$2,598,285.73

11/15/2018

12/12/2018

12/17/2018

04200

YUKON

180 242

04/01/2019

BRIDGE REHABILITATION SH-3: OVER US-81,

2.5 MILES SOUTH OF THE KINGFISHER

COUNTY LINE NEAR OKARCHE. PROJECT

LENGTH = 0.270 MILE

04757(05) SH-4

STP-209C(067)PM

Brooks, Jonathan

$13,135,000.00

Residency:Contract: 190109

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 29 % ( 29 %)

Time Passed: 20 % ( 20 %)

Adjusted:

01/20/2020

$13,135,000.00

11/14/2019

12/13/2019

12/17/2019

04200

YUKON

360 360

04/06/2020

GRADE, DRAIN, SURFACE, AND BRIDGE SH-4:

FROM 1.5 MILES NORTH OF THE SH-66

JUNCTION, EXTEND NORTH IN YUKON.

PROJECT LENGTH = 1.803 MILES

31181(04) COUNTY RO

STP-209C(071)CI

Brooks, Jonathan

$1,474,405.26

Residency:Contract: 190173

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 50 % ( 50 %)

Time Passed: 79 % ( 79 %)

Adjusted:

11/18/2019

$1,473,205.26

05/16/2019

06/12/2019

06/18/2019

04200

YUKON

150 150

11/18/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-112): OVER ARAPAHO CREEK, 2.0 MILES

WEST OF THE US-81 JUNCTION NEAR UNION

CITY. PROJECT LENGTH = 0.378 MILE

Construction Status Report Page 61

Page 62: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27004(04) US-81 (I-

NHPP-209N(051)SS

Brooks, Jonathan

$9,983,088.28

Residency:Contract: 190312

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 16 % ( 16 %)

Time Passed: 10 % ( 10 %)

Adjusted:

02/10/2020

$9,983,088.28

10/17/2019

11/15/2019

12/11/2019

04200

YUKON

450 450

02/03/2020

BRIDGE AND APPROACHES US-81 (I-40B):

OVER THE UNION PACIFIC RAILROAD, 1.1

MILES NORTHWEST OF THE SH-66 JUNCTION

IN EL RENO. PROJECT LENGTH = 0.452 MILE

31439(04) CITY STRE

TAP-209E(076)AG

Brooks, Jonathan

$355,727.60

Residency:Contract: 190322

Contractor: RUDY CONSTRUCTION CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 20 % ( 20 %)

Time Passed: 32 % ( 32 %)

Adjusted:

03/02/2020

$355,727.60

10/17/2019

11/12/2019

11/15/2019

04200

YUKON

90 90

03/02/2020

PEDESTRIAN IMPROVEMENTS (BIKE ROUTE

AND SIDEWALKS) CITY STREETS (NW 36TH

ST/N. OVERHOLSER DR): NW 36TH ST, FROM

AMANDA DR EXT EAST. OVERHOLSER DR,

FROM NW 36TH ST EXT N. PROJECT LENGTH

= 1.260 MILES

27901(10) SH-152

STP-209C(080)PM

Brooks, Jonathan

$46,785.00

Residency:Contract: 200052

Contractor: RMR DEMOLITION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$46,785.00

02/20/2020

03/20/2020

03/24/2020

04200

YUKON

180 180

04/13/2020

RIGHT OF WAY CLEARANCE SH 152: FROM

THE US-81 JUNCTION, EXTEND EAST IN

UNION CITY. PROJECT LENGTH = 9.960

MILESPREQUALIFICATION FOR THIS

PROJECT HAS BEEN WAIVED. BOTH BID

EXPRESS AND WRITTEN BIDS WILL BE

ACCEPTED.

34664(04) CITY STRE

SAP-4000(101)ES

Brooks, Jonathan

$58,990.52

Residency:Contract: 200053

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$58,990.52

02/20/2020

03/13/2020

03/18/2020

04200

YUKON

35 35

05/11/2020

BRIDGE REPAIR CITY STREET (ALFADALE

ROAD): REPAIR VEHICLE IMPACT DAMAGE

OVER I-40, 1.0 MILE EAST OF US-81 IN EL

RENO. PROJECT LENGTH = 0.000 MILE

Construction Status Report Page 62

Page 63: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33889(04) SH-3

NHPP-209N(075)3P

Brooks, Jonathan

$3,794,837.24

Residency:Contract: 200099

Contractor: ATLAS PAVING COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$3,794,837.24

03/19/2020

04/20/2020

04/28/2020

04200

YUKON

90 90

07/06/2020

RESURFACE (ASPHALT) SH-3: FROM 4.0

MILES SOUTHEAST OF US-81, EXTEND

SOUTHEAST NEAR OKARCHE. PROJECT

LENGTH = 3.35 MILES

CarterCounty: Commissioner District: 7

Contracts Under Construction

24819(04) COUNTY RO

CIRB-110C(205)RB

Fuhrmann, Chris

$7,405,012.06

Residency:Contract: 180188

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 87 % ( 86 %)

Time Passed: 99 % ( 99 %)

Adjusted:

02/05/2019

$7,363,057.66

10/18/2018

11/15/2018

11/20/2018

07200

ARDMORE

300 300

03/04/2019

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (DOLESE QUARRY ROAD): FROM I-35,

EXTEND NORTH THEN WEST THEN NORTH

NEAR OVERBROOK. PROJECT LENGTH =

3.070 MILES

24104(07) SH-53

STP-210C(066)PM

Fuhrmann, Chris

$17,577,630.27

Residency:Contract: 180347

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 26 % ( 26 %)

Time Passed: 49 % ( 49 %)

Adjusted:

08/05/2019

$17,577,630.27

11/15/2018

12/12/2018

12/17/2018

07200

ARDMORE

350 350

08/05/2019

GRADE, DRAIN, SURFACE, AND BRIDGE

SH-53: FROM 6.6 MILES EAST OF THE SH-76

JUNCTION, EXTEND EAST NEAR SPRINGER.

PROJECT LENGTH = 7.986 MILES

32977(04) MULTIPLE

TAP-210E(067)TP

EST

$827,379.99

Residency:Contract: 190033

Contractor: SCHIRALLI CONSTRUCTION CORP.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 105 % ( 99 %)

Time Passed: 99 % ( 99 %)

Adjusted:

06/03/2019

$783,773.25

01/17/2019

02/27/2019

03/11/2019

07001

EST, INC.

150 150

06/03/2019

PEDESTRIAN IMPROVEMENTS

(STREETSCAPE) EAST MAIN STREET/DEPOT

PARK PLAZA/DEPOT PARK TRAIL HEAD: AT

MULTIPLE LOCATIONS IN THE CITY OF

ARDMORE. PROJECT LENGTH = 0.11 MILE

PREQUALIFICATION FOR THIS PROJECT HAS

BEEN WAIVED. BOTH BID EXPRESS AND

WRITTEN BIDS WILL BE ACCEPTED.

Construction Status Report Page 63

Page 64: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

30468(04) COUNTY RO

STP-210D(070)CI

Fuhrmann, Chris

$912,955.95

Residency:Contract: 190207

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 5 % ( 5 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$912,955.95

01/16/2020

02/18/2020

02/25/2020

07200

ARDMORE

100 100

06/01/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-176/CARGO ROAD): OVER RATLIFF WEST

CREEK, 0.8 MILES WEST OF THE SH-76

JUNCTION NEAR RATLIFF CITY. PROJECT

LENGTH = 0.156 MILE

32834(04) US-77

SSR-210C(072)SR

Fuhrmann, Chris

$1,768,631.50

Residency:Contract: 200005

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,768,631.50

01/16/2020

02/14/2020

02/25/2020

07200

ARDMORE

45 45

06/01/2020

RESURFACE (ASPHALT) US-77: FROM THE

LOVE COUNTY LINE, EXTEND NORTH NEAR

ARDMORE. PROJECT LENGTH = 4.720 MILES

33457(04) SH-76

SSR-210C(073)SR

Fuhrmann, Chris

$1,261,670.00

Residency:Contract: 200006

Contractor: SEAL MASTERS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,261,670.00

01/16/2020

02/14/2020

02/25/2020

07200

ARDMORE

45 45

06/01/2020

RESURFACE (ASPHALT) SH-76: FROM 7.96

MILES NORTH OF THE US-70 JUNCTION,

EXTEND NORTH NEAR HEALDTON. PROJECT

LENGTH = 4.73 MILES

32829(04) SH-199

STP-210B(074)3P

Fuhrmann, Chris

$858,544.43

Residency:Contract: 200100

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$858,544.43

03/19/2020

04/15/2020

04/21/2020

07200

ARDMORE

45 45

08/03/2020

RESURFACE (ASPHALT) SH-199: FROM 0.4

MILES EAST OF THE US-177 JUNCTION,

EXTEND EAST IN DICKSON. PROJECT

LENGTH = 2.630 MILES

CherokeeCounty: Commissioner District: 1

Contracts Under Construction

Construction Status Report Page 64

Page 65: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27038(04) SH-51

ACSTP-211B(023)SS

Orendorf, Barry

$2,398,511.37

Residency:Contract: 160243

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 82 % ( 82 %)

Time Passed: 445 % ( 295 %)

Adjusted:

12/05/2016

$2,398,511.37

07/21/2016

08/18/2016

08/24/2016

01200

SALLISAW

130 196

12/05/2016

BRIDGE AND APPROACHES SH-51: OVER

PECAN CREEK, 6.6 MILES EAST OF SH-80

NEAR TAHLEQUAH. PROJECT LENGTH =

0.438 MILE.

10437(04) SH-51

STP-011C(345)

Orendorf, Barry

$9,647,306.65

Residency:Contract: 180237

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 79 % ( 80 %)

Time Passed: 58 % ( 58 %)

Adjusted:

11/28/2018

$9,689,966.28

07/19/2018

08/17/2018

08/20/2018

01200

SALLISAW

480 476

12/03/2018

BRIDGE AND APPROACHES SH-51: OVER

ELDON CREEK AND BARON FORK CREEK, 0.2

MILES AND 0.4 MILES SOUTH OF THE US-62

JUNCTION NEAR ELDON. PROJECT LENGTH =

0.842 MILE

27111(09) US-62

SSP-211B(040)RW

Orendorf, Barry

$60,010.00

Residency:Contract: 190343

Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 83 % ( 83 %)

Time Passed: 28 % ( 28 %)

Adjusted:

01/06/2020

$60,010.00

11/14/2019

12/10/2019

12/17/2019

01200

SALLISAW

180 180

01/06/2020

RIGHT-OF-WAY CLEARANCE US-62: FROM 3.4

MILES EAST OF THE SH-82 JUNCTION,

EXTEND EAST NEAR TAHLEQUAH. PROJECT

LENGTH = 2.47 MILES PREQUALIFICATION

FOR THIS PROJECT HAS BEEN WAIVED.

BOTH BID EXPRESS AND WRITTEN BIDS WILL

BE ACCEPTED.

ChoctawCounty: Commissioner District: 2

Contracts Under Construction

24821(04) COUNTY RO

STP-112D(078)CI

CED3

$5,400,150.61

Residency:Contract: 180260

Contractor: H & H BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 47 % ( 47 %)

Time Passed: 78 % ( 78 %)

Adjusted:

04/01/2019

$5,366,503.67

11/15/2018

12/12/2018

01/25/2019

02013

CIRCUIT ENGR. DISTR. # 3

220 220

04/01/2019

BRIDGE AND APPROACHES COUNTY ROAD

(NS-4050): OVER MUDDY BOGGY CREEK, 4.7

MILES AND 5.0 MILES NORTH OF US-70 NEAR

BOSWELL. PROJECT LENGTH = 1.215 MILES

Construction Status Report Page 65

Page 66: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31219(04) COUNTY RO

CIRB-212D(044)RB

CED3

$449,234.32

Residency:Contract: 190004

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 91 % ( 91 %)

Time Passed: 83 % ( 83 %)

Adjusted:

09/16/2019

$449,234.32

05/16/2019

06/12/2019

06/17/2019

02013

CIRCUIT ENGR. DISTR. # 3

90 90

10/07/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-207): OVER UNNAMED CREEK, 0.6 MILES

EAST OF SH-93 NEAR HUGO. PROJECT

LENGTH = 0.176 MILE

32956(04) US-70B

HSIPG-212N(045)AD

Nored, John

$656,225.95

Residency:Contract: 190242

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 70 % ( 70 %)

Time Passed: 31 % ( 31 %)

Adjusted:

01/06/2020

$656,225.95

09/19/2019

10/25/2019

10/29/2019

02100

ANTLERS

75 75

02/03/2020

PEDESTRIAN IMPROVEMENT (SIDEWALKS)

US-70B: FROM 0.8 MILES NORTHWEST OF

THE US-70 JUNCTION, EXTEND WEST IN

HUGO. PROJECT LENGTH = 0.399 MILE

33944(04) US-70

SSR-022N(221)SR

Nored, John

$3,218,681.82

Residency:Contract: 200056

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$3,218,681.82

02/20/2020

03/11/2020

04/23/2020

02100

ANTLERS

60 60

06/01/2020

RESURFACE (ASPHALT) US-70/US-70B: US-70,

FROM 0.1 MI WEST OF US-271B EXT EAST.

US-70B, FROM THE INDIAN NATION TURNPIKE

EXT EAST NEAR HUGO. PROJECT LENGTH =

8.390 MILES

CimarronCounty: Commissioner District: 6

Contracts Under Construction

20941(04) MULTIPLE

NHPP-034N(001)PM

Michael, Charles

$10,793,088.44

Residency:Contract: 190383

Contractor: INTERSTATE HIGHWAY CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 6 % ( 6 %)

Time Passed: 3 % ( 3 %)

Adjusted:

04/06/2020

$10,793,088.44

11/14/2019

12/12/2019

01/14/2020

06200

GUYMON

290 290

04/06/2020

GRADE, DRAIN, AND SURFACE US-64

(CIMARRON AVE)/US-385/CITY STREET (MAIN

ST): FROM 0.3 MILES SOUTH OF THE SH-325

JCT, EXTEND NORTH IN BOISE CITY.

PROJECT LENGTH = 0.994 MILE

Construction Status Report Page 66

Page 67: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31774(04) COUNTY RO

STP-213C(026)CI

Michael, Charles

$2,137,444.60

Residency:Contract: 200089

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

04/09/2020

$2,137,444.60

02/20/2020

03/13/2020

03/18/2020

06200

GUYMON

120 120

07/06/2020

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (EW-23): FROM THE US-385 JUNCTION,

EXTEND EAST NEAR BOISE CITY. PROJECT

LENGTH = 2.022 MILES

ClevelandCounty: Commissioner District: 3

Contracts Under Construction

29293(04) CT.ST.

STP-214B(042)(063)AG

ATKINS

$27,938,876.74

Residency:Contract: 160128

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 104 % ( 100 %)

Time Passed: 98 % ( 80 %)

Adjusted:

07/05/2016

$26,817,149.43

04/21/2016

05/10/2016

05/11/2016

03010

ATKINS

540 662

07/05/2016

GRADE, DRAIN, SURFACE, AND BRIDGE CITY

STREET (LINDSEY STREET): FROM SW 24TH

AVENUE, EXTEND EAST IN THE CITY OF

NORMAN. PROJECT LENGTH = 1.247 MILES.

26879(04) SH-9

STP-114E(258)EH

ZOA

$802,048.75

Residency:Contract: 170312

Contractor: RDNJ, INC. DBA A-TECH PAVING

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 123 % ( 100 %)

Time Passed: 214 % ( 146 %)

Adjusted:

03/05/2018

$649,899.85

10/19/2017

11/20/2017

11/27/2017

03021

OLSSON ASSOCIATES

90 132

03/05/2018

ENHANCEMENT (TRAIL CONSTRUCTION)

SH-9: FROM 24TH AVENUE, EXTEND EAST IN

THE CITY OF NORMAN. PROJECT LENGTH =

1.100 MILES

32155(04) CITY STRE

NHPPI-3500(065)

BCS

$11,523,633.26

Residency:Contract: 180127

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 99 % ( 97 %)

Time Passed: 97 % ( 97 %)

Adjusted:

08/11/2018

$11,269,000.00

06/14/2018

07/20/2018

07/24/2018

03018

BENCHMARK CONSTR. SERVS., LLC

400 400

11/05/2018

GRADE, DRAIN, SURFACE, AND BRIDGE CITY

STREET (SW 34TH STREET): OVER I-35 AND

LITTLE RIVER, 3.7 MILES AND 3.6 MILES WEST

OF SH-77H IN MOORE. PROJECT LENGTH =

0.737 MILE

Construction Status Report Page 67

Page 68: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

30606(04) CITY STRE

STP-214B(091)AG

ZOA

$1,492,817.90

Residency:Contract: 190174

Contractor: CROSSLAND HEAVY CONTRACTORS INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 101 % ( 99 %)

Time Passed: 196 % ( 196 %)

Adjusted:

09/30/2019

$1,475,000.00

05/16/2019

06/18/2019

06/20/2019

03021

OLSSON ASSOCIATES

75 75

10/07/2019

INTERSECTION MODIFICATION AND TRAFFIC

SIGNAL CITY STREETS (24TH AVENUE NW):

AT THE INTERSECTION OF TEE DRIVE/TEE

CIR IN THE CITY OF NORMAN. PROJECT

LENGTH = 0.115 MILE

29300(04) CITY STRE

STP-214B(068)AG

EST

$9,436,999.90

Residency:Contract: 190195

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 32 % ( 32 %)

Time Passed: 43 % ( 41 %)

Adjusted:

09/23/2019

$9,437,000.00

06/20/2019

07/17/2019

07/25/2019

03001

EST, INC.

270 280

11/04/2019

GRADE, DRAIN, SURFACE, AND TRAFFIC

SIGNAL CITY STREET (24TH AVENUE): FROM

LINDSEY STREET, EXTEND NORTH IN THE

CITY OF NORMAN. PROJECT LENGTH = 1.795

MILES

32533(04) CITY STRE

NHPPG-214N(098)AG

Malave, Luis

$207,536.00

Residency:Contract: 190313

Contractor: TRAFFIC SIGNALS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

03/02/2020

$207,536.00

10/17/2019

11/18/2019

11/21/2019

03200

PURCELL

90 90

03/02/2020

TRAFFIC SIGNALS (FIBER OPTIC

INTERCONNECT UPGRADE) CITY STREET

(12TH AVENUE EAST): FROM THE ROBINSON

STREET INTERSECTION, EXTEND SOUTH IN

THE CITY OF NORMAN. PROJECT LENGTH =

0.00 MILE

34452(04) US-77 SB

SAP-214N(099)ES

Malave, Luis

$149,838.70

Residency:Contract: 190381

Contractor: RESTEK, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 79 % ( 73 %)

Time Passed: 110 % ( 88 %)

Adjusted:

02/29/2020

$139,338.70

10/17/2019

11/08/2019

11/15/2019

03200

PURCELL

21 26

03/02/2020

US-77 SB: REPAIR VEHICLE IMPACT DAMAGE

OVER I-35, 3.8 MILES SOUTH OF SH-37 IN

NORMAN. PROJECT LENGTH = 0.00 MILE

Construction Status Report Page 68

Page 69: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

20997(04) US-77

STP-114C(111)SS

BCS

$11,580,500.00

Residency:Contract: 200057

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$11,580,500.00

02/20/2020

03/13/2020

03/18/2020

03018

BENCHMARK CONSTR. SERVS., LLC

300 300

07/06/2020

GRADE, DRAIN, AND SURFACE US-77: FROM

1.0 MILE NORTH OF THE SH-39 JUNCTION,

EXTEND NORTH IN LEXINGTON. PROJECT

LENGTH = 3.315 MILES

CoalCounty: Commissioner District: 3

Contracts Under Construction

29541(04) SH-43

STP-215C(017)SS

Wade, Tony

$2,207,086.69

Residency:Contract: 150330

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 97 % ( 94 %)

Time Passed: 400 % ( 234 %)

Adjusted:

06/24/2016

$2,151,445.69

10/15/2015

11/20/2015

11/25/2015

03100

ADA

210 358

03/07/2016

BRIDGE REHABILITATION SH-43: OVER

MUDDY BOGGY CREEK AND MUDDY BOGGY

O'FLOW, 1.53 MILES EAST OF US-75 NEAR

COALGATE. PROJECT LENGTH = 0.311 MILE

30010(04) CO.RD.

STP-215D(021)CI

Wade, Tony

$543,761.81

Residency:Contract: 170070

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 87 % ( 87 %)

Time Passed: 158 % ( 158 %)

Adjusted:

07/10/2017

$543,761.81

02/16/2017

03/22/2017

03/25/2017

03100

ADA

90 90

07/03/2017

BRIDGE AND APPROACHES COUNTY ROAD

(OLD SH-3): OVER ROCK CREEK, 0.8 MILES

SOUTHEAST OF THE PONTOTOC COUNTY

LINE NEAR STONEWALL. PROJECT LENGTH =

0.311 MILE

24943(04) CO.RD.

CIRB-115C(074)RB

Wade, Tony

$3,929,467.03

Residency:Contract: 170298

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 100 %)

Time Passed: 138 % ( 125 %)

Adjusted:

02/05/2018

$3,854,509.82

09/21/2017

10/18/2017

10/19/2017

03100

ADA

180 200

02/05/2018

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (NS-369): FROM SH-3,

EXTEND SOUTH NEAR TUPELO. PROJECT

LENGTH = 2.964 MILES

Construction Status Report Page 69

Page 70: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27569(04) SH-43

STP-115C(103)PM

ZOA

$3,247,594.25

Residency:Contract: 180349

Contractor: TREAS CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 14 % ( 14 %)

Time Passed: 24 % ( 24 %)

Adjusted:

12/30/2019

$3,247,594.25

10/17/2019

11/12/2019

11/14/2019

03021

OLSSON ASSOCIATES

210 210

02/03/2020

BRIDGE AND APPROACHES SH-43: OVER MILL

CREEK, 4.1 MILES WEST OF THE US-69

JUNCTION NEAR COALGATE. PROJECT

LENGTH = 0.450 MILE

30665(04) COUNTY RO

STP-215D(031)CI

Wade, Tony

$1,017,103.91

Residency:Contract: 190386

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 59 % ( 59 %)

Time Passed: 51 % ( 51 %)

Adjusted:

01/09/2020

$1,017,103.91

11/14/2019

12/10/2019

12/17/2019

03100

ADA

120 120

01/20/2020

BRIDGE AND APPROACHES COUNTY ROAD

(OLD STATE HIGHWAY 3): OVER LEADER

CREEK, 1.7 MILES EAST OF THE SH-48

JUNCTION NEAR TUPELO. PROJECT LENGTH

= 0.188 MILE

34584(04) US-75

SSR-215B(032)SR

Wade, Tony

$4,194,734.93

Residency:Contract: 200058

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

04/20/2020

$4,194,734.93

02/20/2020

03/13/2020

03/16/2020

03100

ADA

90 90

07/06/2020

RESURFACE (A.C AND P.C) US-75: FROM THE

SH-3 JUNCTION, EXTEND NORTH NEAR

COALGATE. PROJECT LENGTH = 6.920 MILES

29731(04) US-75/SH-

NHPP-215N(028)PM

Wade, Tony

$745,765.50

Residency:Contract: 200090

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$745,765.50

02/20/2020

03/13/2020

03/18/2020

03100

ADA

120 120

09/08/2020

BRIDGE REHABILITATION US-75/SH-3: OVER

BRIAR CREEK, 2.9 MILES SOUTH OF THE

SH-43 JUNCTION NEAR LEHIGH. PROJECT

LENGTH = 0.043 MILE

ComancheCounty: Commissioner District: 7

Contracts Under Construction

Construction Status Report Page 70

Page 71: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28782(05) I-44

STP-216F(082)PM

Roberts, Colton

$591,046.42

Residency:Contract: 190196

Contractor: B & B CONSTRUCTION SERVICE J.T., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 19 % ( 19 %)

Time Passed: 36 % ( 32 %)

Adjusted:

02/15/2020

$580,755.45

06/20/2019

07/17/2019

07/24/2019

07100

DUNCAN

90 100

02/15/2020

JOINT SEAL/REPAIR I-44: OVER BISHOP ROAD

(EW-168), 1.2 MILES SOUTH OF THE SH-7

INTERCHANGE IN LAWTON. PROJECT

LENGTH = 0.000 MILE

33886(04) I-44

SBR-4400(056)SB

Knight, Reese

$1,010,948.50

Residency:Contract: 190344

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 50 % ( 49 %)

Time Passed: 41 % ( 41 %)

Adjusted:

03/09/2020

$994,388.50

11/14/2019

12/10/2019

12/19/2019

07300

ANADARKO

100 100

03/02/2020

BRIDGE REHABILITATION I-44: OVER FORT

SILL ROAD AND RAILROAD, 1.8 MILES NORTH

OF US-62 IN LAWTON. PROJECT LENGTH =

0.254 MILE

CottonCounty: Commissioner District: 7

Contracts Under Construction

29800(04) COUNTY RO

CIRB-217C(042)RB

Roberts, Colton

$5,337,711.15

Residency:Contract: 180191

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 95 % ( 94 %)

Time Passed: 93 % ( 87 %)

Adjusted:

05/13/2019

$5,264,109.43

01/17/2019

02/22/2019

03/01/2019

07100

DUNCAN

270 289

06/03/2019

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (NS-250): FROM THE US-70

JUNCTION, EXTEND NORTH NEAR RANDLETT.

PROJECT LENGTH = 4.992 MILES

28037(04) SH-5A

STP-217C(041)PM

Roberts, Colton

$4,109,021.66

Residency:Contract: 180351

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 94 % ( 92 %)

Time Passed: 85 % ( 85 %)

Adjusted:

08/19/2019

$3,994,021.66

05/16/2019

06/12/2019

06/18/2019

07100

DUNCAN

185 185

10/07/2019

BRIDGE AND APPROACHES SH-5A: OVER

WEST CACHE CREEK AND TWO

OVERFLOWS, 2.3 MILES, 2.4 MILES, AND 2.6

MILES EAST OF I-44 NEAR TEMPLE. PROJECT

LENGTH = 0.486 MILE

Construction Status Report Page 71

Page 72: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

CraigCounty: Commissioner District: 8

Contracts Under Construction

31359(04) SH-25

SBR-218C(074)SB

GARV

$764,742.88

Residency:Contract: 190074

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 89 % ( 87 %)

Time Passed: 116 % ( 109 %)

Adjusted:

09/09/2019

$745,245.43

04/18/2019

05/14/2019

05/23/2019

08011

GARVER, LLC.

130 138

09/09/2019

BRIDGE REHABILITATION SH-25: OVER LITTLE

CABIN CREEK, 3.4 MILES WEST OF THE

OTTAWA COUNTY LINE NEAR BLUEJACKET.

PROJECT LENGTH = 0.158 MILE

32714(04) US-60

SSR-218B(075)SR

GARV

$684,122.10

Residency:Contract: 200059

Contractor: EMERY SAPP & SONS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$684,122.10

02/20/2020

03/13/2020

04/06/2020

08011

GARVER, LLC.

60 60

07/06/2020

RESURFACE (ASPHALT) US-60: FROM 3.3

MILES EAST OF THE US-69 JUNCTION,

EXTEND NORTHEAST THEN SOUTHEAST IN

VINITA. PROJECT LENGTH = 1.760 MILES

CreekCounty: Commissioner District: 8

Contracts Under Construction

27071(04) SH-51

ACSTP-219B(047)SS

Scott, Kalynn

$7,365,510.96

Residency:Contract: 160280

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 95 % ( 95 %)

Time Passed: 95 % ( 95 %)

Adjusted:

10/17/2016

$7,356,355.59

08/18/2016

09/16/2016

09/22/2016

08400

SAND SPRINGS

280 280

01/03/2017

BRIDGE AND APPROACHES SH-51: OVER

CIMARRON RIVER, 3.5 MILES EAST OF THE

SH-99 JUNCTION NEAR MANNFORD.

PROJECT LENGTH = 1.021 MILE.

Construction Status Report Page 72

Page 73: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29407(04) CO.RD.

STP-219D(056)CI

BCS

$1,227,000.00

Residency:Contract: 170223

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 100 % ( 100 %)

Time Passed: 152 % ( 140 %)

Adjusted:

04/09/2018

$1,227,000.00

11/16/2017

12/15/2017

12/18/2017

(TURNER TURNPIKE) NEAR DEPEW.

08018

BENCHMARK CONSTR. SERVS., LLC

120 130

04/09/2018

BRIDGE AND APPROACHES COUNTY ROAD

(NS-3650/S 465TH W AVE): OVER LITTLE DEEP

FORK CREEK, 0.1 MI SOUTH OF I-44 (TURNER

TURNPIKE) NEAR DEPEW. PROJECT LENGTH

= 0.589 MILE

27925(04) SH-48

STP-219B(054)SS

TETR

$9,375,961.88

Residency:Contract: 170254

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 95 %)

Time Passed: 107 % ( 104 %)

Adjusted:

01/15/2018

$8,683,795.40

11/16/2017

12/12/2017

12/13/2017

08002

TETRA TECH

420 432

01/16/2018

BRIDGE AND APPROACHES SH-48: OVER

CIMARRON RIVER, 2.6 MILES NORTH OF THE

SH-51 INTERSECTION NEAR MANNFORD.

PROJECT LENGTH = 0.709 MILE

33302(04) MULTIPLE

HSIPG-219F(057)TR

BCS

$1,261,977.01

Residency:Contract: 170316

Contractor: ACTION SAFETY SUPPLY CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 100 %)

Time Passed: 152 % ( 116 %)

Adjusted:

09/04/2018

$1,241,257.55

04/19/2018

05/22/2018

05/31/2018

I, III, AND VIII.

08018

BENCHMARK CONSTR. SERVS., LLC

90 118

09/04/2018

SAFETY IMPROVEMENT (HIGH FRICTION

SURFACE TREATMENT) US-HIGHWAYS/STATE

HIGHWAYS: AT MULTIPLE LOCATIONS IN

DIVISION I, II, III, AND VIII.

22752(04) CO.RD.

STP-119D(131)CI

BCS

$634,701.86

Residency:Contract: 170345

Contractor: H & H BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 75 % ( 104 %)

Time Passed: 93 % ( 93 %)

Adjusted:

04/02/2018

$879,299.67

11/16/2017

12/20/2017

01/26/2018

GHT.

08018

BENCHMARK CONSTR. SERVS., LLC

120 120

04/02/2018

BRIDGE AND APPROACHES COUNTY ROAD

(NS-369): OVER DOG CREEK, 4.2 MILES

NORTH OF THE SH-16 JUNCTION NEAR

DRUMRIGHT. PROJECT LENGTH = 0.359 MILE.

Construction Status Report Page 73

Page 74: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27083(04) SH-33

SSP-219B(063)PM

EST

$1,020,024.30

Residency:Contract: 180193

Contractor: CIMARRON CONSTRUCTION COMPANY, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 108 % ( 100 %)

Time Passed: 127 % ( 101 %)

Adjusted:

10/01/2018

$943,435.00

05/17/2018

06/13/2018

06/14/2018

08001

EST, INC.

120 151

10/01/2018

BRIDGE AND APPROACHES SH-33: OVER

TIGER CREEK, 0.8 MILES WEST OF SH-16 IN

DRUMRIGHT. PROJECT LENGTH = 0.0284 MILE

24132(04) SH-66

HSIP-119C(160)PM

EST

$3,448,792.29

Residency:Contract: 180281

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 63 % ( 62 %)

Time Passed: 227 % ( 227 %)

Adjusted:

02/04/2019

$3,357,000.00

09/20/2018

10/09/2018

10/11/2018

08001

EST, INC.

150 150

02/04/2019

GRADE, DRAIN, AND SURFACE SH-66: FROM

6.7 MILES SOUTHWEST OF THE SH-48

JUNCTION, EXTEND NORTHEAST NEAR

DEPEW. PROJECT LENGTH = 1.265 MILES

32710(04) SH-33

SSR-219B(067)SR

Scott, Kalynn

$2,205,000.00

Residency:Contract: 190038

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

09/03/2019

$2,205,000.00

01/17/2019

02/22/2019

03/01/2019

08400

SAND SPRINGS

45 45

09/03/2019

RESURFACE (ASPHALT) SH-33: FROM 0.28

MILES EAST OF THE SH-16/SH-99B JUNCTION,

EXTEND EAST NEAR DRUMRIGHT. PROJECT

LENGTH = 8.022 MILES

31090(04) SH-48

STP-219B(071)PM

Scott, Kalynn

$3,329,000.00

Residency:Contract: 190243

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

01/06/2020

$3,329,000.00

08/22/2019

09/12/2019

09/23/2019

08400

SAND SPRINGS

60 60

01/06/2020

PAVEMENT REHABILITATION (ASPHALT)

SH-48: FROM 2.0 MILES NORTH OF THE SH-33

JUNCTION, EXTEND NORTH NEAR

MANNFORD. PROJECT LENGTH = 6.318 MILES

CusterCounty: Commissioner District: 5

Contracts Under Construction

Construction Status Report Page 74

Page 75: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28772(04) SH-33

SSP-220B(064)SS

EST

$6,958,489.67

Residency:Contract: 190149

Contractor: TREAS CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 32 % ( 32 %)

Time Passed: 42 % ( 34 %)

Adjusted:

01/06/2020

$6,958,489.67

06/20/2019

07/17/2019

07/24/2019

05001

EST, INC.

