bridging the standardization gap- bangladesh perspective

Post on 15-Jan-2016

32 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

ITU Workshop on “ Bridging the Standardization Gap ” (Vientiane, Lao People’s Democratic Republic, 30-31 July 2012). Bridging the Standardization Gap- Bangladesh perspective. Md. Zakir Hossain Director Bangladesh Telecommunication Regulatory Commission zakir@btrc.gov.bd. Bangladesh. - PowerPoint PPT Presentation

TRANSCRIPT

Bridging the Standardization Gap- Bangladesh perspective

Md. Zakir HossainDirector

Bangladesh Telecommunication Regulatory Commissionzakir@btrc.gov.bd

ITU Workshop on “Bridging the Standardization Gap”

(Vientiane, Lao People’s Democratic Republic, 30-31 July 2012)

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

2

Bangladesh

Population:146.6 Population:146.6 MM

(Census 2011)(Census 2011)

Area:144K sq. Area:144K sq. KM KM

Population Population under poverty under poverty level: 25.1%level: 25.1%

Per Capita Per Capita Income: USD Income: USD

755755

Literacy rate: Literacy rate: 55.08%55.08%

Rural-Urban Rural-Urban Ratio:73:27 Ratio:73:27

(2008)(2008)

Inflation:5.2% Inflation:5.2% (Nov’09)(Nov’09)

GDP Growth GDP Growth Rate: 6.66% Rate: 6.66%

(2010-11)(2010-11)

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

3

Wireless Network Coverage

19973 /64 Districts19973 /64 Districts

200030 /64 Districts200030 /64 Districts

200250 /64 Districts200250 /64 Districts

200461 /64 Districts200461 /64 Districts

At present64 /64 DistrictsAt present64 /64 Districts

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

4

Technology : Today & TomorrowV

oic

e

Backh

au

l/b

ackb

on

e

Data

Fu

ture

*HSPA/WCDMA to be provided under 3G License

* LTE spectrum has been reserved in NFAP.

* FTTx models covered in National Broadband policy

*HSPA/WCDMA to be provided under 3G License

* LTE spectrum has been reserved in NFAP.

* FTTx models covered in National Broadband policy

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

5

Licensing Landscape in Bangladesh

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

6

Telecom Indicators

• Tele-density is more than

62%• Internet Penetration is more

than 18%• Over 92 M Telecom

Subscribers

• More than 26 M Internet users.

• Tele-density is more than

62%• Internet Penetration is more

than 18%• Over 92 M Telecom

Subscribers

• More than 26 M Internet users.

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

7

Telecom Infrastructure & Resources

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

8

Standardisation Gap

Disparities in the ability of developing countries, relative to developed ones, to access, implement, contribute to and influence international ICT standards, specifically ITU Recommendations.

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

9

Way Forward for Developing Countries

THE

08 R

UNGs

OF

THE

LADDER

THE

08 R

UNGs

OF

THE

LADDER

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

10

Key Facts for Bangladesh

Two Governmental Bodies responsible for Two Governmental Bodies responsible for Telecom Standardization in BangladeshTelecom Standardization in Bangladesh

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

11

Vendors & Manufacturing Industry

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

12

Manufacturing Strength & Standardization capacity

We must develop our Standardization Capacity to the highest extent

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

13

Increasing participation in ITU processes

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

14

Increasing participation in ITU processes

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

15

Increasing participation in ITU processes

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

16

Increasing participation in ITU processes

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

17

Increasing participation in ITU processes

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

18

Increasing participation in ITU processes

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

19

Increasing participation in ITU processes

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

20

Increasing participation in ITU processes

Position of Bangladesh

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

21

Conclusion & Recommendation

Including the human resource option from developing countries in regional testing labsIntegrating the concerns of developing countries regarding Standardisation & addressing through a focus group

Having a separate event for developing countries to follow up their advancement along the ‘Ladder’ (it may be a back-to-back event with TSAG)

Vientiane, Lao People’s Democratic Republic, 30-31 July 2012

22

top related