build fast, build affordable, build with steel
TRANSCRIPT
BUILD FAST, BUILD AFFORDABLE, BUILD WITH STEEL
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
SBS IS 100%
designed, manufactured, supplied
pre-engineered steel truss systems
designed, manufactured & supplied
pre-engineered steel buildings
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
Pre-engineered cold formed steel roof trusses manufactured
from high tensile Aluminium-Zinc coated or Galvanized Steel
An advanced engineered solution, quickly supplied & assembled
Offers durability, affordability, strength and structural stability
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
SOME ULTRASPAN STEEEL FACTS
• Steel is 300MPa or 550MPa yield strength
cold rolled structural steel
• Thickness from 0.5mm to 2.0mm
• Corrosion resistance provided by:
Aluminium-Zinc coating 150g/m2
Galvanizing 275g/m2
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
: THE VALUE PROPOSITION
Ease of Construction
Easy and quick to assemble and erect on site
Environment Friendly
Light gauge steel is 100% recyclable, termite
and fire resistant
Reliable Quality Solutions
Fully pre-engineered, supported by specialized
software, made from high tensile coated steel
Ultimate Design Flexibility
Higher spanning capabilities, greater design
flexibility for bespoke shapes, superior aesthetics
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
TIMBER STRUCTURE CHALLENGES
• A fire hazard - combusts / fuels fire
• High wastage & on-site re-work
• Susceptible to pest attacks
• Quality and supply not assured
• Fuels environmental degradation
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
CHIPPING & SPLITTING WOOD ROT, INCONSISTENT TREATMENT
MIXED QUALITY & JOINTING –
UNPREDICTABLE DESIGN PERFOMANCE RAW TIMBER – WARPING & CREEP
TIMBER STRUCTURE CHALLENGES
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
HEAVY GAUGE STEEL CHALLENGES
ADDITIONAL CORROSION PROTECTIONWELDING – Expensive, Inconsistent, Time
COSTLY, HEAVY HANDLING EQUIPMENT HIGHT WASTAGE FACTOR – HIDDEN COST
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
• Protected from rust for the assemblies expected design life
• Virtually maintenance free
• An engineered solution - considers load & context – safe & secure
• Lightweight, quick-install, min-skills need and no wastage
: GROUND-MOUNTED SOLAR SYSTEM SUPPORT
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
: APPLICATIONS
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
: APPLICATIONS
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
: APPLICATIONS
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
: APPLICATIONS
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
: stepping up the value-chain
From Sheets & Accessories To Complete Building Solutions
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
: PEB terminologies
Length
Width
Clear
Span
Apex
Eave
height
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
• Steel pre-engineered buildings (PEBs)
• Designed to world-class standards
• Supplied as factory-fabricated full kit of parts
• Simple, very fast erection; multiple end uses
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
• Galvanized and Al-Zn coated steel components
• G450 high-tensile, lighter steel framing
• Cold-formed Z & C-section structure members
• Design and Engineering optimized for
• 3 - 24 Metre Structure Span
• 2 - 6 metre height at eave & bay spacings
• Lower roof slopes (10° – 15°)
JKUAT Arch Department Colloquium : 13 June, 2019. ©SBS2019. All rights reserved
ASSURED PROCESS
- Factory process with quality control
- Customized supply, minimized waste
DESIGN FLEXIBILITY
- Large spans, few supports, small sections
- Automation – fast, accurate & repeatable
LIGHTWEIGHT CONSTRUCTION
- Simple transport / equipment needs
- Ductile & lightweight so quake-safe
: SYSTEM BENEFITS
JKUAT Arch Department Colloquium : 13 June, 2019. ©SBS2019. All rights reserved
EASE OF CONSTRUCTION
- Fast, Dry construction
- Easily re-locatable
ENVIRONMENT FRIENDLY
- Green building - steel recyclability
ENERGY EFFICIENT
- Low thermal mass components
COST COMPETITIVE
- Faster construction, early returns
- Longer building service life
: SYSTEM BENEFITS
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
• Not a residential house product
• Not suited to multi-storey / mezzanine/ crane
building construction (without separate add-ons)
• No curved / crimped roofs
• No hips or Valleys
• No complex / articulated plans or roofs
: WHAT IS IT NOT (for now)?
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
• Industrialists/ Commercial warehousing
• Agro-utilities, farms & produce markets
• Institutional – educational/ religious etc
• Private/ home-based applications
: KEY TARGET SEGMENTS
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
• Own PEB design software
• Surpasses local design code
• Customized output including
Architectural drawings
Quotations
Full bills of materials &
assembly details
: POWERING
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
Design&
QuotationOrder Process Supply
Consolidate &
Final Dues
Erection with
SupervisionCertification
THE PROCESS
1 – 3
work
days
4* - 12
weeks
* For smaller orders of up to 4.5M spans
**job
based
** Wide variations from a few days up to several weeks
Based on order requirements/ project conditions
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
commercial warehouses, factories and project site buildings
: APPLICATIONS
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
garages and workshops
: APPLICATIONS
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
produce market sheds and retail stalls
: APPLICATIONS
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
Large-scale farm sheds
: APPLICATIONS
Affordable Housing Investment Summit, Radisson Blue Hotel : 26-27 June, 2019. ©SBS2019. All rights reserved
Institutional sports pavilions, halls, class-rooms and utility buildings
: APPLICATIONS
Thank You
Mombasa Road, 4km after JKI Airport turn-off
P.O. Box 244 AthiRiver 00204 Kenya
Tel: +254-20-6427000
Mobile: +254-799 919191
Website: www.mabati.com
Facebook: @MabatiRollingMills
Tweeter: @MRM_Ltd
Instagram: @mrm_ltd