brochure2013 book a4 inglese
Post on 23-Mar-2016
236 Views
Preview:
DESCRIPTION
TRANSCRIPT
AREAS IN WHICH THE COMPANY OPERATES
TYPES OF WASTE WATER TREATMENT • AGRICULTURALAND FOOD INDUSTRIES (1)
• INDUSTRIAL WASTEWATER IN GENERAL
• COSMETIC-HAIR-CARE, PHARMACEUTICAL INDUSTRIES* • PAINT FACTORIES* • BOX AND CORRUGATED CARDBOARDFACTORIES* • TEXTILE FACTORIES AND INDUSTRIAL LAUNDRIES* • PLASTICS RECYCLING INDUSTRY* • PLATFORM FOR LIQUID WASTE TREATMENT FOR THIRD PARTIES
• MEMBRANE PLANTS (MEMBRANE BIO REACTOR - MBR)
• WASTE WATER FROM YARD WASH-OUT
• SCRAPPING AND CAR DEMOLITION ACTIVITIES
• MULTIPURPOSE MONOBLOC PLANTS, MOD. ECOSAR
• CAR WASH INDUSTRY* • INTERNAL TANK, PUBLIC VEHICLE AND TRAIN WASHING
• CAR AND INDUSTRIAL VEHICLE DEALERS
• DPA, AGREED SUPPLIER OF OIL COMPANIES
• DIGESTATE NITROGEN REDUCTION OR EVALUATION PLANTS (SPECIFIC DOCUMENTATION AVAILABLE, ON REQUEST)
• INSTALLATIONS ABROAD
(1) A SPECIFIC BRICHURE IS AVAILABLE, FEATURING THE PLANTS INSTALLED IN DAIRIES, WINERIES, SAUSAGE FACTORIES, BUTCHERIES, ETC...
* MARKET LEADER
COMBINED WATER PURIFICATION PLANT: “PRESSURISED DISSOLVED AIR FLOTATION + S.B.R. (SEQUENCING BATCH REACTOR) BIOLOGICAL PROCESS” FOR THE TREATMENT OF WASTEWATER FROM THE PRODUCTION
OF SAUSAGES AND CURED MEATS. INSTALLATION AT VIANI S.r.l. - SAN GIMIGNANO (SIENA)
M.B.R. BIOLOGICAL WATER PURIFICATION PLANT - WORKING CAPACITY: 30 m³/h PER 24 h/day. INSTALLATION AT BARILLA S.p.A. – NEW FACTORY IN RUBBIANO DI SOLIGNANO (PARMA)
AGRICULTURALAND FOOD INDUSTRIES
M.B.B.R. BIOLOGICAL PLANT WITH 30 m3/h WORKING CAPACITY EQUIPPED WITH PRESSURISED DISSOLVED AIR FLOTATION UNIT. INSTALLATION AT BONDUELLE S.p.A., FACTORY IN S. PAOLO D’ARGON (BERGAMO)
S.B.R. (SEQUENCING BATCH REACTOR) BIOLOGICAL PLANT FOR THE TREATMENT OF WASTE WATER FROM THE DAIRY.INSTALLATION AT ASTORINO CASEARIA S.p.A. – FRASCINETO (COSENZA)
SPA
CHEMICAL-PHYSICAL PLANT OPERATING WITH FENTON REACTION.INSTALLATION AT MICHELIN S.p.A. - FACTORY IN FOSSANO (CUNEO)
