MERITON’S MINDSETBUILDING SAFER, QUICKER, BETTER, SMARTER.

DAVID CREMONA National Director of Construction & Director of Meriton Group

23rd March 2017

Introductory Video – David C & Harry T.

<Insert link for Video>

INTRODUCTION VIDEO

• Time is Money

• Site Acquisition to Settlement

• Innovation provides efficiencies

INTRODUCTION

SAFER

• Risking life or Health is not-negotiable

• Safety Systems are essential

• Adapt to the environment & new innovations.

• Prefabrication / controlled environment & weather

Innovation must be Quantifiable

Meriton approach is to look at critical path and innovate.

Example : Structure Jumpform Systems

i) Chatswoodii) Sundaleiii) Parramattaiv) Surfers Paradise (Future project)

QUICKER

Description:Accelerated core with integrated lift landing platforms & internal self climbing crane.

Benefits: • Core 15 Levels above deck.

• Ability for early construction of lift jambs, cars.

• Early install & commissioning of lifts.

QUICKER – CHATSWOOD JUMP CHATSWOOD - CHATSWOOD

QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT

STANDARD METHOD LIFT LOBBIES POURED (PROGRESSIVE

COMISSIONING OF LIFTS)

QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT

STANDARD METHOD LIFT LOBBIES POURED (PROGRESSIVE

COMISSIONING OF LIFTS)

QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT

STANDARD METHOD

EARLY LIFT

COMISSIONING

LIFT LOBBIES POURED (PROGRESSIVE

COMISSIONING OF LIFTS)

QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT

STANDARD METHOD LIFT LOBBIES POURED (PROGRESSIVE

COMISSIONING OF LIFTS)

QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT

STANDARD METHOD

COMMENCE

STAGED O.C.

LIFT LOBBIES POURED (PROGRESSIVE

COMISSIONING OF LIFTS)

LIFTS COMISSIONING

QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT

STANDARD METHOD

LIFTS COMISSIONING

LIFT LOBBIES POURED (PROGRESSIVE

COMISSIONING OF LIFTS)

QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT

STANDARD METHOD

FULL O.C.

LIFT LOBBIES POURED (PROGRESSIVE

COMISSIONING OF LIFTS)

LIFTS COMISSIONING

QUICKER - SUNDALE JUMP

QUICKER - SUNDALE - SUNDALE

Description:Screw Jack OperatedWrap-around jumpform system

Benefits: • Climbing in high wind loads

(up to 65km/h)

• Ability to pour all vertical elements incl. walls, core & columns

• Horizontal floor slabs poured under cover. 5day cycle

• Hanging screens allowing safe install of façade elements

• Utilised TLM room & KONE jumplift

QUICKER - KONE JUMP LIFT (VIDEO)

QUICKER - SUNDALE - SUNDALE

QUICKER - PARRAMATTA

QUICKER – PARRAMATTA JUMPPARRAMATTA

Description:Hydraulic pocket OperatedWrap-around jumpform system

Benefits:

• Ability to pour all vertical elements incl. core & columns

• Horizontal floor slabs poured under cover.

• Hanging screens allowing safe install of façade elements incl. precast.

• Prefabricated Reinforced columns

QUICKER - PARRAMATTA

Footprint Jump form

Standard Jump form

Wrap Around jumpform Footprint Comparison. Wrap around - Standard

QUICKER - PARRAMATTA

Post pour of jacking / structural columnsColumns with pocket

QUICKER - PARRAMATTA

Conventionally tied columns Co-ord. with jacking pocket Co-ord. & welded columns

QUICKER - PARRAMATTA

Double height Reo ColumnsSingle Floor Reo Column

QUICKER - PARRAMATTA

INSERT PHOTO OF METAL

BEING INSTALLED

QUICKER - PARRAMATTA

The Doughnut Effect

QUICKER – FUTURE JUMP – SURFERS PARADISE

Description (PROPOSAL)90 storey structure.

Accelerated core with Hydraulic or Screw jack assisted wrap-around jumpform.

Jumpstart steel columns

Benefits: • All benefits from

Chatswood / Sundale & Parramatta.

• Jump start columns will leave podium behind (Carpark / transfer beams / mezzanine levels).

QUICKER – SURFERS PARADISE

Excavate Basement

Excavate Basement (Completed)

Pour basement slab

Accelerated Core Jump with landings

Excavate Basement (Completed)

Pour basement slab (Completed)

Accelerated Core Jump with landings

Podium structure complete

Wrap-around jump @ approx. L24

Core jump @ approx. L32

Excavate Basement (Completed)

Pour basement slab (Completed)

Accelerated Core Jump with landings

Podium Jump Start Columns & slabs

Excavate Basement (Completed)

Pour basement slab (Completed)

Accelerated Core Jump with landings

Podium Jump Start Columns & slabs (Completed)

Wrap around Jumpform

Excavate Basement (Completed)

Pour basement slab (Completed)

Accelerated Core Jump with landings (Completed incl. lifts)

Podium Jump Start Columns & slabs (Completed)

Wrap around Jumpform

Early OC – Stage 1 serviced apartments

• Try to do something slightly different than the normal

• Continuously look to improve

• Open to innovation, an environment promoting experimentation

• Failure must be acceptable. Learn from experiences.

• Breed & encourage the correct corporate culture.

BETTER

• Use the collective experience of your Team

• Strive for excellence and innovative will follow

• Example: Dee Why – Lighthouse Project

SMARTER

DEE WHY – LIGHTHOUSE PROJECT

SMARTER – PREFABRICATION & POD TECHNOLOGY – PREFAB ELEMENTAL (BATHROM PODS)

The main difference are :

• Drop in place from tower

crane

• Stack system ready to go

• No navigation access required

SMARTER – PREFABRICATION (MODULAR VOLUMETRIC STRUCTURE))–PREFAB MODULAR

SMARTER - FULL PREFAB MODULAR (VIDEO)– PREFAB MODULAR

https://youtu.be/bd-MhwiDkQ0?t=10

2 min

SMARTER – CONTINUOSLY LEARNING / EXPLORING

PREFAB

VIRTUAL

REALITY

AUGMENTED

REALITY

EV

CHARGING

X-LAM TIMBER

BIO-MIMICRY

BIM

SMART / INTERACTIVE

ELEMENTS

3d STEEL

PRINTED

STRUCTURES

NEAR

RFID

On behalf of Meriton, Thank you.

top related