200 244

02/16/2020

GRADE, DRAIN, SURFACE, AND BRIDGE

SH-33: FROM 1.0 MILE WEST OF THE SH-47

JUNCTION, EXTEND EAST NEAR THOMAS.

PROJECT LENGTH = 0.615 MILE

30696(04) COUNTY RO

STP-220C(067)CI

CED7

$826,389.36

Residency:Contract: 190244

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 95 % ( 94 %)

Time Passed: 78 % ( 78 %)

Adjusted:

12/30/2019

$821,182.26

08/22/2019

09/19/2019

09/24/2019

05005

CIRCUIT ENGR. DISTR. # 7

120 120

01/06/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-099): OVER BARNITZ CREEK, 4.5 MILES

WEST OF THE US-183 JUNCTION NEAR

ARAPAHO. PROJECT LENGTH = 0.161 MILE

28997(04) I-40

NHPPI-4000(073)PM

Sawyer, Dax

$8,606,210.05

Residency:Contract: 190278

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 10 % ( 10 %)

Time Passed: 5 % ( 5 %)

Adjusted:

04/01/2020

$8,606,210.05

09/19/2019

10/23/2019

10/30/2019

05100

CLINTON

210 210

02/03/2020

RESURFACE(ASPHALT), BRIDGE

REHABILITATION, AND CABLE BARRIER I-40:

FROM 7.1 MILES WEST OF US-183, EXTEND

EAST NEAR CLINTON. PROJECT LENGTH =

5.352 MILES

24145(10) SH-54

STP-120C(133)PM

ATKINS

$6,518,011.89

Residency:Contract: 200009

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$6,518,011.89

01/16/2020

02/14/2020

02/25/2020

05010

ATKINS

365 365

06/01/2020

GRADE, DRAIN, SURFACE, AND EROSION

SH-54: FROM SH-33, EXTEND SOUTH NEAR

THOMAS. PROJECT LENGTH = 4.771 MILES

Construction Status Report Page 75

Page 76: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31793(04) SH-73

SBR-220C(066)SB

CED7

$1,010,954.05

Residency:Contract: 200101

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,010,954.05

03/19/2020

04/15/2020

04/21/2020

05005

CIRCUIT ENGR. DISTR. # 7

90 90

09/08/2020

BRIDGE REHABILITATION SH-73: OVER

LITTLE PANTHER CREEK, 5.7 MILES EAST OF

THE SH-34 JUNCTION NEAR FOSS LAKE.

PROJECT LENGTH = 0.170 MILE

27911(08) I-40 ON R

NHPPI-4000-(078)PM

Sawyer, Dax

$2,379,625.77

Residency:Contract: 200132

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,379,625.77

03/19/2020

04/15/2020

04/21/2020

05100

CLINTON

270 270

09/08/2020

GRADE, DRAIN, AND SURFACE I-40 ON

RAMP/FRONTAGE ROAD: FROM 2.2 MILES

EAST OF THE SH-54 JUNCTION, EXTEND

NORTHEAST IN WEATHERFORD. PROJECT

LENGTH = 0.759 MILE

DelawareCounty: Commissioner District: 8

Contracts Under Construction

29896(04) COUNTY RO

STP-221D(043)CI

ATKINS

$1,003,051.80

Residency:Contract: 180224

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 81 % ( 81 %)

Time Passed: 63 % ( 63 %)

Adjusted:

12/02/2019

$1,003,051.80

07/25/2019

08/20/2019

08/23/2019

08010

ATKINS

120 120

12/02/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-520): OVER CRAZY CREEK, 1.2 MILES

WEST OF THE ARKANSAS STATE LINE.

PROJECT LENGTH = 0.247 MILE

24147(04) SH-85

STP-121C(097)SS

Beats, Aaron

$6,138,660.47

Residency:Contract: 180283

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 86 % ( 81 %)

Time Passed: 96 % ( 78 %)

Adjusted:

09/03/2019

$5,716,000.00

10/18/2018

11/14/2018

11/19/2018

08300

CLAREMORE

180 220

09/03/2019

BRIDGE AND APPROACHES SH-85: OVER

DUCK CREEK, 3.2 MILES NORTHEAST OF THE

CRAIG COUNTY LINE NEAR KETCHUM.

PROJECT LENGTH = 0.376 MILE

Construction Status Report Page 76

Page 77: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31361(04) SH-20

SBR-221C(045)SB

Beats, Aaron

$668,492.76

Residency:Contract: 190150

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 25 % ( 25 %)

Time Passed: 49 % ( 49 %)

Adjusted:

12/02/2019

$668,492.76

07/25/2019

08/23/2019

08/27/2019

08300

CLAREMORE

120 120

12/02/2019

BRIDGE REHABILITATION SH-20: OVER

BRUSH CREEK, 1.4 MILES EAST OF THE SH-10

JUNCTION NEAR JAY. PROJECT LENGTH =

0.080 MILE

32725(04) SH-10

SSR-221C(044)SR

Beats, Aaron

$1,741,502.83

Residency:Contract: 200060

Contractor: EMERY SAPP & SONS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,741,502.83

02/20/2020

03/13/2020

03/18/2020

08300

CLAREMORE

60 60

07/06/2020

RESURFACE (ASPHALT) SH-10: FROM THE

SH-25 JUNCTION, EXTEND NORTH NEAR

GROVE. PROJECT LENGTH = 7.900 MILES

DeweyCounty: Commissioner District: 5

Contracts Under Construction

32304(04) COUNTY RO

STP-222C(031)CI

CED7

$708,189.25

Residency:Contract: 190349

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 62 % ( 62 %)

Time Passed: 74 % ( 74 %)

Adjusted:

02/03/2020

$708,189.25

11/14/2019

12/13/2019

12/17/2019

05005

CIRCUIT ENGR. DISTR. # 7

90 90

02/03/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-073): OVER TRIBUTARY OF CANADIAN

RIVER, 5.0 MILES WEST OF THE US-281

JUNCTION NEAR OAKWOOD. PROJECT

LENGTH = 0.132 MILE

32744(04) US-60/SH-

SSR-222F(034)SR

Sawyer, Dax

$2,358,864.15

Residency:Contract: 200011

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,358,864.15

01/16/2020

02/14/2020

02/25/2020

05100

CLINTON

Fixed Completion Date: 10/31/2020

RESURFACE (ASPHALT) US-60/SH-34: US-60,

FROM THE ELLIS COUNTY LINE, EXTEND

EAST. SH-34, FROM THE US-60 JUNCTION,

EXTEND NORTH NEAR VICI. PROJECT

LENGTH = 6.95 MILES

Construction Status Report Page 77

Page 78: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

EllisCounty: Commissioner District: 6

Contracts Under Construction

24223(04) SH-15

NHPP-223N(011)

Dodgion, Richard

$7,832,570.37

Residency:Contract: 180045

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 101 % ( 97 %)

Time Passed: 115 % ( 94 %)

Adjusted:

08/13/2018

$7,466,886.07

01/18/2018

02/27/2018

06/07/2018

06100

BUFFALO

300 366

09/04/2018

WIDEN, RESURFACE, AND BRIDGE SH-15:

FROM 6.4 MILES EAST OF THE SH-46

JUNCTION, EXTEND NORTHEAST NEAR

FARGO. PROJECT LENGTH = 4.415 MILES

31125(04) COUNTY RO

STP-223C(019)CI

CED8

$842,047.83

Residency:Contract: 190245

Contractor: WYATT CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 57 % ( 57 %)

Time Passed: 45 % ( 45 %)

Adjusted:

02/24/2020

$842,047.83

08/22/2019

09/19/2019

09/24/2019

06009

CIRCUIT ENGR. DISTR. # 8

120 120

02/17/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-36): OVER DRY PRONG CREEK, 2.5 MILES

EAST OF THE TEXAS STATE LINE NEAR

CATESBY. PROJECT LENGTH = 0.189 MILE

GarfieldCounty: Commissioner District: 4

Contracts Under Construction

17020(05) CT.ST.

STP-224B(052)UR

Hoover, Jacob

$4,743,926.88

Residency:Contract: 170256

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 103 % ( 100 %)

Time Passed: 99 % ( 99 %)

Adjusted:

05/07/2018

$4,623,996.56

11/16/2017

12/11/2017

01/05/2018

UTH OF WEST CHESTNUT AVENUE, EXTEND NORTH IN THE CITY OF ENID.

04300

ENID

475 475

04/02/2018

GRADE, DRAIN, SURFACE, AND

INTERSECTION MODIFICATION CITY STREET

(NORTH CLEVELAND STREET): FROM 0.1

MILES SOUTH OF WEST CHESTNUT AVENUE,

EXTEND NORTH IN THE CITY OF ENID.

PROJECT LENGTH = 0.808 MILE

Construction Status Report Page 78

Page 79: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

24637(04) US-60

ACNHPP-224N(055)PM

Hoover, Jacob

$10,896,510.93

Residency:Contract: 180132

Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 70 % ( 70 %)

Time Passed: 106 % ( 92 %)

Adjusted:

09/11/2018

$10,889,657.54

05/17/2018

06/19/2018

07/25/2018

NID.

04300

ENID

450 518

10/01/2018

BRIDGE AND APPROACHES US-60: OVER

BNSF RAILROAD, 1.8 MILES NORTH OF THE

US-412 INTERSECTION IN THE CITY OF ENID.

PROJECT LENGTH = 0.323 MILE

27965(04) US-64

NHPP-224N(054)SS

Hoover, Jacob

$1,760,428.52

Residency:Contract: 180352

Contractor: T. MCDONALD CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 76 % ( 76 %)

Time Passed: 162 % ( 155 %)

Adjusted:

04/10/2019

$1,754,263.75

11/15/2018

12/17/2018

12/28/2018

04300

ENID

140 146

04/01/2019

GRADE, DRAIN, AND SURFACE US-64: OVER

BLACK BEAR CREEK, 5.3 MILES WEST OF THE

SH-74 JUNCTION NEAR ENID. PROJECT

LENGTH = 0.073 MILE

27981(04) US-60

STP-224B(058)SS

Hoover, Jacob

$17,498,455.93

Residency:Contract: 190350

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$17,498,455.93

02/20/2020

03/13/2020

03/18/2020

04300

ENID

240 240

05/18/2020

GRADE, DRAIN, AND SURFACE US-60: FROM

SH-45. EXTEND NORTH NEAR ENID. PROJECT

LENGTH = 9.000 MILES

32771(04) US-60

SBR-224N(066)SB

Hoover, Jacob

$670,608.75

Residency:Contract: 190351

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

04/23/2020

$670,608.75

11/14/2019

12/09/2019

12/12/2019

04300

ENID

75 75

04/06/2020

BRIDGE REHABILITATION US-60: OVER CLEAR

CREEK, 1.6 MILES EAST OF THE SH-132

JUNCTION NEAR ENID. PROJECT LENGTH =

0.055 MILE

GarvinCounty: Commissioner District: 3

Contracts Under Construction

Construction Status Report Page 79

Page 80: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27566(04) US-77

STP-125A(190)PM

Wade, Tony

$7,039,995.14

Residency:Contract: 180263

Contractor: ALLEN CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 101 % ( 99 %)

Time Passed: 84 % ( 82 %)

Adjusted:

10/26/2018

$6,850,495.32

08/16/2018

09/25/2018

09/27/2018

03100

ADA

300 305

01/07/2019

BRIDGE AND APPROACHES US-77: OVER

RUSH CREEK, 0.6 MILES SOUTHEAST OF THE

SH-19 JUNCTION IN PAULS VALLEY. PROJECT

LENGTH = 0.421 MILE

27848(04) COUNTY RO

CIRB-225C(073)RB

CEC

$5,076,832.92

Residency:Contract: 180354

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 93 % ( 93 %)

Time Passed: 99 % ( 99 %)

Adjusted:

04/15/2019

$5,076,832.92

11/15/2018

12/12/2018

12/18/2018

03003

CEC CORP.

250 250

05/06/2019

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (INDIAN MERIDIAN ROAD/NS-323):

FROM THE SH-29 JUNCTION, EXTEND SOUTH

NEAR WYNNEWOOD. PROJECT LENGTH =

5.014 MILES

28938(04) SH-74

STP-225C(079)PM

Malave, Luis

$1,597,878.31

Residency:Contract: 190006

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 96 % ( 92 %)

Time Passed: 123 % ( 118 %)

Adjusted:

08/05/2019

$1,526,670.86

04/18/2019

05/21/2019

05/24/2019

03200

PURCELL

120 125

09/09/2019

BRIDGE AND APPROACHES SH-74: OVER

UNNAMED CREEK, 6.4 MILES NORTH OF THE

SH-29 JUNCTION NEAR ANTIOCH. PROJECT

LENGTH = 0.056 MILE

28184(04) I-35

SBR-125N(201)SB

Malave, Luis

$3,555,120.00

Residency:Contract: 190352

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 17 % ( 16 %)

Time Passed: 7 % ( 7 %)

Adjusted:

03/30/2020

$3,522,000.00

01/16/2020

02/18/2020

02/25/2020

03200

PURCELL

220 220

03/30/2020

BRIDGE REHABILITATION I-35: OVER SH-19,

6.6 MILES NORTH OF SH-29 IN PAULS VALLEY.

PROJECT LENGTH = 0.175 MILE

GradyCounty: Commissioner District: 7

Contracts Under Construction

Construction Status Report Page 80

Page 81: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31311(04) US-81

SBR-226N(062)SB

TETR

$3,762,206.04

Residency:Contract: 180047

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 105 % ( 99 %)

Time Passed: 129 % ( 100 %)

Adjusted:

07/16/2018

$3,540,418.11

01/18/2018

02/27/2018

03/01/2018

N CHICKASHA.

07002

TETRA TECH

240 310

09/04/2018

BRIDGE REHABILITATION US-81: OVER

WASHITA RIVER AND OVERFLOWS, 1.4 MI, 1.5

MI, AND 1.8 MI NORTH OF THE US-62

JUNCTION IN CHICKASHA.

20301(04) SH-37

STP-126C(063)

Knight, Reese

$11,770,834.83

Residency:Contract: 180355

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$11,770,834.83

04/18/2019

05/22/2019

05/28/2019

07300

ANADARKO

300 300

09/09/2019

GRADE, DRAIN, SURFACE, AND BRIDGE

SH-37: FROM 0.7 MILES EAST OF THE US-81

JUNCTION, EXTEND EAST NEAR MINCO.

PROJECT LENGTH = 3.929 MILES

32937(04) US-62

HSIPG-226B(081)AD

Knight, Reese

$219,788.94

Residency:Contract: 190212

Contractor: SCHIRALLI CONSTRUCTION CORP.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$219,788.94

07/25/2019

08/20/2019

08/23/2019

07300

ANADARKO

90 90

12/02/2019

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

US-62: FROM THE CADDO COUNTY LINE,

EXTEND EAST IN VERDEN. PROJECT LENGTH

= 0.361 MILE

24428(19) PROPOSED

SSP-011N(106)RW

Knight, Reese

$104,168.00

Residency:Contract: 190246

Contractor: M & M WRECKING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 73 % ( 73 %)

Time Passed: 20 % ( 20 %)

Adjusted:

02/03/2020

$104,168.00

08/22/2019

09/19/2019

09/23/2019

07300

ANADARKO

180 180

10/14/2019

RIGHT-OF-WAY CLEARANCE PROPOSED

US-81 REALIGNMENT: FROM 1.0 MILE NORTH

OF THE US-277 JUNCTION, EXTEND NORTH IN

CHICKASHA. PROJECT LENGTH = 8.310 MILES

PREQUALIFICATION FOR THIS PROJECT HAS

BEEN WAIVED. BOTH BID EXPRESS AND

WRITTEN BIDS WILL BE ACCEPTED.

Construction Status Report Page 81

Page 82: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33478(04) US-81

HSIPG-226N(067)TR

Roberts, Colton

$1,570,196.24

Residency:Contract: 190285

Contractor: ACTION SAFETY SUPPLY CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 61 % ( 61 %)

Time Passed: 44 % ( 44 %)

Adjusted:

01/06/2020

$1,570,196.24

09/19/2019

10/25/2019

10/29/2019

07100

DUNCAN

120 120

01/06/2020

SAFETY IMPROVEMENT (CABLE BARRIER)

US-81: FROM THE STEPHENS COUNTY LINE,

EXTEND NORTH NEAR RUSH SPRINGS.

PROJECT LENGTH = 7.07 MILES

30462(04) COUNTY RO

CIRB-226C(085)RB

Knight, Reese

$998,356.64

Residency:Contract: 190314

Contractor: CENTRAL BRIDGE COMPANY, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 56 % ( 52 %)

Time Passed: 59 % ( 59 %)

Adjusted:

01/06/2020

$925,000.03

10/17/2019

11/19/2019

11/21/2019

07300

ANADARKO

150 150

02/03/2020

BRIDGE AND APPROACHES COUNTY ROAD

(NS-2760): OVER LAKE LOUIS BURTSCHI, 2.4

MILES NORTH OF THE US-277 JUNCTION

NEAR CEMENT. PROJECT LENGTH = 0.387

MILE

33478(05) US-81

HSIPG-226N(068)TR

Roberts, Colton

$1,486,092.33

Residency:Contract: 190390

Contractor: ACTION SAFETY SUPPLY CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,486,092.33

11/14/2019

12/17/2019

12/19/2019

07100

DUNCAN

120 120

03/02/2020

SAFETY IMPROVEMENT (CABLE BARRIER)

US-81: FROM THE SH-17 JUNCTION, EXTEND

NORTH IN RUSH SPRINGS. PROJECT LENGTH

= 7.28 MILES

GrantCounty: Commissioner District: 4

Contracts Under Construction

31372(04) US-60/US-

SSR-227B(026)SR

Hoover, Jacob

$2,095,902.08

Residency:Contract: 190044

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 103 % ( 97 %)

Time Passed: 106 % ( 106 %)

Adjusted:

08/08/2019

$1,985,450.70

01/17/2019

02/20/2019

04/17/2019

04300

ENID

120 120

06/03/2019

RESURFACE (ASPHALT) AND PAVEMENT

REHABILITATION (P.C.) US-60/US-81: US-60,

FROM US-81 JCT, EXTEND E IN POND CREEK.

US-81, FROM 0.54 MI S OF US-60 JCT, EXTEND

N IN POND CREEK. PROJECT LENGTH = 3.350

MILES

Construction Status Report Page 82

Page 83: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31844(04) COUNTY RO

STP-227C(023)CI

CED8

$2,217,086.68

Residency:Contract: 190169

Contractor: VENTURE CORPORATION DBA V. C. O. PAVING

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 86 % ( 87 %)

Time Passed: 98 % ( 98 %)

Adjusted:

08/05/2019

$2,263,454.84

04/18/2019

05/14/2019

07/01/2019

04009

CIRCUIT ENGR. DISTR. # 8

120 120

09/09/2019

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (NS-291): FROM THE SH-11 JUNCTION,

EXTEND NORTH NEAR MEDFORD. PROJECT

LENGTH = 3.043 MILES

30632(04) US-81

STP-227B(027)3P

Hoover, Jacob

$2,276,123.24

Residency:Contract: 190315

Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 8 % ( 8 %)

Time Passed: 14 % ( 14 %)

Adjusted:

03/09/2020

$2,276,123.24

10/17/2019

11/19/2019

11/21/2019

04300

ENID

150 150

03/02/2020

RESURFACE (ASPHALT) US-81: FROM 0.1

MILES SOUTH OF HARMON ROAD, EXTEND

NORTH IN MEDFORD. PROJECT LENGTH =

3.520 MILES

GreerCounty: Commissioner District: 5

Contracts Under Construction

32322(04) COUNTY RO

STP-228D(016)CI

CED7

$300,834.56

Residency:Contract: 190316

Contractor: KLAVER CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 65 % ( 65 %)

Time Passed: 34 % ( 34 %)

Adjusted:

03/02/2020

$300,834.56

10/17/2019

11/15/2019

01/30/2020

05005

CIRCUIT ENGR. DISTR. # 7

90 90

03/02/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-1415): OVER TITTLE CREEK, 1.5 MILES

WEST OF THE SH-6 JUNCTION NEAR

GRANITE. PROJECT LENGTH = 0.066 MILE

29509(04) US-283

STP-228B(017)PM

Holley, Terri

$7,797,408.00

Residency:Contract: 190354

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 22 % ( 22 %)

Time Passed: 9 % ( 9 %)

Adjusted:

03/02/2020

$7,797,408.00

11/14/2019

12/13/2019

12/17/2019

05200

ALTUS

370 370

03/02/2020

BRIDGE AND APPROACHES US-283: OVER

ELM FORK OF RED RIVER AND ELM FORK

OVERFLOW, 1.6 MILES AND 1.9 MILES NORTH

OF SH-9 WEST NEAR MANGUM. PROJECT

LENGTH = 0.625 MILE

Construction Status Report Page 83

Page 84: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

34393(04) SH-6

SSR-228B(018)SR

Holley, Terri

$570,133.91

Residency:Contract: 200064

Contractor: DUSTROL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$570,133.91

02/20/2020

03/13/2020

04/23/2020

05200

ALTUS

Fixed Completion Date: 10/31/2020

RESURFACE (ASPHALT) SH-6: FROM 2.9

MILES NORTH OF THE US-283 JUNCTION,

EXTEND NORTH NEAR GRANITE. PROJECT

LENGTH = 3.150 MILES

HarmonCounty: Commissioner District: 5

Contracts Under Construction

27898(04) SH-30

STP-229C(011)PM

Holley, Terri

$4,064,494.13

Residency:Contract: 170225

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 53 % ( 53 %)

Time Passed: 78 % ( 78 %)

Adjusted:

10/07/2019

$4,064,494.13

05/16/2019

06/12/2019

06/18/2019

05200

ALTUS

210 210

10/07/2019

BRIDGE AND APPROACHES SH-30: OVER

ELM FORK OF RED RIVER, 1.2 MILES SOUTH

OF THE BECKHAM COUNTY LINE. PROJECT

LENGTH = 0.665 MILE

HaskellCounty: Commissioner District: 1

Contracts Under Construction

32838(04) SH-9

HSIPG-231B(040)AD

Orendorf, Barry

$431,875.50

Residency:Contract: 190247

Contractor: ROSSCON, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$431,875.50

02/20/2020

03/13/2020

03/18/2020

01200

SALLISAW

90 90

07/06/2020

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

SH-9: FROM 3RD STREET, EXTEND

NORTHEAST IN THE TOWN OF KEOTA.

PROJECT LENGTH = 0.414 MILE

Construction Status Report Page 84

Page 85: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28499(04) COUNTY RO

CIRB-231C(040)RB

CE2

$7,518,071.77

Residency:Contract: 200043

Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

04/13/2020

$7,518,071.77

01/16/2020

02/14/2020

03/13/2020

01017

CIRCUIT ENGR. DISTR. # 2

210 210

06/01/2020

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROADS (STAR RD/E1175/D1171):

FROM SH-9, EXTEND NORTH ON STAR ROAD

THEN EAST ON E1175 AND D1171 NEAR

KEOTA. PROJECT LENGTH = 6.685 MILES

HughesCounty: Commissioner District: 3

Contracts Under Construction

28575(04) CO.RD.

STP-232C(041)CI

Helton, Matthew

$3,269,971.31

Residency:Contract: 160090

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 91 % ( 90 %)

Time Passed: 255 % ( 141 %)

Adjusted:

09/06/2016

$3,220,801.19

02/18/2016

03/21/2016

03/24/2016

03300

WEWOKA

220 399

07/05/2016

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (EW-126): FROM 3.0 MILES

WEST OF US-75, EXTEND EAST NEAR

HOLDENVILLE. PROJECT LENGTH = 2.879

MILES.

JacksonCounty: Commissioner District: 5

Contracts Under Construction

29526(08) US-62/US-

ACSTP-NBIP(524)PM

EST

$566,293.10

Residency:Contract: 180115

Contractor: SOUTHEAST BRIDGE FL CORP

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 84 % ( 84 %)

Time Passed: 115 % ( 115 %)

Adjusted:

12/02/2018

$566,293.10

03/15/2018

04/18/2018

08/20/2018

05001

EST, INC.

150 150

09/04/2018

BRIDGE PAINTING US-62/US-183: AT

MULTIPLE LOCATIONS IN DIVISION V.

Construction Status Report Page 85

Page 86: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

30698(04) COUNTY RO

STP-233D(037)CI

CED7

$895,542.95

Residency:Contract: 180286

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 96 % ( 96 %)

Time Passed: 98 % ( 98 %)

Adjusted:

03/18/2019

$895,542.95

11/15/2018

12/17/2018

12/20/2018

05005

CIRCUIT ENGR. DISTR. # 7

120 120

04/01/2019

BRIDGE AND APPROACHES COUNTY ROAD

(NS-198): OVER TURKEY CREEK, 1.8 MILES

SOUTH OF THE US-62 JUNCTION NEAR

ALTUS. PROJECT LENGTH = 0.199 MILE

27919(04) SH-5

STP-233C(038)PM

CEC

$2,427,837.39

Residency:Contract: 180356

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 43 % ( 42 %)

Time Passed: 25 % ( 25 %)

Adjusted:

03/02/2020

$2,405,161.72

05/16/2019

06/12/2019

06/18/2019

05003

CEC CORP.

150 150

03/02/2020

BRIDGE AND APPROACHES SH-5: OVER

SANDY CREEK, 2.5 MILES WEST OF THE SH-6

JUNCTION NEAR ELDORADO. PROJECT

LENGTH = 0.255 MILE

28778(04) SH-6

SSP-233C(039)PM

Holley, Terri

$1,107,964.11

Residency:Contract: 190080

Contractor: WYATT CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 105 % ( 97 %)

Time Passed: 86 % ( 86 %)

Adjusted:

10/14/2019

$1,029,093.37

02/14/2019

03/26/2019

06/07/2019

05200

ALTUS

120 120

10/14/2019

BRIDGE AND APPROACHES SH-6: OVER

UNNAMED CREEK, 2.6 MILES NORTHEAST OF

THE SH-34 JUNCTION NEAR OLUSTEE.

PROJECT LENGTH = 0.150 MILE

31149(04) COUNTY RO

STP-233D(041)CI

CED7

$707,827.55

Residency:Contract: 190355

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 22 % ( 22 %)

Time Passed: 8 % ( 8 %)

Adjusted:

04/06/2020

$707,827.55

11/14/2019

12/13/2019

12/17/2019

05005

CIRCUIT ENGR. DISTR. # 7

120 120

04/06/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-167): OVER BITTER CREEK, 3.1 MILES

WEST OF THE US-283 JUNCTION NEAR

ALTUS. PROJECT LENGTH = 0.189 MILE

Construction Status Report Page 86

Page 87: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32726(04) US-62/US-

SBR-020N(048)SB

Holley, Terri

$2,365,212.04

Residency:Contract: 200103

Contractor: B & B CONSTRUCTION SERVICE J.T., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,365,212.04

03/19/2020

04/22/2020

04/28/2020

05200

ALTUS

220 220

09/08/2020

BRIDGE REHABILITATION US-62/US-62 EB:

OVER BITTER CREEK AND TURKEY CREEK,

2.8 MILES AND 15.8 MILES WEST OF US-283

NEAR ALTUS AND DUKE. PROJECT LENGTH =

0.295 MILE

JeffersonCounty: Commissioner District: 7

Contracts Under Construction

29566(04) US-81

NHPPY-234N(041)/NHPPY-23*

ATKINS

$4,034,914.88

Residency:Contract: 170084

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 97 %)

Time Passed: 81 % ( 77 %)

Adjusted:

08/10/2017

$3,849,793.25

03/16/2017

04/14/2017

04/18/2017

*4N(043)SS

07010

ATKINS

280 295

09/05/2017

BRIDGE AND APPROACHES US-81: OVER

UNNAMED CREEK AND HACKBERRY CREEK,

1.7 MILES AND 4.1 MILES NORTH OF SH-32

NEAR RYAN. PROJECT LENGTH = 0.411 MILE

29914(04) COUNTY RO

CIRB-234C(045)RB

Roberts, Colton

$5,986,413.52

Residency:Contract: 190142

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 11 % ( 11 %)

Time Passed: 23 % ( 23 %)

Adjusted:

02/17/2020

$5,986,413.52

06/20/2019

07/17/2019

07/18/2019

07100

DUNCAN

180 180

02/15/2020

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (NOBLE WRAY II ROAD): FROM

4.6 MILES WEST OF THE US-81 JUNCTION,

EXTEND NORTH NEAR RYAN. PROJECT

LENGTH = 5.062 MILES

29368(04) COUNTY RO

STP-234D(046)CI

BCS

$734,799.20

Residency:Contract: 190234

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 97 % ( 97 %)

Time Passed: 81 % ( 81 %)

Adjusted:

11/04/2019

$734,799.20

07/25/2019

08/20/2019

08/23/2019

07018

BENCHMARK CONSTR. SERVS., LLC

100 100

12/02/2019

BRIDGE AND APPROACHES COUNTY ROAD

(NS-301): OVER TRIBUTARY TO MUD CREEK,

4.6 MILES SOUTH OF THE SH-53 JUNCTION

NEAR RINGLING. PROJECT LENGTH = 0.085

MILE

Construction Status Report Page 87

Page 88: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31955(04) US-81

SSR-011N(107)SR

Roberts, Colton

$1,284,844.69

Residency:Contract: 200066

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,284,844.69

02/20/2020

03/13/2020

03/18/2020

07100

DUNCAN

45 45

07/06/2020

RESURFACE (ASPHALT) US-81: FROM 5.0

MILES NORTH OF THE US-70 JUNCTION,

EXTEND NORTH NEAR WAURIKA. PROJECT

LENGTH = 4.450 MILES

JohnstonCounty: Commissioner District: 3

Contracts Under Construction

29603(04) SH-1

SBR-235C(017)SB

Wade, Tony

$2,660,882.47

Residency:Contract: 160287

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 107 % ( 100 %)

Time Passed: 181 % ( 106 %)

Adjusted:

10/18/2016

$2,483,537.37

08/18/2016

09/21/2016

09/26/2016

03100

ADA

210 360

03/06/2017

BRIDGE REHABILITATION SH-1: OVER

WASHITA RIVER AND OVERFLOW, 4.18 MILES

AND 4.44 MILES NORTH OF THE MARSHALL

COUNTY LINE. PROJECT LENGTH = 0.511

MILE.

29666(04) SH-7

STP-235C(037)PM

Wade, Tony

$1,743,285.55

Residency:Contract: 190081

Contractor: TREAS CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 61 % ( 61 %)

Time Passed: 78 % ( 78 %)

Adjusted:

08/12/2019

$1,743,285.55

05/16/2019

06/18/2019

06/20/2019

03100

ADA

210 210

10/07/2019

BRIDGE AND APPROACHES SH-7: OVER

PECAN CREEK, 0.7 MILES EAST OF THE SH-99

JUNCTION NEAR CONNERVILLE. PROJECT

LENGTH = 0.642 MILE

31841(04) SH-22/SH-

STP-235C(038)PM

Wade, Tony

$6,766,067.29

Residency:Contract: 200045

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$6,766,067.29

01/16/2020

02/21/2020

02/26/2020

03100

ADA

250 250

06/01/2020

GRADE, DRAIN, AND SURFACE SH-22/SH-99:

SH-22, FROM 0.4 MILES NW OF SH-9 EXTEND

SE. SH-99, FROM THE SH-22 JUNCTION,

EXTEND NE IN TISHOMINGO. PROJECT

LENGTH = 1.842 MILES

Construction Status Report Page 88

Page 89: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

KayCounty: Commissioner District: 4

Contracts Under Construction

29491(05) SH-11

SBR-236N(052)SB

Zachary, Ted

$5,695,136.64

Residency:Contract: 180164

Contractor: GIBSON & ASSOCIATES, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 69 % ( 64 %)

Time Passed: 117 % ( 117 %)

Adjusted:

09/10/2018

$5,296,804.31

04/19/2018

05/15/2018

06/13/2018

-177 NEAR BLACKWELL.