COMBINED CHEMICAL-PHYSICAL + S.B.R. BIOLOGICAL PLANT FOR THE TREATMENT OF WATER FROM CARPENTRY DEGREASING. INSTALLATION AT BRETON S.p.A. - CASTELLO DI GODEGO (TREVISO)
COMBINED CHEMICAL-PHYSICAL + BIOLOGICAL PLANT FOR THE TREATMENT OF WATER FROM AIRCRAFT STRIPPING AND PAINTING. INSTALLATION AT CAPODICHINO AIRPORT (NAPLES)
INDUSTRIAL WASTEWATER IN GENERAL
PAINTING BAY
S1 ACID
COLLECTION OF WASH WATER FROM AIRPLANES IN YARDS AND FIRST FLUSH WATER FROM YARD WASH-OUT
MAINS AREA
V14 OIL SEPARATION
OILS
V15 PURIFICATION RELAUNCH
MICROFILTRATING VIA AUGER FILTER
PAINT ACCUMULATION PIT V0 LIFTING RECIRCULATION
IN SEWER SYSTEM
RECYCLE IN VO
AT DRAINAGE
S2 OXIDISING OR REDUCING
S3 METALLIC SALT S4 SODA S6 FILTER PRESS
COMPRESSOR
NUTRIENTSS7 REAGENT FOR SLUDGE
CONDITIONING
V5 SETTLING AND CLARIFICATION VIA LAMELLAR SETTLER WITH UPWARD FLOW
V6 NEUTRALISATION
V2 REACTION
MAINS AREA
V3-V4 NEUTRALISATION AND FLOCCULATION
V1 ACCUMULATION HOMOGENISATION AND CHEMICAL AND BIOLOGICAL TREATMENT RELAUNCH
V12 ACCUMULATION FOR RECYCLE USEV10 BALANCE AT FILTRATION
V7 ANOXIC/DENITRIFICATION SELECTOR V8 BIOLOGICAL OXIDATION V9 SETTLING AND CLARIFICATION
MICROFILTRATION
MAINS AREA
Consortile Cuma
MONOBLOC PLANTS PREDISPOSED ON PORTABLE SKIDS FOR THE TREATMENTOF WASTE WATER FOR THE THERMAL POWER STATION IN THE GIOIA TAURO PLAIN.
INSTALLATION AT ANSALDO ENERGIA S.p.A. - RIZZICONI (REGGIO CALABRIA)
CHEMICAL-PHYSICAL PLANT FOR THE TREATMENT OF INDUSTRIAL WASTE WATER CONTAININGFLUORIDES DERIVING FROM THE PRODUCTION OF PHOTOVOLTAIC CELLS.
INSTALLATION AT XGROUP SOLAR INDUSTRIES S.p.A. - S. PIETRO VIMINARIO (PADOVA)
WATER TREATMENT PLANT AT WASH STATION FOR REMOVAL OF SLUDGE DEBRIS FROM CLEANING 37 KM OF SEWER SYSTEM. INSTALLATION AT CONSORTILE CUMA - NAPLES
CHEMICAL-PHYSICAL PLANT SPECIFIC FOR THE REMOVAL OF PH CYANIDES AND CONTROLLED REDOX.WORKING CAPACITY 15,000 l/h. INSTALLATION AT SELCA S.p.A. - BERZO DEMO (BRESCIA)
INDUSTRIAL WASTEWATER IN GENERAL
PLANT FOR TREATMENT OF WATER FROM WASHING AND BLEACHING/AGINGJEANS WITH PUMICE, WORKING CAPACITY 40,000 l/h.
