MERITON’S MINDSETBUILDING SAFER, QUICKER, BETTER, SMARTER.
DAVID CREMONA National Director of Construction & Director of Meriton Group
23rd March 2017
Introductory Video – David C & Harry T.
<Insert link for Video>
INTRODUCTION VIDEO
• Time is Money
• Site Acquisition to Settlement
• Innovation provides efficiencies
INTRODUCTION
SAFER
• Risking life or Health is not-negotiable
• Safety Systems are essential
• Adapt to the environment & new innovations.
• Prefabrication / controlled environment & weather
Innovation must be Quantifiable
Meriton approach is to look at critical path and innovate.
Example : Structure Jumpform Systems
i) Chatswoodii) Sundaleiii) Parramattaiv) Surfers Paradise (Future project)
QUICKER
Description:Accelerated core with integrated lift landing platforms & internal self climbing crane.
Benefits: • Core 15 Levels above deck.
• Ability for early construction of lift jambs, cars.
• Early install & commissioning of lifts.
QUICKER – CHATSWOOD JUMP CHATSWOOD - CHATSWOOD
QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT
STANDARD METHOD LIFT LOBBIES POURED (PROGRESSIVE
COMISSIONING OF LIFTS)
QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT
STANDARD METHOD LIFT LOBBIES POURED (PROGRESSIVE
COMISSIONING OF LIFTS)
QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT
STANDARD METHOD
EARLY LIFT
COMISSIONING
LIFT LOBBIES POURED (PROGRESSIVE
COMISSIONING OF LIFTS)
QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT
STANDARD METHOD LIFT LOBBIES POURED (PROGRESSIVE
COMISSIONING OF LIFTS)
QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT
STANDARD METHOD
COMMENCE
STAGED O.C.
LIFT LOBBIES POURED (PROGRESSIVE
COMISSIONING OF LIFTS)
LIFTS COMISSIONING
QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT
STANDARD METHOD
LIFTS COMISSIONING
LIFT LOBBIES POURED (PROGRESSIVE
COMISSIONING OF LIFTS)
QUICKER – CHATSWOOD JUMP CHATSWOOD PROJECT
STANDARD METHOD
FULL O.C.
LIFT LOBBIES POURED (PROGRESSIVE
COMISSIONING OF LIFTS)
LIFTS COMISSIONING
QUICKER - SUNDALE JUMP
QUICKER - SUNDALE - SUNDALE
Description:Screw Jack OperatedWrap-around jumpform system
Benefits: • Climbing in high wind loads
(up to 65km/h)
• Ability to pour all vertical elements incl. walls, core & columns
• Horizontal floor slabs poured under cover. 5day cycle
• Hanging screens allowing safe install of façade elements
• Utilised TLM room & KONE jumplift
QUICKER - KONE JUMP LIFT (VIDEO)
QUICKER - SUNDALE - SUNDALE
QUICKER - PARRAMATTA
QUICKER – PARRAMATTA JUMPPARRAMATTA
Description:Hydraulic pocket OperatedWrap-around jumpform system
Benefits:
• Ability to pour all vertical elements incl. core & columns
• Horizontal floor slabs poured under cover.
• Hanging screens allowing safe install of façade elements incl. precast.
• Prefabricated Reinforced columns
QUICKER - PARRAMATTA
Footprint Jump form
Standard Jump form
Wrap Around jumpform Footprint Comparison. Wrap around - Standard
QUICKER - PARRAMATTA
Post pour of jacking / structural columnsColumns with pocket
QUICKER - PARRAMATTA
Conventionally tied columns Co-ord. with jacking pocket Co-ord. & welded columns
QUICKER - PARRAMATTA
Double height Reo ColumnsSingle Floor Reo Column
QUICKER - PARRAMATTA
INSERT PHOTO OF METAL
BEING INSTALLED
QUICKER - PARRAMATTA
The Doughnut Effect
QUICKER – FUTURE JUMP – SURFERS PARADISE
Description (PROPOSAL)90 storey structure.
Accelerated core with Hydraulic or Screw jack assisted wrap-around jumpform.
Jumpstart steel columns
Benefits: • All benefits from
Chatswood / Sundale & Parramatta.
• Jump start columns will leave podium behind (Carpark / transfer beams / mezzanine levels).
QUICKER – SURFERS PARADISE
Excavate Basement
Excavate Basement (Completed)
Pour basement slab
Accelerated Core Jump with landings
Excavate Basement (Completed)
Pour basement slab (Completed)
Accelerated Core Jump with landings
Podium structure complete
Wrap-around jump @ approx. L24
Core jump @ approx. L32
Excavate Basement (Completed)
Pour basement slab (Completed)
Accelerated Core Jump with landings
Podium Jump Start Columns & slabs
Excavate Basement (Completed)
Pour basement slab (Completed)
Accelerated Core Jump with landings
Podium Jump Start Columns & slabs (Completed)
Wrap around Jumpform
Excavate Basement (Completed)
Pour basement slab (Completed)
Accelerated Core Jump with landings (Completed incl. lifts)
Podium Jump Start Columns & slabs (Completed)
Wrap around Jumpform
Early OC – Stage 1 serviced apartments
• Try to do something slightly different than the normal
• Continuously look to improve
• Open to innovation, an environment promoting experimentation
• Failure must be acceptable. Learn from experiences.
• Breed & encourage the correct corporate culture.
BETTER
• Use the collective experience of your Team
• Strive for excellence and innovative will follow
• Example: Dee Why – Lighthouse Project
SMARTER
DEE WHY – LIGHTHOUSE PROJECT
SMARTER – PREFABRICATION & POD TECHNOLOGY – PREFAB ELEMENTAL (BATHROM PODS)
The main difference are :
• Drop in place from tower
crane
• Stack system ready to go
• No navigation access required
SMARTER – PREFABRICATION (MODULAR VOLUMETRIC STRUCTURE))–PREFAB MODULAR
SMARTER - FULL PREFAB MODULAR (VIDEO)– PREFAB MODULAR
https://youtu.be/bd-MhwiDkQ0?t=10
2 min
SMARTER – CONTINUOSLY LEARNING / EXPLORING
PREFAB
VIRTUAL
REALITY
AUGMENTED
REALITY
EV
CHARGING
X-LAM TIMBER
BIO-MIMICRY
BIM
SMART / INTERACTIVE
ELEMENTS
3d STEEL
PRINTED
STRUCTURES
NEAR
RFID
On behalf of Meriton, Thank you.