04100

PERRY

325 325

09/04/2018

BRIDGE REHABILITATION SH-11: OVER

CHIKASKIA RIVER AND OVERFLOWS, 0.3 MI,

0.4 MI, 0.9 MI AND 1.1 MI EAST OF US-177

NEAR BLACKWELL. PROJECT LENGTH = 0.687

MILE

32993(04) PEDESTRIA

TAP-236F(031)TP

Zachary, Ted

$1,301,694.77

Residency:Contract: 190116

Contractor: SCHIRALLI CONSTRUCTION CORP.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 37 % ( 38 %)

Time Passed: 81 % ( 81 %)

Adjusted:

10/03/2019

$1,329,681.38

03/14/2019

04/16/2019

04/19/2019

04100

PERRY

90 90

10/01/2019

PEDESTRIAN IMPROVEMENTS (TRAIL

CONSTRUCTION) PEDESTRIAN TRAIL (LAKE

PONCA TRAIL): BETWEEN L A CANN DRIVE

AND CHECKSTAND ROAD IN THE CITY OF

PONCA CITY. PROJECT LENGTH = 1.070

MILES

33687(04) CITY STRE

STP-236B(062)UR

Mitchell, Matt

$1,465,586.78

Residency:Contract: 190198

Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,465,586.78

03/19/2020

04/15/2020

04/21/2020

04500

STILLWATER

150 150

08/03/2020

GRADE, SURFACE, WATER LINE, AND

EROSION CONTROL CITY STREET (WEST

HIGHLAND AVENUE): FROM 1.8 MILES WEST

OF THE US-77 JUNCTION, EXTEND EAST IN

PONCA CITY. PROJECT LENGTH = 0.288 MILE

25085(04) COUNTY RO

CIRB-136C(162)RB

CED8

$2,995,504.11

Residency:Contract: 190317

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 8 % ( 8 %)

Time Passed: 6 % ( 6 %)

Adjusted:

04/03/2020

$2,992,997.01

01/16/2020

02/14/2020

02/25/2020

04009

CIRCUIT ENGR. DISTR. # 8

210 210

06/01/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-9): OVER BITTER CREEK, 0.5 MILES EAST

OF THE US-177 JUNCTION NEAR BLACKWELL.

PROJECT LENGTH = 1.337 MILES

Construction Status Report Page 89

Page 90: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

24380(04) US-77

STP-136B(145)SS

Zachary, Ted

$9,346,021.75

Residency:Contract: 190356

Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$9,346,021.75

01/16/2020

02/18/2020

02/27/2020

04100

PERRY

300 300

05/04/2020

WIDEN AND RESURFACE US-77: FROM 6.3

MILES NORTH OF THE SH-11W JUNCTION,

EXTEND NORTH NEAR NEWKIRK. PROJECT

LENGTH = 4.479 MILES

31923(04) I-35

SBR-3500(079)SB

Zachary, Ted

$1,629,615.48

Residency:Contract: 200012

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,629,615.48

01/16/2020

02/11/2020

02/24/2020

04100

PERRY

360 360

06/01/2020

BRIDGE REHABILITATION I-35: OVER SALT

FORK CREEK, 1.3 MILES SOUTH OF THE

US-60 INTERCHANGE NEAR TONKAWA.

PROJECT LENGTH = 0.221 MILE

32773(04) US-77

SSR-236N(065)SR

Zachary, Ted

$1,687,163.50

Residency:Contract: 200067

Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,687,163.50

02/20/2020

03/13/2020

03/18/2020

04100

PERRY

120 120

07/06/2020

RESURFACE (ASPHALT) US-77: FROM 1.2

MILES NORTH OF THE US-177 JUNCTION,

EXTEND NORTH IN PONCA CITY. PROJECT

LENGTH = 1.850 MILES

KingfisherCounty: Commissioner District: 4

Contracts Under Construction

27980(04) US-81

NHPP-237N(019)SS

Brooks, Jonathan

$8,940,178.46

Residency:Contract: 180009

Contractor: DUIT CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 95 % ( 92 %)

Time Passed: 165 % ( 132 %)

Adjusted:

06/25/2018

$8,595,946.52

02/15/2018

03/16/2018

04/25/2018

ITY OF KINGFISHER.

04200

YUKON

265 330

09/04/2018

GRADE, DRAIN, AND SURFACE US-81: FROM

1.3 MILES SOUTH OF THE SH-33

INTERSECTION, EXTEND SOUTHWEST NEAR

THE CITY OF KINGFISHER. PROJECT LENGTH

= 3.314 MILES

Construction Status Report Page 90

Page 91: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29842(04) US-81

NHPP-237N(041)SS

Hoover, Jacob

$3,604,685.76

Residency:Contract: 180048

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 103 % ( 100 %)

Time Passed: 88 % ( 88 %)

Adjusted:

05/08/2018

$3,481,003.40

01/18/2018

02/27/2018

03/02/2018

04300

ENID

365 365

09/04/2018

BRIDGE AND APPROACHES US-81: OVER

KINGFISHER CREEK, 0.7 MILES NORTH OF

THE SH-3 INTERSECTION IN KINGFISHER.

PROJECT LENGTH = 0.146 MILE

30445(04) US-81/SH-

STP-237B(049)PM

Mitchell, Matt

$1,249,805.98

Residency:Contract: 190177

Contractor: SCHIRALLI CONSTRUCTION CORP.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 38 % ( 28 %)

Adjusted:

03/01/2020

$1,249,805.98

05/16/2019

06/14/2019

06/17/2019

04500

STILLWATER

120 162

02/03/2020

PAVEMENT REHABILITATION (P. C.

CONCRETE) US-81/SH-33: US-81, FROM

SHERIDAN AVENUE EXTEND NORTH. SH-33,

FROM US-81, EXTEND EAST IN THE CITY OF

KINGFISHER. PROJECT LENGTH = 0.450 MILE

33017(04) CITY STRE

TAP-237E(048)TP

Brooks, Jonathan

$1,882,692.96

Residency:Contract: 190178

Contractor: SCHIRALLI CONSTRUCTION CORP.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,882,692.96

05/16/2019

06/14/2019

06/17/2019

04200

YUKON

180 180

01/06/2020

GRADE, SURFACE, TRAFFIC SIGNAL, AND

SIDEWALKS CITY STREET (OKLAHOMA

AVENUE): FROM THE US-81 JUNCTION,

EXTEND EAST IN THE TOWN OF OKARCHE.

PROJECT LENGTH = 0.233 MILE

KiowaCounty: Commissioner District: 5

Contracts Under Construction

27904(04) SH-19

STP-238C(045)SS

Holley, Terri

$2,126,115.44

Residency:Contract: 180010

Contractor: RRY SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 98 % ( 96 %)

Time Passed: 111 % ( 100 %)

Adjusted:

09/05/2018

$2,082,170.05

02/15/2018

03/23/2018

03/29/2018

05200

ALTUS

210 233

09/04/2018

BRIDGE AND APPROACHES SH-19: OVER

UNNAMED CREEKS, 0.2 MI AND 3.1 MI WEST

OF THE CADDO COUNTY LINE. PROJECT

LENGTH = 0.496 MILE

Construction Status Report Page 91

Page 92: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

15027(04) SH-6

STP-038B(232)SS

Holley, Terri

$20,338,888.42

Residency:Contract: 180357

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 38 % ( 38 %)

Time Passed: 35 % ( 35 %)

Adjusted:

09/03/2019

$20,140,968.11

04/18/2019

05/16/2019

05/21/2019

05200

ALTUS

460 460

09/09/2019

GRADE, DRAIN, SURFACE, AND BRIDGE SH-6:

FROM 5.7 MILES SOUTH OF THE SH-55E

JUNCTION, EXTEND NORTH NEAR SENTINEL.

PROJECT LENGTH = 5.401 MILES

28780(04) US-62B

STP-238C(052)PM

Holley, Terri

$983,132.10

Residency:Contract: 190117

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 84 % ( 83 %)

Time Passed: 105 % ( 98 %)

Adjusted:

11/04/2019

$971,654.30

05/16/2019

06/12/2019

06/19/2019

05200

ALTUS

100 107

11/04/2019

BRIDGE AND APPROACHES US-62B: OVER

WEST FORK OF DEEP CREEK, 0.5 MILES

NORTHWEST OF THE US-62 JUNCTION NEAR

SNYDER. PROJECT LENGTH = 0.119 MILE

30075(04) COUNTY RO

STP-238C(056)CI

CED7

$623,051.75

Residency:Contract: 190361

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$623,051.75

11/14/2019

12/13/2019

12/17/2019

05005

CIRCUIT ENGR. DISTR. # 7

120 120

06/22/2020

BRIDGE AND APPROACHES COUNTY ROAD

(NS-236): OVER LONGHORN CREEK, 2.4 MILES

NORTH OF THE SH-19 JUNCTION NEAR

GOTEBO. PROJECT LENGTH = 0.133 MILE

32912(04) COUNTY RO

STP-238C(060)CI

CED7

$1,301,210.87

Residency:Contract: 200107

Contractor: T & G CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,301,210.87

03/19/2020

04/20/2020

04/28/2020

05005

CIRCUIT ENGR. DISTR. # 7

60 60

05/18/2020

RESURFACE (ASPHALT) COUNTY ROAD

(OZARK TRAIL ROAD): FROM THE US-183

JUNCTION, EXTEND EAST NEAR HOBART.

PROJECT LENGTH = 5.000 MILES

Le FloreCounty: Commissioner District: 2

Contracts Under Construction

Construction Status Report Page 92

Page 93: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31160(04) SH-63

SBR-240C(072)SB

Davis, Tim

$1,905,526.84

Residency:Contract: 190152

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 63 % ( 63 %)

Time Passed: 56 % ( 56 %)

Adjusted:

09/09/2019

$1,905,526.84

04/18/2019

05/16/2019

05/21/2019

02200

HEAVENER

165 165

09/09/2019

BRIDGE REHABILITATION SH-63: OVER

SYCAMORE CREEK, 11.9 MILES WEST OF THE

US-259 JUNCTION, NEAR LENOX. PROJECT

LENGTH: 0.00 MILE

33387(04) US-271

SSR-240N(077)SR

Davis, Tim

$932,015.50

Residency:Contract: 200013

Contractor: JOB CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$932,015.50

01/16/2020

02/14/2020

02/25/2020

02200

HEAVENER

30 30

05/04/2020

RESURFACE (ASPHALT) US-271: FROM 0.7

MILES SOUTHWEST OF THE SH-9A JUNCTION,

EXTEND EAST NEAR POCOLA. PROJECT

LENGTH = 3.945 MILES

34504(04) US-271

SAP-240C(078)ES

Davis, Tim

$116,245.00

Residency:Contract: 200014

Contractor: B & B CONSTRUCTION SERVICE J.T., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$116,245.00

01/16/2020

02/19/2020

02/25/2020

02200

HEAVENER

15 15

05/04/2020

BRIDGE REPAIR US-271: REPAIR VEHICLE

IMPACT DAMAGE OVER FOURCHE MALINE

CREEK, 2.8 MILES SOUTHWEST OF THE

US-270 JCT NEAR FANSHAWE. PROJECT

LENGTH = 0.00 MILE

LincolnCounty: Commissioner District: 3

Contracts Under Construction

27143(04) SH-18

STP-241C(058)PM

Mitchell, Matt

$3,280,371.54

Residency:Contract: 180091

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 100 %)

Time Passed: 148 % ( 105 %)

Adjusted:

05/25/2018

$3,216,964.08

02/15/2018

03/23/2018

03/29/2018

R CHANDLER.

04500

STILLWATER

210 294

09/04/2018

BRIDGE AND APPROACHES SH-18: OVER DRY

CREEK OVERFLOW AND DRY CREEK, 5.6

MILES AND 5.7 MILES NORTH OF I-44 NEAR

CHANDLER. PROJECT LENGTH = 0.661 MILE

Construction Status Report Page 93

Page 94: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29567(04) SH-66

SBR-241C(012)SB

Helton, Matthew

$524,613.07

Residency:Contract: 190153

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 98 % ( 94 %)

Time Passed: 101 % ( 85 %)

Adjusted:

10/07/2019

$500,674.67

05/16/2019

06/21/2019

06/21/2019

03300

WEWOKA

90 107

10/07/2019

BRIDGE REHABILITATION SH-66: OVER BELL

COW CREEK, 0.1 MILES WEST OF THE SH-18

JUNCTION IN CHANDLER. PROJECT LENGTH =

0.090 MILE

32371(04) COUNTY RO

STP-241D(067)CI

Helton, Matthew

$602,774.92

Residency:Contract: 190387

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 56 % ( 55 %)

Time Passed: 68 % ( 68 %)

Adjusted:

01/14/2020

$591,126.76

11/14/2019

12/11/2019

12/18/2019

03300

WEWOKA

90 90

04/06/2020

BRIDGE AND APPROACHES COUNTY ROAD

(NS-333): OVER DUGOUT CREEK, 1.0 MILE

NORTH OF THE SH-105 JUNCTION NEAR

CARNEY. PROJECT LENGTH = 0.302 MILE

29267(04) COUNTY RO

STP-241D(063)CI

David Hendricks

$840,777.04

Residency:Contract: 200069

Contractor: COWBOY CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$840,777.04

02/20/2020

03/20/2020

03/20/2020

03024

CIRCUIT ENGR. DISTR. #4

90 90

09/08/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-90): OVER DOSIE CREEK, 2.1 MILES EAST

OF THE SH-66 JUNCTION NEAR DAVENPORT.

PROJECT LENGTH = 0.391 MILE

29543(04) SH-99

STP-241B(064)PM

ZSRB

$2,188,771.00

Residency:Contract: 200070

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,188,771.00

02/20/2020

03/13/2020

03/18/2020

03022

SMITH ROBERTS BALDISCHWILER, LLC

180 180

09/08/2020

BRIDGE AND APPROACHES SH-99: OVER

SALT CREEK, 0.7 MILES NORTH OF I-44

(TURNER TURNPIKE) IN STROUD. PROJECT

LENGTH = 0.069 MILE

LoganCounty: Commissioner District: 4

Contracts Under Construction

Construction Status Report Page 94

Page 95: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28312(04) SH-74D

STP-242C(059)SS

Mitchell, Matt

$2,323,270.05

Residency:Contract: 170351

Contractor: RRY SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 96 % ( 96 %)

Time Passed: 140 % ( 99 %)

Adjusted:

02/05/2018

$2,323,270.05

11/16/2017

12/18/2017

12/27/2017

04500

STILLWATER

210 296

02/05/2018

BRIDGE AND APPROACHES SH-74D: OVER

ROCK CREEK, 1.7 MILES WEST OF SH-74

NEAR LOVELL. PROJECT LENGTH = 0.122

MILE.

32641(04) COUNTY RO

STP-242C(070)AG

ATKINS

$3,198,985.28

Residency:Contract: 180242

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 25 % ( 25 %)

Time Passed: 208 % ( 208 %)

Adjusted:

06/10/2019

$3,156,262.28

01/17/2019

02/20/2019

03/01/2019

04010

ATKINS

180 180

04/08/2019

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (COLTRANE ROAD): FROM SIMPSON

ROAD, EXTEND NORTH NEAR EDMOND.

PROJECT LENGTH = 1.991 MILES

27099(04) SH-51

STP-242C(057)SS

Mitchell, Matt

$4,453,837.32

Residency:Contract: 180358

Contractor: RRY SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 46 % ( 46 %)

Time Passed: 61 % ( 60 %)

Adjusted:

05/13/2019

$4,406,957.99

01/17/2019

02/26/2019

03/07/2019

04500

STILLWATER

340 344

06/03/2019

BRIDGE AND APPROACHES SH-51: OVER

MIDDLE BEAVER CREEK AND WEST BEAVER

CREEK, 2.2 MILES AND 3.3 MILES WEST OF

US-77 NEAR MULHALL. PROJECT LENGTH =

0.507 MILE

33803(04) US-77

SSR-242B(075)SR

Mitchell, Matt

$2,425,000.00

Residency:Contract: 200015

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,425,000.00

01/16/2020

02/11/2020

02/14/2020

04500

STILLWATER

210 210

03/09/2020

RESURFACE (ASPHALT) US-77/SH-33: US-77,

FROM 0.05 MI S OF INDUSTRIAL AVE EXT N.

SH-33, FROM 0.16 MI WEST OF 19TH ST EXT

EAST IN GUTHRIE. PROJECT LENGTH = 3.210

MILES

Construction Status Report Page 95

Page 96: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33810(04) SH-74

SSR-242C(083)SR

Mitchell, Matt

$1,344,425.00

Residency:Contract: 200071

Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,344,425.00

02/20/2020

03/13/2020

03/18/2020

04500

STILLWATER

120 120

07/06/2020

PAVEMENT REHABILITATION (ASPHALT)

SH-74: FROM 1.28 MILES NORTH OF THE

SH-74F JUNCTION, EXTEND NORTH NEAR

CEDAR VALLEY. PROJECT LENGTH = 3.780

MILES

LoveCounty: Commissioner District: 7

Contracts Under Construction

31603(04) I-35

HSIPIG-3500-(014)IT

ATKINS

$628,819.00

Residency:Contract: 170286

Contractor: MIDSTATE TRAFFIC CONTROL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 100 % ( 100 %)

Time Passed: 243 % ( 92 %)

Adjusted:

03/18/2019

$628,819.00

04/19/2018

05/18/2018

05/30/2018

07010

ATKINS

120 316

09/04/2018

SAFETY IMPROVEMENT (ITS) I-35: AT

MULTIPLE LOCATIONS IN DIVISION III, IV AND

VII.

31411(04) COUNTY RO

CIRB-243C(031)RB

Fuhrmann, Chris

$1,424,000.00

Residency:Contract: 190214

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,424,000.00

01/16/2020

02/18/2020

03/26/2020

07200

ARDMORE

150 150

06/01/2020

BRIDGE AND APPROACHES COUNTY ROAD

(MERLE WOLFE ROAD): OVER TRIBUTARY TO

BLUE LAKE, 3.0 MILES NORTH OF THE TEXAS

STATE LINE NEAR THACKERVILLE. PROJECT

LENGTH = 0.292 MILE

33878(04) SH

SSP-269F(068)PM

Fuhrmann, Chris

$330,920.00

Residency:Contract: 200124

Contractor: DIRECT TRAFFIC CONTROL INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$330,920.00

03/19/2020

04/20/2020

04/28/2020

07200

ARDMORE

30 30

08/03/2020

STRIPING AND PAVEMENT MARKING AT

MULTIPLE LOCATIONS IN DIVISION VII.

PROJECT LENGTH = 0.000

Construction Status Report Page 96

Page 97: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

McClainCounty: Commissioner District: 3

Contracts Under Construction

27946(04) US-77

ACNHPP-244N(052)SS

Malave, Luis

$37,963,701.89

Residency:Contract: 170264

Contractor: WEBBER, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 105 % ( 99 %)

Time Passed: 79 % ( 77 %)

Adjusted:

10/30/2017

$35,939,300.00

08/17/2017

09/20/2017

09/29/2017

03200

PURCELL

800 826

10/30/2017

BRIDGE AND APPROACHES US-77: OVER

SOUTH CANADIAN RIVER AND OVER BNSF

RAILROAD, 0.3 MILES AND 0.8 MILES WEST

OF THE SH-39 JUNCTION IN PURCELL.

PROJECT LENGTH = 0.882 MILE

27220(04) I-35/CNTY

NHPPI-3500-(074)PM

Malave, Luis

$9,167,090.00

Residency:Contract: 190013

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 74 % ( 73 %)

Time Passed: 83 % ( 72 %)

Adjusted:

08/12/2019

$9,029,100.00

05/16/2019

06/14/2019

06/18/2019

03200

PURCELL

240 275

10/07/2019

GRADE, DRAIN, SURFACE, AND BRIDGE

I-35/CNTY RD(LADD RD): I-35, FROM 3.3 MI SE

OF SH-74, EXT N. CNTY RD (LADD RD), FROM

0.2 MI W OF I-35, EXT E IN GOLDSBY.

PROJECT LENGTH = 0.980 MILE

30111(04) COUNTY RO

STP-244D(066)CI

JACOBS

$1,504,587.17

Residency:Contract: 190179

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 78 % ( 78 %)

Time Passed: 63 % ( 63 %)

Adjusted:

11/18/2019

$1,505,087.17

05/16/2019

06/12/2019

06/17/2019

03004

JACOBS ENGINEERING

150 150

11/18/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-130): OVER NORTH FORK OF WALNUT

CREEK, 4.6 MILES EAST OF THE US-62

JUNCTION NEAR BLANCHARD. PROJECT

LENGTH = 0.296 MILE

23283(04) I-35

NHPPI-0035(297)SS

Malave, Luis

$4,858,804.60

Residency:Contract: 190216

Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 25 % ( 24 %)

Time Passed: 22 % ( 22 %)

Adjusted:

02/02/2020

$4,792,564.60

09/19/2019

10/23/2019

10/29/2019

03200

PURCELL

270 270

02/03/2020

GRADE, DRAIN, AND SURFACE I-35: FROM 0.5

MILES NORTHWEST OF SH-74, EXTEND

SOUTHEAST IN GOLDSBY. PROJECT LENGTH

= 1.065 MILES

Construction Status Report Page 97

Page 98: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

34098(04) MULTIPLE

STP-244F(067)000

EST

$435,365.70

Residency:Contract: 190291

Contractor: B & B CONSTRUCTION SERVICE J.T., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$435,365.70

09/19/2019

10/25/2019

10/25/2019

03001

EST, INC.

90 90

04/06/2020

JOINT SEAL/REPAIR

US-75/US-377/SH-19/SH-24/SH-31/SH-39/SH-56/

SH-59/SH-74B/ SH-99/SH-102: AT MULTIPLE

LOCATIONS IN DIVISION III. PROJECT LENGTH

= 0.00 MILE

29734(04) I-35

NHPPI-3500-(077)PM

Malave, Luis

$16,636,130.93

Residency:Contract: 200046

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 18 % ( 18 %)

Time Passed: 45 % ( 19 %)

Adjusted:

03/02/2020

$16,636,130.93

01/16/2020

02/11/2020

02/12/2020

03200

PURCELL

Fixed Completion Date: 10/07/2020

GRADE, DRAIN, AND SURFACE I-35: FROM

SH-59, EXTEND NORTH NEAR WAYNE.

PROJECT LENGTH = 2.400 MILES

McCurtainCounty: Commissioner District: 2

Contracts Under Construction

24219(08) SH-3

NHPP-245N(053)PM

Nored, John

$5,087,104.72

Residency:Contract: 180244

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 96 % ( 94 %)

Time Passed: 77 % ( 77 %)

Adjusted:

12/03/2018

$4,970,196.52

07/19/2018

08/20/2018

08/21/2018

02100

ANTLERS

365 365

12/03/2018

BRIDGE REHABILITATION SH-3: OVER

YASHAU CREEK AND LUKFATA CREEK, 1.0

MILE AND 4.1 MILES NORTHWEST OF THE

US-259 JUNCTION NEAR BROKEN BOW.

PROJECT LENGTH = 0.10 MILE

30657(04) COUNTY RO

STP-245D(055)CI

CED3

$616,448.14

Residency:Contract: 190015

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 95 % ( 95 %)

Time Passed: 119 % ( 113 %)

Adjusted:

05/06/2019

$616,448.14

02/14/2019

03/15/2019

03/25/2019

02013

CIRCUIT ENGR. DISTR. # 3

90 95

07/01/2019

BRIDGE AND APPROACHES COUNTY ROAD

(NS-449): OVER WHITE OAK CREEK, 4.7

MILES NORTH OF THE US-70 JUNCTION NEAR

WRIGHT CITY. PROJECT LENGTH = 0.064

MILES

Construction Status Report Page 98

Page 99: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

24404(07) US-259

SSP-245N(058)RW

Nored, John

$67,700.00

Residency:Contract: 190321

Contractor: RMR DEMOLITION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 53 % ( 53 %)

Time Passed: 6 % ( 6 %)

Adjusted:

12/16/2019

$67,700.00

10/17/2019

11/19/2019

11/21/2019

02100

ANTLERS

180 180

12/16/2019

RIGHT-OF-WAY CLEARANCE US-259: FROM

2.0 MILES NORTH OF THE TEXAS STATE LINE,

EXTEND NORTH NEAR IDABEL. PROJECT

LENGTH = 13.44 MILES PREQUALIFICATION

FOR THIS PROJECT HAS BEEN WAIVED.

BOTH BID EXPRESS AND WRITTEN BIDS WILL

BE ACCEPTED.

34382(04) US-259

SSR-245C(061)SR

Davis, Tim

$993,368.65

Residency:Contract: 200017

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 17 % ( 17 %)

Time Passed: 37 % ( 46 %)

Adjusted:

03/10/2020

$993,368.65

01/16/2020

02/14/2020

02/25/2020

02200

HEAVENER

Fixed Completion Date: 05/15/2020

INTERSECTION MODIFICATION US-259: AT

THE INTERSECTION OF SH-259A AND

LUKFATA TRAIL ROAD, 8.3 MI AND 11.4 MI N

OF THE SH-3 JCT NEAR BROKEN BOW.

PROJECT LENGTH = 0.570 MILE

McIntoshCounty: Commissioner District: 1

Contracts Under Construction

30256(04) CO.RD.

STP-246C(009)CI

Hagerman, Jeremy

$2,689,316.85

Residency:Contract: 140242

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 93 % ( 93 %)

Time Passed: 259 % ( 33 %)

Adjusted:

01/29/2015

$2,689,316.85

08/21/2014

09/22/2014

09/25/2014

01100

MUSKOGEE

Fixed Completion Date: 04/30/2015

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (MC-4626C/TEXANNA RD): BEGIN 4.0 MI

EAST AND 1.0 MI SOUTH OF THE

US-69/SH-150 JCT, EXTEND SOUTH AND

EAST. PROJECT LENGTH = 2.898 MILES.

29750(06) US-266

SSR-246C(024)(025)SR

Hagerman, Jeremy

$1,985,106.23

Residency:Contract: 170031

Contractor: GLOVER & ASSOCIATES, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 95 % ( 95 %)

Time Passed: 155 % ( 155 %)

Adjusted:

08/30/2017

$1,985,106.23

03/16/2017

04/21/2017

04/25/2017

01100

MUSKOGEE

60 60

08/07/2017

RESURFACE (ASPHALT) US-266: FROM THE

OKMULGEE COUNTY LINE, EXTEND EAST

NEAR LAKE EUFAULA. PROJECT LENGTH =

13.798 MILES

Construction Status Report Page 99

Page 100: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29755(04) US-69

NHPP-246N(027)

Hagerman, Jeremy

$27,240,998.58

Residency:Contract: 180055

Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 109 % ( 98 %)

Time Passed: 118 % ( 79 %)

Adjusted:

06/04/2018

$24,507,964.30

01/18/2018

02/27/2018

03/13/2018

01100

MUSKOGEE

365 550

06/04/2018

PAVEMENT REHABILITATION (ASPHALT)

US-69: FROM THE PITTSBURG COUNTY LINE,

EXTEND NORTH NEAR EUFAULA. PROJECT

LENGTH = 4.91 MILES

28502(04) COUNTY RO

CIRB-246C(039)RB

CE2

$4,099,771.00

Residency:Contract: 180201

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 30 % ( 30 %)

Time Passed: 106 % ( 106 %)

Adjusted:

09/09/2019

$4,099,771.00

04/18/2019

05/21/2019

05/24/2019

01017

CIRCUIT ENGR. DISTR. # 2

120 120

09/09/2019

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (TEXANNA ROAD): FROM THE US-266

JUNCTION, EXTEND SOUTH THEN WEST

NEAR CHECOTAH. PROJECT LENGTH = 5.113

MILES

27958(04) I-40

NHPPI-4000-(066)PM

TETR

$15,723,795.76

Residency:Contract: 190016

Contractor: OBC, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 18 % ( 18 %)

Time Passed: 26 % ( 26 %)

Adjusted:

11/04/2019

$15,723,795.76

06/20/2019

07/11/2019

10/09/2019

01002

TETRA TECH

500 500

11/04/2019

BRIDGE AND APPROACHES I-40: OVER

US-69B AND UNION PACIFIC RAILROAD, 0.8

MILES AND 0.9 MILES EAST OF THE US-69

INTERCHANGE IN CHECOTAH. PROJECT

LENGTH = 1.058 MILES

34093(04) MULTIPLE

NHPP-NBIP(530)3B

TETR

$383,630.00

Residency:Contract: 190292

Contractor: POSEIDON CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 86 % ( 86 %)

Time Passed: 64 % ( 64 %)

Adjusted:

02/03/2020

$383,630.00

09/19/2019

10/30/2019

01/17/2020

01002

TETRA TECH

90 90

02/03/2020

BRIDGE PAINTING COUNTY ROADS (E1080

ROAD/E1090 ROAD/ONAPA ROAD): OVER

US-69, 0.7 MI, 1.7 MI, AND 3.8 MI SOUTH OF

THE I-40 JUNCTION. PROJECT LENGTH = 0.00

MILE

Construction Status Report Page 100

Page 101: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28973(04) SH-52

STP-246C(042)PM

Hagerman, Jeremy

$4,100,175.39

Residency:Contract: 200018

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$4,100,175.39

01/16/2020

02/14/2020

02/25/2020

01100

MUSKOGEE

240 240

06/01/2020

BRIDGE AND APPROACHES SH-52: OVER MILL

CREEK AND CHISHOLM CREEK, 3.6 MILES

AND 1.7 MILES SOUTH OF THE SH-9

JUNCTION NEAR HANNA. PROJECT LENGTH =

0.233 MILE

MajorCounty: Commissioner District: 6

Contracts Under Construction

27009(04) US-60

ACNHPP-247N(018)SS

Dodgion, Richard

$8,846,494.22

Residency:Contract: 170267

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 113 % ( 100 %)

Time Passed: 88 % ( 88 %)

Adjusted:

11/06/2017

$7,816,100.52

08/17/2017

09/13/2017

09/15/2017

06100

BUFFALO

440 440

01/08/2018

BRIDGE AND APPROACHES US-60: OVER

CIMARRON RIVER, 1.5 MILES SOUTHWEST OF

THE SH-8 JUNCTION NEAR CLEO SPRINGS.

PROJECT LENGTH = 1.316 MILES.

29477(04) SH-58

SBR-247C(025)SB

BCS

$4,150,000.00

Residency:Contract: 190384

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 24 % ( 24 %)

Time Passed: 16 % ( 16 %)

Adjusted:

02/17/2020

$4,150,000.00

11/14/2019

12/13/2019

12/18/2019

06018

BENCHMARK CONSTR. SERVS., LLC

320 320

04/06/2020

BRIDGE REHABILITATION SH-58: OVER

CIMARRON RIVER, 0.4 MILES NORTH OF THE

SH-8 JUNCTION NEAR RINGWOOD. PROJECT

LENGTH = 0.361 MILE

33390(04) US-60

SBR-247N(022)SB

Dodgion, Richard

$2,797,243.15

Residency:Contract: 200136

Contractor: FRONTIER BRIDGE, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,797,243.15

03/19/2020

04/15/2020

04/21/2020

06100

BUFFALO

270 270

09/08/2020

BRIDGE REHABILITATION US-60: OVER INDIAN

CREEK, 0.1 MILES EAST OF THE SH-58

JUNCTION NEAR RINGWOOD. PROJECT

LENGTH = 0.090 MILE

Construction Status Report Page 101

Page 102: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

MarshallCounty: Commissioner District: 2

Contracts Under Construction

29986(04) CO.RD.

CIRB-248C(034)RB

CED3

$2,802,594.26

Residency:Contract: 180052

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 101 % ( 92 %)

Time Passed: 244 % ( 220 %)

Adjusted:

04/23/2018

$2,563,204.62

02/15/2018

03/16/2018

03/21/2018

KINGSTON.

02013

CIRCUIT ENGR. DISTR. # 3

90 100

04/23/2018

GRADE,DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (ENOS ROAD): FROM 4.0

MILES SOUTH OF SH-32, EXTEND SOUTH

NEAR KINGSTON. PROJECT LENGTH = 3.039

MILES

28828(04) US-377/SH

STP-248C(036)PM

Bishop, Justin

$43,712,476.10

Residency:Contract: 180203

Contractor: JENSEN CONSTRUCTION COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 29 % ( 29 %)

Time Passed: 25 % ( 25 %)

Adjusted:

05/06/2019

$43,256,556.24

10/18/2018

11/20/2018

11/29/2018

02300

MADILL

780 780

05/06/2019

BRIDGE AND APPROACHES US-377/SH-99:

OVER LAKE TEXOMA (WILLIS BRIDGE), ON

THE TEXAS STATE LINE NEAR WILLIS.

PROJECT LENGTH = 1.669 MILES

29305(04) COUNTY RO

STP-248D(044)CI

CED3

$666,481.70

Residency:Contract: 190181

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 65 % ( 64 %)

Time Passed: 90 % ( 88 %)

Adjusted:

10/07/2019

$660,534.20

05/16/2019

06/12/2019

06/18/2019

02013

CIRCUIT ENGR. DISTR. # 3

120 123

10/07/2019

BRIDGE AND APPROACHES COUNTY ROAD

(TYLER ROAD): OVER TRIBUTARY OF LITTLE

HAUANI CREEK, 1.5 MILES NORTH OF THE

US-70 JUNCTION NEAR MCMILLAN. PROJECT

LENGTH = 0.209 MILE

33881(04) US-70

SSR-248N(047)SR

Bishop, Justin

$2,633,513.94

Residency:Contract: 190215

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 85 % ( 85 %)

Time Passed: 80 % ( 80 %)

Adjusted:

09/30/2019

$2,633,513.94

07/25/2019

08/20/2019

08/23/2019

02300

MADILL

180 180

09/30/2019

GRADE, DRAIN, AND SURFACE US-70: FROM

2.7 MILES EAST OF THE SH-32 JUNCTION,

EXTEND EAST NEAR KINGSTON. PROJECT

LENGTH = 0.536 MILE

Construction Status Report Page 102

Page 103: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29985(04) COUNTY RO

CIRB-248D(039)RB

CED3

$1,628,785.75

Residency:Contract: 190290

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 61 % ( 61 %)

Time Passed: 30 % ( 30 %)

Adjusted:

03/03/2020

$1,628,785.75

09/19/2019

10/23/2019

10/29/2019

02013

CIRCUIT ENGR. DISTR. # 3

90 90

03/03/2020

RESURFACE (ASPHALT) COUNTY ROAD

(POWELL ROAD): FROM 0.2 MILES SOUTH OF

THE SH-32 JUNCTION, EXTEND SOUTH, THEN

EAST NEAR LEBANON. PROJECT LENGTH =

4.979 MILES

28623(04) COUNTY RO

STP-248D(049)CI

CED3

$300,481.64

Residency:Contract: 200073

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$300,481.64

02/20/2020

03/13/2020

03/18/2020

02013

CIRCUIT ENGR. DISTR. # 3

120 120

09/08/2020

BRIDGE AND APPROACHES COUNTY ROAD

(JOE JOHNSON ROAD/PURSER ROAD): OVER

UNNAMED CREEK, 0.8 MILES WEST OF THE

SH-99C JUNCTION NEAR OAKLAND. PROJECT

LENGTH = 0.112 MILE

MayesCounty: Commissioner District: 8

Contracts Under Construction

27068(04) SH-82

STP-249C(047)PM

C&KI

$3,444,478.06

Residency:Contract: 180275

Contractor: C-GAWF CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 67 % ( 67 %)

Time Passed: 75 % ( 75 %)

Adjusted:

02/16/2019

$3,444,478.06

08/16/2018

09/25/2018

09/27/2018

08007

CRAIG & KEITHLINE, INC.