INSTALLATION AT LE GROUP - FACTORY IN DURRES (ALBANIA)
PLANT FOR THE TREATMENT OF WASTE WATER FROM COSMETIC/PHARMACEUTICAL INDUSTRIES.INSTALLATION AT FARMACEUTICI DOTT. CICCARELLI S.p.A. - MILAN
CHEMICAL-PHYSICAL PLANT FOR THE REMOVAL OF METALS CONTAINED IN WATER FROM MINE DRILLING AND WITH TREATED WATER RECYCLING. INSTALLATION AT ECO.GE.M.M.A. Srl - CAGLIARI
INDUSTRIAL WASTEWATER IN GENERAL
SOME OF THE DEPUR PADANA ACQUE CUSTOMER COMPANIES
COMBINED TECHNOLOGY PLANT, CHEMICAL-PHYSICAL ROUGHING + S.B.R. BIOLOGICAL FINISHING TREATMENT. INSTALLATION AT BOTTEGA VERDE S.r.l.- COLORNO (PARMA)
SIMPLIFIED TECHNOLOGY CHEMICAL-PHYSICAL PLANT COMPLETE WITH SLUDGE DEHYDRATION SECTIONVIA AUTOMATIC FILTER PRESS. INSTALLATION AT L’ERBOLARIO S.r.l. - LODI (MILAN)
COMBINED TECHNOLOGY PLANT: 1ST STAGE CHEMICAL-PHYSICAL ROUGHING PRE-TREATMENT; 2ND STAGE, S.B.R. BIOLOGICAL FINISHING TREATMENT. INSTALLATION AT OSMOS S.p.A. – LAZZATE (MILAN)
COSMETIC /HAIR-CARE AND PHARMACEUTICAL INDUSTRIES
MARKET LEADERMARKET LEADER
SOME OF THE DEPUR PADANA ACQUE CUSTOMER COMPANIES
COMBINED PLANT WITH CHEMICAL-PHYSICAL PRE-TREATMENT SECTION AND SUBSEQUENT BIOLOGICAL STAGE WITH TOTAL OXIDATION - Customer: AKZO NOBEL COATINGS S.p.A. – FACTORY IN CASTELLETTO TICINO (NO)
BIOLOGICAL PLANT WITH AUTOMATIC DISCONTINUOUS OPERATION AND S.B.R. (Sequency Batch Reactor) TECHNOLOGY TREATMENT WORKING CAPACITY: up to 15 m³/day - Customer: LECHLER S.p.A. – FACTORY IN FOLIGNO (PERUGIA)
CHEMICAL-PHYSICAL PLANT EQUIPPED WITH AUTOMATIC FILTER PRESS, FOR THE DEHYDRATION OF PROCESSING SLUDGE. INSTALLATION AT MATERIS PAINTS ITALIA S.p.A. – FACTORY IN RESANA (TREVISO)
PLANTS SUPPLIED TO FACILITIES IN: CASTELLETTO TICINO (TURIN), DORMELLETTO (NOVARA), CERNOBBIO (COMO), ARGENTA (FERRARA), MOSCOW (RUSSIA)
PAINT FACTORIESMARKET LEADERMARKET LEADER
SOME OF THE DEPUR PADANA ACQUE CUSTOMER COMPANIESPLANT FOR THE TREATMENT OF WASTE WATER FROM CORRUGATING MACHINE AND FLEXOGRAPHIC PRINTING LINES WASHING;
PURIFIED WATER REUSED FOR THE PRODUCTION OF STARCH GLUE. INSTALLATION AT MAURO BENEDETTI S.p.A.
