Design DeliveryBIM Implementation
Building Information Management (BIM)
A new way of working
Ivor BarbrookHead of Design Delivery and BIM Implementation
Design DeliveryBIM Implementation
Building Information Management (BIM)
BIM is a digital representation of physical and functional characteristics of a facility.
A BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life cycle; defined as existing from earliest concept design to destruction
(National BIM Standard – United States)
Design DeliveryBIM Implementation
What are the BIM levels?
By 2016
Design DeliveryBIM Implementation
Can BIM give a save of 20% ?
5% 15%
Build it twice, once in the model the first time right on site
Use the model to establish effective end user utilisation, maintenance and decommissioning
So BIM can save 20% if it starts right at the beginning and if whole life cost considerations are taken into account
Design DeliveryBIM Implementation
• 2D: Traditional 2D drawings.
• 3D: Using three dimensional computer graphics to develop a mathematical representation of how the project fits together within itself and in its environment. The common computer software (platforms) used are Autodesk, Bentley and Tecla.
• 4D: Combines three dimensional modelling with schedules of how a construction project can be built i.e. time. Therefore 4D = 3D + time.
• 5D: Links the four dimensional model and allows the project to estimate cost of quantities and track change during the construction process through to completion. Therefore 5D = 3D + time + cost + change.
What are the BIM dimensions?
Design DeliveryBIM Implementation
• 6D: The handover of the project Health and Safety File (with Operation and Maintenance Manual) to the client as a computer model. Therefore 6D = Construction Phase + Facility Management, using COBie data
What are the BIM dimensions?
Design DeliveryBIM Implementation
What is BIM Level 2 Look like?
• 3D model structural elements/foundations in a detail design
Identify clashes and resolve interface issues
• 4D programme/model for construction sequence visualisation
• 5D Earned value and change management derived from object data
Design DeliveryBIM Implementation
What is BIM Level 2 Look like?
• 3D model structural elements/foundations in a detail design
Identify clashes and resolve interface issues
• 4D programme/model for construction sequence visualisation
• 5D Earned value and change management derived from object data
Design DeliveryBIM Implementation
What is BIM Level 2 Look like?
• 3D model structural elements/foundations in a detail design
Identify clashes and resolve interface issues
• 4D programme/model for construction sequence visualisation
• 5D Earned value and change management derived from object data
Design DeliveryBIM Implementation
What is BIM Level 2 Look like?
• 6D model used to manage H&S handover documentation
• Construction Operations Building Information Exchange (COBie)
COBie - enter the data as it is created during design, construction, and commissioning.
Design DeliveryBIM Implementation
What are our ambitions?
It has to be more than drawing 3D models ……
It is about:
• Everyone working collaboratively together – at the same time – quickly and accurately – using a single source of truth
• Using technology in a new way of working
• Working collaboratively with the supply chain and designers using a federated model to efficiently exchange information
• Using data rich objects that can be interfaced with software systems used by estimators, planners, designers, project managers, supply chain, employers and end user.
• Partnering with the Employer to deliver a cost effective product backed with COBie data for maintenance
Design DeliveryBIM Implementation
What are our ambitions?
What is it not about:
• Employees, departments, group companies, subcontractors working on their own in a lonely BIM.
Design DeliveryBIM Implementation
Fragmented BIM
Point cloud surveys
Design DeliveryBIM Implementation
Fragmented BIM
Laser scanning
Design DeliveryBIM Implementation
Fragmented BIM
M&E Plant room layout
Design DeliveryBIM Implementation
Fragmented BIM
Ground Modelling – LSS, Autodesk 3D Civil …….
Design DeliveryBIM Implementation
Fragmented BIM
Design
Design DeliveryBIM Implementation
Fragmented BIM
3D Printing
Design DeliveryBIM Implementation
Fragmented BIM
Digital setting out -Grading with GPS or LPS 3D total station system
Advanced control system linked directly to 3D design
data
Design DeliveryBIM Implementation
What is the value of BIM?
Return for investment in three workflows
• Improvement in Work Winning
i.e. planning, estimating, M&E, Formwork, Design, Business Development and Buying
• Improvement in Operations
i.e. project data and records (EDRMS)
• Improvement in Engineering
i.e. Design, Formwork, M&E and permanent works design
Design DeliveryBIM Implementation
Can we opt out?
Design DeliveryBIM Implementation
• We are not in a relay race, passing the batten onto the next team mate
• We are an instrument in a orchestra, collaboratively working with other instruments to meet the requirements of the musical score in a process managed by the BIM conductor.
• The problem is that we don’t have all the pages of music and we need to improvise and record what we have don, pick the best outcome and hand it on for others to play
• And we have all got to think in a wider context than the sound of our own instroment.
What is this new way of working?
Design DeliveryBIM Implementation
We are using BIM to manage this project!
• What does that mean?
• It’s like saying we are going to have a home!
what does it mean? what is its value? Design BIM from the outset
Design DeliveryBIM Implementation
What are the issues?
Hardware and software:
• Upgrade of PCs
• Upgrade of central and local servers
• Data transfer and backup
• Working in the cloud
• Moving from 2D software to 3D software
• Which platform do you base the business process on?
• How can we manage confederation of platforms?
• We all have fire walls – where can we share data?
• Conversion of BIM model from one platform to another
Design DeliveryBIM Implementation
What are the issues?
Training and systems:
• Moving from 2D to 3D
• New way of working to get outputs
• Mapping information flows
• There is not a single or complete solution
• All stakeholders need to get value out of BIM tools
• How much enriched data do we invest in the model?
• How do we make this an inclusive process – not everyone can deliver 3D
• How do we feed the business process if the employer is not working in 3D
Design DeliveryBIM Implementation
What are the issues?
We need a plan!
A BIM Execution Plan
Design DeliveryBIM Implementation
How do we make this work?
We need a plan!
A BIM Execution Plan
Design DeliveryBIM Implementation
BIM Execution Plan
First Goals
Second BIM Uses
Third Data & Software & System Architecture
Fourth Process & Protocol & Skills
Design DeliveryBIM Implementation
Building Information Management (BIM)
A new way of working
Ivor BarbrookHead of Design Delivery and BIM Implementation
top related