310 310

01/07/2019

BRIDGE AND APPROACHES SH-82: OVER

SALINE CREEK, 1.7 MILES SOUTH OF THE

SH-20 JUNCTION NEAR SALINA. PROJECT

LENGTH = 0.170 MILE

31161(04) COUNTY RO

STP-249C(053)CI

GARV

$3,560,000.00

Residency:Contract: 190364

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 28 % ( 28 %)

Time Passed: 47 % ( 47 %)

Adjusted:

02/03/2020

$3,560,000.00

11/14/2019

12/13/2019

12/18/2019

08011

GARVER, LLC.

120 120

02/03/2020

RESURFACE (P. C. CONCRETE) AND BRIDGE

AND APPROACHES COUNTY ROAD (NS-435):

FROM 0.5 MILES SOUTH OF THE SH-28

JUNCTION, EXTEND SOUTH NEAR ADAIR.

PROJECT LENGTH = 3.444 MILES

Construction Status Report Page 103

Page 104: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

MurrayCounty: Commissioner District: 7

Contracts Under Construction

33320(04) SH-7

SSP-250N(018)PM

Fuhrmann, Chris

$3,516,249.58

Residency:Contract: 190051

Contractor: SEAL MASTERS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 70 % ( 70 %)

Time Passed: 91 % ( 91 %)

Adjusted:

06/03/2019

$3,517,749.58

01/17/2019

02/22/2019

03/07/2019

07200

ARDMORE

210 210

06/03/2019

GRADE, DRAIN, SURFACE, AND SIDEWALKS

SH-7: FROM 0.1 MILE EAST OF THE US-77

JUNCTION, EXTEND EAST IN DAVIS. PROJECT

LENGTH = 1.324 MILES

31309(04) SH-7 WB

SBR-3500(080)SB

Fuhrmann, Chris

$2,086,981.99

Residency:Contract: 190217

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 43 % ( 42 %)

Time Passed: 59 % ( 55 %)

Adjusted:

12/02/2019

$2,077,716.75

07/25/2019

08/20/2019

08/26/2019

07200

ARDMORE

150 159

12/02/2019

BRIDGE REHABILITATION SH-7 WB: OVER I-35,

2.8 MILES WEST OF THE US-77 JUNCTION

NEAR DAVIS. PROJECT LENGTH = 0.115 MILE

34144(04) I-35

HSIPG-243F(033)TR

Fuhrmann, Chris

$2,605,904.15

Residency:Contract: 190320

Contractor: ACTION SAFETY SUPPLY CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 8 % ( 8 %)

Time Passed: 12 % ( 12 %)

Adjusted:

02/03/2020

$2,605,904.15

10/17/2019

11/20/2019

11/25/2019

07200

ARDMORE

300 300

02/03/2020

TRAFFIC SIGNING I-35: FROM THE TEXAS

STATE LINE, EXTEND NORTH. PROJECT

LENGTH = 57.00 MILES

MuskogeeCounty: Commissioner District: 1

Contracts Under Construction

Construction Status Report Page 104

Page 105: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28962(04) SH-10

ACSTP-251C(081)SS

Hagerman, Jeremy

$7,788,707.82

Residency:Contract: 170269

Contractor: C-GAWF CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 103 % ( 99 %)

Time Passed: 96 % ( 96 %)

Adjusted:

02/19/2018

$7,488,677.57

09/21/2017

10/18/2017

10/19/2017

01100

MUSKOGEE

580 580

01/08/2018

BRIDGE AND APPROACHES SH-10: OVER

LITTLE GREEN LEAF CREEK, 6.7 MILES

NORTH OF THE MCINTOSH COUNTY LINE

NEAR BRAGGS. PROJECT LENGTH = 0.592

MILE

26287(04) US-62

ACSTP-151C(198)

Hagerman, Jeremy

$3,927,203.59

Residency:Contract: 170281

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 82 % ( 81 %)

Time Passed: 222 % ( 222 %)

Adjusted:

03/14/2018

$3,888,426.59

08/17/2017

09/18/2017

09/20/2017

01100

MUSKOGEE

210 210

01/08/2018

BRIDGE AND APPROACHES US-62: OVER

CANE CREEK AND CANE CREEK TRIBUTARY,

1.3 MILES AND 1.6 MILES SOUTH OF THE

US-64 INTERSECTION NEAR TAFT. PROJECT

LENGTH = 0.719 MILE

33094(04) SH-165

HSIPG-251N(074)TR

Hagerman, Jeremy

$1,446,978.38

Residency:Contract: 170288

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 33 % ( 33 %)

Time Passed: 177 % ( 177 %)

Adjusted:

04/23/2019

$1,446,978.38

02/15/2018

03/19/2018

03/26/2018

H IN MUSKOGEE.

01100

MUSKOGEE

180 180

07/09/2018

SAFETY IMPROVEMENT (RUMBLE STRIP AND

CABLE BARRIER) SH-165: FROM 0.8 MILES

NORTH OF THE US-62 INTERCHANGE,

EXTEND SOUTH IN MUSKOGEE.

29714(04) US-62

STP-251B(087)PM

Hagerman, Jeremy

$2,153,851.07

Residency:Contract: 180291

Contractor: T. MCDONALD CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 93 % ( 88 %)

Time Passed: 110 % ( 104 %)

Adjusted:

12/17/2018

$2,044,020.05

09/20/2018

10/16/2018

10/18/2018

01100

MUSKOGEE

90 95

11/26/2018

BRIDGE AND APPROACHES US-62: OVER

ABANDONED RAILROAD, 2.3 MILES EAST OF

THE SH-162 JUNCTION NEAR TAFT. PROJECT

LENGTH = 0.369 MILE

Construction Status Report Page 105

Page 106: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29383(04) COUNTY RO

CIRB-251C(095)RB

CE2

$1,234,254.65

Residency:Contract: 190119

Contractor: H & H BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 10 % ( 10 %)

Time Passed: 49 % ( 41 %)

Adjusted:

11/04/2019

$1,234,254.65

06/20/2019

07/11/2019

10/02/2019

01017

CIRCUIT ENGR. DISTR. # 2

200 237

11/04/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-082/DUNCAN ROAD): OVER CONCHARTY

CREEK, 4.4 MILES WEST OF THE US-64

JUNCTION NEAR HASKELL. PROJECT LENGTH

= 0.269 MILE

28807(04) CITY STRE

STP-151E(242)EH

Hagerman, Jeremy

$810,271.50

Residency:Contract: 190388

Contractor: ROSSCON, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 19 % ( 19 %)

Time Passed: 43 % ( 43 %)

Adjusted:

02/03/2020

$810,271.50

11/14/2019

12/12/2019

12/17/2019

01100

MUSKOGEE

120 120

02/03/2020

PEDESTRIAN IMPROVEMENTS (TRAIL

CONSTRUCTION) CITY STREETS (CHICAGO

ST/MACEDONIA ST): FROM 0.4 MI SOUTH OF

US-62, EXTEND NORTH THEN EAST THEN

NORTHEAST IN MUSKOGEE. PROJECT

LENGTH = 2.240 MILES

34447(04) SH-10

ERSTP-251C(100)ER

Hagerman, Jeremy

$773,678.00

Residency:Contract: 190391

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 101 % ( 98 %)

Time Passed: 82 % ( 82 %)

Adjusted:

01/02/2020

$749,739.00

10/17/2019

11/19/2019

12/03/2019

01100

MUSKOGEE

60 60

12/30/2019

SLOPE STABILIZATION SH-10: FROM 0.3

MILES EAST OF THE US-62 JUNCTION,

EXTEND EAST NEAR MUSKOGEE. PROJECT

LENGTH = 0.094 MILE

34448(04) US-62

ERSTP-251B(101)ER

Hagerman, Jeremy

$716,564.84

Residency:Contract: 200019

Contractor: C-GAWF CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 5 % ( 5 %)

Time Passed: 0 % ( 0 %)

Adjusted:

03/16/2020

$716,564.84

01/16/2020

02/14/2020

02/26/2020

01100

MUSKOGEE

60 60

03/16/2020

BRIDGE REPAIR US-62 WB: REPAIR SCOUR

DAMAGE OVER ROSS LAKE, 0.1 MILES EAST

OF THE SH-10 JUNCTION IN FORT GIBSON.

PROJECT LENGTH = 0.000 MILE

Construction Status Report Page 106

Page 107: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32787(04) SH-165

SSR-251N(099)SR

Hagerman, Jeremy

$867,105.04

Residency:Contract: 200074

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$867,105.04

02/20/2020

03/19/2020

03/20/2020

01100

MUSKOGEE

30 30

06/01/2020

RESURFACE (ASPHALT) SH-165: FROM US-64,

EXTEND EAST IN MUSKOGEE. PROJECT

LENGTH = 1.524 MILES

NobleCounty: Commissioner District: 4

Contracts Under Construction

32745(04) US-64

HSIPG-252N(037)AD

Zachary, Ted

$1,585,579.82

Residency:Contract: 180331

Contractor: SCHIRALLI CONSTRUCTION CORP.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 105 % ( 97 %)

Time Passed: 107 % ( 100 %)

Adjusted:

05/06/2019

$1,468,214.75

11/15/2018

12/12/2018

12/18/2018

04100

PERRY

150 160

05/01/2019

PEDESTRIAN IMPROVEMENTS AND

SIDEWALKS US-64 (FIR STREET)/CITY

STREETS (N 14TH STREET/N 15TH STREET

/UNNAMED STREET): AT MULTIPLE

LOCATIONS IN PERRY. PROJECT LENGTH =

2.145 MILES

25421(13) COUNTY RO

CIRB-252C(056)RB

Zachary, Ted

$3,848,116.74

Residency:Contract: 200020

Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$3,848,116.74

01/16/2020

02/14/2020

02/26/2020

04100

PERRY

180 180

06/01/2020

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (RED ROCK ROAD): FROM 0.8 MILES

NORTH OF US-412, EXTEND NORTH NEAR

RED ROCK. PROJECT LENGTH = 3.988 MILES

NowataCounty: Commissioner District: 8

Contracts Under Construction

Construction Status Report Page 107

Page 108: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27012(05) US-60

NHPP-253N(042)PM

Beats, Aaron

$8,299,131.56

Residency:Contract: 180246

Contractor: A. M. COHRON & SON, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 96 % ( 97 %)

Time Passed: 83 % ( 83 %)

Adjusted:

12/03/2018

$8,357,408.85

09/20/2018

10/11/2018

11/28/2018

08300

CLAREMORE

395 395

02/04/2019

BRIDGE AND APPROACHES US-60: OVER

VERDIGRIS RIVER AND KENTUCKY CREEK,

3.9 MILES AND 4.7 MILES EAST OF THE US-169

JUNCTION NEAR NOWATA. PROJECT LENGTH

= 1.086 MILES

28558(04) COUNTY RO

STP-253D(044)CI

CEC

$999,746.26

Residency:Contract: 190017

Contractor: H & H BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 89 % ( 89 %)

Time Passed: 84 % ( 84 %)

Adjusted:

10/07/2019

$999,746.26

05/16/2019

06/14/2019

09/12/2019

08003

CEC CORP.

120 120

10/07/2019

BRIDGE AND APPROACHES COUNTY ROAD

(NS-4140): OVER DOUBLE CREEK, 1.5 MILES

SOUTH OF US-169 NEAR NOWATA. PROJECT

LENGTH = 0.151 MILE

30494(04) COUNTY RO

STP-253D(045)CI

TETR

$817,920.00

Residency:Contract: 190018

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 15 % ( 15 %)

Time Passed: 47 % ( 22 %)

Adjusted:

11/04/2019

$817,920.00

05/16/2019

06/18/2019

06/20/2019

08002

TETRA TECH

120 255

11/04/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-27): OVER PANTHER CREEK, 1.8 MILES

WEST OF THE SH-28 JUNCTION NEAR

CHELSEA. PROJECT LENGTH = 0.117 MILE

31364(04) SH-10

SBR-253C(046)SB

CEC

$519,208.48

Residency:Contract: 190087

Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 100 % ( 100 %)

Time Passed: 81 % ( 81 %)

Adjusted:

09/09/2019

$519,208.48

04/18/2019

05/21/2019

05/24/2019

08003

CEC CORP.

120 120

09/09/2019

BRIDGE REHABILITATION SH-10: OVER

UNNAMED CREEK, 1.6 MILES EAST OF THE

US-169 JUNCTION NEAR LENAPAH. PROJECT

LENGTH = 0.108 MILE

Construction Status Report Page 108

Page 109: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

25423(04) COUNTY RO

CIRB-153D(160)RB

TETR

$1,511,649.18

Residency:Contract: 190200

Contractor: H & H BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 52 % ( 52 %)

Time Passed: 81 % ( 81 %)

Adjusted:

11/04/2019

$1,511,649.18

06/20/2019

07/11/2019

10/02/2019

08002

TETRA TECH

150 150

11/04/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-15): OVER CALIFORNIA CREEK LOW

WATER CROSSING, 2.3 MILES WEST OF

US-169 NEAR DELAWARE. PROJECT LENGTH

= 0.985 MILE

OkfuskeeCounty: Commissioner District: 3

Contracts Under Construction

27963(04) US-62

STP-254C(040)SS

Helton, Matthew

$2,845,789.12

Residency:Contract: 180019

Contractor: TREAS CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 106 % ( 94 %)

Time Passed: 106 % ( 93 %)

Adjusted:

05/21/2018

$2,519,492.84

01/18/2018

02/27/2018

03/07/2018

03300

WEWOKA

210 240

09/04/2018

BRIDGE AND APPROACHES US-62: OVER

BOLEY CREEK, 4.3 MILES NORTHWEST OF

THE SH-48 INTERSECTION NEAR BOLEY.

PROJECT LENGTH = 0.320 MILE

21007(06) I-40

NHPPI-4000-(077)PM

Helton, Matthew

$19,003,873.60

Residency:Contract: 190182

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 12 % ( 12 %)

Time Passed: 23 % ( 22 %)

Adjusted:

12/02/2019

$18,920,365.00

06/20/2019

07/09/2019

07/18/2019

03300

WEWOKA

240 254

12/02/2019

RESURFACE (ASPHALT) AND CABLE BARRIER

I-40: FROM 0.5 MILES WEST OF SH-27,

EXTEND EAST NEAR OKEMAH. PROJECT

LENGTH = 5.793 MILES

OklahomaCounty: Commissioner District: 4

Contracts Under Construction

Construction Status Report Page 109

Page 110: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

09033(16) I-235

ACNHPPI-2350-(004)(005)SS

Hubbard, Tom

$89,866,595.96

Residency:Contract: 160189

Contractor: ALLEN CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 110 % ( 99 %)

Time Passed: 73 % ( 62 %)

Adjusted:

01/02/2017

$80,999,877.96

04/21/2016

05/13/2016

05/18/2016

04400

EDMOND

850 1,008

01/02/2017

GRADE, DRAIN, SURFACE AND BRIDGE I-235:

FROM THE NW 36TH STREET INTERCHANGE,

EXTEND NORTH IN OKLAHOMA CITY.

PROJECT LENGTH = 1.718 MILES.

31008(04) I-35/I-40

SSP-3500(049)SS/SSP-4000*

Hubbard, Tom

$11,672,273.86

Residency:Contract: 160427

Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 106 % ( 91 %)

Time Passed: 118 % ( 102 %)

Adjusted:

04/03/2017

$9,960,682.12

11/17/2016

12/16/2016

12/20/2016

(042)SS

04400

EDMOND

360 417

04/03/2017

PAVEMENT REHABILITATION I-35: FROM NE

122ND ST, EXTEND NORTH IN THE CITY OF

EDMOND. I-40: FROM MERIDIAN AVE,

EXTEND EAST IN OKLAHOMA CITY. PROJECT

LENGTH = 6.41 MILES.

20324(04) I-40

ACNHPPI-0040-5(382)/ACNH*

Harlin, Chris

$71,191,972.84

Residency:Contract: 170289

Contractor: DUIT CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 95 % ( 95 %)

Time Passed: 104 % ( 97 %)

Adjusted:

01/06/2018

$71,328,987.96

09/21/2017

10/11/2017

10/16/2017

04600

OKLAHOMA CITY

800 853

01/08/2018

GRADE, DRAIN, SURFACE, AND BRIDGE I-40:

FROM THE I-240 INTERSECTION, EXTEND

SOUTHEAST IN OKLAHOMA CITY. PROJECT

LENGTH = 5.182 MILES

32625(04) I-35

HSIPIG-3500(044)TR

Brooks, Jonathan

$5,154,792.48

Residency:Contract: 170328

Contractor: ACTION SAFETY SUPPLY CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 166 % ( 100 %)

Time Passed: 196 % ( 98 %)

Adjusted:

04/24/2018

$3,100,572.22

10/19/2017

11/20/2017

11/27/2017

04200

YUKON

180 360

02/05/2018

TRAFFIC SIGNING I-35: FROM ROBINSON

AVENUE, EXTEND NORTH IN NORMAN,

MOORE, OKLAHOMA CITY AND EDMOND.

Construction Status Report Page 110

Page 111: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

17428(88) CT.ST.

OKC-XTWN(078)SS

Harlin, Chris

$28,634,578.66

Residency:Contract: 170356

Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 110 % ( 100 %)

Time Passed: 121 % ( 82 %)

Adjusted:

02/12/2018

$26,110,616.59

11/16/2017

12/18/2017

12/21/2017

UE, EXTEND SOUTHEAST IN OKLAHOMA CITY.

04600

OKLAHOMA CITY

445 651

01/29/2018

GRADE, DRAIN, SURFACE, AND BRIDGE CITY

STREET (OKLAHOMA CITY BOULEVARD):

FROM 0.1 MILES WEST OF WESTERN

AVENUE, EXTEND SOUTHEAST IN OKLAHOMA

CITY. PROJECT LENGTH = 1.095 MILES

14964(08) SH-74

STP-155C(569)SS

Hubbard, Tom

$21,003,265.56

Residency:Contract: 170377

Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 87 % ( 87 %)

Time Passed: 103 % ( 98 %)

Adjusted:

02/05/2018

$20,998,215.56

11/16/2017

12/18/2017

12/20/2017

ITY.

04400

EDMOND

535 566

02/05/2018

GRADE, DRAIN, SURFACE, AND BRIDGE

SH-74: FROM 0.2 MILE NORTH OF NW 164TH

STREET, EXTEND NORTH IN OKLAHOMA CITY.

PROJECT LENGTH = 4.237 MILES.

28855(04) I-44

NHPPI-4400-(034)SS

Harlin, Chris

$6,217,830.03

Residency:Contract: 180020

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 69 % ( 69 %)

Time Passed: 149 % ( 116 %)

Adjusted:

01/07/2019

$6,161,372.45

08/16/2018

09/25/2018

10/01/2018

04600

OKLAHOMA CITY

270 348

01/07/2019

GRADE, DRAIN, BRIDGE REHABILITATION,

AND BANK STABILIZATION I-44/I-44 RAMPS:

OVER DEEP FORK CREEK, 0.8 MILES WEST

OF THE I-235 INTERCHANGE IN OKLAHOMA

CITY. PROJECT LENGTH = 0.134 MILE

29495(04) I-44

NHPPI-4400-(027)PM

Mitchell, Matt

$4,653,530.09

Residency:Contract: 180100

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 112 % ( 98 %)

Time Passed: 173 % ( 110 %)

Adjusted:

07/09/2018

$4,070,015.02

02/15/2018

03/14/2018

03/20/2018

IN OKLAHOMA CITY.

04500

STILLWATER

160 251

07/09/2018

BRIDGE REHABILITATION I-44 (WEST TO

SOUTH RAMP): OVER SH-66 AND SH-3, 3.6

MILES NORTH OF THE I-40 INTERCHANGE IN

OKLAHOMA CITY. PROJECT LENGTH = 0.270

MILE

Construction Status Report Page 111

Page 112: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27897(04) I-35

NHPPI-3500-(066)FP

Hubbard, Tom

$31,707,345.94

Residency:Contract: 180139

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 90 % ( 83 %)

Time Passed: 91 % ( 67 %)

Adjusted:

09/17/2018

$29,200,520.28

03/15/2018

04/11/2018

04/13/2018

04400

EDMOND

570 775

09/17/2018

BRIDGE AND APPROACHES I-35: OVER DEEP

FORK CREEK, 0.2 MILES SOUTH OF THE I-44

INTERCHANGE IN OKLAHOMA CITY. PROJECT

LENGTH = 0.442 MILE

31504(04) SANTA FE

STP-255E(354)AG

CEC

$2,204,250.00

Residency:Contract: 180204

Contractor: JIM COOLEY CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 87 % ( 85 %)

Time Passed: 68 % ( 100 %)

Adjusted:

10/01/2018

$2,149,250.00

05/17/2018

06/19/2018

08/29/2018

04003

CEC CORP.

380 258

10/01/2018

PLATFORM IMPROVEMENTS SANTA FE

STATION: 0.6 MILES NORTH OF I-40, IN

OKLAHOMA CITY. PROJECT LENGTH = 0.00

MILES

30193(04) CITY STRE

STP-255E(475)AG

ZFAN

$6,213,380.00

Residency:Contract: 180292

Contractor: TRAFFIC SIGNALS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 93 % ( 93 %)

Time Passed: 113 % ( 102 %)

Adjusted:

02/04/2019

$6,200,000.00

09/20/2018

10/11/2018

03/11/2019

04023

FREESE & NICHOLS

375 412

02/04/2019

SAFETY IMPROVEMENT (ITS CORRIDOR) CITY

STREETS (BROADWAY AVE/DANFORTH

RD/SANTA FE AVE): AT MULTIPLE

LOCATIONS IN THE CITY OF EDMOND.

PROJECT LENGTH = 11.157 MILES

33616(04) I-44

STP-255F(473)3B

Brooks, Jonathan

$409,521.80

Residency:Contract: 180294

Contractor: RESTEK, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 96 % ( 96 %)

Time Passed: 104 % ( 104 %)

Adjusted:

09/03/2019

$409,521.80

01/17/2019

02/20/2019

03/07/2019

04200

YUKON

45 45

09/01/2019

JOINT SEAL/REPAIR I-44: OVER M.L. KING

BOULEVARD, 0.8 MILES WEST OF THE I-35

INTERCHANGE IN OKLAHOMA CITY. PROJECT

LENGTH = 0.00 MILE

Construction Status Report Page 112

Page 113: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

09033(27) I-235

NHPPI-2350-(009)PM

Hubbard, Tom

$101,545,966.03

Residency:Contract: 180359

Contractor: ALLEN CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 52 % ( 52 %)

Time Passed: 42 % ( 42 %)

Adjusted:

03/25/2019

$101,080,883.05

11/15/2018

12/05/2018

12/11/2018

04400

EDMOND

900 900

04/01/2019

GRADE, DRAIN, SURFACE, AND BRIDGE I-235:

FROM THE NW 50TH INTERCHANGE, EXTEND

NORTH IN OKLAHOMA CITY. PROJECT

LENGTH = 0.957 MILE

31521(04) CITY STRE

STP-255B(455)AG

Hubbard, Tom

$2,280,120.55

Residency:Contract: 190019

Contractor: CROSSLAND HEAVY CONTRACTORS INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 89 % ( 85 %)

Time Passed: 183 % ( 62 %)

Adjusted:

07/22/2019

$2,171,000.00

01/17/2019

02/22/2019

03/07/2019

04400

EDMOND

Fixed Completion Date: 09/10/2019

PAVEMENT REHABILITATION (A.C. AND P.C.)

CITY STREET (NW 10TH STREET): FROM

NORTH MAY AVENUE EXTEND EAST IN THE

CITY OF OKLAHOMA CITY. PROJECT LENGTH

= 0.980 MILE

33739(04) CITY STRE

STPG-255F(482)AG

Harlin, Chris

$430,830.45

Residency:Contract: 190124

Contractor: TRAFFIC SIGNALS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 100 % ( 97 %)

Time Passed: 119 % ( 110 %)

Adjusted:

12/02/2019

$419,246.50

07/25/2019

08/14/2019

11/06/2019

04600

OKLAHOMA CITY

90 97

12/02/2019

TRAFFIC SIGNALS CITY STREETS (DOUGLAS

BLVD/ORCHARD BLVD/AIR DEPOT BLVD/

BOMBER RAIL TRAIL): AT MULTIPLE

LOCATIONS IN MIDWEST CITY. PROJECT

LENGTH: 0.000

31434(04) I-35 FRON

TAP-255D(327)AG

Zachary, Ted

$488,163.40

Residency:Contract: 190155

Contractor: CGC, LLC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 89 % ( 83 %)

Time Passed: 116 % ( 97 %)

Adjusted:

09/09/2019

$458,041.35

04/18/2019

05/21/2019

05/24/2019

04100

PERRY

120 143

09/09/2019

PEDESTRIAN IMPROVEMENTS (TRAIL

CONSTRUCTION) I-35 FRONTAGE ROAD (FOX

LAKE TRAIL LINKAGES): FROM 0.2 MILES

SOUTH OF 15TH STREET, EXTEND NORTH IN

EDMOND. PROJECT LENGTH = 0.370 MILE

Construction Status Report Page 113

Page 114: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31548(04) CITY STRE

STP-255B(461)AG

Harlin, Chris

$4,389,619.75

Residency:Contract: 190156

Contractor: SCHWARZ PAVING CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 16 % ( 16 %)

Time Passed: 89 % ( 61 %)

Adjusted:

11/04/2019

$4,389,619.75

06/20/2019

07/17/2019

07/25/2019

04600

OKLAHOMA CITY

180 266

11/04/2019

WIDEN, RESURFACE, AND SIDEWALKS CITY

STREET (SE 29TH STREET): FROM MIDWEST

BOULEVARD, EXTEND EAST IN MIDWEST

CITY. PROJECT LENGTH = 1.01 MILES

31546(04) CITY STRE

STP-255N(496)AG

Harlin, Chris

$2,567,607.67

Residency:Contract: 190183

Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 50 % ( 50 %)

Time Passed: 104 % ( 70 %)

Adjusted:

10/07/2019

$2,567,607.67

05/16/2019

06/12/2019

06/21/2019

04600

OKLAHOMA CITY

180 269

10/07/2019

RESURFACE (A.C. AND P.C.) CITY STREET

(DOUGLAS BOULEVARD): FROM SE 4TH

STREET, EXTEND NORTH IN THE CITY OF

MIDWEST CITY. PROJECT LENGTH = 1.240

MILES

24238(09) MULTIPLE

STP-252F(053)PM

Zachary, Ted

$108,524.30

Residency:Contract: 190220

Contractor: JLT CONTRACTING, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 89 % ( 89 %)

Time Passed: 85 % ( 85 %)

Adjusted:

09/16/2019

$108,524.30

07/25/2019

08/21/2019

08/23/2019

04100

PERRY

20 20

09/16/2019

BRIDGE WATER PROOF SEAL

SH-33/SH-51/CITY STREET (NW 23RD

STREET)/COUNTY ROAD (BENDER ROAD): AT

MULTIPLE LOCATIONS IN DIVISION IV.

PROJECT LENGTH = 0.000 MILE

24239(18) MULTIPLE

STP-252F(055)PM

EST

$865,860.00

Residency:Contract: 190222

Contractor: POSEIDON CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

04/23/2020

$865,860.00

09/19/2019

10/30/2019

01/16/2020

04001

EST, INC.

100 100

04/02/2020

BRIDGE PAINTING US-62/CITY STREETS ('A'

AVENUE/POLE YARD ROAD/POST ROAD): AT

MULTIPLE LOCATIONS IN DIVISION IV.

PROJECT LENGTH = 0.00 MILE

Construction Status Report Page 114

Page 115: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32929(04) COUNTY RO

STP-255C(487)CO

Hubbard, Tom

$577,710.00

Residency:Contract: 190224

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 35 % ( 35 %)

Time Passed: 47 % ( 47 %)

Adjusted:

02/17/2020

$577,710.00

09/19/2019

10/23/2019

10/29/2019

04400

EDMOND

90 90

02/15/2020

BRIDGE AND APPROACHES COUNTY ROAD

(WATERLOO RD): OVER TRIBUTARY TO

BLOODY RUSH CREEK, 0.5 MILES WEST OF

THE SH-74 JUNCTION NEAR EDMOND.

PROJECT LENGTH = 0.123 MILE

33777(04) I-40

NHPPI-4000-(082)3P

Harlin, Chris

$1,422,438.18

Residency:Contract: 190225

Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 100 % ( 100 %)

Time Passed: 19 % ( 10 %)

Adjusted:

03/29/2020

$1,419,438.18

09/19/2019

10/25/2019

10/31/2019

04600

OKLAHOMA CITY

Fixed Completion Date: 04/30/2020

RESURFACE (ASPHALT) I-40: FROM THE I-35

INTERCHANGE, EXTEND SOUTHEAST IN DEL

CITY. PROJECT LENGTH = 2.64 MILES

32591(04) COUNTY RO

STP-255D(499)CO

Hubbard, Tom

$508,497.03

Residency:Contract: 190250

Contractor: WYATT CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 48 % ( 48 %)

Time Passed: 18 % ( 18 %)

Adjusted:

03/23/2020

$508,497.03

08/22/2019

09/19/2019

09/26/2019

04400

EDMOND

120 120

01/06/2020

BRIDGE AND APPROACHES COUNTY ROAD

(BRITTON ROAD): OVER TRIBUTARY OF

NORTH CANADIAN RIVER, 11.3 MILES EAST

OF I-35 IN JONES. PROJECT LENGTH = 0.133

MILE

33860(04) I-35/I-44

HSIP-255E(486)PM

Brooks, Jonathan

$2,688,148.60

Residency:Contract: 190294

Contractor: ACTION SAFETY SUPPLY CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,688,148.60

10/17/2019

11/20/2019

11/25/2019

04200

YUKON

180 180

04/06/2020

TRAFFIC SIGNING I-35/I-44/I-240/US-60: AT

MULTIPLE LOCATIONS IN DIVISION IV.