CHEMICAL-PHYSICAL PLANT EQUIPPED WITH CENTRIFUGE FOR THE DEHYDRATION OF PROCESSING SLUDGE.INSTALLATION AT ONDULATI MARANELLO S.p.A. – MARANELLO (MODENA)
PLANT FOR THE TREATMENT OF WASTE WATER FROM CORRUGATED CARDBOARD PRODUCTION AND PRINTING;PURIFIED WATER REUSED FOR THE PRODUCTION OF STARCH GLUE.INSTALLATION AT SCA PACKAGING ITALIA S.p.A. – VIGASIO (VERONA)
PLANTS SUPPLIED TO FACILITIES IN: ARZANO (NAPLES), MODUGNO (BARI), CARNATE (MILAN)
BOX AND CORRUGATED CARDBOARDFACTORIES AND GRAPHIC INDUSTRIES
MARKET LEADERMARKET LEADER
SOME OF THE DEPUR PADANA ACQUE CUSTOMER COMPANIES
S.B.R. DISCONTINUOUS BIOLOGICAL PLANT FOR THE TREATMENT OF WASTE WATER FROM INDUSTRIAL LAUNDRIES.WORKING CAPACITY: BETWEEN 20 AND 50 m³/d. INSTALLATION AT DOMINA CALZE S.r.l. – CALVISANO (BRESCIA)
BIOLOGICAL ACTIVATED SLUDGE PLANT, WITH TOTAL OXIDATION, FOR THE TREATMENT OF WASTE WATER FROMINDUSTRIAL LAUNDRIES. INSTALLATION AT LAVANDERIA DALTA S.r.l. – ARGENTA (FERRARA)
BIOLOGICAL PLANT WITH TOTAL OXIDATION, FOR THE TREATMENT OF WASTE WATER FROM TEXTILE FACTORIES.WORKING CAPACITY 1000 m3/d. INSTALLATION AT EURONASTRI S.r.l. - BUSTO GAROLFO (MILAN)
TEXTILE FACTORIES AND INDUSTRIAL LAUNDRIES
MARKET LEADERMARKET LEADER
SOME OF THE DEPUR PADANA ACQUE CUSTOMER COMPANIES
WATER TREATMENT PLANT, WITH RECYCLING: INSTALLATION FOR HDPE RECYCLING LINEWITH 4,000 kg/h CAPACITY. INSTALLATION AT PEBO S.p.A. - FACTORY IN SESTINO (AREZZO)
PLANT FOR THE TREATMENT AND RECYCLING OF WATER FROM HDPE/PP PROCESSING LINE WITH 1500 kg/h CAPACITY.INSTALLATION AT SOCIETA’ COOPERATIVA RIGENERAZIONE PLASTICA SENESE - COLLE VAL D’ELSA (SIENA)
PLANT FOR THE TREATMENT OF DEGASSING WATER WITH CLOSED CIRCUIT SYSTEM, VIA FLOTATION,FOR THE 9 POLYAMMIDE EXTRUSION LINES.
INSTALLATION AT RADICI NOVACIPS S.p.A. - FACTORY AT VILLA D’OGNA (BERGAMO)
PLASTICS RECYCLING AND EXTRUSION FACTORIES
MARKET LEADERMARKET LEADER
COMBINED CHEMICAL-PHYSICAL AND BIOLOGICAL TECHNOLOGY PLANT WITH FLAT MEMBRANES FOR THE TREATMENT OF WASTE WATER FROM THE PRODUCTION OF COSMETICS AND DIETARY SUPPLEMENTS.
INSTALLATION AT BIOFARMA S.p.A. – MERETO DI TOMBA (UDINE)
HOLLOW FIBRE MEMBRANE SECTION - WORKING CAPACITY: 30 m³/h PER 24 h/dayINSTALLATION AT BARILLA S.p.A. – FACTORY IN RUBBIANO DI SOLIGNANO (PARMA)
BIOLOGICAL PLANT WITH FLAT MEMBRANES FOR THE TREATMENT OF WASTE WATER FROM THE PRODUCTIONOF FOOD FOR ANIMALS. INSTALLATION AT NESTLE’ PURINA PETCARE ITALIA S.p.A. – UDINE
BIOLOGICAL PLANT WITH FLAT MEMBRANES FOR THE TREATMENT OF DIVERSIFIED WASTE WATERFROM: PRODUCTION OF COSMETICS, PLANT EXTRACTS AND DIETARY SUPPLEMENTS.
