build fast, build affordable, build with steel

Post on 16-Oct-2021

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

BUILD FAST, BUILD AFFORDABLE, BUILD WITH STEEL

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

SBS IS 100%

designed, manufactured, supplied

pre-engineered steel truss systems

designed, manufactured & supplied

pre-engineered steel buildings

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

Pre-engineered cold formed steel roof trusses manufactured

from high tensile Aluminium-Zinc coated or Galvanized Steel

An advanced engineered solution, quickly supplied & assembled

Offers durability, affordability, strength and structural stability

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

SOME ULTRASPAN STEEEL FACTS

• Steel is 300MPa or 550MPa yield strength

cold rolled structural steel

• Thickness from 0.5mm to 2.0mm

• Corrosion resistance provided by:

Aluminium-Zinc coating 150g/m2

Galvanizing 275g/m2

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

: THE VALUE PROPOSITION

Ease of Construction

Easy and quick to assemble and erect on site

Environment Friendly

Light gauge steel is 100% recyclable, termite

and fire resistant

Reliable Quality Solutions

Fully pre-engineered, supported by specialized

software, made from high tensile coated steel

Ultimate Design Flexibility

Higher spanning capabilities, greater design

flexibility for bespoke shapes, superior aesthetics

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

TIMBER STRUCTURE CHALLENGES

• A fire hazard - combusts / fuels fire

• High wastage & on-site re-work

• Susceptible to pest attacks

• Quality and supply not assured

• Fuels environmental degradation

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

CHIPPING & SPLITTING WOOD ROT, INCONSISTENT TREATMENT

MIXED QUALITY & JOINTING –

UNPREDICTABLE DESIGN PERFOMANCE RAW TIMBER – WARPING & CREEP

TIMBER STRUCTURE CHALLENGES

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

HEAVY GAUGE STEEL CHALLENGES

ADDITIONAL CORROSION PROTECTIONWELDING – Expensive, Inconsistent, Time

COSTLY, HEAVY HANDLING EQUIPMENT HIGHT WASTAGE FACTOR – HIDDEN COST

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

• Protected from rust for the assemblies expected design life

• Virtually maintenance free

• An engineered solution - considers load & context – safe & secure

• Lightweight, quick-install, min-skills need and no wastage

: GROUND-MOUNTED SOLAR SYSTEM SUPPORT

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

: APPLICATIONS

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

: APPLICATIONS

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

: APPLICATIONS

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

: APPLICATIONS

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

: stepping up the value-chain

From Sheets & Accessories To Complete Building Solutions

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

: PEB terminologies

Length

Width

Clear

Span

Apex

Eave

height

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

• Steel pre-engineered buildings (PEBs)

• Designed to world-class standards

• Supplied as factory-fabricated full kit of parts

• Simple, very fast erection; multiple end uses

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

• Galvanized and Al-Zn coated steel components

• G450 high-tensile, lighter steel framing

• Cold-formed Z & C-section structure members

• Design and Engineering optimized for

• 3 - 24 Metre Structure Span

• 2 - 6 metre height at eave & bay spacings

• Lower roof slopes (10° – 15°)

JKUAT Arch Department Colloquium : 13 June, 2019. ©SBS2019. All rights reserved

ASSURED PROCESS

- Factory process with quality control

- Customized supply, minimized waste

DESIGN FLEXIBILITY

- Large spans, few supports, small sections

- Automation – fast, accurate & repeatable

LIGHTWEIGHT CONSTRUCTION

- Simple transport / equipment needs

- Ductile & lightweight so quake-safe

: SYSTEM BENEFITS

JKUAT Arch Department Colloquium : 13 June, 2019. ©SBS2019. All rights reserved

EASE OF CONSTRUCTION

- Fast, Dry construction

- Easily re-locatable

ENVIRONMENT FRIENDLY

- Green building - steel recyclability

ENERGY EFFICIENT

- Low thermal mass components

COST COMPETITIVE

- Faster construction, early returns

- Longer building service life

: SYSTEM BENEFITS

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

• Not a residential house product

• Not suited to multi-storey / mezzanine/ crane

building construction (without separate add-ons)

• No curved / crimped roofs

• No hips or Valleys

• No complex / articulated plans or roofs

: WHAT IS IT NOT (for now)?

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

• Industrialists/ Commercial warehousing

• Agro-utilities, farms & produce markets

• Institutional – educational/ religious etc

• Private/ home-based applications

: KEY TARGET SEGMENTS

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

• Own PEB design software

• Surpasses local design code

• Customized output including

Architectural drawings

Quotations

Full bills of materials &

assembly details

: POWERING

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

Design&

QuotationOrder Process Supply

Consolidate &

Final Dues

Erection with

SupervisionCertification

THE PROCESS

1 – 3

work

days

4* - 12

weeks

* For smaller orders of up to 4.5M spans

**job

based

** Wide variations from a few days up to several weeks

Based on order requirements/ project conditions

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

commercial warehouses, factories and project site buildings

: APPLICATIONS

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

garages and workshops

: APPLICATIONS

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

produce market sheds and retail stalls

: APPLICATIONS

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

Large-scale farm sheds

: APPLICATIONS

Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved

Institutional sports pavilions, halls, class-rooms and utility buildings

: APPLICATIONS

Thank You

Mombasa Road, 4km after JKI Airport turn-off

P.O. Box 244 AthiRiver 00204 Kenya

Tel: +254-20-6427000

Mobile: +254-799 919191

Website: www.mabati.com

Facebook: @MabatiRollingMills

Tweeter: @MRM_Ltd

Instagram: @mrm_ltd

top related