PROJECT LENGTH = 0.00 MILE

Construction Status Report Page 115

Page 116: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

34180(04) MULTIPLE

STP-255F(501)3B

Mitchell, Matt

$838,938.55

Residency:Contract: 190295

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 21 % ( 21 %)

Time Passed: 28 % ( 28 %)

Adjusted:

02/24/2020

$814,538.55

09/19/2019

10/25/2019

10/29/2019

04500

STILLWATER

150 150

02/03/2020

JOINT SEAL/REPAIR I-35/US-77 NB/CITY

STREETS (SOONER ROAD SB/WESTERN

AVENUE): AT MULTIPLE LOCATIONS IN

DIVISION IV. PROJECT LENGTH = 0.00 MILE

32777(04) SH-74

STP-242C(078)3P

Mitchell, Matt

$1,803,496.75

Residency:Contract: 190319

Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,803,496.75

10/17/2019

11/15/2019

11/20/2019

04500

STILLWATER

120 120

03/02/2020

RESURFACE (ASPHALT) SH-74: FROM 0.64

MILES SOUTH OF WATERLOO ROAD, EXTEND

NORTH NEAR EDMOND. PROJECT LENGTH =

6.920 MILES

32984(04) SH-66

TAP-255C(490)TP

Mitchell, Matt

$3,498,010.71

Residency:Contract: 190323

Contractor: CROSSLAND HEAVY CONTRACTORS INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 29 % ( 29 %)

Time Passed: 24 % ( 24 %)

Adjusted:

01/20/2020

$3,498,010.71

10/17/2019

11/18/2019

11/22/2019

04500

STILLWATER

270 270

03/02/2020

PEDESTRIAN IMPROVEMENTS (TRAIL

CONSTRUCTION) SH-66 MULTI-USE TRAIL:

FROM MIDWEST BOULEVARD, EXTEND EAST

IN THE CITY OF EDMOND. PROJECT LENGTH

= 2.427 MILES

33344(04) CITY STRE

STPG-255F(483)

Harlin, Chris

$618,806.50

Residency:Contract: 190325

Contractor: MIDSTATE TRAFFIC CONTROL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 27 % ( 27 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$618,806.50

10/17/2019

11/18/2019

11/22/2019

04600

OKLAHOMA CITY

90 90

05/04/2020

TRAFFIC SIGNALS CITY STREETS: AT

MULTIPLE LOCATIONS IN THE CITY OF

MIDWEST CITY. PROJECT LENGTH = 0.00

MILE

Construction Status Report Page 116

Page 117: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33346(04) CITY STRE

STPG-255F(480)AG

Harlin, Chris

$175,476.60

Residency:Contract: 190326

Contractor: ACTION SAFETY SUPPLY CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

04/06/2020

$175,476.60

10/17/2019

11/20/2019

11/25/2019

04600

OKLAHOMA CITY

90 90

04/06/2020

STRIPING AND PAVEMENT MARKING CITY

STREETS: AT MULTIPLE LOCATIONS IN

MIDWEST CITY. PROJECT LENGTH = 11.330

MILES

OkmulgeeCounty: Commissioner District: 1

Contracts Under Construction

31193(04) COUNTY RO

STP-256C(044)CI

CE2

$1,670,367.51

Residency:Contract: 180205

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 46 % ( 46 %)

Time Passed: 348 % ( 326 %)

Adjusted:

02/04/2019

$1,637,000.00

10/18/2018

11/14/2018

11/20/2018

01017

CIRCUIT ENGR. DISTR. # 2

75 80

02/04/2019

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (BIXBY ROAD): FROM 2.2 MILES SOUTH

OF THE TULSA COUNTY LINE EXTEND

SOUTHEAST NEAR WINCHESTER. PROJECT

LENGTH = 0.682 MILE

28967(04) US-75

NHPP-256N(034)PM

Hagerman, Jeremy

$4,095,487.61

Residency:Contract: 190020

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 79 % ( 79 %)

Time Passed: 92 % ( 82 %)

Adjusted:

06/03/2019

$4,085,462.55

01/17/2019

02/22/2019

03/07/2019

01100

MUSKOGEE

230 258

06/03/2019

INTERSECTION MODIFICATION AND CABLE

BARRIER US-75: AT MULTIPLE LOCATIONS

FROM 1.4 MILES NORTH OF THE SH-56

JUNCTION, BETWEEN OKMULGEE AND

BEGGS. PROJECT LENGTH = 4.861 MILES

29385(04) COUNTY RO

CIRB-256D(049)RB

ZPAA

$1,150,150.50

Residency:Contract: 190125

Contractor: RRY SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 41 % ( 41 %)

Time Passed: 63 % ( 63 %)

Adjusted:

10/04/2019

$1,150,150.50

06/20/2019

07/16/2019

07/17/2019

01020

POE AND ASSOCIATES

180 180

11/04/2019

BRIDGE AND APPROACHES COUNTY ROAD

(NS-3890/ROCKY HILL RD): OVER OKMULGEE

CREEK AND UNNAMED CREEK, 0.6 MI AND 0.7

MI S OF SH-56 NEAR OKMULGEE. PROJECT

LENGTH = 0.200 MILE

Construction Status Report Page 117

Page 118: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29673(04) US-75

NHPP-256N(045)PM

Hagerman, Jeremy

$3,836,789.37

Residency:Contract: 190226

Contractor: C-GAWF CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 49 % ( 48 %)

Time Passed: 31 % ( 30 %)

Adjusted:

10/07/2019

$3,829,814.97

07/25/2019

08/21/2019

08/26/2019

01100

MUSKOGEE

320 325

12/02/2019

BRIDGE AND APPROACHES US-75: OVER

COAL CREEK AND ABANDONED RAILROAD,

0.7 MILES AND 1.1 MILES NORTH OF THE I-40

INTERCHANGE IN HENRYETTA. PROJECT

LENGTH = 0.666 MILE

OsageCounty: Commissioner District: 8

Contracts Under Construction

24261(04) SH-99

SSP-157B(101)SS

Scott, Kalynn

$6,744,794.52

Residency:Contract: 170361

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 96 % ( 96 %)

Time Passed: 112 % ( 112 %)

Adjusted:

04/02/2018

$6,705,000.00

11/16/2017

12/15/2017

12/18/2017

A.

08400

SAND SPRINGS

450 451

04/02/2018

BRIDGE AND APPROACHES SH-99: OVER

BIRCH CREEK AND AN ABANDONED

RAILROAD, 1.4 MILES SOUTH OF SH-11 NEAR

WYNONA. PROJECT LENGTH = 1.874 MILES.

25528(04) COUNTY RO

STP-157C(167)CI

CEC

$2,268,477.06

Residency:Contract: 180107

Contractor: RRY SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 27 % ( 27 %)

Time Passed: 70 % ( 70 %)

Adjusted:

11/04/2019

$2,268,477.06

06/20/2019

07/16/2019

07/17/2019

08003

CEC CORP.

150 150

11/04/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-28): OVER LITTLE DRUM CREEK, 7.8

MILES EAST OF THE NOBLE COUNTY LINE.

PROJECT LENGTH = 0.955 MILE

31942(04) SH-123

STP-257C(071)3P

GARV

$1,623,000.00

Residency:Contract: 190129

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,623,000.00

03/14/2019

04/11/2019

04/19/2019

08011

GARVER, LLC.

75 75

08/05/2019

RESURFACE (ASPHALT) SH-123: FROM 5.2

MILES SOUTH OF THE US-60 (ADAMS

BOULEVARD) JUNCTION, EXTEND NORTH IN

BARTLESVILLE. PROJECT LENGTH = 5.25

MILES

Construction Status Report Page 118

Page 119: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

24268(08) SH-20

STP-257C(076)RW

Scott, Kalynn

$157,600.00

Residency:Contract: 190296

Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 40 % ( 40 %)

Time Passed: 11 % ( 11 %)

Adjusted:

11/25/2019

$157,600.00

09/19/2019

10/25/2019

10/31/2019

08400

SAND SPRINGS

180 180

11/25/2019

RIGHT-OF-WAY CLEARANCE SH-20: FROM

THE SH-99 JUNCTION, EXTEND SOUTHEAST

NEAR HOMINY. PROJECT LENGTH = 5.016

MILES PREQUALIFICATION FOR THIS

PROJECT HAS BEEN WAIVED. BOTH BID

EXPRESS AND WRITTEN BIDS WILL BE

ACCEPTED.

27995(04) SH-99

STP-257B(035)PM

Scott, Kalynn

$16,002,441.99

Residency:Contract: 200044

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$16,002,441.99

01/16/2020

02/11/2020

02/14/2020

08400

SAND SPRINGS

450 450

06/01/2020

BRIDGE AND APPROACHES SH-99: OVER

CANEY RIVER AND POND CREEK, 2.2 MILES

AND 4.4 MILES SOUTH OF THE KANSAS

STATE LINE. PROJECT LENGTH = 1.056 MILES

32717(04) SH-11

STP-257B(072)3P

Scott, Kalynn

$803,266.40

Residency:Contract: 200118

Contractor: JLT CONTRACTING, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$803,266.40

03/19/2020

04/22/2020

04/28/2020

08400

SAND SPRINGS

60 60

08/03/2020

RESURFACE (CHIP SEAL) SH-11: FROM THE

SH-99 JUNCTION, EXTEND EAST NEAR

PERSHING. PROJECT LENGTH = 9.360 MILES

OttawaCounty: Commissioner District: 8

Contracts Under Construction

28871(04) SH-125

STP-258B(045)PM

TETR

$3,201,952.01

Residency:Contract: 180206

Contractor: CROSSLAND CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 103 % ( 99 %)

Time Passed: 198 % ( 172 %)

Adjusted:

10/29/2018

$3,098,013.12

05/17/2018

06/14/2018

06/15/2018

08002

TETRA TECH

180 208

10/01/2018

BRIDGE REHABILITATION SH-125: OVER

NEOSHO RIVER, 0.5 MILES SOUTH OF THE

US-69 JUNCTION IN MIAMI. PROJECT LENGTH

= 0.251 MILE

Construction Status Report Page 119

Page 120: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

30710(04) COUNTY RO

CIRB-258D(049)RB

ATKINS

$1,004,791.78

Residency:Contract: 180207

Contractor: B & B BRIDGE COMPANY, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 87 % ( 86 %)

Time Passed: 81 % ( 71 %)

Adjusted:

11/15/2019

$988,083.78

06/20/2019

07/11/2019

07/23/2019

08010

ATKINS

120 137

11/15/2019

BRIDGE REHABILITATION COUNTY ROAD

(EW-30): OVER TAR CREEK, 0.8 MILES WEST

OF US-69 NEAR PICHER. PROJECT LENGTH =

0.160 MILE

30554(04) COUNTY RO

STP-258D(050)CI

GARV

$656,410.38

Residency:Contract: 180248

Contractor: B & B BRIDGE COMPANY, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 87 % ( 87 %)

Time Passed: 97 % ( 97 %)

Adjusted:

10/07/2019

$656,410.38

05/16/2019

06/12/2019

06/24/2019

08011

GARVER, LLC.

100 100

10/07/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-19): OVER TRIBUTARY TO HORSE

CREEK, 0.6 MILES WEST OF THE US-69

JUNCTION NEAR AFTON. PROJECT LENGTH =

0.166 MILE

24273(04) US-60

SSP-158B(119)PM

Beats, Aaron

$3,769,758.16

Residency:Contract: 180297

Contractor: RRY SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 80 % ( 80 %)

Time Passed: 87 % ( 87 %)

Adjusted:

12/31/2018

$3,769,758.16

10/18/2018

11/13/2018

11/19/2018

08300

CLAREMORE

255 255

12/31/2018

BRIDGE AND APPROACHES US-60: OVER

HORSE CREEK, 1.7 MILES SOUTHWEST OF

THE US-59 JUNCTION IN THE CITY OF AFTON.

PROJECT LENGTH = 0.139 MILE

30709(04) COUNTY RO

CIRB-258D(051)RB

ATKINS

$625,224.80

Residency:Contract: 190056

Contractor: RRY SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 93 % ( 93 %)

Time Passed: 100 % ( 100 %)

Adjusted:

11/04/2019

$625,224.80

06/20/2019

07/16/2019

07/17/2019

08010

ATKINS

100 100

11/04/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-128): OVER MODOC CREEK, 1.8 MILES

WEST OF THE MISSOURI STATE LINE.

PROJECT LENGTH = 0.058 MILE

Construction Status Report Page 120

Page 121: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32712(04) US-60

SSR-258B(055)SR

Beats, Aaron

$1,050,000.00

Residency:Contract: 200023

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,050,000.00

01/16/2020

02/11/2020

02/24/2020

08300

CLAREMORE

90 90

06/01/2020

RESURFACE (P.C. CONCRETE) US-60: FROM

THE SH-125 JUNCTION, EXTEND NORTHEAST

IN FAIRLAND. PROJECT LENGTH = 0.580 MILE

33376(04) US-59

SSR-258N(057)SR

Beats, Aaron

$2,040,000.00

Residency:Contract: 200026

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,040,000.00

01/16/2020

02/11/2020

02/24/2020

08300

CLAREMORE

110 110

06/01/2020

RESURFACE (ASPHALT) US-59: FROM 0.5

MILES NORTH OF I-44, EXTEND NORTH NEAR

AFTON. PROJECT LENGTH = 8.810 MILES

PawneeCounty: Commissioner District: 8

Contracts Under Construction

24323(04) US-64

STP-159C(077)SS

Scott, Kalynn

$9,540,525.30

Residency:Contract: 170205

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 97 % ( 95 %)

Time Passed: 156 % ( 129 %)

Adjusted:

10/09/2017

$9,368,000.00

06/15/2017

06/18/2017

07/19/2017

08400

SAND SPRINGS

400 483

10/02/2017

GRADE, DRAIN, SURFACE, AND BRIDGE

US-64: FROM 3.1 MILES WEST OF THE SH-99

JUNCTION, EXTEND WEST NEAR PAWNEE.

PROJECT LENGTH = 2.982 MILES.

30321(04) US-412

NHPP-256N(037)

CEC

$1,052,893.53

Residency:Contract: 180064

Contractor: BREWER CONSTRUCTION OKLAHOMA, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 87 % ( 97 %)

Time Passed: 98 % ( 98 %)

Adjusted:

10/01/2018

$1,179,474.38

02/15/2018

03/14/2018

03/19/2018

08003

CEC CORP.

60 60

10/01/2018

GRADE AND DRAIN US-412: FROM THE US-64

INTERCHANGE, EXTEND EAST NEAR

WESTPORT. PROJECT LENGTH = 7.58 MILES

Construction Status Report Page 121

Page 122: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

24323(07) US-64

STP-259C(050)PM

Scott, Kalynn

$14,224,346.71

Residency:Contract: 180298

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 88 % ( 86 %)

Time Passed: 58 % ( 58 %)

Adjusted:

02/04/2019

$13,885,202.71

09/20/2018

10/11/2018

10/12/2018

08400

SAND SPRINGS

435 435

02/04/2019

GRADE, DRAIN, SURFACE, AND BRIDGE

US-64: FROM 3.4 MILES WEST OF THE SH-99

JUNCTION, EXTEND EAST NEAR THE CITY OF

CLEVELAND. PROJECT LENGTH = 3.381 MILES

31180(04) COUNTY RO

STP-259D(051)CI

JACOBS

$1,162,147.24

Residency:Contract: 190022

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 96 % ( 96 %)

Time Passed: 104 % ( 99 %)

Adjusted:

09/17/2019

$1,162,147.30

05/16/2019

06/18/2019

06/20/2019

08004

JACOBS ENGINEERING

120 126

10/07/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EW-500): OVER PEPPER CREEK, 3.9 MILES

WEST OF SH-18 NEAR PAWNEE. PROJECT

LENGTH = 0.284 MILE

27934(04) US-64

STP-259B(034)SS

Scott, Kalynn

$10,827,000.00

Residency:Contract: 190130

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 23 % ( 23 %)

Time Passed: 45 % ( 45 %)

Adjusted:

10/07/2019

$10,827,000.00

05/16/2019

06/12/2019

06/17/2019

08400

SAND SPRINGS

325 325

10/07/2019

BRIDGE AND APPROACHES US-64: OVER

CEDAR CREEK AND PEDESTRIAN TRAIL, 0.1

MILES SOUTH OF THE SH-99 JUNCTION IN

THE CITY OF CLEVELAND. PROJECT LENGTH

= 0.364 MILE

32716(04) SH-18

STP-259B(052)3P

Scott, Kalynn

$628,523.50

Residency:Contract: 200119

Contractor: JLT CONTRACTING, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$628,523.50

03/19/2020

04/22/2020

04/28/2020

08400

SAND SPRINGS

60 60

05/18/2020

RESURFACE (CHIP SEAL) SH-18: FROM 0.4

MILES NORTH OF THE US-64 JUNCTION,

EXTEND NORTH NEAR PAWNEE. PROJECT

LENGTH = 7.590 MILES

PayneCounty: Commissioner District: 4

Contracts Under Construction

Construction Status Report Page 122

Page 123: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28582(04) COUNTY RO

CIRB-260D(032)RB

Mitchell, Matt

$785,953.74

Residency:Contract: 180208

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 100 %)

Time Passed: 104 % ( 93 %)

Adjusted:

11/19/2018

$769,370.00

09/20/2018

10/11/2018

10/12/2018

04500

STILLWATER

120 134

11/19/2018

BRIDGE AND APPROACHES COUNTY ROAD

(EW-63): OVER SALT CREEK, 2.6 MILES EAST

OF THE SH-18 JUNCTION NEAR YALE.

PROJECT LENGTH = 0.203 MILE

34596(04) I-35

E-SAP-3500(088)ES

Mitchell, Matt

$672,194.27

Residency:Contract: 190392

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

04/27/2020

$643,850.00

11/14/2019

12/13/2019

12/19/2019

04500

STILLWATER

90 90

04/06/2020

BRIDGE REPAIR I-35: REPAIR VEHICLE

IMPACT DAMAGE OVER SH-51, 11.2 MILES

SOUTH OF US-77 NEAR STILLWATER.

PROJECT LENGTH = 0.00 MILE

32597(04) COUNTY RO

STP-260C(041)CI

Mitchell, Matt

$907,376.34

Residency:Contract: 200027

Contractor: ATLAS PAVING COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$907,376.34

03/19/2020

04/20/2020

04/28/2020

04500

STILLWATER

90 90

06/01/2020

RESURFACE (ASPHALT) COUNTY ROAD

(FAIRGROUNDS / NS-337): FROM THE SH-51

JUNCTION, EXTEND SOUTH NEAR

STILLWATER. PROJECT LENGTH = 4.930

MILES

PittsburgCounty: Commissioner District: 2

Contracts Under Construction

28912(04) SH-31

STP-261C(071)PM

Plymate, Larry

$9,286,475.15

Residency:Contract: 180299

Contractor: C-GAWF CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 61 % ( 61 %)

Time Passed: 43 % ( 43 %)

Adjusted:

02/04/2019

$9,224,320.92

09/20/2018

10/16/2018

10/18/2018

02400

MCALESTER

475 475

02/04/2019

BRIDGE REHABILITATION SH-31: OVER

GAINES CREEK AND ASH CREEK, 7.2 MILES

AND 10.7 MILES NORTHEAST OF THE US-270

JUNCTION NEAR KREBS. PROJECT LENGTH =

0.410 MILE

Construction Status Report Page 123

Page 124: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29996(04) COUNTY RO

STP-261D(083)CI

CED3

$752,310.64

Residency:Contract: 190090

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 79 % ( 79 %)

Time Passed: 166 % ( 116 %)

Adjusted:

08/19/2019

$752,310.64

02/14/2019

03/12/2019

03/19/2019

02013

CIRCUIT ENGR. DISTR. # 3

90 129

07/01/2019

BRIDGE AND APPROACHES COUNTY ROAD

(CABINISS ROAD): OVER BIG WILDHORSE

CREEK, 0.6 MILES NORTH OF THE US-270

JUNCTION NEAR CABINISS. PROJECT

LENGTH = 0.189 MILE

32359(04) COUNTY RO

CIRB-261C(089)RB

CED3

$1,297,565.00

Residency:Contract: 190254

Contractor: ROSSCON, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 99 % ( 99 %)

Time Passed: 233 % ( 233 %)

Adjusted:

10/14/2019

$1,297,565.00

08/22/2019

09/12/2019

09/23/2019

02013

CIRCUIT ENGR. DISTR. # 3

30 30

10/14/2019

RESURFACE (ASPHALT) COUNTY ROAD

(ASHLAND ROAD): FROM THE SH-31

JUNCTION, EXTEND EAST IN ASHLAND.

PROJECT LENGTH = 4.000 MILES

33393(04) US-69

NHPP-013N(168)3P

Plymate, Larry

$1,176,515.00

Residency:Contract: 190268

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,176,515.00

02/20/2020

03/13/2020

03/18/2020

02400

MCALESTER

75 75

07/06/2020

RESURFACE (ASPHALT) US-69: FROM 3.0

MILES NORTH OF THE ATOKA COUNTY LINE,

EXTEND NORTH NEAR KIOWA. PROJECT

LENGTH = 1.79 MILES

29738(04) SH-31 EB

SBR-261B(090)SB

Plymate, Larry

$2,124,741.60

Residency:Contract: 190369

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 18 % ( 18 %)

Time Passed: 60 % ( 60 %)

Adjusted:

02/03/2020

$2,124,741.60

11/14/2019

12/12/2019

12/18/2019

02400

MCALESTER

90 90

02/03/2020

BRIDGE REHABILITATION SH-31 EB: OVER

US-270, 0.7 MILES EAST OF THE US-69

INTERCHANGE IN MCALESTER. PROJECT

LENGTH = 0.159 MILE

Construction Status Report Page 124

Page 125: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

34329(04) US-69

SSP-013N(176)PM

Plymate, Larry

$6,365,930.45

Residency:Contract: 190370

Contractor: DUIT CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 4 % ( 4 %)

Time Passed: 11 % ( 11 %)

Adjusted:

03/23/2020

$6,365,930.45

01/16/2020

02/11/2020

02/14/2020

02400

MCALESTER

180 180

06/01/2020

PAVEMENT REHABILITATION US-69: FROM 0.5

MILES NORTH OF THE US-270 INTERCHANGE,

EXTENDED NORTH IN MCALESTER. PROJECT

LENGTH = 3.679 MILES

PontotocCounty: Commissioner District: 3

Contracts Under Construction

31252(04) EW-165

CIRB-262C(048)RB

Wade, Tony

$5,472,842.44

Residency:Contract: 190101

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 57 % ( 57 %)

Time Passed: 106 % ( 98 %)

Adjusted:

04/22/2019

$5,534,406.04

02/14/2019

03/14/2019

03/19/2019

03100

ADA

220 239

04/22/2019

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (EW-165/OLD FITTSTOWN HIGHWAY):

FROM THE US-377 JUNCTION, EXTEND WEST

NEAR FITTSTOWN. PROJECT LENGTH = 5.979

MILES

23286(10) SH-99

STP-162B(207)SS

Wade, Tony

$6,126,960.99

Residency:Contract: 190132

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

10/07/2019

$6,126,960.99

05/16/2019

06/12/2019

06/17/2019

03100

ADA

300 300

10/07/2019

WIDEN AND RESURFACE (ASPHALT) SH-99:

FROM 2.6 MILES SOUTH OF THE SH-3

JUNCTION, EXTEND NORTH NEAR ADA.

PROJECT LENGTH = 2.452 MILES

28571(08) COUNTY RO

STP-262C(043)CI

Wade, Tony

$1,114,835.75

Residency:Contract: 190255

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 37 % ( 37 %)

Time Passed: 23 % ( 23 %)

Adjusted:

03/25/2020

$1,114,835.75

02/20/2020

03/11/2020

03/12/2020

03100

ADA

150 150

09/08/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-151): OVER LITTLE SANDY CREEK, 2.4

MILES EAST OF THE US-377 JUNCTION NEAR

ADA. PROJECT LENGTH = 0.171 MILE

Construction Status Report Page 125

Page 126: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33057(04) OLD STATE

CIRB-262C(059)RB

Wade, Tony

$3,074,256.90

Residency:Contract: 200120

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$3,074,256.90

03/19/2020

04/15/2020

04/21/2020

03100

ADA

150 150

09/08/2020

WIDEN, RESURFACE, AND BRIDGE OLD

STATE HIGHWAY 99: FROM 2.0 MILES NORTH

OF THE SH-1 JUNCTION, EXTEND NORTH

NEAR ADA. PROJECT LENGTH = 5.800 MILES

PottawatomieCounty: Commissioner District: 3

Contracts Under Construction

28922(04) SH-3E

STP-263C(066)PM

TETR

$2,651,369.08

Residency:Contract: 190023

Contractor: CP3 ENTERPRISES, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 24 % ( 23 %)

Time Passed: 89 % ( 89 %)

Adjusted:

11/05/2019

$2,580,009.08

05/16/2019

06/18/2019

06/21/2019

03002

TETRA TECH

150 150

10/07/2019

BRIDGE AND APPROACHES SH-3E: OVER

ROCK CREEK, 2.1 MILES WEST OF THE SH-9A

JUNCTION NEAR SHAWNEE. PROJECT

LENGTH = 0.204 MILE

34097(04) MULTIPLE

STP-NBIP(531)3B

EST

$242,005.00

Residency:Contract: 190276

Contractor: POSEIDON CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$242,005.00

09/19/2019

10/30/2019

01/17/2020

03001

EST, INC.

45 45

02/03/2020

BRIDGE PAINTING US-270

SB/US-377/SH-99/CITY STREET (ROBINSON

STREET): AT MULTIPLE LOCATIONS IN

DIVISION III. PROJECT LENGTH = 0.00 MILE

33838(04) SH-39

SSR-263B(067)SR

Wade, Tony

$1,577,900.00

Residency:Contract: 200078

Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,577,900.00

02/20/2020

03/13/2020

03/18/2020

03100

ADA

45 45

07/06/2020

RESURFACE (ASPHALT) SH-39: FROM THE

CLEVELAND COUNTY LINE, EXTEND EAST

NEAR EASON. PROJECT LENGTH = 6.640

MILES

Construction Status Report Page 126

Page 127: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33336(04) I-40

NHPPI-4000(096)3P

Helton, Matthew

$5,924,420.29

Residency:Contract: 200121

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$5,924,420.29

03/19/2020

04/15/2020

04/21/2020

03300

WEWOKA

70 70

07/06/2020

RESURFACE (ASPHALT AND UTBWC) I-40:

FROM THE SH-18 JUNCTION, EXTEND EAST

NEAR SHAWNEE. PROJECT LENGTH = 14.050

MILES

PushmatahaCounty: Commissioner District: 2

Contracts Under Construction

28835(04) US-271

STP-264B(062)PM

Nored, John

$2,175,792.02

Residency:Contract: 190264

Contractor: HUB CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

02/24/2020

$2,175,792.02

10/17/2019

11/12/2019

11/18/2019

02100

ANTLERS

240 240

02/03/2020

BRIDGE AND APPROACHES US-271: OVER

UNNAMED CREEKS, 10.3 MILES AND 51.1

MILES NORTHEAST OF THE SH-3 JUNCTION

NEAR FINLEY AND ALBION. PROJECT LENGTH

= 0.169 MILE

30433(04) US-271

SBR-264B(065)SB

Nored, John

$1,719,086.74

Residency:Contract: 190373

Contractor: L & N BRIDGE, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 16 % ( 16 %)

Time Passed: 7 % ( 7 %)

Adjusted:

02/24/2020

$1,719,086.74

11/14/2019

12/13/2019

12/18/2019

02100

ANTLERS

290 290

02/03/2020

BRIDGE REHABILITATION US-271: OVER

SNOW CREEK AND UNNAMED CREEK, 10.0

MILES AND 10.4 MILES SOUTHWEST OF THE

SH-144 JUNCTION NEAR SNOW. PROJECT

LENGTH = 0.00 MILE

Roger MillsCounty: Commissioner District: 5

Contracts Under Construction

Construction Status Report Page 127

Page 128: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

25477(04) CO.RD.

CIRB-165C(099)RB

CED7

$7,006,386.22

Residency:Contract: 170095

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 110 % ( 98 %)

Time Passed: 108 % ( 100 %)

Adjusted:

09/05/2017

$6,283,092.30

02/16/2017

03/21/2017

03/25/2017

05005

CIRCUIT ENGR. DISTR. # 7

270 292

09/05/2017

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (NS-197/EW-97/NS-200/EW-96):

FROM SH-34, EXTEND WEST AND SOUTH TO

THE EW-98/NS-197 JCT NEAR HAMMON.

PROJECT LENGTH = 7.79 MILES.

25478(04) CO.RD.

CIRB-165C(100)RB

CED7

$6,133,922.80

Residency:Contract: 180113

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 108 % ( 100 %)

Time Passed: 120 % ( 100 %)

Adjusted:

04/17/2018

$5,668,110.30

02/15/2018

03/19/2018

03/26/2018

D E THEN S ON NS-192, THEN E ON EW-98.

05005

CIRCUIT ENGR. DISTR. # 7

235 280

09/04/2018

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROADS (EW-97/NS-192/EW-98): ON

EW-97 FROM 4.7 MI E OF US-283, EXTEND E

THEN S ON NS-192, THEN E ON EW-98.

PROJECT LENGTH = 6.975 MILES

27899(04) US-283

STP-265B(017)SS

ATKINS

$2,307,772.40

Residency:Contract: 190269

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 49 % ( 49 %)

Time Passed: 60 % ( 60 %)

Adjusted:

01/13/2020

$2,307,772.40

07/25/2019

08/20/2019

08/26/2019

05010

ATKINS

150 150

12/21/2019

BRIDGE AND APPROACHES US-283: OVER

DEAD WARRIOR CREEK, 3.0 MILES NORTH OF

THE SH-33 JUNCTION NEAR CHEYENNE.

PROJECT LENGTH = 0.179 MILE

32739(04) SH-30/SH-

SSR-265C(021)SR

Sawyer, Dax

$6,203,209.26

Residency:Contract: 200029

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$6,203,209.26

01/16/2020

02/19/2020

02/25/2020

05100

CLINTON

Fixed Completion Date: 10/31/2020

RESURFACE (ASPHALT) SH-30/SH-33: SH-30

FROM THE SH-47 JUNCTION EXTEND NORTH

NEAR REYDON. SH-33, FROM THE TEXAS

STATE LINE EXTEND EAST. PROJECT LENGTH

= 29.790 MILES

RogersCounty: Commissioner District: 8

Contracts Under Construction

Construction Status Report Page 128

Page 129: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

22144(04) CT.ST.

STP-166B(164)IG

GARV

$2,831,426.52

Residency:Contract: 160259

Contractor: PARAGON CONTRACTORS, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 117 % ( 97 %)

Time Passed: 150 % ( 150 %)

Adjusted:

12/06/2016

$2,343,181.49

08/18/2016

09/16/2016

09/22/2016

08011

GARVER, LLC.

270 270

01/03/2017

GRADE, DRAIN, AND SURFACE CITY STREET

(PINE STREET): FROM NORTH 193RD

AVENUE, EXTEND EAST IN CATOOSA.

PROJECT LENGTH = 0.631 MILE.

23170(10) US-412/SH

SSP-266N(056)SS

C&KI

$8,626,854.28

Residency:Contract: 180030

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 113 % ( 100 %)

Time Passed: 128 % ( 106 %)

Adjusted:

04/30/2018

$7,647,000.00

01/18/2018

02/27/2018

03/07/2018

S-412 EXT N. S4200, FR US-412 EXT S.

08007

CRAIG & KEITHLINE, INC.

345 415

09/04/2018

GRADE, DRAIN, AND SURFACE

US-412/SH-88/S4200 RD: US-412, FR 0.2 MI W

OF SH-88 EXT E. SH-88, FR 0.1 MI S OF US-412

EXT N. S4200, FR US-412 EXT S. PROJECT

LENGTH = 4.629 MILES

20315(04) I-44

NHPPI-0044-2(422)238

Beats, Aaron

$20,244,807.92

Residency:Contract: 190133

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 59 % ( 59 %)

Time Passed: 53 % ( 53 %)

Adjusted:

08/05/2019

$20,248,311.85

03/14/2019

04/11/2019

04/19/2019

08300

CLAREMORE

360 360

08/05/2019

INTERCHANGE I-44: AT THE INTERSECTION

OF 165TH EAST AVENUE, 1.8 MILES WEST OF

THE SH-167 JUNCTION IN THE CITY OF

TULSA. PROJECT LENGTH = 1.072 MILES

29601(04) US-412

NHPP-019N(135)PM

Beats, Aaron

$6,469,627.45

Residency:Contract: 190161

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 33 % ( 33 %)

Time Passed: 52 % ( 52 %)

Adjusted:

09/09/2019

$6,465,000.00

04/18/2019

05/14/2019

05/23/2019

08300

CLAREMORE

310 310

09/09/2019

BRIDGE AND APPROACHES US-412: OVER

THE VERDIGRIS RIVER O'FLOW, 5.9 MILES

EAST OF THE I-44 INTERCHANGE NEAR FAIR

OAKS. PROJECT LENGTH = 0.837 MILE

Construction Status Report Page 129

Page 130: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27031(08) SH-20

STP-266B(069)RW

Beats, Aaron

$183,500.00

Residency:Contract: 190202

Contractor: MJM CONSTRUCTION & APPLICATION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 43 % ( 43 %)

Time Passed: 18 % ( 18 %)

Adjusted:

08/12/2019

$183,500.00

06/20/2019

07/25/2019

07/25/2019

08300

CLAREMORE

180 180

08/12/2019

RIGHT-OF-WAY CLEARANCE SH-20: FROM 4.1

MILES EAST OF THE US-169 JUNCTION,

EXTEND EAST NEAR CLAREMORE. PROJECT

LENGTH = 4.290 MILES PREQUALIFICATION

FOR THIS PROJECT HAS BEEN WAIVED.

BOTH BID EXPRESS AND WRITTEN BIDS WILL

BE ACCEPTED.

31402(04) COUNTY RO

STP-266D(073)CI

C&KI

$2,311,461.41

Residency:Contract: 190297

Contractor: B & B BRIDGE COMPANY, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

04/06/2020

$2,311,461.41

11/14/2019

12/10/2019

03/13/2020

08007

CRAIG & KEITHLINE, INC.

120 120

04/06/2020

BRIDGE AND APPROACHES COUNTY ROADS

(NS-4210/EW-0405): NS-4210, OVER DOG

CREEK 1.1 MI E OF SH-66. EW-0405, FROM

NS-4210 EXTEND E NEAR FOYIL. PROJECT

LENGTH = 0.281 MILE

33016(04) SUMMERLIN

TAP-266E(071)TP

C&KI

$385,825.90

Residency:Contract: 190327

Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 8 % ( 8 %)

Time Passed: 3 % ( 3 %)

Adjusted:

02/17/2020

$385,825.90

10/17/2019

11/19/2019

11/22/2019

08007

CRAIG & KEITHLINE, INC.