INSTALLATION AT GUABER S.p.A. - CASTELLO D’ARGILE (BOLOGNA)
BIOLOGICAL M.B.R. SYSTEMS(Membrane Bio Reactor)
WASTE TREATMENT PLATFORMCUSTOMER: ValleSabbia Servizi srl - Loc. Adro (Brescia)FEASIBILITY STUDY - VIA AND AIA DOCUMENTATION PROCESSING: SETAM Srl - Loc. Flero (Brescia) EXECUTIVE PROJECT DEVELOPMENT AND PLANT IMPLEMENTATION: DEPUR PADANA ACQUE Srl
DESCRIPTION OF PURIFICATION TECHNOLOGIES APPLIEDThe type of waste delivered Vallesabbia Servizi Treatment Centre is extremely varied. The first stage of the process consists in the control and acceptance of liquid waste, via specific laboratory analyses; once accepted, the waste is then temporarily stored in special tanks, divided according to the class (CER code). Such qualitative diversification required the design and implementation of a plant with a multiplicity of treatments applied and integrated between them. For example, oily emulsions require an energetic treatment with specific de-emulsifiers and oil separation takes place via a lamellar oil separator; while waste characterised by inorganic contamination undergoes a physical-chemical process with controlled pH, able to ensure the removal of a wide range of pollutants such as: Suspended solids, metals, fluorides, phosphorus, surfactants, etc. Water with very high contamination, generally considered non-purifiable with “normal” methods is pre-treated with Vacuum Evaporation. All the clarified water obtained following the processes described above, before being drained, undergo an “activated sludge” biological treatment (using 1000 m3 oxidation tanks) through which the dissolved and biodegradable organic component is removed. And as a possible additional safety measure, before entering the public sewer system, the water leaving the biological stage can be processed further via filtration on quartzite and activated carbon beds. After each treatment, and in any case before drainage into the public sewer system, the quality of the purified water is analysed by an equipped chemical laboratory inside the Treatment Centre. In the event of non-compliance, the waters undergo purification again.
GRAPHIC DISPLAY OF PLC SCREENS PURIFICATION, WITH POSSIBILITY OF CONTROL AND
TOTAL INVESTMENT FOR THE IMPLEMENTATION OF THE TREATMENT CENTRE: € 7,500,000AMOUNT RELATING TO THE LIQUID WASTE TREATMENT PLANT: € 2,500,000FACILITY SURFACE AREA: 4500 m2 LIQUID WASTE TREATMENT WORKING CAPACITY: 200 m3/day
FOR MONITORING THE ENTIRE REMOTE MANAGEMENT PROCESS OF EVERY SINGLE UTILITY AND SECTION
LIQUIDS FOR THIRD PARTIES
Caustic soda (SR5)
Distillate storage (S15 – S16)
Sodium sulphide
Ferric chloride
Ferrous chloride
Sulphuric acid
SLUDGE THICKENING (V15)
Polyelectrolyte
Lime milk
Carbon in susp.
Hydrogen peroxideOrganic water (S11 – S14)
Mains water
Mains water
Without Supply Pumps
Without Supply Pumps
With Supply Pumps
With Supply Pumps
Mains water
