Massaro

Bethel Park High SchoolBethel Park, PA

Weekly Progress Slide Show

March 19, 2010

Massaro

Waterproofing Continuing

Massaro

Building Perimeter Receiving Good

Wrap

Massaro

Area F Walls Forms Stripped and

Stacked

Massaro

Plumbing Beginning to Extend into

Area B

Massaro

Excavations in Area D

Massaro

Area B Footing Reinforcements

Massaro

Forms in Area H Coming Along

Massaro

Whole Site is Active

Massaro

Rebar Keeps Arriving and Being

Tied

Massaro

Forms are Getting Higher!

Massaro

Cage and Netting Complete on

Batting Cage!

Massaro

Scheduled Work For Next Few

Weeks:• Building foundations and wall forming.

• Several Walls and Grade Beams Poured.

• Continue stock pile, soil stabilization items and back fill operations.

• Waterproofing in areas C, F, and H.

• Area D Excavations

• Underground building MEP items.

• Steel Fabrication continues at Sippel Fab.

Massaro

Thank You

The EndBy Jeremy Beiter

Intern, Massaro CMS, LLC