90 90

03/02/2020

PEDESTRIAN IMPROVEMENTS (BICYCLE AND

PEDESTRIAN TRAIL) SUMMERLIN TRAIL:

FROM INOLA ELEMENTARY SCHOOL, EXTEND

NORTH IN THE TOWN OF INOLA. PROJECT

LENGTH = 0.499 MILE

33314(04) CITY STRE

STP-266B(072)IG

EST

$809,001.10

Residency:Contract: 190328

Contractor: ELLSWORTH CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 30 % ( 30 %)

Time Passed: 60 % ( 50 %)

Adjusted:

03/23/2020

$809,001.10

10/17/2019

11/25/2019

11/26/2019

08001

EST, INC.

45 54

03/02/2020

RESURFACE (ASPHALT) CITY STREET (PINE

STREET): FROM THE SH-167 JUNCTION,

EXTEND WEST IN CATOOSA. PROJECT

LENGTH = 2.982 MILES

Construction Status Report Page 130

Page 131: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32733(04) SH-88

SBR-266C(077)SB

Beats, Aaron

$553,618.45

Residency:Contract: 200031

Contractor: B & B CONSTRUCTION SERVICE J.T., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$553,618.45

01/16/2020

02/19/2020

02/26/2020

08300

CLAREMORE

180 180

06/01/2020

BRIDGE REHABILITATION SH-88: OVER

PANTHER CREEK, 2.2 MILES SOUTHEAST OF

I-44 NEAR CLAREMORE. PROJECT LENGTH =

0.029 MILE

SeminoleCounty: Commissioner District: 3

Contracts Under Construction

30039(08) CO.RD.

CIRB-267C(053)RB

Helton, Matthew

$2,512,694.19

Residency:Contract: 170097

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 92 % ( 92 %)

Time Passed: 266 % ( 266 %)

Adjusted:

10/09/2017

$2,508,689.16

02/16/2017

03/21/2017

03/25/2017

03300

WEWOKA

150 150

09/05/2017

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (NS-360/MARKET ROAD): FROM 1.1

MILES NORTH OF SH-9, EXTEND NORTH NEAR

SEMINOLE. PROJECT LENGTH = 2.963 MILES

32798(04) US-77

HSIPG-267F(057)TR/HSIPG-*

Wade, Tony

$143,206.00

Residency:Contract: 170100

Contractor: ACTION SAFETY SUPPLY CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 83 % ( 83 %)

Time Passed: 80 % ( 80 %)

Adjusted:

05/01/2017

$143,206.00

02/16/2017

03/21/2017

03/24/2017

*235C(032)TR

03100

ADA

30 30

07/03/2017

SAFETY IMPROVEMENT (RUMBLE STRIP AND

PAVEMENT MARKING)

US-77/US-270/SH-9/SH-78: AT MULTIPLE

LOCATIONS IN DIVISION III.

23289(10) SH-99

NHPP-267N(062)PM

Wade, Tony

$10,032,738.66

Residency:Contract: 170236

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 99 %)

Time Passed: 141 % ( 99 %)

Adjusted:

09/04/2018

$9,733,613.40

06/14/2018

07/12/2018

07/13/2018

03100

ADA

250 355

09/04/2018

BRIDGE AND APPROACHES SH-99: OVER

SANDY CREEK AND SALT CREEK, 6.0 MILES

AND 7.9 MILES NORTH OF THE SH-56

INTERSECTION NEAR SEMINOLE. PROJECT

LENGTH = 1.754 MILES

Construction Status Report Page 131

Page 132: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28943(04) SH-9

STP-267C(051)PM

TETR

$4,218,914.85

Residency:Contract: 170275

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 23 % ( 23 %)

Time Passed: 112 % ( 69 %)

Adjusted:

11/05/2018

$4,203,929.85

02/15/2018

03/19/2018

03/22/2018

INTERSECTION NEAR SEMINOLE.

03002

TETRA TECH

360 589

11/05/2018

BRIDGE AND APPROACHES SH-9: OVER

UNNAMED CREEKS, 4.4 MILES, 6.0 MILES AND

6.3 MILES EAST OF THE US-270/SH-3E

INTERSECTION NEAR SEMINOLE. PROJECT

LENGTH = 0.468 MILE

29109(04) US-270

NHPP-267N(004)SS

Helton, Matthew

$2,176,534.67

Residency:Contract: 180032

Contractor: T. MCDONALD CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 104 % ( 100 %)

Time Passed: 100 % ( 100 %)

Adjusted:

06/04/2018

$2,082,389.19

01/18/2018

02/27/2018

03/08/2018

03300

WEWOKA

240 240

06/04/2018

BRIDGE AND APPROACHES US-270: OVER

MAGNOLIA CREEK, 0.7 MILES EAST OF THE

SH-99 INTERSECTION IN SEMINOLE. PROJECT

LENGTH = 0.141 MILE

29460(04) SH-99A

STP-267C(071)SS

CEC

$4,587,468.99

Residency:Contract: 180233

Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 100 % ( 98 %)

Time Passed: 103 % ( 100 %)

Adjusted:

11/05/2018

$4,508,696.39

05/17/2018

06/13/2018

06/18/2018

ON, NEAR CROMWELL AND LITTLE.

03003

CEC CORP.

240 246

11/05/2018

BRIDGE AND APPROACHES SH-99A: OVER

SAND CREEK AND TURKEY CREEK, 2.0 MI

AND 13.1 MI WEST OF THE SH-56 JUNCTION,

NEAR CROMWELL AND LITTLE. PROJECT

LENGTH = 0.700 MILE

21006(16) US-270

STP-267B(075)RW

Helton, Matthew

$273,995.75

Residency:Contract: 180271

Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$273,995.75

08/16/2018

09/27/2018

10/02/2018

03300

WEWOKA

180 180

10/22/2018

RIGHT-OF-WAY CLEARANCE US-270: FROM

THE SH-270A JUNCTION, EXTEND

SOUTHEAST NEAR SEMINOLE. PROJECT

LENGTH = 8.04 MILES

Construction Status Report Page 132

Page 133: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

21006(07) US-270

STP-167B(122)PM

Helton, Matthew

$11,874,202.91

Residency:Contract: 180304

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 36 % ( 36 %)

Time Passed: 11 % ( 11 %)

Adjusted:

12/03/2019

$11,794,403.73

10/17/2019

11/13/2019

11/19/2019

03300

WEWOKA

595 606

02/03/2020

BRIDGE AND APPROACHES US-270: OVER

WEWOKA CREEK AND RAILROAD, 3.5 MILES

AND 3.7 MILES NORTHWEST OF THE US-59

JUNCTION NEAR WEWOKA. PROJECT

LENGTH = 0.586 MILE

28923(04) US-270

STP-267B(076)PM

Helton, Matthew

$1,732,543.42

Residency:Contract: 180313

Contractor: B & B BRIDGE COMPANY, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 86 % ( 85 %)

Time Passed: 109 % ( 108 %)

Adjusted:

02/15/2019

$1,708,926.24

09/20/2018

11/15/2018

11/30/2018

03300

WEWOKA

210 212

02/04/2019

BRIDGE AND APPROACHES US-270: OVER

UNNAMED CREEK, 1.6 MILES WEST OF THE

SH-3E JUNCTION NEAR SEMINOLE. PROJECT

LENGTH = 0.164 MILE

30580(04) SH-56

SBR-267C(077)SB

Helton, Matthew

$3,835,981.22

Residency:Contract: 180361

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 111 % ( 100 %)

Time Passed: 75 % ( 75 %)

Adjusted:

01/28/2019

$3,447,514.16

11/15/2018

12/17/2018

12/31/2018

03300

WEWOKA

240 240

04/01/2019

BRIDGE REHABILITATION SH-56: OVER SAND

CREEK AND WEWOKA CREEK, 0.6 MILES AND

0.7 MILES NORTH OF THE US-270B JUNCTION

IN WEWOKA. PROJECT LENGTH = 0.322 MILE

21845(04) SH-9

STPY-167C(102)

Helton, Matthew

$3,506,191.80

Residency:Contract: 190024

Contractor: HASKELL LEMON CONSTRUCTION CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 34 % ( 34 %)

Time Passed: 48 % ( 43 %)

Adjusted:

11/11/2019

$3,467,035.00

05/16/2019

06/12/2019

06/17/2019

03300

WEWOKA

210 231

11/11/2019

GRADE, DRAIN, AND SURFACE SH-9: FROM

6.8 MILES EAST OF THE US-377 JUNCTION,

EXTEND EAST NEAR SEMINOLE. PROJECT

LENGTH = 1.022 MILES

Construction Status Report Page 133

Page 134: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

30048(04) COUNTY RO

STP-267D(081)CI

Helton, Matthew

$641,974.90

Residency:Contract: 200032

Contractor: RRY SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$641,974.90

03/19/2020

04/15/2020

04/21/2020

03300

WEWOKA

120 120

08/03/2020

BRIDGE AND APPROACHES COUNTY ROAD

(NS-3650 ROAD) : OVER UNNAMED CREEK, 0.1

MILES SOUTH OF THE US-59 JUNCTION NEAR

WEWOKA. PROJECT LENGTH = 0.111 MILE

33321(04) SH-39

SSR-267C(082)SR

Wade, Tony

$1,249,097.40

Residency:Contract: 200033

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,249,097.40

01/16/2020

02/14/2020

02/26/2020

03100

ADA

45 45

06/01/2020

RESURFACE (ASPHALT) SH-39: FROM THE

POTTAWATOMIE COUNTY LINE, EXTEND

EAST NEAR KONOWA. PROJECT LENGTH =

6.190 MILES

SequoyahCounty: Commissioner District: 1

Contracts Under Construction

10618(07) I-40/US-6

NHPPI-4000-(248)FP

Orendorf, Barry

$42,517,321.61

Residency:Contract: 180251

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 58 % ( 58 %)

Time Passed: 43 % ( 43 %)

Adjusted:

01/07/2019

$42,434,900.32

07/19/2018

08/21/2018

11/26/2018

01200

SALLISAW

700 700

01/07/2019

GRADE, DRAIN, SURFACE, BRIDGE, AND

APPROACHES I-40/US-64: I-40, FROM 1.1 MI

EAST OF US-59, EXTEND EAST. US-64, AT THE

I-40 INTERCHANGE, NEAR SALLISAW.

PROJECT LENGTH = 2.867 MILES

28501(04) COUNTY RO

CIRB-268D(058)RB

CE2

$2,096,174.67

Residency:Contract: 190059

Contractor: T. MCDONALD CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 33 % ( 33 %)

Time Passed: 81 % ( 67 %)

Adjusted:

04/15/2019

$2,096,174.67

01/17/2019

02/27/2019

03/11/2019

01017

CIRCUIT ENGR. DISTR. # 2

250 303

04/15/2019

GRADE, DRAIN, BRIDGE, AND SURFACE

COUNTY ROAD (EW-1090): OVER SALLISAW

CREEK, 2.6 MILES WEST OF THE US-59

JUNCTION NEAR SALLISAW. PROJECT

LENGTH = 0.370 MILE

Construction Status Report Page 134

Page 135: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33730(04) MULTIPLE

HSIPG-251F(091)TR

Hagerman, Jeremy

$825,000.00

Residency:Contract: 190086

Contractor: DIRECT TRAFFIC CONTROL INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 72 % ( 72 %)

Time Passed: 165 % ( 120 %)

Adjusted:

07/30/2019

$825,000.00

05/16/2019

06/11/2019

06/17/2019

01100

MUSKOGEE

Fixed Completion Date: 10/31/2019

STRIPING AND PAVEMENT MARKING

I-40/US-59/US-62/US-75/SH-51: AT MULTIPLE

LOCATIONS IN DIVISION I. PROJECT LENGTH

= 0.000 MILE

28988(04) I-40

NHPPI-4000-(076)PM

TETR

$36,536,881.25

Residency:Contract: 190186

Contractor: DUIT CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 14 % ( 14 %)

Time Passed: 42 % ( 42 %)

Adjusted:

10/07/2019

$36,536,881.25

05/16/2019

06/12/2019

06/19/2019

01002

TETRA TECH

400 400

10/07/2019

PAVEMENT AND BRIDGE

REHABILITATION,AND BRIDGE AND

APPROACHES I-40: FROM 1.0 MILE EAST OF

SH-10, EXTEND EAST NEAR VIAN. PROJECT

LENGTH = 6.497 MILES

32055(04) US-64

SSR-268C(054)SR

Orendorf, Barry

$2,471,375.93

Residency:Contract: 190236

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 90 % ( 89 %)

Time Passed: 103 % ( 107 %)

Adjusted:

09/09/2019

$2,456,937.63

07/25/2019

08/22/2019

08/27/2019

01200

SALLISAW

Fixed Completion Date: 11/30/2019

RESURFACE (ASPHALT) US-64: FROM 0.9

MILES EAST OF SH-64B, EXTEND EAST NEAR

ROLAND. PROJECT LENGTH = 5.143 MILES

32396(04) MULTIPLE

STP-268C(056)CI

CE2

$8,848,045.86

Residency:Contract: 190257

Contractor: JOB CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 6 % ( 6 %)

Time Passed: 9 % ( 9 %)

Adjusted:

03/16/2020

$8,848,045.86

08/22/2019

09/12/2019

09/23/2019

01017

CIRCUIT ENGR. DISTR. # 2

515 515

01/06/2020

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (DWIGHT MISSION/SEQUOYAH

LANDING ROAD): FROM I-40, EXTEND NORTH

NEAR SALLISAW. PROJECT LENGTH = 5.555

MILES

Construction Status Report Page 135

Page 136: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33439(04) US-64

SBR-268C(068)SB

Orendorf, Barry

$1,084,765.90

Residency:Contract: 200123

Contractor: B & B CONSTRUCTION SERVICE J.T., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,084,765.90

03/19/2020

04/22/2020

04/28/2020

01200

SALLISAW

90 90

09/08/2020

BRIDGE REHABILITATION US-64: OVER VIAN

CREEK, 1.0 MILE WEST OF THE SH-82

JUNCTION NEAR VIAN. PROJECT LENGTH =

0.083 MILE

StephensCounty: Commissioner District: 7

Contracts Under Construction

27847(04) CO.RD.

CIRB-269C(002)RB

Roberts, Colton

$5,271,083.89

Residency:Contract: 170381

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 109 % ( 99 %)

Time Passed: 122 % ( 101 %)

Adjusted:

04/02/2018

$4,783,900.66

11/16/2017

12/18/2017

12/21/2017

ILES

07100

DUNCAN

200 242

04/02/2018

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (EW-187): FROM US-81,

EXTEND WEST NEAR COMANCHE. PROJECT

LENGTH = 4.982 MILES

24412(04) SH-29

STP-169B(134)PM

Roberts, Colton

$12,809,408.35

Residency:Contract: 180211

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 64 % ( 62 %)

Time Passed: 87 % ( 87 %)

Adjusted:

09/04/2018

$12,462,832.15

05/17/2018

06/15/2018

06/18/2018

07100

DUNCAN

420 422

09/04/2018

GRADE, DRAIN, SURFACE, AND BRIDGE

SH-29: FROM 2.4 MILES EAST OF THE US-81

JUNCTION, EXTEND EAST NEAR MARLOW.

PROJECT LENGTH = 4.418 MILES

27966(04) SH-53

STP-269C(049)SS

Roberts, Colton

$1,745,199.06

Residency:Contract: 180362

Contractor: C3 CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 81 % ( 74 %)

Time Passed: 118 % ( 101 %)

Adjusted:

01/06/2020

$1,610,199.06

05/16/2019

06/18/2019

06/21/2019

07100

DUNCAN

60 70

01/16/2020

BRIDGE AND APPROACHES SH-53: OVER

SOUTH FORK OF DEER CREEK, 4.3 MILES

EAST OF THE US-81 JUNCTION NEAR

COMANCHE. PROJECT LENGTH = 0.160 MILE

Construction Status Report Page 136

Page 137: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

24412(09) SH-29

STP-269C(054)PM

Roberts, Colton

$12,244,587.15

Residency:Contract: 190165

Contractor: OVERLAND CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 15 % ( 15 %)

Time Passed: 35 % ( 35 %)

Adjusted:

09/09/2019

$12,247,790.70

04/18/2019

05/14/2019

05/23/2019

07100

DUNCAN

450 450

09/09/2019

GRADE, DRAIN, AND SURFACE SH-29: FROM

6.8 MILES EAST OF THE US-81 JUNCTION,

EXTEND EAST NEAR MARLOW. PROJECT

LENGTH = 4.632 MILES

28781(04) MULTIPLE

STP-269F(053)PM

Roberts, Colton

$177,886.03

Residency:Contract: 190166

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 92 % ( 92 %)

Time Passed: 68 % ( 68 %)

Adjusted:

08/06/2019

$177,886.03

04/18/2019

05/15/2019

05/23/2019

07100

DUNCAN

60 60

09/09/2019

BRIDGE WATER PROOF SEAL

US-81/US-277/DUNCAN

BYPASS/SH-32/SH-53/SH-79/ROCK CRUSHER

ROAD: AT MULTIPLE LOCATIONS IN DIVISION

VII. PROJECT LENGTH = 0.000 MILE

29932(04) COUNTY RO

STP-269D(055)CI

Roberts, Colton

$1,102,330.18

Residency:Contract: 190167

Contractor: RRY SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 77 % ( 77 %)

Time Passed: 133 % ( 131 %)

Adjusted:

08/30/2019

$1,096,463.15

04/18/2019

05/20/2019

05/23/2019

07100

DUNCAN

120 122

09/09/2019

BRIDGE AND APPROACHES COUNTY ROAD

(EAST CHESTNUT AVENUE/EW-173): OVER

EAST COW CREEK, 2.8 MILES EAST OF SH-7

NEAR DUNCAN. PROJECT LENGTH = 0.208

MILE

32939(04) US-81 (BR

HSIPG-269N(050)AD

Roberts, Colton

$320,729.46

Residency:Contract: 190298

Contractor: TOM HUDSON PAVING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 69 % ( 69 %)

Time Passed: 56 % ( 56 %)

Adjusted:

02/02/2020

$320,729.46

09/19/2019

10/23/2019

10/29/2019

07100

DUNCAN

45 45

02/02/2020

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

US-81 (BROADWAY STREET): FROM

CHICKASAW AVENUE, EXTEND NORTH IN

MARLOW. PROJECT LENGTH = 0.372 MILE

Construction Status Report Page 137

Page 138: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

34129(04) US-81/SH-

STP-269F(060)3B

Roberts, Colton

$642,011.00

Residency:Contract: 190299

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 51 % ( 51 %)

Time Passed: 61 % ( 61 %)

Adjusted:

02/17/2020

$642,011.00

09/19/2019

10/23/2019

10/30/2019

07100

DUNCAN

90 90

02/03/2020

JOINT SEAL/REPAIR US-81/SH-7 EB: US-81,

OVER CLARIDY CREEK 5.9 MI N OF

SH-53.SH-7 EB, OVER US-81 0.8 MI S OF SH-7A

IN DUNCAN. PROJECT LENGTH = 0.00 MILE

27967(04) SH-53

STP-269C(057)PM

Roberts, Colton

$4,768,286.95

Residency:Contract: 190375

Contractor: TREAS CONSTRUCTION, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$4,699,292.79

11/14/2019

12/13/2019

12/18/2019

07100

DUNCAN

185 185

03/16/2020

BRIDGE AND APPROACHES SH-53: OVER

MUD CREEK AND OVERFLOWS, 11.1 MILES

AND 11.0 MILES EAST OF THE US-81

JUNCTION NEAR COMANCHE. PROJECT

LENGTH = 0.572 MILE

TexasCounty: Commissioner District: 6

Contracts Under Construction

20839(08) US-54

NHPP-270N(017)FP

Michael, Charles

$9,413,377.47

Residency:Contract: 170101

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 104 % ( 94 %)

Time Passed: 118 % ( 92 %)

Adjusted:

04/02/2018

$8,539,125.29

11/16/2017

12/12/2017

01/16/2018

NE.

06200

GUYMON

360 461

04/02/2018

GRADE, DRAIN, AND SURFACE US-54: FROM

8.5 MILES NORTHEAST OF THE US-64

JUNCTION, EXTEND NORTHEAST NEAR

TYRONE. PROJECT LENGTH = 2.041 MILES.

20947(04) US-54

NHPP-008N(059)FP

Michael, Charles

$11,898,921.62

Residency:Contract: 190097

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 74 % ( 74 %)

Time Passed: 74 % ( 74 %)

Adjusted:

07/01/2019

$11,898,921.62

02/14/2019

03/12/2019

06/07/2019

06200

GUYMON

300 300

07/01/2019

GRADE, DRAIN, AND SURFACE US-54: FROM

4.8 MILES NORTHEAST OF THE US-64

JUNCTION. PROJECT LENGTH = 7.294 MILES

Construction Status Report Page 138

Page 139: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

14971(44) SH-54

NHPP-008N(103)RW

Michael, Charles

$63,500.00

Residency:Contract: 200080

Contractor: D T SPECIALIZED SERVICES, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$63,500.00

02/20/2020

03/19/2020

03/20/2020

06200

GUYMON

180 180

04/13/2020

RIGHT-OF-WAY CLEARANCE SH-54: FROM

10.5 MILES NORTHEAST OF THE US-64

JUNCTION, EXTEND NORTHEAST NEAR

TYRONE. PROJECT LENGTH = 3.670 MILES

PREQUALIFICATIONS FOR THIS PROJECT

HAS BEEN WAIVED. BOTH BID EXPRESS AD

WRITTEN BIDS WILL BE ACCEPTED.

28465(11) COUNTY RO

CIRB-270C(038)RB

Michael, Charles

$5,906,691.33

Residency:Contract: 200083

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$5,906,691.33

02/20/2020

03/13/2020

03/18/2020

06200

GUYMON

210 210

06/01/2020

GRADE, DRAIN, AND SURFACE COUNTY

ROADS (EW-10/NS-100): EW-10, FROM SH-136

EXTEND EAST NEAR STRAIGHT. NS-100,

FROM US-54 EXTEND NORTH NEAR HOOKER.

PROJECT LENGTH = 5.833 MILES

24241(04) SH-136

STP-170C(123)SS

Michael, Charles

$17,864,751.39

Residency:Contract: 200183

Contractor: J & R SAND COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$17,864,751.39

02/20/2020

03/13/2020

03/18/2020

06200

GUYMON

580 580

07/06/2020

GRADE, DRAIN, WIDEN, AND RESURFACE

SH-136: FROM THE TEXAS STATE LINE,

EXTEND NORTH, AND FROM 6.2 MILES SOUTH

OF THE US-412 JCT, EXTEND NORTH

PROJECT LENTH = 8.189 MILES

TillmanCounty: Commissioner District: 5

Contracts Under Construction

31137(04) COUNTY RO

STP-271D(059)CI

CED7

$1,225,591.35

Residency:Contract: 180184

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 115 % ( 91 %)

Time Passed: 103 % ( 100 %)

Adjusted:

12/03/2018

$974,723.30

07/19/2018

08/20/2018

08/21/2018

05005

CIRCUIT ENGR. DISTR. # 7

120 124

12/03/2018

BRIDGE AND APPROACHES COUNTY ROAD

(NS-215): OVER OTTER CREEK, 3.6 MILES

NORTH OF THE SH-5 JUNCTION NEAR

TIPTON. PROJECT LENGTH = 0.161 MILE

Construction Status Report Page 139

Page 140: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33435(04) US-183

SSR-271B(062)SR

Holley, Terri

$4,404,728.07

Residency:Contract: 190062

Contractor: CORNELL CONSTRUCTION COMPANY, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 99 %)

Time Passed: 164 % ( 120 %)

Adjusted:

11/05/2019

$4,260,389.07

05/16/2019

06/12/2019

06/17/2019

05200

ALTUS

Fixed Completion Date: 10/31/2019

RESURFACE (ASPHALT) US-183: FROM 1.02

MILES NORTH OF THE SH-5 JUNCTION,

EXTEND NORTH NEAR FREDERICK. PROJECT

LENGTH = 7.05 MILES

31154(04) COUNTY RO

STP-271D(065)CI

CED7

$368,793.53

Residency:Contract: 190258

Contractor: WYATT CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 65 % ( 65 %)

Time Passed: 57 % ( 57 %)

Adjusted:

01/06/2020

$368,793.53

08/22/2019

09/19/2019

09/26/2019

05005

CIRCUIT ENGR. DISTR. # 7

60 60

01/06/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-190): OVER BOTTLE CREEK, 0.2 MILES

EAST OF THE US-183 JUNCTION NEAR

DAVIDSON. PROJECT LENGTH = 0.121 MILE

29514(04) US-70

STP-271C(067)PM

Holley, Terri

$3,199,743.58

Residency:Contract: 200035

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 6 % ( 6 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$3,199,743.58

01/16/2020

02/18/2020

02/26/2020

05200

ALTUS

310 310

06/01/2020

BRIDGE AND APPROACHES US-70: OVER

BOTTLE CREEK AND SUTTLE CREEK, 1.1

MILES AND 3.3 MILES EAST OF THE US-183

JUNCTION NEAR DAVIDSON. PROJECT

LENGTH = 0.378 MILE

29516(04) SH-5

STP-271C(066)PM

Holley, Terri

$7,189,781.75

Residency:Contract: 200125

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$7,189,781.75

03/19/2020

04/20/2020

04/28/2020

05200

ALTUS

300 300

09/08/2020

BRIDGE AND APPROACHES SH-5: OVER

NORTH FORK OF RED RIVER AND

OVERFLOW, 4.3 MILES WEST OF THE SH-5C

JUNCTION NEAR TIPTON. PROJECT LENGTH =

0.937 MILE

TulsaCounty: Commissioner District: 8

Contracts Under Construction

Construction Status Report Page 140

Page 141: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31943(05) MULTIPLE

SSP-272F(220)SS

CEC

$166,017.84

Residency:Contract: 170168

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 100 % ( 100 %)

Time Passed: 78 % ( 78 %)

Adjusted:

06/04/2018

$166,017.84

01/18/2018

02/27/2018

03/08/2018

08003

CEC CORP.

45 45

06/04/2018

BRIDGE WATER PROOF SEAL

I-244/US-59/US-60/US-69/SH-75A/SH-99: AT

MULTIPLE LOCATIONS IN DIVISION VIII.

32626(04) INTERSTAT

HSIPG-272F(180)TR

Arnold, Bruce

$383,768.51

Residency:Contract: 180071

Contractor: ACTION SAFETY SUPPLY CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 53 % ( 53 %)

Time Passed: 71 % ( 71 %)

Adjusted:

01/06/2020

$383,768.51

09/19/2019

10/25/2019

10/30/2019

08100

TULSA

90 90

02/03/2020

TRAFFIC SIGNING INTERSTATES/US

HWYS/STATE HWYS/CITY STREETS: AT

MULTIPLE LOCATIONS IN THE CITY OF TULSA.

PROJECT LENGTH = 0.00 MILE

31943(06) MULTIPLE

SSP-272F(239)PM

CEC

$349,659.80

Residency:Contract: 180118

Contractor: JLT CONTRACTING, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 81 % ( 78 %)

Time Passed: 312 % ( 173 %)

Adjusted:

09/04/2018

$336,439.80

02/15/2018

03/23/2018

03/29/2018

08003

CEC CORP.

60 108

07/09/2018

BRIDGE WATER PROOF SEAL

INTERSTATES/US-HIGHWAYS/STATE

HIGHWAYS/CITY STREETS: AT MULTIPLE

LOCATIONS IN DIVISION VIII.

28900(04) I-444

NHPPI-4440-(007)PM

Arnold, Bruce

$25,104,810.21

Residency:Contract: 180229

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 102 % ( 98 %)

Time Passed: 104 % ( 104 %)

Adjusted:

01/02/2019

$24,104,826.47

06/14/2018

07/16/2018

07/19/2018

08100

TULSA

360 360

01/02/2019

RESURFACE (P.C. CONCRETE) AND BRIDGE

REHABILITATION I-444: OVER HOUSTON

AVENUE, SOUTHWEST BLVD RAMP, 6TH

STREET, 11TH STREET, AT MULTIPLE

LOCATIONS IN THE CITY OF TULSA. PROJECT

LENGTH = 1.630 MILES

Construction Status Report Page 141

Page 142: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29076(04) SH-11

NHPP-272N(245)PM

EST

$8,463,531.63

Residency:Contract: 180253

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 81 % ( 81 %)

Time Passed: 114 % ( 114 %)

Adjusted:

01/07/2019

$8,467,000.00

07/19/2018

08/16/2018

10/03/2018

08001

EST, INC.

380 380

01/07/2019

BRIDGE REHABILITATION SH-11:OVER BNSF

RAILROAD, PINE STREET, AND RAMP OVER

I-244, AT MULTIPLE LOCATIONS IN THE CITY

OF TULSA. PROJECT LENGTH = 0.749 MILE

11477(04) SH-51

SSP-272N(206)PM

C&KI

$12,835,737.20

Residency:Contract: 180307

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 80 % ( 80 %)

Time Passed: 60 % ( 60 %)

Adjusted:

05/01/2019

$12,797,000.00

09/20/2018

10/09/2018

10/11/2018

08007

CRAIG & KEITHLINE, INC.

525 525

05/01/2019

BRIDGE REHABILITATION SH-51/BROKEN

ARROW EXPRESSWAY: OVER LEWIS AVE,

RAILROAD, AND 15TH ST, 1.0 MI, 1.1 MI, AND

1.3 MI E OF US-75 IN TULSA. PROJECT

LENGTH = 0.575 MILE

31368(04) US-75/CHE

SBR-272N(257)SB

TETR

$1,241,307.68

Residency:Contract: 190098

Contractor: PBX CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 85 % ( 85 %)

Time Passed: 143 % ( 143 %)

Adjusted:

11/04/2019

$1,241,307.68

02/14/2019

03/26/2019

03/27/2019

08002

TETRA TECH

75 75

11/04/2019

BRIDGE REHABILITATION US-75/CHEROKEE

EXPRESSWAY: UNDER PINE STREET AND

OVER LEWIS AVENUE, 1.3 MILES AND 2.6

MILES NORTH OF I-244 IN TULSA. PROJECT

LENGTH = 0.083 MILE

32541(04) CITY STRE

STP-272C(259)IG

ATKINS

$1,540,713.06

Residency:Contract: 190099

Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 98 % ( 91 %)

Time Passed: 109 % ( 109 %)

Adjusted:

08/05/2019

$1,439,272.30

04/18/2019

05/21/2019

05/24/2019

08010

ATKINS

180 180

08/05/2019

INTERSECTION MODIFICATION CITY STREET

(EAST 131ST STREET): AT THE

INTERSECTION OF SOUTH MINGO ROAD, IN

THE CITY OF BIXBY. PROJECT LENGTH =

0.370 MILE

Construction Status Report Page 142

Page 143: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32203(04) CITY STRE

STP-272C(261)CI

GARV

$2,135,503.45

Residency:Contract: 190137

Contractor: RRY SERVICES, LLC / GRADE LINE CONSTRUCTION, LLC JV

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

04/20/2020

$2,135,503.45

06/20/2019

07/17/2019

07/23/2019

08011

GARVER, LLC.

150 150

04/20/2020

GRADE, DRAIN, AND SURFACE CITY STREET

(EAST 86TH STREET NORTH): AT THE

INTERSECTION OF NORTH SHERIDAN ROAD,

1.2 MILES EAST OF US-75 NEAR OWASSO.

PROJECT LENGTH = 0.619 MILE

30596(04) CITY STRE

NHPPI-2440-(016)PM

Arnold, Bruce

$4,194,469.57

Residency:Contract: 190228

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 80 % ( 79 %)

Time Passed: 62 % ( 62 %)

Adjusted:

12/02/2019

$4,119,889.57

07/25/2019

08/14/2019

08/29/2019

08100

TULSA

180 180

12/02/2019

BRIDGE REHABILITATION CITY STREETS

(SHERIDAN RD/GARNETT RD): OVER I-244, 2.4

MILES WEST AND 0.5 MILES EAST OF THE

US-169 INTERCHANGE IN TULSA. PROJECT

LENGTH = 0.00 MILE

30318(09) MULTIPLE

SSP-272F(268)SS

EST

$1,547,517.34

Residency:Contract: 190259

Contractor: JK INDUSTRIES, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 64 % ( 61 %)

Time Passed: 67 % ( 62 %)

Adjusted:

10/28/2019

$1,489,640.20

08/22/2019

09/12/2019

10/04/2019

08001

EST, INC.

150 163

10/28/2019

BRIDGE PAINTING I-44/US-75 NB/CITY

STREETS (YALE AVE/PITTSBURG

AVE/HARVARD AVE/MEMORIAL RD): AT

MULTIPLE LOCATIONS IN DIVISION VIII.

PROJECT LENGTH = 0.00 MILE

31943(07) MULTIPLE

SSP-272F(267)SS

TETR

$136,504.89

Residency:Contract: 190260

Contractor: LOGOS CONSTRUCTION CO., LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 100 % ( 100 %)

Time Passed: 70 % ( 70 %)

Adjusted:

01/06/2020

$136,504.89

08/22/2019

09/12/2019

09/20/2019

08002

TETRA TECH

70 70

01/06/2020

BRIDGE WATER PROOF SEAL

US-64/US-75/US-412EB/SH-10/SH-11/SH-51/HA

RVARD AVE/PITTSBURG AVE/YALE AVE: AT

MULTIPLE LOCATIONS IN DIVISION VIII.