BASIC NUTRIENTS C BASIC NUTRIENTS N-P
DENITRIFICATION SECTION
CENTRIFUGAL EXTRACTOR
FILTRATION ON SAND BEDS
Mains water
Mains water Thick waste (S19 – S20)
Clarified water (V23)
Basic waste (S7 – S8)
Acid Waste Water (S5 – S6)
De-emulsified water (S4)
Reactor 1 Status: Waste Water Load
Batch 1 Recipe
Reactor 2 Status: Waste Water Load
Batch 2 Recipe
Reactor 3 Status: Waste Water Load
Batch 3 Recipe
SELECTION
SELECTION
SELECTION
OF DATA
OF DATA
OF DATA
TANK V21
Caustic soda
Evaporator concentrate storage (S17)
Sulphuric acid (SR6)
Basic waste (S7 o S8)
Acid waste (S5 or S6)
De-emulsified water (S4)
Service tank
High COD water surfactants (S12-S13)
Clarified water (V23)
Continuous load
Single load
Recipe in progressEvaporator consent
HOMOGENISATION AND NEUTRALISATION FOR
EVAPORATOR 1
INVERTER RESET
BIOLOGICAL OXIDATION SECTION 1 BIOLOGICAL OXIDATION SECTION 2SCRAPED SETTLER FILTRATION ON SAND
RELAUNCH
WASTE WATER ACCUMULATION IN BIOLOGICAL
DENITRIFICATION
DENITRIFICATION SETTLING
SETTLING
POLYELECTROLYTE
SAND FILTERS
CAUSTIC SODA
SULPHURIC ACID
EVAPORATOR DISTILLATE (S18)
FILTER BACKWASHING
REACTORS
BACKWASHING IN V21
SCRAPED SETTLER
MAINS COMPRESSED AIR
FILTRATION ON CARBON RELAUNCH
SODIUM SULPHIDE FERRIC CHLORIDE FERROUS CHLORIDE HYDROGEN PEROXIDE
Start Backwash FQ1
Start Backwash FQ2
Active Filter Exchange
BACKWASHING IN V21
Sludge relaunch tank (V17)
Drainage Tank (V31)
Centrifuge Parameters
SERVICE TANK
STORAGE OF NON-CONCENTRATED ACID WASTE
STORAGE OF CONCENTRATED ACID WASTE
EVAPOR. (V11)
REACTORS
REACTORS REACTORS REACTORS REACTORS
REACTORS
DENITRIFICATION
BLOWERSBIOLOGICAL OXID.
BIOLOGICAL OXID.
WASTE WATER ACCUMULATION
EVAPOR. (V11)
NUTRIENTS
BIOLOGICAL OXID.
BIOLOGICAL OXID.
MUD THICKENING
PID MP61 MP62 Flow Rate Parameters
EVAPORATION SECTION NO. 1
DELIVERY OF WATER TO BE PURIFIED VIA TANKERS
RECEIPT, CHARACTERISATION AND WATER TREATMENT STAGES
DEHYDRATION OF CHEMICAL-PHYSICAL AND BIOLOGICAL EXCESS SLUDGE VIA PIERALISI CENTRIFUGAL EXTRACTOR
CHEMICAL-PHYSICAL BATCH SECTION WITHTRADITIONAL TECHNOLOGY AND FENTON REACTION
DEHYDRATION OF CHEMICAL-PHYSICAL AND BIOLOGICAL EXCESS SLUDGE VIA PIERALISI CENTRIFUGAL EXTRACTOR CONCENTRATE TREATMENT VIA VACUUM EVAPORATION
WATER PROCESSING PHASES
PLANT FOR THE TREATMENT OF METORIC WATER FROM YARD WASH-OUT - SURFACE AREA: 60.000 m².INSTALLATION AT LATERLITE S.p.A. - FACTORY IN RUBBIANO DI SOLIGNANO (PARMA)
PLANT FOR THE TREATMENT OF METORIC WATER FROM YARD WASH-OUT - SURFACE AREA: 55,000 m²WORKING CAPACITY 20 m3/h. INSTALLATION AT CEMENTERIE BARBETTI S.p.A. – GUBBIO (PERUGIA)
PLANT FOR THE TREATMENT OF INDUSTRIAL AND METEORIC WASTE WATER FROMBOAT STORAGE ACTIVITIES. INSTALLATION AT NAUTICA CALA GALERA S.p.A. SHIPYARD
PORTO ERCOLE - ARGENTARIO (GROSSETO)
PLANT FOR THE TREATMENT OF METEORIC WATER FROM YARD WASH-OUTSURFACE AREA: 25,000 m², WORKING CAPACITY 6,000 l/h. INSTALLATION AT RAFFMETAL S.p.A.
WASHING AWAY OF UNCOVEREDAREAS (METEORIC WATER)
PLANTS SUPPLIED TO FACILITIES IN: ODOLO (BRESCIA), CASTO (BRESCIA)
CONTINUOUS OIL SEPARATOR
FIRST FLUSH OIL SEPARATORUNLOADING AND POSITIONING OF MONOLITHIC FIRST FLUSH TANKS,
MADE OF PRE-CAST REINFORCED CONCRETE. INSTALLATION AT INTERSERVICE S.p.A. - TRENTO
MONOLITHIC CIRCULAR TANKSFOR FIRST RAIN PLANTS
WATER FROM SANDING
WATER FROM SANDING
PSC – DRAINAGE PIT
FIRST FLUSH WATER ACCUMULATION BASIN
COALESCENT DE-OILING
2ND FLUSH WATER AT DRAINAGE
SAMPLE COLLECTION PIT
AT DRAINAGE
AT DRAINAGE
YARD COALESCENT DE-OILING
SAMPLE COLLECTION PIT
SAMPLE COLLECTION
PIT
TANKS OF PLANT FOR THE TREATMENT OF METEORIC WATER DERIVING FROMSTEEL SLAG STABILISATION. INSTALLATION AT ZEROCENTO S.r.l - PADUA
TANKS FOR RESTAURANT-PIZZERIA WATER PURIFICATION PLANT. INSTALLATION AT MICHELANGELO DA VINCI - VILLAMARZANA (ROVIGO)
PRE-CAST TANKS FOR WATER PURIFICATION PLANT.INSTALLATION AT TRANCERIA PRIULA S.p.A. - SUSEGANA (TREVISO)
MONOLITHIC CIRCULAR TANKSFOR RAIN WATER TEATMENT SYSTEMS
PLANT FOR THE TREATMENT OF FIRST FLUSH WATER FROM YARD WASH-OUT (20.000 m2) USEDAS SCRAP DEPOT. INSTALLATION AT ZOFFOLI METALLI S.r.l. - TAMARA (FERRARA)
SOME OF THE DEPUR PADANA ACQUE CUSTOMER COMPANIES
PLANT FOR THE TREATMENT OF FIRST FLUSH WASH-OUT WATER FROM YARD (12,000 m2 )USED AS FERROUS MATERIAL DEPOT.
INSTALLATION AT FRASSINE S.r.l. - ROSEGAFERRO DI VILLAFRANCA (VERONA)
PLANT FOR THE TREATMENT OF METEORIC WATER FROM YARD WASH-OUTSCRAP DEPOT (2,800 m2). INSTALLATION AT SARI GIANNI S.r.l.- JESOLO (VENICE)
SCRAPPING AND CARWRECKING ACTIVITIES
MARKET LEADERMARKET LEADER
FIRST PROTOTYPE OF MONOBLOC PLANT OPERATING WITH LIQUID REAGENTS WITH CONTROLLED PH;MOD. ECOSAR CFA/S (COAGULANT, SODA)
FAIRED PLANT, OPERATING WITH A SINGLE POWDER REAGENT, ALSO COMBINEDWITH A LIQUID REAGENT, WITH CONTROLLED PH; MOD. ECOSAR CFA/O - SERIES Y
1978: FIRST MODEL
SUPPLY OF 96 CHEMICAL-PHYSICAL PLANTS MOD. ECOSAR CFA/OTO MECHANICAL WORKSHOPS – JOB ORDER OF 1998
PLANTS OPERATING WITH LIQUID REAGENTS WITH CONTROLLED PH;MOD. ECOSAR CFA/S (COAGULANT, SODA) AND MOD. ECOSAR CFA/C (COAGULANT, LIME MILK)
EVOLUTION 1982
EVOLUTION 1996
EVOLUTION 1988PLANTS OPERATING WITH A SINGLE FLOCCULANT POWDER REAGENT ECOSAR CFA/O
MULTIPORPOSE MONOBLOCK PLANTS ECOSAR SERIE
MOD. ECOSAR