PROJECT LENGTH = 0.00 MILES

Construction Status Report Page 143

Page 144: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

30742(04) CITY STRE

STP-272B(258)IG

TETR

$8,897,000.00

Residency:Contract: 190262

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 10 % ( 10 %)

Time Passed: 12 % ( 12 %)

Adjusted:

01/06/2020

$8,897,000.00

08/22/2019

09/12/2019

09/19/2019

08002

TETRA TECH

425 425

01/06/2020

GRADE, DRAIN, AND SURFACE CITY STREET

(NORTH GARNETT ROAD): FROM EAST 96TH

STREET NORTH, EXTEND NORTH IN THE CITY

OF OWASSO. PROJECT LENGTH = 0.870 MILE

27291(04) CITY STRE

STP-172B(484)IG

JACOBS

$8,095,431.84

Residency:Contract: 190271

Contractor: PARAGON CONTRACTORS, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 34 % ( 32 %)

Time Passed: 11 % ( 11 %)

Adjusted:

01/13/2020

$7,755,557.00

08/22/2019

09/19/2019

11/18/2019

08004

JACOBS ENGINEERING

500 500

01/06/2020

GRADE, DRAIN, AND SURFACE CITY STREET

(MAIN STREET): FROM SH-97 (WILSON

AVENUE), EXTEND EAST THEN NORTH IN THE

CITY OF SAND SPRINGS. PROJECT LENGTH =

1.230 MILES

34157(04) I-44/CITY

STP-272F(276)3B

CEC

$1,048,323.04

Residency:Contract: 190301

Contractor: PBX CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 57 % ( 57 %)

Time Passed: 54 % ( 54 %)

Adjusted:

02/16/2020

$1,048,323.04

09/19/2019

10/25/2019

12/19/2019

08003

CEC CORP.

90 90

02/03/2020

JOINT SEAL/REPAIR I-44/CITY STREET

(ADMIRAL PLACE): AT MULTIPLE LOCATIONS

IN DIVISION VIII. PROJECT LENGTH = 0.00

MILE

29693(04) I-44

NHPPI-4400(058)PM

Arnold, Bruce

$10,889,659.61

Residency:Contract: 190331

Contractor: SHERWOOD CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 23 % ( 23 %)

Time Passed: 18 % ( 18 %)

Adjusted:

01/27/2020

$10,884,214.61

10/17/2019

11/15/2019

11/20/2019

08100

TULSA

380 380

03/02/2020

BRIDGE AND APPROACHES I-44: OVER 33RD

WEST AVENUE, 0.5 MILES EAST OF THE I-244

INTERCHANGE IN TULSA. PROJECT LENGTH =

0.312 MILE

Construction Status Report Page 144

Page 145: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31619(04) CITY STRE

TAP-272D(279)IG

C&KI

$64,374.15

Residency:Contract: 190332

Contractor: ADVANCED WORKZONE SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 81 % ( 81 %)

Time Passed: 55 % ( 55 %)

Adjusted:

03/02/2020

$64,374.15

10/17/2019

11/18/2019

11/22/2019

08007

CRAIG & KEITHLINE, INC.

20 20

03/02/2020

PEDESTRIAN IMPROVEMENTS (BIKE LANE

SIGNING AND STRIPING) CITY STREETS (4TH

STREET/4TH PLACE): FROM HARVARD

AVENUE, EXTEND EAST IN TULSA. PROJECT

LENGTH = 1.02 MILES

31620(04) CITY STRE

TAP-272D(280)IG

C&KI

$500,000.00

Residency:Contract: 190333

Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 53 % ( 53 %)

Time Passed: 55 % ( 55 %)

Adjusted:

03/02/2020

$500,000.00

10/17/2019

11/19/2019

11/22/2019

08007

CRAIG & KEITHLINE, INC.

60 60

03/02/2020

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

CITY STREETS (E. 36TH PL/E. 37TH ST/S.

QUINCY AVE/ S. ROCKFORD AVE): AT

MULTIPLE LOCATIONS IN TULSA. PROJECT

LENGTH = 1.580 MILES

31621(04) CITY STRE

TAP-272N(281)IG

C&KI

$1,536,866.70

Residency:Contract: 190334

Contractor: GRADE LINE CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 27 % ( 27 %)

Time Passed: 29 % ( 29 %)

Adjusted:

03/02/2020

$1,536,866.70

10/17/2019

11/15/2019

11/20/2019

08007

CRAIG & KEITHLINE, INC.

120 120

03/02/2020

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

CITY STREET (S. MEMORIAL DRIVE): FROM

CREEK TURNPIKE, EXTEND NORTH IN TULSA.

PROJECT LENGTH = 4.670 MILES

31885(04) SH-11

STP-272B(266)PM

Arnold, Bruce

$1,753,055.53

Residency:Contract: 190335

Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 2 % ( 2 %)

Time Passed: 0 % ( 0 %)

Adjusted:

12/16/2019

$1,753,055.53

10/17/2019

11/19/2019

11/22/2019

08100

TULSA

120 120

12/16/2019

BRIDGE AND APPROACHES SH-11: OVER

DIRTY BUTTER CREEK, 1.2 MILES WEST OF

THE US-75 JUNCTION IN TULSA. PROJECT

LENGTH = 0.075 MILE

Construction Status Report Page 145

Page 146: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29326(04) CITY STRE

STP-272B(277)IG

ATKINS

$8,451,811.83

Residency:Contract: 190389

Contractor: CROSSLAND HEAVY CONTRACTORS INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 14 % ( 14 %)

Time Passed: 15 % ( 15 %)

Adjusted:

02/03/2020

$8,445,000.00

11/14/2019

12/13/2019

12/19/2019

08010

ATKINS

400 400

02/03/2020

GRADE, DRAIN,SURFACE, AND BRIDGE CITY

STREET (EAST 76TH STREET NORTH): FROM

0.1 MILES EAST OF THE US-169

INTERSECTION, EXTENDED EAST IN

OWASSO. PROJECT LENGTH 0.844 MILE

30604(04) US-64/CIT

SBR-272N(292)SB

Scott, Kalynn

$1,856,453.77

Residency:Contract: 200036

Contractor: PBX CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 9 % ( 9 %)

Time Passed: 15 % ( 15 %)

Adjusted:

03/23/2020

$1,856,453.77

01/16/2020

02/19/2020

02/26/2020

08400

SAND SPRINGS

150 150

06/01/2020

BRIDGE REHABILITATION US-64/CITY STREET

(209TH W AVE): US-64, OVER UNNAMED CR

1.5 MI E OF SH-151. 209TH W AVE, OVER

US-64 1.2 MI N OF SH-51. PROJECT LENGTH =

0.092 MILE

33019(04) CITY STRE

TAP-272E(294)CO

JACOBS

$1,847,662.84

Residency:Contract: 200086

Contractor: ELLSWORTH CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$1,847,662.84

02/20/2020

03/19/2020

03/20/2020

08004

JACOBS ENGINEERING

120 120

06/01/2020

PEDESTRIAN IMPROVEMENTS (TRAIL

CONSTRUCTION) CITY STREET (WEKIWA

ROAD): FROM THE NORTH 161ST STREET

JUNCTION, EXTEND SOUTHEAST NEAR SAND

SPRINGS. PROJECT LENGTH = 2.122 MILES

33039(04) TRAILS

TAP-272E(282)IG

JACOBS

$261,105.80

Residency:Contract: 200087

Contractor: ELLSWORTH CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$261,105.80

02/20/2020

03/19/2020

03/20/2020

08004

JACOBS ENGINEERING

90 90

07/06/2020

PEDESTRIAN IMPROVEMENTS (TRAIL

CONSTRUCTION) TRAILS (CHURCHILL PARK

AND SOUTH CREEK SUBDIVISIONS):

BETWEEN ELM STREET AND ELWOOD

AVENUE IN THE CITY OF JENKS. PROJECT

LENGTH = 1.885 MILES

Construction Status Report Page 146

Page 147: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

24346(04) SH-20

STP-172B(360)SS

Arnold, Bruce

$15,450,000.00

Residency:Contract: 200092

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$15,450,000.00

01/16/2020

02/11/2020

02/24/2020

08100

TULSA

350 350

06/01/2020

GRADE, DRAIN, SURFACE, AND BRIDGE

SH-20: FROM 0.1 MILES EAST OF THE US-75

JUNCTION, EXTEND EAST NEAR SKIATOOK.

PROJECT LENGTH = 3.780 MILES

WagonerCounty: Commissioner District: 1

Contracts Under Construction

24366(04) SH-16

ACSTP-273C(025)SS

Hagerman, Jeremy

$14,612,666.55

Residency:Contract: 160306

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 91 % ( 89 %)

Time Passed: 201 % ( 115 %)

Adjusted:

07/24/2017

$14,277,000.00

01/19/2017

02/21/2017

02/24/2017

01100

MUSKOGEE

320 560

07/24/2017

GRADE, DRAIN, SURFACE, AND BRIDGE

SH-16: FROM 0.1 MILE NORTH OF THE SH-51

JUNCTION, EXTEND SOUTH NEAR WAGONER.

PROJECT LENGTH = 6.050 MILES.

32395(04) COUNTY RO

STP-273C(051)CI

CE2

$1,340,613.00

Residency:Contract: 190139

Contractor: PARAGON CONTRACTORS, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 75 % ( 73 %)

Time Passed: 98 % ( 78 %)

Adjusted:

10/07/2019

$1,290,092.00

05/16/2019

06/14/2019

06/18/2019

01017

CIRCUIT ENGR. DISTR. # 2

120 152

10/07/2019

GRADE, DRAIN, AND SURFACE COUNTY

ROAD (EAST 121ST STREET SOUTH): FROM

SOUTH 23RD STREET, EXTEND EAST NEAR

COWETA. PROJECT LENGTH = 1.012 MILES

32789(04) US-69 NB

SSR-013N(171)SR

Hagerman, Jeremy

$1,402,005.00

Residency:Contract: 200038

Contractor: APAC-CENTRAL, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

04/27/2020

$1,402,005.00

01/16/2020

02/11/2020

02/14/2020

01100

MUSKOGEE

60 60

06/01/2020

RESURFACE (ASPHALT) US-69 NB: FROM 0.7

MILES NORTH OF THE SH-51 JUNCTION,

EXTEND NORTH NEAR WAGONER. PROJECT

LENGTH = 5.405 MILES

Construction Status Report Page 147

Page 148: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

32791(04) SH-51

NHPP-273N(053)3P

Hagerman, Jeremy

$2,170,629.85

Residency:Contract: 200130

Contractor: ROSSCON, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$2,170,629.85

03/19/2020

04/15/2020

04/21/2020

01100

MUSKOGEE

Fixed Completion Date: 08/01/2020

RESURFACE (ASPHALT) SH-51: FROM 4.2

MILES SOUTHEAST OF THE CREEK

TURNPIKE, EXTEND SOUTHEAST NEAR

COWETA. PROJECT LENGTH = 4.490 MILES

WashingtonCounty: Commissioner District: 8

Contracts Under Construction

25490(04) CO.RD.

CIRB-174D(062)RB

EST

$4,604,950.00

Residency:Contract: 180151

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 97 % ( 96 %)

Time Passed: 216 % ( 216 %)

Adjusted:

09/04/2018

$4,589,000.00

03/15/2018

04/13/2018

04/17/2018

THEN SOUTH ON NS-398 NEAR DEWEY.

08001

EST, INC.

180 180

09/04/2018

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROADS (EW-14/NS-398): FROM THE

US-75 JUNCTION, EXTEND EAST ON EW-14

THEN SOUTH ON NS-398 NEAR DEWEY.

PROJECT LENGTH = 3.214 MILES

24242(04) US-60

NHPP-018N(053)

EST

$15,867,000.00

Residency:Contract: 190027

Contractor: BECCO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 15 % ( 15 %)

Time Passed: 33 % ( 33 %)

Adjusted:

11/04/2019

$15,867,000.00

05/16/2019

06/12/2019

06/17/2019

08001

EST, INC.

360 360

11/04/2019

GRADE, DRAIN, SURFACE, AND BRIDGE

US-60: FROM 2.3 MILES EAST OF THE US-75

JCT, EXTEND EAST NEAR BARTLESVILLE.

PROJECT LENGTH = 4.894 MILES

31369(04) US-75

SBR-274N(021)SB

ATKINS

$4,365,872.05

Residency:Contract: 190104

Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 60 % ( 60 %)

Time Passed: 54 % ( 53 %)

Adjusted:

08/27/2019

$4,364,927.05

02/14/2019

03/15/2019

03/25/2019

08010

ATKINS

300 304

09/09/2019

BRIDGE REHABILITATION US-75: OVER

COTTON CREEK, 2.3 MILES NORTH OF THE

SH-10 JUNCTION NEAR COPAN. PROJECT

LENGTH = 0.208 MILE

Construction Status Report Page 148

Page 149: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

31944(07) US-75

SSP-272F(269)SS

EST

$509,146.79

Residency:Contract: 190261

Contractor: PBX CORPORATION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 82 % ( 82 %)

Time Passed: 100 % ( 100 %)

Adjusted:

12/09/2019

$509,146.79

08/22/2019

09/19/2019

09/26/2019

08001

EST, INC.

90 90

12/09/2019

JOINT SEAL/REPAIR US-75: OVER CANEY

RIVER O'FLOW, NORTH AND SOUTH FORK

DOUBLE CREEK, AND SK &O RAILROAD IN

DIVISIONS VIII. PROJECT LENGTH - 0.00 MILE

30618(04) COUNTY RO

CIRB-274D(024)RB

BCS

$822,394.71

Residency:Contract: 190309

Contractor: BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 68 % ( 68 %)

Time Passed: 71 % ( 71 %)

Adjusted:

02/13/2020

$822,394.71

11/14/2019

12/17/2019

12/19/2019

08018

BENCHMARK CONSTR. SERVS., LLC

90 90

01/27/2020

BRIDGE AND APPROACHES COUNTY ROAD

(NS-400): OVER BEVAN CREEK, 4.0 MILES

NORTH OF THE TULSA COUNTY LINE NEAR

VERA. PROJECT LENGTH = 0.163 MILE

WashitaCounty: Commissioner District: 5

Contracts Under Construction

27935(04) I-40

ACNHPPI-4000-(057)PM

Sawyer, Dax

$9,190,302.38

Residency:Contract: 180152

Contractor: CASWELL CONTRACTING, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 101 % ( 94 %)

Time Passed: 155 % ( 124 %)

Adjusted:

09/04/2018

$8,502,098.06

05/17/2018

06/15/2018

06/20/2018

MILES

05100

CLINTON

240 300

09/04/2018

RESURFACE (ASPHALT)AND CABLE BARRIER

I-40: FROM 0.4 MILES WEST OF SH-44,

EXTEND WEST NEAR FOSS. PROJECT

LENGTH = 7.841 MILES

31101(04) SH-54

SBR-275C(046)SB

Sawyer, Dax

$1,299,500.06

Residency:Contract: 180364

Contractor: BRIDGECO CONTRACTORS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 97 % ( 97 %)

Time Passed: 113 % ( 113 %)

Adjusted:

09/03/2019

$1,299,500.06

04/18/2019

05/21/2019

05/23/2019

05100

CLINTON

120 120

09/09/2019

BRIDGE REHABILITATION SH-54: OVER

CALVARY CREEK, 1.0 MILE SOUTH OF THE

SH-152 JUNCTION NEAR CLOUD CHIEF.

PROJECT LENGTH = 0.206 MILE

Construction Status Report Page 149

Page 150: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

29278(04) SH-44

SBR-275C(048)SB

Holley, Terri

$1,082,884.80

Residency:Contract: 190229

Contractor: K & R BUILDERS, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 90 % ( 84 %)

Time Passed: 54 % ( 54 %)

Adjusted:

02/17/2020

$1,013,537.00

07/25/2019

08/14/2019

08/16/2019

05200

ALTUS

90 90

02/17/2020

BRIDGE REHABILITATION SH-44: OVER LITTLE

ELK CREEK, 0.5 MILES NORTH OF THE SH-152

JUNCTION NEAR DILL CITY. PROJECT

LENGTH = 0.049 MILE

34099(04) US-183 SB

STP-275F(050)3B

Sawyer, Dax

$739,397.60

Residency:Contract: 190302

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 43 % ( 43 %)

Time Passed: 42 % ( 42 %)

Adjusted:

02/06/2020

$739,397.60

09/19/2019

10/25/2019

10/29/2019

05100

CLINTON

120 120

02/04/2020

JOINT SEAL/REPAIR US-183 SB/SH-152: AT

MULTIPLE LOCATIONS IN DIVISION V.

PROJECT LENGTH = 0.00 MILE

32323(04) COUNTY RO

STP-275D(049)CI

CED7

$631,296.40

Residency:Contract: 190378

Contractor: SEWELL BROS., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 8 % ( 8 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$631,296.40

11/14/2019

12/13/2019

12/19/2019

05005

CIRCUIT ENGR. DISTR. # 7

120 120

06/01/2020

BRIDGE AND APPROACHES COUNTY ROAD

(EW-110): OVER GYP CREEK, 6.7 MILES WEST

OF THE SH-54 JUNCTION NEAR CORN.

PROJECT LENGTH = 0.152 MILE

WoodsCounty: Commissioner District: 6

Contracts Under Construction

25493(04) CO.RD.

CIRB-176C(151)RB

CED8

$3,631,483.61

Residency:Contract: 170245

Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 99 % ( 100 %)

Time Passed: 91 % ( 91 %)

Adjusted:

10/20/2017

$3,634,540.76

07/20/2017

08/21/2017

09/22/2017

E.

06009

CIRCUIT ENGR. DISTR. # 8

210 210

12/04/2017

BRIDGE AND APPROACHES COUNTY ROAD

(N2380 ROAD): OVER SALT FORK RIVER, 2.6

MILES SOUTH OF THE KANSAS STATE LINE.

PROJECT LENGTH = 0.850 MILE

Construction Status Report Page 150

Page 151: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

27923(04) US-64

STP-276B(032)PM

Dodgion, Richard

$4,595,214.64

Residency:Contract: 180215

Contractor: VENTURE CORPORATION DBA V. C. O. PAVING

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 108 % ( 99 %)

Time Passed: 127 % ( 84 %)

Adjusted:

09/10/2018

$4,191,320.10

05/17/2018

06/12/2018

07/18/2018

06100

BUFFALO

210 319

10/01/2018

BRIDGE AND APPROACHES US-64: OVER

BNSF RAILROAD, 2.1 MILES WEST OF THE

US-281 JUNCTION NEAR ALVA. PROJECT

LENGTH = 0.687 MILE

27922(04) US-64

STP-276B(029)PM

Dodgion, Richard

$2,431,234.70

Residency:Contract: 180256

Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 101 % ( 99 %)

Time Passed: 136 % ( 103 %)

Adjusted:

11/09/2018

$2,393,762.35

07/19/2018

08/15/2018

08/31/2018

06100

BUFFALO

160 210

12/03/2018

BRIDGE AND APPROACHES US-64: OVER

ANDERSON CREEK, 2.1 MILES EAST OF THE

SH-50 JUNCTION NEAR FREEDOM. PROJECT

LENGTH = 0.198 MILE

34138(04) US-281/US

STP-276F(036)3B

Dodgion, Richard

$151,953.24

Residency:Contract: 190306

Contractor: RESTEK, INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 53 % ( 53 %)

Time Passed: 57 % ( 57 %)

Adjusted:

01/31/2020

$151,953.24

09/19/2019

10/23/2019

10/30/2019

06100

BUFFALO

90 90

02/03/2020

JOINT SEAL/REPAIR US-281/US-412: AT

MULTIPLE LOCATIONS IN DIVISION VI.

PROJECT LENGTH - 0.00 MILE

29782(04) COUNTY RO

CIRB-276D(044)RB

CED8

$610,698.86

Residency:Contract: 200039

Contractor: RRY SERVICES, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$610,698.86

01/16/2020

03/19/2020

03/20/2020

06009

CIRCUIT ENGR. DISTR. # 8

120 120

06/01/2020

BRIDGE AND APPROACHES COUNTY ROAD

(NS-246): OVER SAND CREEK, 2.7 MILES

NORTH OF SH-45 NEAR DACOMA. PROJECT

LENGTH = 0.175 MILE

WoodwardCounty: Commissioner District: 6

Contracts Under Construction

Construction Status Report Page 151

Page 152: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

17457(16) US-183

NHPP-277N(010)SS/NHPP-17*

Dodgion, Richard

$19,784,232.10

Residency:Contract: 150274

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 96 % ( 96 %)

Time Passed: 133 % ( 133 %)

Adjusted:

12/07/2015

$19,773,696.37

08/20/2015

09/22/2015

11/06/2015

*N(060)SS

06100

BUFFALO

525 527

12/07/2015

GRADE, DRAIN, SURFACE, AND BRIDGE

US-183: FROM 5.0 MILES SOUTHEAST OF THE

SH-50 JUNCTION, EXTEND SOUTHEAST NEAR

MUTUAL. PROJECT LENGTH = 5.643 MILES.

29799(04) CT.ST.

ACSTP-277C(043)UR

Dodgion, Richard

$8,564,897.16

Residency:Contract: 180122

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 74 % ( 74 %)

Time Passed: 133 % ( 93 %)

Adjusted:

08/06/2018

$8,553,070.73

03/15/2018

04/11/2018

04/17/2018

WARD.

06100

BUFFALO

365 523

08/06/2018

GRADE, DRAIN, SURFACE, AND BRIDGE CITY

STREET (34TH STREET): FROM THE US-412

JUNCTION, EXTEND SOUTH IN WOODWARD.

PROJECT LENGTH = 2.074 MILES

17457(20) US-183/US

NHPP-017N(063)

Dodgion, Richard

$12,326,684.39

Residency:Contract: 180366

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 41 % ( 41 %)

Time Passed: 80 % ( 71 %)

Adjusted:

04/01/2019

$12,326,684.39

11/15/2018

12/17/2018

12/20/2018

06100

BUFFALO

380 427

04/01/2019

GRADE, DRAIN, SURFACE, AND BRIDGE

US-183/US-270: FROM 9.8 MILES NORTHWEST

OF THE US-60 JUNCTION, EXTEND

SOUTHEAST NEAR SEILING. PROJECT

LENGTH = 3.694 MILES

27407(04) COUNTY RO

CIRB-177C(113)RB

CED8

$6,464,095.36

Residency:Contract: 190064

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 56 % ( 55 %)

Time Passed: 111 % ( 88 %)

Adjusted:

06/03/2019

$6,342,476.10

01/17/2019

02/20/2019

02/28/2019

06009

CIRCUIT ENGR. DISTR. # 8

210 266

06/03/2019

GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (QUINLAN ROAD): FROM 4.3

MILES NORTHEAST OF THE US-412

JUNCTION, EXTEND NORTHEAST NEAR

QUINLAN. PROJECT LENGTH = 6.225 MILES

Construction Status Report Page 152

Page 153: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

26974(06) US-64/US-

STP-230F(031)PM

Dodgion, Richard

$381,383.20

Residency:Contract: 190205

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 48 % ( 48 %)

Time Passed: 77 % ( 77 %)

Adjusted:

10/11/2019

$381,383.20

07/25/2019

08/20/2019

08/23/2019

06100

BUFFALO

90 90

12/02/2019

JOINT SEAL/REPAIR US-64/US-183: AT

MULTIPLE LOCATIONS IN DIVISION VI.

PROJECT LENGTH = 0.000 MILES

17457(54) US-183/US

NHPP-017N(206)PM

Dodgion, Richard

$21,069,785.08

Residency:Contract: 190379

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 2 % ( 2 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$21,069,785.08

11/14/2019

12/17/2019

12/19/2019

06100

BUFFALO

485 485

04/01/2020

GRADE, DRAIN, SURFACE, AND BRIDGE

US-183/US-270: FROM 1.6 MILES NORTHWEST

OF THE US-60 JUNCTION, EXTEND

NORTHWEST NEAR SEILING. PROJECT

LENGTH = 4.360 MILES

31767(04) US-412

NHPP-019N(140)3P

Dodgion, Richard

$4,837,667.00

Residency:Contract: 200131

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Engineer:

Contract Amount: ( )

Adjusted:

Contract Time: ( )

Letting Date:

Contract Date:

W/O Issued

W/O Effective:

Work Started:

Amount Paid: 0 % ( 0 %)

Time Passed: 0 % ( 0 %)

Adjusted:

$4,837,667.00

03/19/2020

04/22/2020

04/28/2020

06100

BUFFALO

Fixed Completion Date: 10/31/2020

RESURFACE (ASPHALT) US-412: FROM 1.08

MILES EAST OF US-183S JUNCTION, EXTEND

EAST NEAR WOODWARD. PROJECT LENGTH

= 7.623 MILES

Construction Status Report Page 153

Page 154: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

AdairCounty: Commissioner District: 1

Contracts Awarded - NTP Not Processed

32792(04) SBR-268B(067)SBMULTIPLE200170Contract:

Contractor: B & B CONSTRUCTION SERVICE J.T., INC.

Contract Amount:

Letting Date:

$305,254.46

04/16/2020

Residency: 01100

MUSKOGEE

BRIDGE

REHABILITATIONI-40/US-59/US-62/US-64/SH-9/SH-16/

SH-51 EB/SH-82/SH-101: ATMULTIPLE LOCATIONS IN

DIVISION I.PROJECT LENGTH = 0.000 MILES

BeaverCounty: Commissioner District: 6

Contracts Awarded - NTP Not Processed

30500(04) STP-204C(031)CICOUNTY RO200138Contract:

Contractor: K & R BUILDERS, INC.

Contract Amount:

Letting Date:

$1,360,625.24

04/16/2020

Residency: 06200

GUYMON

BRIDGE AND APPROACHESCOUNTY ROAD (EW-34):

OVER KIOWA CREEK, 15.5 MILES EAST OFTHE

SH-23 JUNCTION NEAR LOGAN.PROJECT LENGTH =

0.464 MILE

BlaineCounty: Commissioner District: 5

Contracts Awarded - NTP Not Processed

29512(04) STP-206C(061)PMSH-58200216Contract:

Contractor: K & R BUILDERS, INC.

Contract Amount:

Letting Date:

$2,279,999.17

04/16/2020

Residency: 05100

CLINTON

BRIDGE AND APPROACHESSH-58: OVER

MINNEHAHA CREEK, 0.1 MILES SOUTH OF THE

SH-51JUNCTION IN CANTON.PROJECT LENGTH =

0.156 MILE

BryanCounty: Commissioner District: 2

Contracts Awarded - NTP Not Processed

23145(10) SSP-264F(071)PMUS-70200140Contract:

Contractor: MONOKO, LLC

Contract Amount:

Letting Date:

$1,171,890.00

04/16/2020

Residency: 02002

TETRA TECH

BRIDGE PAINTINGUS-70: OVER LAKE TEXOMA, 5.5

MILES EAST OF THE SH-32JUNCTION NEAR

KINGSTON.PROJECT LENGTH = 0.000 MILES

CaddoCounty: Commissioner District: 7

Contracts Awarded - NTP Not Processed

33883(04) STP-208B(072)3PUS-62200142Contract:

Contractor: T & G CONSTRUCTION, INC.

Contract Amount:

Letting Date:

$735,101.05

04/16/2020

Residency: 07300

ANADARKO

RESURFACE (ASPHALT)US-62: FROM 6.3 MILES

EAST OF THE SH-9 JUNCTION, EXTENDEAST THEN

NORTH IN ANADARKO.PROJECT LENGTH = 1.620

MILES

Construction Status Report Page 154

Page 155: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

CherokeeCounty: Commissioner District: 1

Contracts Awarded - NTP Not Processed

32790(04) STP-211B(038)3PUS-62/SH-200144Contract:

Contractor: APAC-CENTRAL, INC.

Contract Amount:

Letting Date:

$1,128,103.20

04/16/2020

Residency: 01100

MUSKOGEE

RESURFACE (ASPHALT)US-62/SH-10 (EB ONLY):

FROM 0.42 MILES EAST OF THE

MUSKOGEECOUNTY LINE, EXTEND EAST NEAR

FORT GIBSON.PROJECT LENGTH = 3.280 MILES

ClevelandCounty: Commissioner District: 3

Contracts Awarded - NTP Not Processed

33270(04) TAP-214D(101)AGSH-9200145Contract:

Contractor: SAC SERVICES, INC.

Contract Amount:

Letting Date:

$737,860.25

04/16/2020

Residency: 03021

OLSSON ASSOCIATES

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)SH-9:

FROM 36TH AVENUE, EXTEND EAST IN THE CITY OF

NORMAN.PROJECT LENGTH = 0.980 MILE

34760(04) MC-3500(090)MDI-35 (NB200186Contract:

Contractor: HASKELL LEMON CONSTRUCTION CO.

Contract Amount:

Letting Date:

$247,891.75

04/16/2020

Residency: 03200

PURCELL

RESURFACE (ASPHALT AND UTBWC)I-35 (NB LANES

ONLY): FROM 0.5 MILES SOUTH OF THE

US-77JUNCTION, EXTEND NORTH IN

NORMAN.PROJECT LENGTH = 0.530 MILE

CreekCounty: Commissioner District: 8

Contracts Awarded - NTP Not Processed

32731(04) SBR-219N(075)SBUS-75A200008Contract:

Contractor: LOGOS CONSTRUCTION CO., LLC

Contract Amount:

Letting Date:

$785,645.21

04/16/2020

Residency: 08400

SAND SPRINGS

BRIDGE REHABILITATIONUS-75A: OVER POLECAT

CREEK, 2.0 MILES SOUTHEAST OF THESH-117

INTERSECTION NEAR SAPULPA.PROJECT LENGTH

= 0.236 MILE

31360(04) SBR-219B(070)SBSH-33200146Contract:

Contractor: CONCRETE SERVICES CORPORATION

Contract Amount:

Letting Date:

$1,060,069.62

04/16/2020

Residency: 08400

SAND SPRINGS

BRIDGE REHABILITATIONSH-33: OVER BROWNS

CREEK, 3.8 MILES EAST OF THE SH-48JUNCTION

NEAR LAKE HEYBURN.PROJECT LENGTH = 0.322

MILE

32715(04) STP-219C(069)3PSH-16200147Contract:

Contractor: ROSSCON, LLC

Contract Amount:

Letting Date:

$1,674,760.70

04/16/2020

Residency: 08400

SAND SPRINGS

RESURFACE (ASPHALT)SH-16: FROM 7.16 MILES

SOUTHEAST OF THE SH-33 JUNCTION,EXTEND

EAST NEAR SHAMROCK.PROJECT LENGTH = 8.000

MILES

DelawareCounty: Commissioner District: 8

Contracts Awarded - NTP Not Processed

Construction Status Report Page 155

Page 156: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

28856(04) STP-221C(046)PMSH 85A200148Contract:

Contractor: C-GAWF CONSTRUCTION, INC.

Contract Amount:

Letting Date:

$14,482,070.35

04/16/2020

Residency: 08300

CLAREMORE

BRIDGE AND APPROACHESSH-85A: OVER HORSE

CREEK, 2.1 MILES SOUTHWEST OF THE

SH-125JUNCTION IN BERNICE.PROJECT LENGTH =

0.562 MILE

33915(04) CIRB-221D(049)RBCOUNTY RO200149Contract:

Contractor: K & R BUILDERS, INC.

Contract Amount:

Letting Date:

$1,173,154.30

04/16/2020

Residency: 08010

ATKINS

BRIDGE AND APPROACHESCOUNTY ROADS

(EW-450/D4643): OVER BEATY CREEK, 3.5

MILESSOUTH OF THE SH-20 JUNCTION NEAR

SYCAMORE.PROJECT LENGTH = 0.165 MILE

EllisCounty: Commissioner District: 6

Contracts Awarded - NTP Not Processed

24160(04) NHPP-223N(021)SSSH-15200062Contract:

Contractor: J & R SAND COMPANY, INC.

Contract Amount:

Letting Date:

$8,778,549.03

02/20/2020

Residency: 06100

BUFFALO

GRADE, DRAIN, SURFACE AND BRIDGESH-15: FROM

2.5 MILES EAST OF THE SH-64 JUNCTION,

EXTENDNORTHEAST NEAR GAGE.PROJECT

LENGTH = 4.219 MILES

GarfieldCounty: Commissioner District: 4

Contracts Awarded - NTP Not Processed

30641(04) SBR-019N(134)SBUS-64/US-200151Contract:

Contractor: BRIDGECO CONTRACTORS, INC.

Contract Amount:

Letting Date:

$892,764.17

04/16/2020

Residency: 04300

ENID

BRIDGE REHABILITATIONUS-64/US-412: OVER

SKELETON CREEK, 4.3 MILES EAST OF THEUS-81

JUNCTION IN ENID.PROJECT LENGTH 0.071 MILE

GradyCounty: Commissioner District: 7

Contracts Awarded - NTP Not Processed

30078(04) STP-208F(078)PMMULTIPLE200141Contract:

Contractor: GARY A. CRAIN, INC.

Contract Amount:

Letting Date:

$151,132.16

04/16/2020

Residency: 07300

ANADARKO

BRIDGE WATER PROOF SEALUS-62

EB/US-81/SH-9/SH-19/SH-58: AT MULTIPLE

LOCATIONS INDIVISION VII.PROJECT LENGTH =

0.000 MILE

GrantCounty: Commissioner District: 4

Contracts Awarded - NTP Not Processed

28416(04) STP-227D(025)CICOUNTY RO200102Contract:

Contractor: H & H BRIDGE COMPANY

Contract Amount:

Letting Date:

$744,732.20

03/19/2020

Residency: 04009

CIRCUIT ENGR. DISTR.

# 8

BRIDGE AND APPROACHESCOUNTY ROAD

(EW-026): OVER WILD HORSE CREEK, 5.3 MILES

EASTOF THE US-81 JUNCTION NEAR POND

CREEK.PROJECT LENGTH = 0.298 MILE

Construction Status Report Page 156

Page 157: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

HarmonCounty: Commissioner District: 5

Contracts Awarded - NTP Not Processed

24134(10) STP-206F(064)PMMULTIPLE200139Contract:

Contractor: GARY A. CRAIN, INC.

Contract Amount:

Letting Date:

$90,090.10

04/16/2020

Residency: 05200

ALTUS

BRIDGE WATER PROOF

SEALSH-8/SH-19/SH-30/SH-51/SH-55: AT MULTIPLE

LOCATIONS INDIVISION V.PROJECT LENGTH = 0.000

MILE

HaskellCounty: Commissioner District: 1

Contracts Awarded - NTP Not Processed

24967(04) CIRB-131C(087)RBCOUNTY RO200133Contract:

Contractor: C3 CONSTRUCTION, INC.

Contract Amount:

Letting Date:

$2,684,648.91

03/19/2020

Residency: 01017

CIRCUIT ENGR. DISTR.

# 2

WIDEN, RESURFACE, AND BRIDGECOUNTY ROAD

(NS-447/TAMAHA ROAD): FROM SH-9, EXTEND

NORTHNEAR STIGLER.PROJECT LENGTH = 3.977

MILES

31195(04) STP-231B(042)PMSH-2200152Contract:

Contractor: C-GAWF CONSTRUCTION, INC.

Contract Amount:

Letting Date:

$1,250,001.46

04/16/2020

Residency: 01200

SALLISAW

GRADE, DRAIN, AND SURFACESH-2: FROM 2.3

MILES NORTH OF THE LATIMER COUNTY

LINE,EXTEND NORTH NEAR WILBURTON.PROJECT

LENGTH = 0.159 MILE

HughesCounty: Commissioner District: 3

Contracts Awarded - NTP Not Processed

29545(04) STP-232B(062)PMUS-75200065Contract:

Contractor: TREAS CONSTRUCTION, INC.

Contract Amount:

Letting Date:

$1,832,059.37

04/16/2020

Residency: 03100

ADA

BRIDGE AND APPROACHESUS-75: OVER SALT

CREEK, 5.7 MILES SOUTH OF THE US-270JUNCTION

NEAR CALVIN.PROJECT LENGTH = 0.159 MILE

JeffersonCounty: Commissioner District: 7

Contracts Awarded - NTP Not Processed

29359(04) STP-234D(050)CIEW-207200153Contract:

Contractor: K & R BUILDERS, INC.

Contract Amount:

Letting Date:

$939,292.76

04/16/2020

Residency: 07100

DUNCAN

BRIDGES AND APPROACHESCOUNTY ROAD

(EW-207): OVER BAKER CR AND TRIBUTARY TO

BAKERCR, 4.0 MILES AND 3.0 MILES WEST OF THE

SH-32 NEAR GRADY.PROJECT LENGTH = 0.381 MILE

KayCounty: Commissioner District: 4

Contracts Awarded - NTP Not Processed

Construction Status Report Page 157

Page 158: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

33000(04) TAP-236N(063)TPCITY STRE200154Contract:

Contractor: DOWNEY CONTRACTING, LLC

Contract Amount:

Letting Date:

$758,115.30

04/16/2020

Residency: 04100

PERRY

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)CITY

STREET (MAIN STREET): FROM 0.1 MILES SOUTH

OF US-60B(E NORTH AVENUE), EXTEND NORTH IN

THE CITY OF TONKAWA.PROJECT LENGTH = 0.987

MILE

KiowaCounty: Commissioner District: 5

Contracts Awarded - NTP Not Processed

31712(04) STP-238C(055)3PSH-44A200106Contract:

Contractor: CASWELL CONTRACTING, INC.

Contract Amount:

Letting Date:

$495,629.69

03/19/2020

Residency: 05200

ALTUS

RESURFACE (ASPHALT)SH-44A: FROM THE SH-44

JUNCTION, EXTEND NORTH NEAR

LUGERT.PROJECT LENGTH = 1.360 MILES

LatimerCounty: Commissioner District: 2

Contracts Awarded - NTP Not Processed

23144(12) SSP-264F(072)PMMULTIPLE200168Contract:

Contractor: GARY A. CRAIN, INC.

Contract Amount:

Letting Date:

$82,194.68

04/16/2020

Residency: 02200

HEAVENER

BRIDGE WATER PROOF SEALUS-69

SB/US-259/SH-1/SH-113/CROWDER ROAD: AT

MULTIPLELOCATIONS IN DIVISION II.PROJECT

LENGTH = 0.000 MILES

LincolnCounty: Commissioner District: 3

Contracts Awarded - NTP Not Processed

22529(04) STP-141D(150)CICOUNTY RO200155Contract:

Contractor: BRIDGECO CONTRACTORS, INC.

Contract Amount:

Letting Date:

$505,437.59

04/16/2020

Residency: 03024

CIRCUIT ENGR. DISTR.

#4

BRIDGE AND APPROACHESCOUNTY ROAD (EW-77):

OVER SAND CREEK, 0.2 MILES EAST OF THESH-99

JUNCTION NEAR SHAMROCK.PROJECT LENGTH =

0.180 MILE

MajorCounty: Commissioner District: 6

Contracts Awarded - NTP Not Processed

31771(04) STP-247C(026)CICOUNTY RO200109Contract:

Contractor: WILDCAT CONSTRUCTION CO., INC. &

SUBSIDIARIES

Contract Amount:

Letting Date:

$647,868.96

03/19/2020

Residency: 06009

CIRCUIT ENGR. DISTR.

# 8

BRIDGE REHABILITATIONCOUNTY ROAD (D0553):

OVER CIMARRON RIVER, 3.5 MILES WEST OFTHE

SH-8 JUNCTION NEAR AMES.PROJECT LENGTH =

0.288 MILE

27005(10) SSP-019N(136)PMUS-412200217Contract:

Contractor: TOM HUDSON PAVING, INC.

Contract Amount:

Letting Date:

$109,649.37

04/16/2020

Residency: 06100

BUFFALO

GRADE AND DRAINUS-412: FROM 1.7 MILES EAST

OF THE WOODWARD COUNTY LINE,EXTEND

EAST.PROJECT LENGTH = 0.060 MILE

Construction Status Report Page 158

Page 159: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

MarshallCounty: Commissioner District: 2

Contracts Awarded - NTP Not Processed

31278(04) NHPP-248N(050)PMUS-70200157Contract:

Contractor: OVERLAND CORPORATION

Contract Amount:

Letting Date:

$8,382,350.95

04/16/2020

Residency: 02300

MADILL

WIDEN AND RESURFACEUS-70: FROM 1.9 MILES

EAST OF THE CARTER COUNTY LINE, EXTENDEAST

NEAR MADILL.PROJECT LENGTH = 5.227 MILES

McIntoshCounty: Commissioner District: 1

Contracts Awarded - NTP Not Processed

28503(04) CIRB-246C(043)RBCOUNTY RO200110Contract:

Contractor: ROBINSON CONSTRUCTION, LLC

Contract Amount:

Letting Date:

$3,157,980.13

03/19/2020

Residency: 01017

CIRCUIT ENGR. DISTR.

# 2

GRADE, DRAIN, AND SURFACECOUNTY ROAD

(DAM ROAD): FROM 0.4 MILES NORTH OF THE

SH-71JUNCTION, EXTEND NORTH NEAR

TEXANNA.PROJECT LENGTH = 3.418 MILES

MuskogeeCounty: Commissioner District: 1

Contracts Awarded - NTP Not Processed

32723(04) SBR-251C(096)SBSH-72200159Contract:

Contractor: PARADIGM CONSTRUCTION & ENGINEERING,

INC

Contract Amount:

Letting Date:

$1,780,880.63

04/16/2020

Residency: 01100

MUSKOGEE

BRIDGE REHABILITATIONSH-72: OVER COAL

CREEK, 1.3 MILES NORTH OF THE US-64JUNCTION

NEAR HASKELL.PROJECT LENGTH = 0.160 MILE

NobleCounty: Commissioner District: 4

Contracts Awarded - NTP Not Processed

30633(04) STP-252C(062)3PSH-15200162Contract:

Contractor: EVANS & ASSOCIATES CONSTRUCTION CO.,

INC.

Contract Amount:

Letting Date:

$1,553,774.00

04/16/2020

Residency: 04100

PERRY

RESURFACE (ASPHALT)SH-15: FROM THE

GARFIELD COUNTY LINE, EXTEND EAST

NEARBILLINGS.PROJECT LENGTH = 6.500 MILES

OkfuskeeCounty: Commissioner District: 3

Contracts Awarded - NTP Not Processed

23957(04) STP-154D(099)CIEW-107200113Contract:

Contractor: H & H BRIDGE COMPANY

Contract Amount:

Letting Date:

$788,391.38

03/19/2020

Residency: 03004

JACOBS ENGINEERING

BRIDGE AND APPROACHESCOUNTY ROAD (EW-107)

: OVER ROCK CREEK, 5.5 MILES EAST OFUS-377

NEAR PADEN.PROJECT LENGTH = 0.189 MILE

Construction Status Report Page 159

Page 160: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

OklahomaCounty: Commissioner District: 4

Contracts Awarded - NTP Not Processed

31438(04) TAP-255N(331)AGI-240 FRO200075Contract:

Contractor: SAC SERVICES, INC.

Contract Amount:

Letting Date:

$627,738.55

04/16/2020

Residency: 04600

OKLAHOMA CITY

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)I-240

FRONTAGE ROAD: AT THE INTERSECTION OF MAY

AVENUE,PENNSYLVANIA AVENUE, AND SANTA FE

AVENUE IN OKLAHOMA CITY.PROJECT LENGTH =

0.334 MILE

27586(04) SBR-155A(874)SBSH-66200165Contract:

Contractor: MANHATTAN ROAD & BRIDGE COMPANY

Contract Amount:

Letting Date:

$3,525,432.35

04/16/2020

Residency: 04600

OKLAHOMA CITY

BRIDGE REHABILITATIONSH-66: OVER SH-74, 4.0

MILES WEST OF THE I-235 INTERCHANGEIN

OKLAHOMA CITY.PROJECT LENGTH = 0.139 MILE

27107(04) SBR-255N(517)SBSH-77H200185Contract:

Contractor: FRONTIER BRIDGE, INC.

Contract Amount:

Letting Date:

$3,664,145.19

04/16/2020

Residency: 04600

OKLAHOMA CITY

BRIDGE REHABILITATIONSH-77H (SOONER ROAD):

OVER I-240, 4.0 MILES EAST OF THE

I-35INTERCHANGE IN OKLAHOMA CITY.PROJECT

LENGTH = 0.131 MILE

OsageCounty: Commissioner District: 8

Contracts Awarded - NTP Not Processed

31074(04) SBR-257B(079)SBSH-11200166Contract:

Contractor: LOGOS CONSTRUCTION CO., LLC

Contract Amount:

Letting Date:

$805,293.60

04/16/2020

Residency: 08002

TETRA TECH

BRIDGE REHABILITATIONSH-11: OVER BIRD CREEK,

0.2 MILES SOUTH OF THE US-60JUNCTION IN

PAWHUSKA.PROJECT LENGTH = 0.104 MILE

32732(04) SBR-257N(080)SBUS-60200167Contract:

Contractor: LOGOS CONSTRUCTION CO., LLC

Contract Amount:

Letting Date:

$1,230,198.84

04/16/2020

Residency: 04100

PERRY

BRIDGE REHABILITATIONUS-60: OVER COUNTY

ROAD AND ARKANSAS RIVER, 0.1 MILES AND0.3

MILES EAST OF THE US-177 JUNCTION IN PONCA

CITY.PROJECT LENGTH = 0.430 MILE

PushmatahaCounty: Commissioner District: 2

Contracts Awarded - NTP Not Processed

28631(04) CIRB-264D(068)RBCOUNTY RO200028Contract:

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Contract Amount:

Letting Date:

$5,376,195.20

04/16/2020

Residency: 02200

HEAVENER

GRADE, DRAIN, AND SURFACECOUNTY ROAD

(NOLIA LOOP ROAD): FROM THE SH-144

JUNCTION,EXTEND SOUTHEAST THEN NORTHEAST

NEAR NASHOBA.PROJECT LENGTH = 3.938 MILES

RogersCounty: Commissioner District: 8

Contracts Awarded - NTP Not Processed

Construction Status Report Page 160

Page 161: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

26242(10) SSP-266N(083)RWSH-20200122Contract:

Contractor: ROBIN HAUSNER HOUSE MOVERS &

DEMOLITION, LLC

Contract Amount:

Letting Date:

$58,338.00

04/16/2020

Residency: 08300

CLAREMORE

RIGHT-OF-WAY CLEARANCESH-20 REALIGNMENT:

FROM 0.7 MILES EAST OF THE SH-66JUNCTION,

EXTEND NORTHWEST IN CLAREMORE.PROJECT

LENGTH = 1.723 MILES

32718(04) NHPP-030N(078)3PUS-169200169Contract:

Contractor: BECCO CONTRACTORS, INC.

Contract Amount:

Letting Date:

$1,793,000.00

04/16/2020

Residency: 08300

CLAREMORE

RESURFACE (ASPHALT)US-169: FROM 7.36 MILES

NORTHEAST OF THE TULSA COUNTY LINE,EXTEND

NORTH NEAR OOLOGAH.PROJECT LENGTH = 5.010

MILES

SeminoleCounty: Commissioner District: 3

Contracts Awarded - NTP Not Processed

32376(04) CIRB-267C(080)RBOLD STATE200079Contract:

Contractor: THE CUMMINS CONSTRUCTION CO., INC.

Contract Amount:

Letting Date:

$3,921,365.94

04/16/2020

Residency: 03024

CIRCUIT ENGR. DISTR.

#4

PAVEMENT REHABILITATION (ASPHALT)OLD STATE

HIGHWAY 99: FROM THE SH-39 JUNCTION,

EXTENDNORTHEAST IN KONAWA.PROJECT

LENGTH = 6.784 MILES

SequoyahCounty: Commissioner District: 1

Contracts Awarded - NTP Not Processed

32761(04) SBR-268C(060)SBUS-64190163Contract:

Contractor: BRIDGECO CONTRACTORS, INC.

Contract Amount:

Letting Date:

$1,300,344.65

04/16/2020

Residency: 01200

SALLISAW

BRIDGE REHABILITATIONUS-64: OVER LITTLE SKIN

BAYOU, 1.3 MILES WEST OF THE US-64BJUNCTION

IN MULDROW.PROJECT LENGTH = 0.000 MILE

34713(04) MC-268C(070)I-40200184Contract:

Contractor: SCODELLER CONSTRUCTION, INC.

Contract Amount:

Letting Date:

$685,220.00

04/16/2020

Residency: 01200

SALLISAW

CONCRETE PAVEMENT JOINT SEALI-40: FROM THE

US-64 JUNCTION, EXTEND NORTHEAST NEAR

ROLAND.PROJECT LENGTH = 6.000 MILES

TillmanCounty: Commissioner District: 5

Contracts Awarded - NTP Not Processed

31710(04) STP-271C(061)3PUS-70180337Contract:

Contractor: CORNELL CONSTRUCTION COMPANY, INC.

Contract Amount:

Letting Date:

$4,625,438.49

04/16/2020

Residency: 05200

ALTUS

RESURFACE (ASPHALT)US-70: FROM THE US-183

JUNCTION, EXTEND EAST NEAR DAVIDSONAND

GRANDFIELD.PROJECT LENGTH = 18.190 MILES

TulsaCounty: Commissioner District: 8

Contracts Awarded - NTP Not Processed

Construction Status Report Page 161

Page 162: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

30703(04) STP-272B(278)CICITY STRE200085Contract:

Contractor: CROSSLAND HEAVY CONTRACTORS INC.

Contract Amount:

Letting Date:

$2,887,000.00

03/19/2020

Residency: 08011

GARVER, LLC.

GRADE, DRAIN, SURFACE, AND TRAFFIC

SIGNALSCITY STREETS (EAST 116TH STREET

NORTH): AT THE INTERSECTIONOF NORTH 129TH

EAST AVENUE IN OWASSO.PROJECT LENGTH =

0.426 MILE

33450(04) SBR-2440(025)SBI-244200173Contract:

Contractor: CONCRETE SERVICES CORPORATION

Contract Amount:

Letting Date:

$160,478.84

04/16/2020

Residency: 08100

TULSA

BRIDGE REHABILITATIONI-244 WB RAMP TO E. 1ST

STREET: OVER US-75, 1.4 MILES EASTOF THE

US-64/US-412/SH-51 INTERCHANGE IN THE CITY OF

TULSA.PROJECT LENGTH = 0.000 MILE

WagonerCounty: Commissioner District: 1

Contracts Awarded - NTP Not Processed

20916(04) STP-173C(087)PMSH-72200175Contract:

Contractor: APAC-CENTRAL, INC.

Contract Amount:

Letting Date:

$6,945,000.00

04/16/2020

Residency: 01100

MUSKOGEE

GRADE, DRAIN, AND SURFACESH-72: FROM 4.4

MILES NORTH OF THE US-64 JUNCTION,

EXTENDNORTH NEAR HASKELL.PROJECT LENGTH

= 2.301 MILES

32724(04) SBR-273C(052)SBSH-72200176Contract:

Contractor: BECCO CONTRACTORS, INC.

Contract Amount:

Letting Date:

$2,187,000.00

04/16/2020

Residency: 01100

MUSKOGEE

BRIDGE REHABILITATIONSH-72: OVER THE

ARKANSAS RIVER, 2.6 MILES SOUTH OF THE

SH-51JUNCTION NEAR COWETA.PROJECT LENGTH

= 0.322 MILE

WashingtonCounty: Commissioner District: 8

Contracts Awarded - NTP Not Processed

31085(04) SBR-274N(028)SBUS-75200178Contract:

Contractor: BUILT RIGHT CONSTRUCTION, LLC

Contract Amount:

Letting Date:

$695,255.70

04/16/2020

Residency: 08001

EST, INC.

BRIDGE REHABILITATIONUS-75: OVER CANEY

RIVER, 6.0 MILES SOUTH OF THE US-60JUNCTION

NEAR BARTLESVILLE.PROJECT LENGTH = 0.181

MILE

WoodsCounty: Commissioner District: 6

Contracts Awarded - NTP Not Processed

32755(04) SSR-276C(040)SRSH-8/SH-1200040Contract:

Contractor: VENTURE CORPORATION DBA V. C. O.

PAVING

Contract Amount:

Letting Date:

$1,562,640.60

01/16/2020

Residency: 06100

BUFFALO

RESURFACE (ASPHALT)SH-8/SH-11: SH-8, FROM

THE NS-257 JUNCTION EXTEND WEST.SH-11, FROM

THE US-281 JUNCTION EXTEND EAST NEAR

CAPRON.PROJECT LENGTH = 8.980 MILES

33410(04) STP-276B(039)ADUS-281200181Contract:

Contractor: DOWNEY CONTRACTING, LLC

Contract Amount:

Letting Date:

$327,183.24

04/16/2020

Residency: 06100

BUFFALO

PEDESTRIAN IMPROVEMENTS (SIDEWALKS)US-281

(SANTA FE ST/FLYNN ST): FROM THE MAIN ST JCT,

EXTENDEAST ON SANTA FE ST THEN NORTH ON

FLYNN ST IN WAYNOKA.PROJECT LENGTH = 0.190

MILE

Construction Status Report Page 162

Page 163: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

Resident Directory

EST

3201 S. BERRY ROADNORMAN, OK

(405)307-8378

73072

(405)329-1914 [email protected]

0X001 - EST, INC.Residency:

Engineer: Ph: Fx:

TETR

525 CENTRAL PARK DRIVE, SUITE

403

OKLAHOMA CITY, OK

(405)606-8600

73105

(405)608-8601 [email protected]

0X002 - TETRA TECHResidency:

Engineer: Ph: Fx:

CEC

4555 W. MEMORIAL RD.OKLAHOMA CITY, OK

(405)753-4200

73142

(405)384-4589

0X003 - CEC CORP.Residency:

Engineer: Ph: Fx:

JACOBS

10001 N. BROADWAY EXTENSIONOKLAHOMA CITY, OK

(405) 810-8254

73114

(405) 810-2980

0X004 - JACOBS ENGINEERINGResidency:

Engineer: Ph: Fx:

CED7

PO BOX 337 - 1779 MARSHALL RD.CLINTON, OK

(580)323-8685

736010X005 - CIRCUIT ENGR. DISTR. # 7Residency:

Engineer: Ph: Fx:

O&OE

PO BOX 5997NORMAN, OK

405-364-0281

730700X006 - OLLAR & OLLAR ENGINEERINGResidency:

Engineer: Ph: Fx:

C&KI

6940 S. UTICA AVE.TULSA, OK

(918)743-6611

74136

(918)743-6680

0X007 - CRAIG & KEITHLINE, INC.Residency:

Engineer: Ph: Fx:

BEC

521 S SECOND STREETMCALESTER, OK

(918)420-5500

745010X008 - BRAWLEY ENGINEERING CORP.Residency:

Engineer: Ph: Fx:

CED8

909 WEST LAKES DRIVEALVA, OK

(580)430-5078

737170X009 - CIRCUIT ENGR. DISTR. # 8Residency:

Engineer: Ph: Fx:

ATKINS

350 DAVID L. BOREN BOULEVARD,

SUITE 1510

NORMAN, OK

(405)321-2480

730720X010 - ATKINSResidency:

Engineer: Ph: Fx:

GARV

6450 S. LEWISTULSA, OK

(918)250-5922

741360X011 - GARVER, LLC.Residency:

Engineer: Ph: Fx:

DEWB

1350 SOUTH BOULDER, STE 600TULSA, OK

(918)587-7283

741190X012 - DEWBERRYResidency:

Engineer: Ph: Fx:

CED3

203 PEPSI COLA AVEHUGO, OK

(580)326-9191

747430X013 - CIRCUIT ENGR. DISTR. # 3Residency:

Engineer: Ph: Fx:

BENH

9400 NORTH BROADWAY, SUITE

300

OKLAHOMA CITY, OK

(405)478-5353

731140X014 - BENHAM (AKA - LEIDOS)Residency:

Engineer: Ph: Fx:

FCM

9636 N MAY ST STE 200OKLAHOMA CITY

(405)753-4142

731200X015 - FOSTER CM GROUPResidency:

Engineer: Ph: Fx:

MKEC

9500 WESTGATE RD, STE 100OKLAHOMA CITY

(405)603-7608

731620X016 - MKEC (AKA - KONERU)Residency:

Engineer: Ph: Fx:

CE2

PO BOX 2366MUSKOGEE

(918) 682-2125

744020X017 - CIRCUIT ENGR. DISTR. # 2Residency:

Engineer: Ph: Fx:

Construction Status Report Page 163

Page 164: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

BCS

3430 MAC DONNELL DR.NORMAN

580-665-5178

730690X018 - BENCHMARK CONSTR. SERVS., LLCResidency:

Engineer: Ph: Fx:

BKL

1623 E. 6TH STREETTULSA, OK

918-835-9588

741200X019 - BKL, INCORPORATEDResidency:

Engineer: Ph: Fx:

ZPAA

4606 S GARNETT RD, STE 600TULSA, OK

9186658800

741460X020 - POE AND ASSOCIATESResidency:

Engineer: Ph: Fx:

ZOA

201 NW 63RD STREET, SUITE 130OKLAHOMA CITY, OK

4052426601

731160X021 - OLSSON ASSOCIATESResidency:

Engineer: Ph: Fx:

ZSRB

100 NE 5TH STOKLAHOMA CITY, OK

4058407094

731040X022 - SMITH ROBERTS BALDISCHWILER, LLCResidency:

Engineer: Ph: Fx:

ZFAN

6303 N PORTLAND AVE SUITE 100OKLAHOMA CITY, OK

4056077060

731120X023 - FREESE & NICHOLSResidency:

Engineer: Ph: Fx:

David Hendricks

40002 Benson Park RdShawnee 748010X024 - CIRCUIT ENGR. DISTR. #4Residency:

Engineer: Ph: Fx:

Hagerman, Jeremy

2800 S. 32ND - US-69 3 MI. S OF

US-62

MUSKOGEE, OK

(918) 682-9471

74401

(918) 682-2597 [email protected]

01100 - MUSKOGEEResidency:

Engineer: Ph: Fx:

Orendorf, Barry

P.O. BOX 449 - 113 MCGEE DRIVESALLISAW, OK

(918) 775-2751

74955

(918) 776-0285 [email protected]

01200 - SALLISAWResidency:

Engineer: Ph: Fx:

Vacant

2800 S. 32ND - US-69 3 MI. S

US-62

MUSKOGEE, OK

(918) 682-9471

74401

(918) 682-2597

01700 - DIV. 1 BRIDGEResidency:

Engineer: Ph: Fx:

Nored, John

P. O. BOX DRAWER 628 - US-271 2

MI. S. TOWN

ANTLERS, OK

(580) 298-3081

74523

(580) 298-6152 [email protected]

02100 - ANTLERSResidency:

Engineer: Ph: Fx:

Davis, Tim

P.O. BOX 835 - N. HIGHWAY 59HEAVENER, OK

(918) 653-7896

74937

(918) 653-4532 [email protected]

02200 - HEAVENERResidency:

Engineer: Ph: Fx:

Bishop, Justin

P. O. BOX 297 - HWY. BLDG. S.

MADILL

MADILL, OK

(580) 795-3675

73446

(580) 795-7461 [email protected]

02300 - MADILLResidency:

Engineer: Ph: Fx:

Plymate, Larry

P.O. BOX 3269 - US-270 E.

MCALESTER

MCALESTER, OK

(918) 423-5443

74502

(918) 429-0807 [email protected]

02400 - MCALESTERResidency:

Engineer: Ph: Fx:

Nabors, Monte

P.O. BOX DRAWER 628 - US-271 2

MI. S TOWN

ANTLERS, OK

(580) 298-3371

74523

(580) 298-6152 [email protected]

02700 - DIV. 2 BRIDGEResidency:

Engineer: Ph: Fx:

Wade, Tony

P.O. BOX 157 - 3 MI. NW ADA ON

SH-3W

ADA, OK

(580) 332-2094

74820

(580) 332-2566 [email protected]

03100 - ADAResidency:

Engineer: Ph: Fx:

Malave, Luis

P.O. BOX 468 - SH-74 2 MI. SW OF

PURCELL

PURCELL, OK

(405) 527-5569

73080

(405) 527-6576 [email protected]

03200 - PURCELLResidency:

Engineer: Ph: Fx:

Helton, Matthew

P.O. BOX 918 - 1.5 MI. N. WEWOKA

ON SH-56

WEWOKA, OK

(405) 257-3325

74884

(405) 257-5003 [email protected]

03300 - WEWOKAResidency:

Engineer: Ph: Fx:

Construction Status Report Page 164

Page 165: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

Vacant

P.O. BOX 549 - 3 MI. N.W. OF ADA

ON SH-3W

ADA, OK

(580) 332-1526

74820

(580) 332-0261

03700 - DIV. 3 BRIDGEResidency:

Engineer: Ph: Fx:

Zachary, Ted

P.O. BOX 548 - US-77 1/4 M. E. OF

I-35

PERRY, OK

(580) 336-7374

73077

(580) 336-7373 [email protected]

04100 - PERRYResidency:

Engineer: Ph: Fx:

Brooks, Jonathan

15100 NW 36th St.Yukon, OK

(405) 350-2331

73099

(405) 350-2199 [email protected]

04200 - YUKONResidency:

Engineer: Ph: Fx:

Hoover, Jacob

410 KREMLINENID, OK

(580) 234-3223

73701

(580) 237-3328 [email protected]

04300 - ENIDResidency:

Engineer: Ph: Fx:

Hubbard, Tom

4105 E. MEMORIAL RD.EDMOND, OK

(405) 475-2860

73013

(405) 478-1126 [email protected]

04400 - EDMONDResidency:

Engineer: Ph: Fx:

Mitchell, Matt

3613 N. HUSBANDSTILLWATER, OK

(405) 372-5644

74075

(405) 377-8321 [email protected]

04500 - STILLWATERResidency:

Engineer: Ph: Fx:

Harlin, Chris

701 S.E. 82nd St.OKLAHOMA CITY, OK

(405) 522-5575

73149

[email protected]

04600 - OKLAHOMA CITYResidency:

Engineer: Ph: Fx:

Vacant

P.O. BOX 471 - US-77 1/4 MI. E

I-35

PERRY, OK

(580) 336-7340

73077

(580) 336-7350

04700 - DIV. 4 BRIDGEResidency:

Engineer: Ph: Fx:

Sawyer, Dax

P.O. BOX 818 - US-183 1 MI S. OF

I-40

CLINTON, OK

(580) 323-0702

73601

(580) 323-3551 [email protected]

05100 - CLINTONResidency:

Engineer: Ph: Fx:

Holley, Terri

608 S. JACKSON STALTUS, OK

(580) 482-3191

73521

(580) 482-0792 [email protected]

05200 - ALTUSResidency:

Engineer: Ph: Fx:

Clanton, Mike

P.O. BOX 1449 - US-183 1 MI. S.

I-40

CLINTON, OK

(580) 323-1431

73601

(580) 323-1430 [email protected]

05700 - DIV. 5 BRIDGEResidency:

Engineer: Ph: Fx:

Dodgion, Richard

P. O. BOX 190 - US-64 1 MI. W

US-183

BUFFALO, OK

(580) 735-2537

73834

(580) 735-2024 [email protected]

06100 - BUFFALOResidency:

Engineer: Ph: Fx:

Michael, Charles

P.O. BOX 348 - 504 S. CRUMLEYGUYMON, OK

(580) 338-3545

73942

(580) 338-5685 [email protected]

06200 - GUYMONResidency:

Engineer: Ph: Fx:

Roesner, Wayne

P.O. BOX 190 - US-64 1 MI. W

US-183

BUFFALO, OK

(580) 735-2561

73834

(580) 735-2248 [email protected]

06700 - DIV. 6 BRIDGEResidency:

Engineer: Ph: Fx:

Roberts, Colton

P.O. BOX 1107 - 2205 S. US-81

BYPASS

DUNCAN, OK

(580) 255-7609

73534

(580) 252-6178 [email protected]

07100 - DUNCANResidency:

Engineer: Ph: Fx:

Fuhrmann, Chris

P. O. BOX 1826 - 525 INTERSTATE

DR.

ARDMORE, OK

(580) 223-1351

73402

(580) 226-8146 [email protected]

07200 - ARDMOREResidency:

Engineer: Ph: Fx:

Knight, Reese

P.O. BOX 220 - 211 W MAIN ST.ANADARKO, OK

(405) 247-2462

73005

(405) 247-2057 [email protected]

07300 - ANADARKOResidency:

Engineer: Ph: Fx:

Lawson, Bryce

P.O. BOX 460 - 2205 S. US-81

BYPASS

DUNCAN, OK

(580) 255-7586

73533

(580) 255-5064 [email protected]

07700 - DIV. 7 BRIDGEResidency:

Engineer: Ph: Fx:

Construction Status Report Page 165

Page 166: C O N S T R U C T I O N R E P O R T COMPILED BY CONSTRUCTION ENGINEER BY … · 2020-05-06 · DBA SCUDDER BRIDGE CO. Engineer: Contract Amount: Completion Date: 12/06/2018 Final

Arnold, Bruce

4002 N. MINGO VAL. EXPWY.TULSA, OK

(918) 836-7116

74116

(918) 832-0383 [email protected]

08100 - TULSAResidency:

Engineer: Ph: Fx:

Beats, Aaron

25825-B S. HWY. 66 - 729 S.

MORETZ

CLAREMORE, OK

(918) 266-1160

74018

(918) 343-1203 [email protected]

08300 - CLAREMOREResidency:

Engineer: Ph: Fx:

Scott, Kalynn

110 E. 41ST (PRATTVILLE)SAND SPRINGS, OK

(918) 245-9531

74063

(918) 245-0953 [email protected]

08400 - SAND SPRINGSResidency:

Engineer: Ph: Fx:

Casillas, Matt

P.O. BOX 660 - 4002 N. MINGO

VAL. EXPWY.

TULSA, OK

(918) 838-9933

74101

(918) 832-9074 [email protected]

08700 - DIV. 8 BRIDGEResidency:

Engineer: Ph: Fx:

Construction Status Report Page 166