PLANTS MOD. ECOSAR 300 CFA/O, PRODUCED IN SERIES, OF HIGH QUALITYMADE OF STAINLESS STEEL AND POLYPROPYLENE
PLANTS, WORKING CAPACITY BETWEEN 2,000 AND 50,000 l/hPLANTS, WORKING CAPACITY 300 - 500 - 1,000 l/hAutomatic operation,
with simplified technology, high efficiency
MOD. ECOSAREVOLUTION FROM 2005 TO DATE EVOLUTION FROM 2009 TO DATE
Plants equipped with lamellar unit,made of stainless steel, polypropylene and fibreglass
OVER 10,000 PLANTS INSTALLED
“MULTI-BAY SELF-SERVICE” CAR WASH EQUIPPED WITH ECOBIOX PLANT MOD. 2C
“PORTAL” CAR WASH EQUIPPED WITH ECOBIOX PLANT MOD. 1C, WITH PURIFIED WATER RECYCLING
“TUNNEL” CAR WASH EQUIPPED WITH ECOBIOX PLANT MOD. 3C, WITH PURIFIED WATER RECYCLING
UNDISPUTED MARKET LEADER
COMBINED “MULTI-BAY AND PORTAL” CAR WASH WITH SELF-SERVICE OPERATION, EQUIPPED WITH INNOVATIVE TECHNOLOGY PLANT, WITH ALMOST TOTAL RECYCLING OF PURIFIED WATER
PURIFICATION OF CAR WASH WATER AND NOT ONLY,VIA BIO-OXIDATION, WITHOUT USING
CHEMICALS AND RECYCLING THE PURIFIED WATER
®
1999 : HISTORICAL INNOVATION
CONSOLIDATED INNOVATION
MBR PURIFICATION
(membrane bio reactor)
CAR WASH SECTOR
COMBINED CHEMICAL-PHYSICAL + BIOLOGICAL PLANT FOR THE TREATMENT OF WASTE WATERFROM WASHING CHEMICAL AND FOOD TANKERS.
INSTALLATION AT ALESSANDRIA SUD S.r.l. - ALESSANDRIA
M.B.R. BIOLOGICAL PLANT WITH FLAT MEMBRANES FOR WASHING TANKERS.INSTALLATION AT CONSAR Società Cooperativa Consortile - RAVENNA
PLANT FOR WASHING TRAIN CARRIAGES.INSTALLATION AT TRENITALIA S.p.A.
SERMIDE (MANTOVA) TRAIN STATION
BIO-OXIDATION PLANT WITH FINAL FILTRATION SECTION FOR RECYCLING THE WASH WATER FROM THE NEW “LINE C” UNDERGROUND TRAIN CARRIAGES IN ROME. INSTALLATION AT METRO C S.p.A.
CHEMICAL-PHYSICAL PLANT COMPLETE WITH FILTRATION LINE FOR WASTE WASH WATER FROM BUSES. INSTALLATION AT DEPOT OF BUSITALIA SITA NORD - PADUA
SUPPLY OF 3 PLANTS FOR WASHING NEW HIGH SPEED TRAINS. INSTALLATION AT
TRENITALIA S.p.A.
BOLOGNA RAVONE, ROME OSTIENSE AND MILAN PORTA GARIBALDI TRAIN STATIONS
INSTALLATION OF PLANTS AT DEPOTS IN:ADRIA AND BADIA POLESINE (ROVIGO), PADUA, FLORENCE, SAN SEPOLCRO (AREZZO), ROME
WASHING OF TANKERS,PUBBLIC VEHICLES AND TRAINS
OVER 1000 PLANTS INSTALLED
CAR AND INDUSTRIAL VEHICLE DEALERS
TRANSPORT COMPANIES AND DEWAXING CENTRES
AGREED SUPPLIEROF OIL COMPANIES
OVER 4000 PLANTS INSTALLED
POLONIA
IRLANDA
GIAPPONE
INDONESIA
INSTALLATIONS ABROAD
top related